rip-rap summary.pdf · hec-11 method •psheuibdl by fhwa in 1989 • combination of theory and...

79
RIP-RAP Equation Selection and Rock Sizing

Upload: lythu

Post on 04-Mar-2018

215 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

RIP-RAPEquation Selection and

Rock Sizing

Page 2: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than
Page 3: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

Common Rock Sizing Relations

• HEC-11• USACE• Isbash• CALTRANS• USBR• ASCE• USGS

Page 4: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

DEVELOPMENT OF RELATIONSHIPS

Page 5: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

Common Rock Sizing Relations

• HEC-11• USACE• Isbash• CALTRANS• USBR• ASCE• USGS

Page 6: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

HEC-11 Method

• Published by FHWA in 1989• Combination of theory and field

observations• Use in rivers and streams with:

– Discharges greater than 50 cfs– Uniform or gradually varied flow conditions– Straight or mildly curving reaches– Uniform cross section geometry

Page 7: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

HEC-11 Method

D50 = C s CsfD50 = C s Csf

11.5Kd

3a0.001V

1.5Kd

3a0.001V

1.5Kd

3a0.001V

Page 8: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

HEC-11 Method

Where:

D50 = stone size (ft)Cs = (2.12 / (Gs-1)1.5)Csf = (SF / 1.2)(1.5)

Va = average channel velocity (ft/s)d = average flow depth (ft)K1 = [ 1 – (sin2(θ) / sin2(Φ))](1/2)

D50 = C s CsfD50 = C s Csf

11.5Kd

3a0.001V

1.5Kd

3a0.001V

1.5Kd

3a0.001V

Page 9: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

HEC-11 Method

• Used field observations to verify theoretical approach– Water surface slope 0.00006 – 0.0162– Maximum flow depths 4.8 – 48.5 ft– Average velocities 2.4 – 12.5 fps– Channel discharges 1,270 – 76,300 cfs– D50 range 0.5 – 2.3 ft

D50 = Cs CsfD50 = Cs Csf11.5Kd

3a0.001V1.5Kd

3a0.001V1.5Kd

3a0.001V

Page 10: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

HEC-11 Method

• Provides guidance for SF selection– For varying (R/W) ratios

• SF = 1 - 1.2 for R/W > 30• SF = 1.3 - 1.6 for 10 < R/W < 30• SF = 1.6 – 2 for R/W < 10

D50 = Cs CsfD50 = Cs Csf11.5Kd

3a0.001V1.5Kd

3a0.001V1.5Kd

3a0.001V 5.1

2.1_

⎟⎠⎞

⎜⎝⎛=

factorsafetyC f

Page 11: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

HEC-11 Method

• Provides guidance for SF selection– For varying flow conditions

• SF = 1 - 1.2 for uniform flow, no impact from wave or floating debris and complete certainty in design parameters

• SF = 1.3 - 1.6 for gradually varying flow with moderate impact from debris or waves

• SF = 1.6 – 2 for rapidly varying or turbulent flow, significant impact from debris or ice and wave heights up to 2 feet.

D50 = Cs CsfD50 = Cs Csf11.5Kd

3a0.001V1.5Kd

3a0.001V1.5Kd

3a0.001V 5.1

2.1_

⎟⎠⎞

⎜⎝⎛=

factorsafetyC f

Page 12: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

Common Rock Sizing Relations

• HEC-11• USACE• Isbash• CALTRANS• USBR• ASCE• USGS

Page 13: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

USACE Method

• Published in 1994 in EM-1601• Use in man-made or natural channels

with:– Low turbulence– Slopes less than 2%– Not immediately downstream of turbulent

areas

Page 14: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

USACE Method

2.5

gd1KV

0.5

wγsγwγdtCvCsCfS30D

⎟⎟⎟⎟⎟

⎜⎜⎜⎜⎜

⎟⎟⎟

⎜⎜⎜

−=

Page 15: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

USACE Method2.5

gd1KV

0.5

wγsγwγdtCvCsCfS30D

⎟⎟⎟⎟⎟

⎜⎜⎜⎜⎜

⎟⎟⎟

⎜⎜⎜

−=

Where:

