rich upgrade simulation: updates s.easo 11-2-2015 rich upgrade-mechanics meeting 1

13
RICH upgrade simulation: updates S.Easo 11-2-2015 RICH upgrade-mechanics meeting 1

Upload: margaret-parker

Post on 17-Jan-2016

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: RICH upgrade simulation: updates S.Easo 11-2-2015 RICH upgrade-mechanics meeting 1

1

RICH upgrade simulation: updates

S.Easo11-2-2015

RICH upgrade-mechanics meeting

Page 2: RICH upgrade simulation: updates S.Easo 11-2-2015 RICH upgrade-mechanics meeting 1

2

PID results : cross-checking with different software versions

Outline

• LHCb tracking• PID tuning

Page 3: RICH upgrade simulation: updates S.Easo 11-2-2015 RICH upgrade-mechanics meeting 1

3

LHCb Tracking

• 2012-13 (TDR studies): No ‘upgrade tracking’ available for RICH studies Used current LHCb tracking geometry + different versions of RICH upgrade geometry Not a perfect , but a practical solution at the time.

2014 : ‘Upgrade tracking’ became available, so started using it for RICH. 2014 Feb : Upgrade/current tracking comparisons in terms of PID. Track quality parameters were not available. So assumed all long tracks are ‘good tracks’ as a first step.

2015 : Track ghost probability parameter available , Used this to filter the upgrade tracks used for RICH.

This talk: PID with some of the above tracking setups. They all use same PYTHIA (generator) and beam configurations . So expect only minor variations of performance among them.

• RICH performance depends on the tracks input to RICH.

Page 4: RICH upgrade simulation: updates S.Easo 11-2-2015 RICH upgrade-mechanics meeting 1

4

Simulation Configuration

Gauss v47r0p1, Boole 29r3, Brunel v47r4

Tracking : Recent version as in Brunel v47r4 for upgrade/current LHCb

Luminosity : Lumi20 ( 2X 1034 cm2s-1 ) , no spillover

Bs ff events

RICH Optics:

• ROC 3800 mm, 3600 mm, 3650 mm• With/without photon plane shift of 100 mm.• Current standard setup in software: ROC 3800mm, no plane shift• RICH2 : large+ small pmts

PID Tuning: Current/Old tuning. Current tuning is default.

Page 5: RICH upgrade simulation: updates S.Easo 11-2-2015 RICH upgrade-mechanics meeting 1

5

Red: Upgrade LHCb Tracking + Tracks selected with ghost probability cut Blue: Upgrade LHCb Tracking + All tracks Black: Current LHCb Tracking + Tracks selected with ghost probability cut

PID from Upgrade LHCb trackingimproved compared to that fromCurrent LHCb tracking

RICH1: standard setup

Same relative performances obtained with different RICH optics setup also.

Page 6: RICH upgrade simulation: updates S.Easo 11-2-2015 RICH upgrade-mechanics meeting 1

6

Upgrade tracking,ghost probability< 0.3

Red: RICH1 ROC 3800 mmBlack: RICH1 ROC 3800 mm, photon plane shift 100 mmBlue: RICH1 ROC 3600mm , photon plane shift 100 mmCyan : RICH1 ROC 3650 mm, photon plane shift 100 mm

Effect from photonplane shift recovered bychange in ROC

Page 7: RICH upgrade simulation: updates S.Easo 11-2-2015 RICH upgrade-mechanics meeting 1

7

Current LHCb tracking

Red: RICH1 ROC 3800 mmBlack: RICH1 ROC 3800 mm, photon plane shift 100 mmBlue: RICH1 ROC 3600mm , photon plane shift 100 mm

Upgrade tracking, : All tracks

• Effect from photon plane shift recovered by change in ROC• This conclusion on optics obtained , independent of the tracking used.

Page 8: RICH upgrade simulation: updates S.Easo 11-2-2015 RICH upgrade-mechanics meeting 1

8

Optics and PID tuning : Upgrade LHCb Tracking

Upgrade LHCb Tracking,Current PID Tuning

Upgrade LHCb TrackingOld PID Tuning

• Effect from photon plane shift recovered by change in ROC• This conclusion on optics obtained , is independent of the PID tuning used with

Upgrade LHCb tracking or Current LHCb Tracking. (Similar plots obtained from Current LHCb Tracking ).

Red: RICH1 ROC 3800 mmBlack: RICH1 ROC 3800 mm, photon plane shift 100 mmBlue: RICH1 ROC 3600mm , photon plane shift 100 mm

Page 9: RICH upgrade simulation: updates S.Easo 11-2-2015 RICH upgrade-mechanics meeting 1

9

SUMMARY and PLANS

Using latest version of software for RICH upgrade.

Various cross-checks made with previous versions and results look consistent with each other.

Plans• Flat mirror size tune• Long term: Rebuild the PMT array with Elementary cells.

Page 10: RICH upgrade simulation: updates S.Easo 11-2-2015 RICH upgrade-mechanics meeting 1

10

BACKUP SLIDES

Page 11: RICH upgrade simulation: updates S.Easo 11-2-2015 RICH upgrade-mechanics meeting 1

Effects from PID tuning

• Some tuning done in 2013• Now re-visiting with current versions• For illustration use tracks with 7.5 < P < 100 GeV/c on this page.

Blue: Current tuningMagenta: Old Tuning

All Plots:RICH1 ROC=3800 mm using upgrade tracking

Top Plot: Standard setup, no shift in photon plane

Bottom plot: Photon plane shift=100 mm

Tuning gave a small improvement inPID performance in both plots

Page 12: RICH upgrade simulation: updates S.Easo 11-2-2015 RICH upgrade-mechanics meeting 1

12

PID vs Momentum

Upgrade tracking, ghost probability <0.3RICH standard setup (ROC 3800 mm)

Current LHCb tracking, ghost probability <0.3RICH standard setup (ROC 3800 mm)

Page 13: RICH upgrade simulation: updates S.Easo 11-2-2015 RICH upgrade-mechanics meeting 1

13

Optics and PID tuning : Current LHCb Tracking

Current LHCb Tracking,Current PID Tuning

Current LHCb TrackingOld PID Tuning

• Effect from photon plane shift recovered by change in ROC• This conclusion on optics obtained , is independent of the PID tuning used

with Current LHCb tracking

Red: RICH1 ROC 3800 mmBlack: RICH1 ROC 3800 mm, photon plane shift 100 mmBlue: RICH1 ROC 3600mm , photon plane shift 100 mm