Richard Penn Grant Pellegrin June 6, 2017

Upload: others

Post on 25-May-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Richard Penn Grant Pellegrin June 6, 2017 - Alberta Electric … · 2017-06-05 · Ø The Transmission Rate Projection (TRP) has an average 2.4% demand increase and Ø In other jurisdictions

Richard PennGrant PellegrinJune 6, 2017

Page 2: Richard Penn Grant Pellegrin June 6, 2017 - Alberta Electric … · 2017-06-05 · Ø The Transmission Rate Projection (TRP) has an average 2.4% demand increase and Ø In other jurisdictions

ABOUT IPCAA

Ø IPCAA was formed in 1983 as a membership-based societyrepresenting Alberta’s large industrial electricity consumers.

Ø Our members are involved in key Alberta industries, including Oil& Gas, Pipelines, Petrochemicals, Agriculture and Steel.

Ø Our mission is to take a leadership role in ensuring that acompetitive marketplace exists for electrical services.

2

Page 3: Richard Penn Grant Pellegrin June 6, 2017 - Alberta Electric … · 2017-06-05 · Ø The Transmission Rate Projection (TRP) has an average 2.4% demand increase and Ø In other jurisdictions

1. AESO Demand and Capacity Forecast2. Wires Costs: Competitiveness3. AESO TRIP Model4. Energy and Ancillary Services Pricing5. AESO Own Costs: Value Proposition6. Optimizing Use of Existing Transmission

3

AESO BUDGET: KEY COMMENTS

Page 4: Richard Penn Grant Pellegrin June 6, 2017 - Alberta Electric … · 2017-06-05 · Ø The Transmission Rate Projection (TRP) has an average 2.4% demand increase and Ø In other jurisdictions

Ø Over-forecasting is an issue in AlbertaØ Over-forecasting causes future transmission costs to appear

lower Ø Recently, AESO forecasts have been improving; however, over-

forecasting continues to occur.Ø Historically, this practice has led to an overbuild in

transmission.Ø Key Question: will AESO’s forecasting of generation capacity

requirements result in an over-supply of capacity and corresponding extra costs to customers?

4

AESO DEMAND & CAPACITY FORECAST

Page 5: Richard Penn Grant Pellegrin June 6, 2017 - Alberta Electric … · 2017-06-05 · Ø The Transmission Rate Projection (TRP) has an average 2.4% demand increase and Ø In other jurisdictions

5

AIL

DTS

AIL VERSUS DTS PEAK DEMAND

Page 6: Richard Penn Grant Pellegrin June 6, 2017 - Alberta Electric … · 2017-06-05 · Ø The Transmission Rate Projection (TRP) has an average 2.4% demand increase and Ø In other jurisdictions

8000

10000

12000

14000

16000

18000

20000

2001

2002

2003

2004

2005

2006

2007

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

2031

2032

2033

2034

AIL Actuals (2001-2017) and Forecast (2007-2016) Based on AESO LTOs

Actual 2007 2008 2009 2012 LTO 2014 LTO 2016 LTO Linear (Actual)

6

AIL PEAK DEMAND: FORECAST VS. ACTUAL

Trend Line

Page 7: Richard Penn Grant Pellegrin June 6, 2017 - Alberta Electric … · 2017-06-05 · Ø The Transmission Rate Projection (TRP) has an average 2.4% demand increase and Ø In other jurisdictions

6000

8000

10000

12000

14000

16000

2001

2002

2003

2004

2005

2006

2007

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

2031

2032

2033

2034

2035

2036

AIES Actuals (2001-2017) and Forecast (2007-2016) Based on AESO LTOs

System Load at AIL Peak

Actual 2007 2008 2009 2012 LTO 2014 LTO 2016 LTO Linear (Actual)

7

AIES PEAK DEMAND: FORECAST VS. ACTUAL

Trend Line

Page 8: Richard Penn Grant Pellegrin June 6, 2017 - Alberta Electric … · 2017-06-05 · Ø The Transmission Rate Projection (TRP) has an average 2.4% demand increase and Ø In other jurisdictions

Ø The Transmission Rate Projection (TRP) has an average 2.4% demand increase and

Ø In other jurisdictions such as NYISO, they are projecting a 0.75% decrease from 2016 due to energy efficiency and the growth of distributed BTF generation

Ø Given the current interest in Alberta inenergy efficiency and BTF generation, a low growth scenario would be a more reasonable rate projection

8

The AESO should put more emphasis on the DTS load forecast

IMPROVING FORECAST ACCURACY

Page 9: Richard Penn Grant Pellegrin June 6, 2017 - Alberta Electric … · 2017-06-05 · Ø The Transmission Rate Projection (TRP) has an average 2.4% demand increase and Ø In other jurisdictions

Ø A review of transmission rates in various jurisdictions is provided (see next slide):Ø Alberta: approximately $31/MWhØ Montana: approximately $4/MWh

Ø ATCO Residential Rate for transmission and distribution in 2016 was $174/MWh plus the commodity etc.

Ø High rates make all consumers examine the benefit of energy efficiency and distributed BTF generation

9

The AESO should prioritize controlling transmission costs, as unchecked rate increases

lead customers towards other energy options.

