risk assessment for the fifth day of filming
TRANSCRIPT
Production title:Short film
Production date(s):4/2/15
Producer name:Emma Irwin, Ellisha Clapham, Alice Mee, Amber Renshaw
Director name:Emma Irwin, Ellisha Clapham, Alice Mee, Amber Renshaw
Date of risk assessment:9/2/15
Risk assessment conducted by:Emma Irwin
Hazard Persons who may be harmed
Property that could be damaged
Risk controls that are already in place
Risk Assessment, LOW, MODERATE, HIGH, EXTREME
Further action required to control risk
Slipping when we were shooting outside
All team and cast Camera and tripod Make sure we are careful, no running and work as a team when carrying equipment
High Always look where we are standing and wear sensible shoes
Being hurt when getting dragged down the hallway
Actor playing Agnes
Camera and tripod if they are not steady
Make sure that the character is not being hurt when dragged and make sure they are held steadily
Low Be co-operative with each other
Equipment falling over
Cast and crew Camera and tripod Make sure the equipment is always stable and do not mess about
Moderate Make sure the equipment is always stable and that the camera is screwed onto the tripod right