D30 = stone size (ft)Sf = safety factor (1.25)Cs = stability coefficient for incipient failure

0.3 for angular rockCv = vertical velocity distribution coefficient

1.0 for straight channels, inside bends1.283 – 0.2 log (R/W), outside bends

Ct = thickness coefficient1.0 for 1*D100 or 1.5*D50

Page 16: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

USACE Method2.5

gd1KV

0.5

wγsγwγdtCvCsCfS30D

⎟⎟⎟⎟⎟

⎜⎜⎜⎜⎜

⎟⎟⎟

⎜⎜⎜

−=

Where:

d = local depth of flow (ft)s = unit weight of stone (lbs/ft3)W = unit weight of water (lbs/ft3)

V = local depth averaged velocity (ft/s)g = gravitational constant (ft/s2)K1 = side slope correction factor

1.0 for bottom riprap0.5

2sinθ2sin1⎟⎟⎟

⎜⎜⎜

⎛−

φ

Page 17: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

USACE Method

• Method based on lab data from late 80’s– D50: 0.5 – 2.0 inches– Thickness: 0.75 – 2 inches– Average velocity: 0.6 – 6.6 ft/s– Discharge: 15 – 100 cfs– Bed slope: 0.00087 – 0.015– Max side slope: 1.5:1

• Verified with some field data

5.2

1

5.0

30 )( ⎟⎟

⎜⎜

⎛⎟⎟⎠

⎞⎜⎜⎝

⎛−

=gdK

VdCCCSDws

wtvsf γγ

γ

Page 18: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

Common Rock Sizing Relations

• HEC-11• USACE• Isbash• CALTRANS• USBR• ASCE• USGS

Page 19: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

ISBASH Method

• Developed by Isbash in 1936• Adopted by USACE in 1971• Developed for construction of dams by

placing rock in flowing water

Page 20: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

ISBASH Method

( )1sG22gC

2aV

50D−

=

Page 21: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

ISBASH Method

( )1sG22gC

2aV

50D−

=

Where:

D50 = stone size (ft)Va = average channel velocity (ft/s)Gs = specific gravity of stoneG = gravitational constant (ft/s2)C = 0.86 for high turbulence zones

1.20 for low turbulence zones

Page 22: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

ISBASH Method

• Empirical values for C determined to be 0.86 for minimum velocity required to move stones

• Empirical values for C determined to be 1.20 for maximum velocity required to move stones

• Rock size ranged from 4.7 to 9.8 inches

( )1sG22gC

2aV

50D−

=

Page 23: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

Common Rock Sizing Relations

• HEC-11• USACE• Isbash• CALTRANS• USBR• ASCE• USGS

Page 24: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

CALTRANS Method

• Developed the California Bank and Shore Protection method to protect highway embankments

• Result of a study by the Joint Bank Protection Committee appointed in 1949

• Incorporated lab and field data• Recommends individually designed

layers of protection

Page 25: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

CALTRANS Method

( ) ( )⎟⎟⎟⎟

⎜⎜⎜⎜

−−=

θρ3sin31sGsG60.00002V

33W

Page 26: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

CALTRANS Method

( ) ( )⎟⎟⎟⎟

⎜⎜⎜⎜

−−=

θρ3sin31sGsG60.00002V

33W

Where:

W33 = minimum weight of outside stone (lbs)V = stream velocity at bank (ft/s)

4/3 Va for impinging flow2/3 Va for tangential flowVa = average channel velocity (ft/s)

= 700 for randomly placed rubble= bank angle (degrees)

Gs = specific gravity of stone

Page 27: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

CALTRANS Method

• Face of slope revetment no steeper than 1.5:1

• Stone weight values tested:– 3 – 30.4 lbs for impinging flow– 1 – 950 lbs for tangential flow

• Velocities examined– Average velocity 4.5 – 24 fps– Impinging velocity 6 – 32 fps– Tangential velocity 3 – 16 fps

