RHIC PS UPDATE 1/21/14 NESTED IR PS HI-POTS COMPLETE NESTED IR PS CABLES CONNECTED AT LINK BOXES AND VALVE BOXES UNLOCKING NESTED IR PS’S THIS WEEK 77K HI-POTS OF SEXTUPOLE AND TQ MAGNETS 10K MAIN RING HI-POT 7.5K LOW CURRENT PS TESTING BEGINS 4.5K 24 HR SOAK MAIN PS TURNS ON

Upload: burton-mcguire

Post on 31-Dec-2015

18 views

Category:

Documents


0 download

DESCRIPTION

RHIC PS UPDATE 1/21/14. NESTED IR PS HI-POTS COMPLETE NESTED IR PS CABLES CONNECTED AT LINK BOXES AND VALVE BOXES UNLOCKING NESTED IR PS’S THIS WEEK 77K HI-POTS OF SEXTUPOLE AND TQ MAGNETS 10K MAIN RING HI-POT 7.5K LOW CURRENT PS TESTING BEGINS 4.5K 24 HR SOAK MAIN PS TURNS ON. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: RHIC PS UPDATE 1/21/14

RHIC PS UPDATE 1/21/14NESTED IR PS HI-POTS COMPLETENESTED IR PS CABLES CONNECTED AT LINK BOXES AND VALVE BOXESUNLOCKING NESTED IR PS’S THIS WEEK77K HI-POTS OF SEXTUPOLE AND TQ MAGNETS10K MAIN RING HI-POT7.5K LOW CURRENT PS TESTING BEGINS4.5K 24 HR SOAK MAIN PS TURNS ON