RHIC PS UPDATE 1/21/14. NESTED IR PS HI-POTS COMPLETE NESTED IR PS CABLES CONNECTED AT LINK BOXES AND VALVE BOXES UNLOCKING NESTED IR PS’S THIS WEEK 77K HI-POTS OF SEXTUPOLE AND TQ MAGNETS 10K MAIN RING HI-POT 7.5K LOW CURRENT PS TESTING BEGINS 4.5K 24 HR SOAK MAIN PS TURNS ON. - PowerPoint PPT PresentationTRANSCRIPT
RHIC PS UPDATE 1/21/14NESTED IR PS HI-POTS COMPLETENESTED IR PS CABLES CONNECTED AT LINK BOXES AND VALVE BOXESUNLOCKING NESTED IR PS’S THIS WEEK77K HI-POTS OF SEXTUPOLE AND TQ MAGNETS10K MAIN RING HI-POT7.5K LOW CURRENT PS TESTING BEGINS4.5K 24 HR SOAK MAIN PS TURNS ON