( ) ( )⎟⎟⎟⎟

⎜⎜⎜⎜

−−=

θρ3sin31sGsG60.00002V

33W

Page 28: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

Common Rock Sizing Relations

• HEC-11• USACE• Isbash• CALTRANS• USBR• ASCE• USGS

Page 29: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

USBR Method

• Developed by Peterka and published in EM-25 in 1958

• Developed for estimating rock size for use downstream of stilling basins

• Procedure based on prototype installations

Page 30: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

USBR Method

2.06aV0.012250D =

Page 31: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

USBR Method2.06aV0.012250D =

Where:

D50 = stone size (ft)Va = average channel velocity (ft/s)

Page 32: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

USBR Method

• Prototype velocities ranged from 1-8 ft/s• Tests conducted on sands, gravels and

stone up to 2.5 inches• Field observations of riprap up to 18

inches• Riprap layer must have no more than 40%

smaller than stable stone size

2.06aV0.012250D =

Page 33: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

Common Rock Sizing Relations

• HEC-11• USACE• Isbash• CALTRANS• USBR• ASCE• USGS

Page 34: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

ASCE

• Published by Vanoni in 1977• Based on Isbash (1936)• Modified to account for channel slope• Rocks size dependent on:

– Flow velocity– Unit weight of stone– Channel side slope

Page 35: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

ASCE Method

1/3

sπγ6W

50D⎟⎟

⎜⎜

⎛=

Page 36: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

ASCE Method1/3

sπγ6W

50D⎟⎟

⎜⎜

⎛=

Where:

W = ( ) ( )θ3cos31sG

6Vs0.000041G−

D50 = stone size (ft)W = weight of stone (lbs)V = local depth averaged velocity (ft/sec)

s = unit weight of stone (ib/ft3)W = unit weight of water (lb/ft3)

Gs = specific gravity of stone ( s/ w)

Page 37: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

ASCE Method

• Based on Isbash equation with a modification to account for channel bank slope

• Uses Isbash because it is “in line with experience” to rock size that will resist movement by flow

• Velocity taken 10 feet from bank• Angle of attack less than 30 degrees

1/3

sπγ6W

50D⎟⎟

⎜⎜

⎛=

Page 38: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

Common Rock Sizing Relations

• HEC-11• USACE• Isbash• CALTRANS• USBR• ASCE• USGS

Page 39: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

USGS Method

• Result of analysis by Blodgett (1981) examining field data from Washington, Oregon, California, Nevada and Arizona

• Published equation stated to apply to all channels, curved or straight, with side slopes less than or equal to 1.5:1

• Incorporated HEC-11 relationship

Page 40: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

USGS Method

44.250 01.0 aVD =

Page 41: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

USGS Method

Where:

D50 = stone size (ft)Va = average cross section velocity (ft/s)

44.250 01.0 aVD =

Page 42: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

USGS Method

• Incorporated 26 sites and 39 flow events• 14 failure points due to particle erosion• Utilized HEC-11 velocity/D50 values to add

points to plot• Approximate range of velocities utilized:

2.5 <Vaverage < 17 fps• Approximate range of median rock sizes:

0.5 < D50 < 3.0 ft

44.250 01.0 aVD =

Page 43: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

Abt and Johnson

• Steep slope sizing equation• Result of flume testing by Abt and

Johnson (1991)• Developed for the NRC to protect low

level waste impoundments

Page 44: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

Abt and Johnson (1991)56.043.0

50 23.5 dqSD =Rule of thumb:

Increase qd by 35% to use as an envelope relationship

Page 45: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

Abt and Johnson (1991)

56.043.050 23.5 dqSD =

Page 46: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

Abt and Johnson Method

• Tested on slopes of 1, 2, 8, 10 and 20%• Unit discharges up to ~7cfs/ft• Rock sizes of 1, 2, 4, 5 and 6 inches

56.043.050 23.5 dqSD =

Page 47: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

Abt and Johnson (1991)56.043.0

50 23.5 dqSD =Where:

D50 = stone size (in)S = bed slopeqd = unit discharge (ft2/s)

Page 48: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

Summary of MethodsY=10ft, z=2, SF =1.5

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

5 7 9 11 13 15 17 19 21

Flow Velocity (ft/sec)

