revision of city development plan for visakhapatnam · pdf filerevision of city development...
TRANSCRIPT
Revision of City Development Plan for
Visakhapatnam
6th April, 2013
CDP activity & Proposals
Clean,
Healthy and
Safe
Environment
Economic
Growth and
Prosperity
Opportunities
for All
Water supply Sewage and
Sanitation
Traffic and
transportation
Urban
Renewal
Health and
Education
Urban
environment
Tourism and
Recreation
Solid waste
management
Vizag 2020
Economic
development
Storm water
management
Governance
and Finance
Climate
change
Strong sectoral linkages
To become an economical vibrant, safe and
inclusive city providing the best social and physical
infrastructure facilities for its residents, businesses
and visitors
Methodology
Existing Demand
Hotspots and Stress
Areas
Future Demands Future Gaps and
Deficits
Existing gaps and
deficits
Proposed
Augmentations
Future stress areas
with current trends
Existing Supply
/Existing Coverage
Technology changes- green
infrastructure
Looking beyond firefighting
Mobilizing resources smartly
Norms and Manuals
CPHEEO- Water supply and Sanitation
MSW 2000- Solid Waste
CPCB – Pollution control, disagree standards
GW regulation – GoAP
GoI guidelines for MRTS systems
RAY Guidelines
Special demand of Vizag
Sectoral Assessments and Project Listing
CDP Objective and Performance Benchmark- Water Supply
OBJECTIVES / OUTCOMES Baseline CDP
Targets
Status Comments
2005 2011 2012
1. Improve consumer satisfaction
a) Achieve 100% household connections 30% 70% 75% Good progress, on track
b) Achieve 24 hour water supply 0 40% 3% Task complexity apparently
underestimated. Trying to
convert branch network to loop
system is a onerous task.
c) Enhance consumption to 150 lpcd 62 120 110 On track with a bit of lag
2. Improve water resource management
a) Reduce NRW to 25% 45% 38% 36% On track
b) Increase metering to 100% 7.70% 95% 20% Ambitious target. All
apartment connections, bulk
supplies metered, 7000
domestic connections metered.
Water Supply- Projects
Name of Project Cost (Rs in Cr)
Laying pipeline from Yeleru to city 1905
Laying pipeline from Raiwada to city 350
Sea water desalination plant - 10 mld capacity
80
Desilting of reservoirs 0.5
Alternate water storage tank 170.85
Water Quality monitoring 5
Water Supply- Projects
Name of ProjectCost (in Cr)
Replacement of Old Pipe lines 150
SCADA based water distribution system 18
Rain water harvesting as a building reform 0.5
Groundwater metering and management 26
Total Sectoral Investment – 2705.85 Crores
CDP Objective and Performance Benchmark- Sewerage
OBJECTIVES / OUTCOMES
Baseline
CDP
Target Status Comments
2005 2011 2012
1. Improve consumer satisfaction
a) Sewerage network coverage 7% 45% 59% Implementation delay
b) Household connectivity 8% 45% 37%
Reluctance to Hh connection by
people
2. Improve treatment and management
a) Treatment ratio 10% 60% 30%
Lag due to slow pace of
connections
b) Reuse ratio 5% 30% 10%
Sewerage -Projects
Name of Project Cost (Rs in Cr)
Refurbishment, Technology and Capacity Up-grading of Kailashgiri STP
10
100% SS connectivity including 3 planned STPs and remaining High Density areas for 32 peripherals
300
Sale of treated Waste Water 300
Public toilets 10
Septage Management 12
DEWATS for peripherals (Low Density) 45
Household Toilet Connection to 50000 units
100
Total Sectoral Investment - 777 Crores
CDP Objective and Performance Benchmark- Storm Water Drainage
OBJECTIVES / OUTCOMES
Baseline
CDP
Target Status Comments
2005 2011 2012 Comments
1. Improve consumer satisfaction
a) Reduce Flooding 10% 5% 7%
SWD master plan not fully
implemented
b) Increase safety 24 12
2. Storm water drainage system
a) Adequate network coverage 20% 50% 35% Bottlenecks and encroachments
b) Management of natural system 20% 90% 50%
3. Environmental friendliness
a) Recharge / reuse of storm water 30% 40% 35%
b) Safe disposal 70% 90% 80%
Storm Water Drainage-Projects
Name of Project Cost (In rs Cr)
Restoration of 3 water bodies –
Kambalakonda, Mudsarlova and
Gambheeram
10
Mapping of all the water bodies 1
Improved coverage of storm water drains
(priority drains identified in earlier CDP, not
taken up under JNNURM) a)Hanumantawaka/ Mudasarlova Gedda & Sub geddas
(Zone-V SWD)
b)Vidyanagar Gedda & Sub geddas(Zone-VI SWD)
c)Madhavadhara Gedda & Sub geddas(Zone-IX SWD)
d) Mulgada Gedda (Zone-XIII SWD)
e) Oota gedda
125.05
Total Sectoral Investment – 136.05 Crores
CDP Objective and Performance Benchmark- Solid Waste Management
OBJECTIVES / OUTCOMES
Baseline
CDP
Targets Status Comments
2005 2011 2014 Comments
1. Improve consumer satisfaction
a) Solid waste network coverage 7% 45% 100% Good coverage achieved
b) Household connectivity 8% 45% 100
100% door to door
collection in all 72 wards.