WIRES COSTS: COMPETITIVENESS

Page 10: Richard Penn Grant Pellegrin June 6, 2017 - Alberta Electric … · 2017-06-05 · Ø The Transmission Rate Projection (TRP) has an average 2.4% demand increase and Ø In other jurisdictions

10

TRANSMISSION CHARGES: 2014/15

Page 11: Richard Penn Grant Pellegrin June 6, 2017 - Alberta Electric … · 2017-06-05 · Ø The Transmission Rate Projection (TRP) has an average 2.4% demand increase and Ø In other jurisdictions

Ø The AESO Transmission Rate Impact Projection (TRIP) model hasbeen very helpful to IPCAA members in forecasting their internalbudgets.

Ø The AESO’s TRIP model has not been publicly updated since June2014.

Ø An updated TRIP model along with yearly updates has great value toIPCAA members.

Ø The present Transmission Rate Projection (TRP) provides insufficientdetail.

The AESO should re-publish the TRIP model along with annual updates.

11

AESO TRIP Model

Page 12: Richard Penn Grant Pellegrin June 6, 2017 - Alberta Electric … · 2017-06-05 · Ø The Transmission Rate Projection (TRP) has an average 2.4% demand increase and Ø In other jurisdictions

Ø IPCAA has advocated for an updated energy price that uses a much smallertime increment, i.e. 5 minutes, instead of hourly average pricing.

Ø Discussions are in the Straw-Man working groupsØ The recent FERC Order 825 (June 16, 2016) stipulates ISOs must settle:

Ø Energy transactions in real-time markets at the same time interval itdispatches energy,

Ø Operating reserves transactions in real-time markets at the same timeinterval it prices operating reserves, and

Ø Intertie transactions at the same time interval it schedules intertietransactions.

Ø As they have learned in the US, the energy and AS markets send the signalsfor the type of flexible capacity needed.

12

The AESO should update the energy and ancillary services markets as a part of the

capacity market implementation.

ENERGY & ANCILLARY SERVICES PRICING

Page 13: Richard Penn Grant Pellegrin June 6, 2017 - Alberta Electric … · 2017-06-05 · Ø The Transmission Rate Projection (TRP) has an average 2.4% demand increase and Ø In other jurisdictions

Ø The AESO G&A costs are reaching $100M per year. At this level theyshould be reviewed by the AUC as part of the AESO tariff application.

Ø As part of the BRP the AESO should consider bench-marking theAESO own costs to other ISOs in order to establish the value formoney proposition for Alberta. For example:Ø The AESO’s G&A costs for 2017: $98.5 M or about $1.62/MWh

(roughly $1.20/MWh US)Ø The Ontario IESO for 2017 has:

• Costs of $191.4 M or $1.2187/MWh (roughly $0.915 / MWh)• 687 Core FTEs and 25 Incremental FTEs (contract)

13

AESO OWN COSTS: VALUE PROPOSITION

Page 14: Richard Penn Grant Pellegrin June 6, 2017 - Alberta Electric … · 2017-06-05 · Ø The Transmission Rate Projection (TRP) has an average 2.4% demand increase and Ø In other jurisdictions

14

http://www.nyiso.com/public/webdocs/markets_operations/committees/mc_bpwg/meeting_materials/2016-09-12/NYISO%202017%20BUDGET%20OVERVIEW.pdf

AESO OWN COSTS: VALUE PROPOSITION

Page 15: Richard Penn Grant Pellegrin June 6, 2017 - Alberta Electric … · 2017-06-05 · Ø The Transmission Rate Projection (TRP) has an average 2.4% demand increase and Ø In other jurisdictions

15

The AESO should benchmark its own costs and submit them to additional regulatory scrutiny

when G&A costs exceed $100M annually.

AESO OWN COSTS: VALUE PROPOSITION

Ø While scale is an issue, these other ISOs provide:Ø Capacity markets;Ø Security constrained Day-ahead markets for energy and ancillary

services;Ø Unit commitment;Ø Security constrained Real-time markets for energy and ancillary

services; andØ Settlement day-ahead and real-time

Page 16: Richard Penn Grant Pellegrin June 6, 2017 - Alberta Electric … · 2017-06-05 · Ø The Transmission Rate Projection (TRP) has an average 2.4% demand increase and Ø In other jurisdictions

Ø As part of the Renewable Electricity Program, the AESO opted toproponents to make use of the existing transmission system.

Ø Effective utilization of the existing transmission system helps toreduce costs.

The AESO should continue to promote effective utilization of existing transmission assets, prior

to requiring new transmission to be constructed.

16

USE OF EXISTING TRANSMISSION LINES

Page 17: Richard Penn Grant Pellegrin June 6, 2017 - Alberta Electric … · 2017-06-05 · Ø The Transmission Rate Projection (TRP) has an average 2.4% demand increase and Ø In other jurisdictions

17

Please feel free to contact us:

Ø Richard Penn, Acting Executive Director(403) [email protected]

Ø Vittoria Bellissimo, Policy and Regulatory Consultant(403) 966–[email protected]

QUESTIONS?