Rock

Siz

e (f

t) HEC-11IsbashUSBRASCEUSACE

Page 49: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

Riprap Design Criteria, Riprap Design Criteria, Specifications and Quality Specifications and Quality

ControlControl

NCHRP Report 568NCHRP Report 568

Page 50: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

NCHRP Project 24NCHRP Project 24--2323ObjectivesObjectives

Riprap applicationsRiprap applications::

•• Channel banks Channel banks •• Bridge piersBridge piers•• Bridge abutmentsBridge abutments•• Guide banks and other countermeasuresGuide banks and other countermeasures•• Overtopping flowOvertopping flow

Page 51: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

NCHRP Report 568NCHRP Report 568ObjectivesObjectives

ProductProduct::

•• Design guidelinesDesign guidelines•• Material specifications & test methodsMaterial specifications & test methods•• Construction & Quality Control guidelinesConstruction & Quality Control guidelines

Page 52: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

Riprap size, shape, and qualityRiprap size, shape, and quality

C (thickness)

A (length)

B (width)

•• Characteristic diameter Characteristic diameter ““dd”” corresponds to the corresponds to the intermediate (B) axisintermediate (B) axis

•• A/C ratio should not exceed 3.0 so that particles A/C ratio should not exceed 3.0 so that particles are not needleare not needle--like, nor are they platylike, nor are they platy

•• Particles should be angular, not round Particles should be angular, not round

Page 53: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

Riprap gradationRiprap gradation0.10 m0.25 m0.50 m0.75 m1.0 m

0

10

20

30

40

50

60

70

80

90

100

012243648

Stone Size, inches

Perc

ent F

iner

by

Wei

ght,

%

Allowable d85/d15minimum: 27.3/18.3 = 1.5ideal: 30.0/16.0 = 1.9 maximum: 32.3/12.8 = 2.5

d85

d15

Allowable range of sizes for Class VI riprap (d50 = 21 inches)

d50

Page 54: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

Revetment RiprapRevetment Riprap

Page 55: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

Maximum slope 1V:1.5H Ambient bed elevation

Geotextile orgranular filter

Design high water

Minimum freeboard 2 ft (0.6 m)

Minimum riprap thickness = larger of (1.5d50 or d100)

Toe down riprap tomaximum scour depth

Maximum scour depth :

(Long-term degradation) + (Toe scour) + (Contraction scour)

Revetment RiprapRevetment Riprap

Page 56: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

Riprap mound height =desired toe down depth

Ambient bed elevation

Design high water

Minimum freeboard 2 ft (0.6 m)

Riprap mound thickness =2x layer thickness on slope

Revetment RiprapRevetment Riprap

Alternative toe detailAlternative toe detail

Page 57: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

5.2

g1

destvsf30 gy)1S(K

V)CCCS(yd⎥⎥⎦

⎢⎢⎣

−=

US Army Corps of Engineers EMUS Army Corps of Engineers EM--16011601

Revetment RiprapRevetment Riprap

Note: dNote: d5050 ~ 1.2(d~ 1.2(d3030))

Page 58: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

EM-1601

0.01

0.1

1

0.1 1

V/[gd(Sg-1)]0.5

D30

/dFailed D85/D15 < 1.6Stable D85/D15 < 1.6Failed D85/D15 = 2.8Stable D85/D15 = 2.8Failed D85/D15 = 3.9Stable D85/D15 = 3.9Failed D85/D15 = 4.6Stable D85/D15 = 4.6EM 1601

5.2

g

30

gd)1S(V30.0

dD

⎥⎥⎦

⎢⎢⎣

−=

Page 59: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

HEC-11

0.01

0.1

1

0.1 1

V/[gd(Sg-1)]0.5

D50

/dFailed D85/D15 < 1.6Stable D85/D15 < 1.6Failed D85/D15 = 2.8Stable D85/D15 = 2.8Failed D85/D15 = 3.9Stable D85/D15 = 3.9Failed D85/D15 = 4.6Stable D85/D15 = 4.6HEC-11