2. Solid waste treatment and management
a) Treatment ratio 10% 60% 20%
b) Reuse ratio 5% 30% 25%
3. Sustain good financial management
a) Solid waste working ratio 0 0.4
Solid Waste Management -Projects
Name of Project Cost (In Rs Cr)
100% Waste collection 30
Zone wise waste transfer stations- 5 (+ landfill)
-Decentralized compost plants
- Sorting and recycling yards
100
Waste treatment facility
Sanitary landfill100
Re-engineering Kapluppada landfill 100
Information Communication Education
(ICE) for solid waste management 2
Energy/resource recovery from waste 200
Total Sectoral Investment – 532 Crores
OBJECTIVES / OUTCOMES
Baseline CDP Target Status
Comments 2005 2011 2012
1. Improve consumer satisfaction
a) Increased average speed 15 km/h 20 km/h 18 km/h No net improvement
b) Reduction in road accidents 994 minus 25% -
c) Accessibility for disabled pilots
Accessibility included in all
transport projects
d) Sidewalk length (% of total road
length) 3% 40% 10% Overambitious targets
2. Efficient transport management
a) Road network coverage 6% 13%
b) Share of public transport (modal split)20% 25% 20% Only 20km stretch is operational
c) Rail as share of total public transport 0% 3%
3. Improving the city's environment
a) Enviornmental improvements (air
pollution) In limits Worse off
b) Use of alternative fuels 15%
CDP Objective and Performance Benchmark- Transportation
Transportation Projects
Name of Project Cost (Rs in Cr)
Multi-Level Car parking in 9 locations 16.5
ITS Technology 15
Bus stops along all routes 20
New BRT network-Gajuwaka to City Central
-Connecting Madhurwada
351
Regularization of IPT 10
Bi-cycle track at neighbourhood level 25
Junction improvements- 19
4 lane flyovers at NAD, Gajuwaka,
Gopalpatnam & Convent Junction200
Improvements of Arterial Roads 50
Improvements of Peripherals Roads 50
Pre- Feasibility Study of Metro Railway 1.6
Total Sectoral Investment – 758.10 Crores
Urban Poor- Projects
Name of Project Cost (In Rs CR)
Vocational training and livelihood linkages 5
Slum housing, in situ and relocation, 50000
dwellings 1200
Identification of land bank for housing of urban
poor, aspects of livelihood restoration and
connectivity to be studied
2
Construction of night shelters - City railway station
- bus station
- Gajuwaka,
- Gopalpatnam,
- Madhurwada
2.5
Total Sectoral Investment – 1209.50 Crores
New Sectors undertaken in RCDP
Environment - Projects
Name of Project Cost (Rs In CR)
‘Vizag 30’ – Open / Recreational Space
Provision and Network 40
Morbidity pattern studies 1
LED lighting for Street Lights (Only City
Portion)80
Construction of 4 indoor stadium in zone
I, II, V, VI 40
Total Sectoral Investment – 161 Crores
Tourism & Urban Renewal- Projects
Name of Project Cost (In Rs Cr)
Restoration of heritage buildings and heritage
walk in old city 18
Poorna Market revitalization 15
Promotion of Eco tourism project near
Shambhuvanipalem5
Promotion of Eco tourism project at Mudsarlova5
Total Sectoral Investment – 43 crores
Financial Allocation
Total Sectoral Investments (as per Financial Plan)
Share of Different Sectors
Sector
Total Investment
(in Cr) Percentage
Water Supply 2705.85 42.72%
Sewerage 777 12.27%
Storm Water Drainage 136.05 2.15%
Solid Waste Management 532 8.40%
Traffic and Transportation 758.1 11.97%
Urban Poor 1209.5 19.09%
Environment 161 2.54%Tourism and Urban
Renewal 43 0.68%
Capacity Building 12 0.19%
Total 6334.5 100.00%
43%
12%
2%8%
12%
19%
3% 1%Water Supply
Sewerage
Storm WaterDrainage
Solid WasteManagement
Traffic andTransportation
Financial Plan
JnNURM
Multilateral
PPP
State Govt
Municipalty
Sources of Fund
Components Rs. In Cr % Composition
Loans 1383.75 30%
Central Grants 1171.95 25%
State Grants 906.83 19%
ULB Contribution 483.87 10%
PPPs / Others 716.54 15%
Total 4662.94 100%
Financial Plan for next 7 years
RCDP Projects
Preparatory Phase(1-3 Years)
Implementation Phase(1-7 Years)
The total project cost varies with the project cost given in table, as there is a spill over of implementation of certain projects beyond the 7-year horizon of the CDP.
JnNURM Projects & Financial Summary
650.29
84.87281.52
452.93 531.67
490.34
58.42
237.71
302.74
438.97
529.9
60.19
249.95
311.61
446.85
0
200
400
600
800
1000
1200
1400
1600
1800
Water Supply Storm Water Sewerage Urban Transport BSUP Housing
Project Cost Expenditure incurred so far Value of work done
JnNURM Projects – Financial Summary
Sector No. of
projects
No. of
completed
projects
Water
Supply 8 4
Storm Water 3 2
Sewerage 2 1
Urban
Transport 1 0
BSUP Housing 6 2
23%
12%
4%21%2%
38%
Water Supply
Sewerage
Storm Water Drainage
Traffic and Transport
Solid Waste Management
Services to the UrbanPoor
Sector wise Allocation of Funds
Amount Sanctioned & Expenditure Incurred
Thank You……