3

g

50

gd)1S(V295.0

dD

⎥⎥⎦

⎢⎢⎣

−=

Page 60: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

Pier RiprapPier Riprap

Schoharie Creek, NYSchoharie Creek, NY

Page 61: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

Pier RiprapPier Riprap

Schoharie Creek bridge pier No. 2Schoharie Creek bridge pier No. 2

Page 62: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

Pier RiprapPier Riprap

Minimum riprap thickness t = 3dMinimum riprap thickness t = 3d5050 , depth of , depth of contraction scour, or depth of bedform trough, contraction scour, or depth of bedform trough, whichever is greatestwhichever is greatest

Filter placement = 4/3(a) from pier (all around)Filter placement = 4/3(a) from pier (all around)

t

Filter

FLOWPier

Page 63: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

Pier RiprapPier Riprap

Pier width = Pier width = ““aa”” (normal to flow)(normal to flow)

Riprap placement = minimum 2(a) from pier (all around)Riprap placement = minimum 2(a) from pier (all around)

aFLOW 2a

2a

Page 64: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

Pier RiprapPier Riprap

2

g

des50 g2)1S(

V692.0d⎥⎥⎦

⎢⎢⎣

−=

FHWA Hydraulic Engineering Circular 23FHWA Hydraulic Engineering Circular 23

Page 65: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

Abutment RiprapAbutment Riprap

Page 66: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

Abutment RiprapAbutment Riprap

Page 67: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

Abutment RiprapAbutment Riprap

Page 68: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

Abutment RiprapAbutment Riprap

1V:2H

FloodplainGeotextile or

Granular Filter

Apron

Design High Water

2’ (0.6 m) Freeboard

Abu

tmen

t

Riprap Thickness = 1.5D50 or D100

Page 69: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

Abutment RiprapAbutment Riprap

0.8Fforyg

V1)(S

KD r

2

g≤⎟⎟

⎞⎜⎜⎝

⎛−

= y50

0.8Fforyg

V1)(S

KD r

0.142

g>⎟⎟

⎞⎜⎜⎝

⎛−

= y50

Page 70: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

Abutment RiprapAbutment Riprap

Abutment riprap sizing based on Abutment riprap sizing based on ““Setback RatioSetback Ratio”” (SBR) method:(SBR) method:

Distance from main channelDistance from main channelFlow depth in main channelFlow depth in main channelSBR =SBR =

Page 71: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

Abutment Riprap, SBR > 5Abutment Riprap, SBR > 5

Page 72: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

Abutment Riprap, SBR < 5Abutment Riprap, SBR < 5

Page 73: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

Abutment Riprap, SBR > 5Abutment Riprap, SBR > 5SBR < 5SBR < 5

Page 74: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

Minimum of: 2y or 25 feet

RiprapExtent

Abutment

Apron

FLOW

Main Channel

Channel Bank

Floodplain

Maximum of: 2y or 25 feet

Page 75: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

3.4 m/s

3.0 m/s2.72.42.11.81.51.20.90.60.30.0

Abutment vs. Abutment vs. guide bankguide bank

Page 76: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

ISBASH Method

• Developed by Isbash in 1936• Adopted by USACE in 1971• Developed for construction of dams by placing rock in flowing water

Page 77: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

ISBASH Method

( )1sG22gC

2aV

50D−

=

Page 78: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

ISBASH Method

( )1sG22gC

2aV

50D−

=

Where:

D50 = stone size (ft)Va = average channel velocity (ft/s)Gs = specific gravity of stoneG = gravitational constant (ft/s2)C = 0.86 for high turbulence zones

1.20 for low turbulence zones

Page 79: RIP-RAP Summary.pdf · HEC-11 Method •Psheuibdl by FHWA in 1989 • Combination of theory and field observations • Use in rivers and streams with: – Discharges greater than

5.2

g1

destvsf30 gy)1S(K

V)CCCS(yd⎥⎥⎦

⎢⎢⎣

−=

US Army Corps of Engineers EMUS Army Corps of Engineers EM--16011601

Revetment RiprapRevetment Riprap

Cv = 1.25Note: dNote: d5050 ~ 1.2(d~ 1.2(d3030))