RESOURCESCHEDULINGALGORITHM
FORMAINTENANCEPLANNING
RESOURCESCHEDULINGALGORITHMFORMAINTENANCEPLANNING
INTERIMPROJECTREPORTSUBMITTEDINPARTIALFULFILLMENTFORTHEREQUIREMENTSOFTHEMODULE
BPJ420
KIRSTENYOUNG14062471
UniversityofPretoria
SEPTEMBER4,2017
RESOURCESCHEDULINGALGORITHM
FORMAINTENANCEPLANNING
i
ANTIPLAGIARISMPAGEI,KirstenYoung,studentnumber14062471herebydeclarethatthisreportismyownoriginalwork,
and that the references listedprovides a comprehensive list of all sources citedor quoted in this
report.
RESOURCESCHEDULINGALGORITHM
FORMAINTENANCEPLANNING
ii
EXECUTIVESUMMARY“CompanyXYZ” isacompanywhichoutsourcesmaintenance tovariousenterprisesalloverSouth
Africa. Technicians are hired to travel to their customers which are geographically far from one
anothertoperformmaintenanceonelectricaldevicessuchasservers,computersandairconditioners.
Anemployee’sworkdayconsistsofboththeirtraveltimeandworkingtimeandsoroutingmustbe
carefully considered in order to reduce travel costs. Company XYZ’s employees find that their
workloadsareunbalancedi.e.somedaystheywillworkmuchlongerhoursthanothers.Thishasled
toCompanyXYZrequiringawaytoefficientlyscheduletheiremployeessothatcustomersdemand
can bemet,while keeping costs low, resource utilization high andworkloads balanced. Fourier-E
attempted solving Company XYZ’s problem by creating a linear programming resource allocation
model.Themodelworkedbutthereisstillmuchroomforimprovement.Allthedatawastherefore
alreadyavailableinadevicedatabasewhichcouldbeusedinthedevelopmentofanewsolution.
Afterperformingaliteraturestudyitwasfoundthattheproblemathandhasmanysimilaraspectsto
that of aMultiple Travelling Salesman Problem and so themanymethods of solving this kind of
problemwere researched. The genetic algorithmwas selected as themost suitable algorithm for
solving theproblembecauseof its short running timeand thestudent’sability tocode it.Specific
selection,crossoverandmutationtechniqueswereusedtoevolvetheinitialpopulationofsolutions.
Witheverynewgeneration,abetterschedulewasfound.Thebestsolutionofthefinalgeneration
wasselectedasthescheduletoanalyse.
Thegeneticalgorithmexhibitedmanyadvantagesoverusingtheexistinglinearprogrammingmethod.
Thechosenschedulesignificantlyreducedovertime,reducedtraveldistancesandbalancedresource
workloads.Itisuptothecompanytodecidewhethertheyshouldimplementitornot.CompanyXYZ
shouldvalidatethefinalschedulebyusingatestingteamtoensurethattheassumptionsonwhich
themodelwasbasedareacceptable.
RESOURCESCHEDULINGALGORITHM
FORMAINTENANCEPLANNING
iii
TABLEOFCONTENTSANTIPLAGIARISMPAGE...................................................................................................................I
EXECUTIVESUMMARY....................................................................................................................II
LISTOFFIGURES............................................................................................................................IV
LISTOFTABLES..............................................................................................................................IV
1. INTRODUCTIONANDBACKGROUND.......................................................................................11.1. THESERVICEINDUSTRY................................................................................................................11.2. COMPANYXYZ...........................................................................................................................11.3. PROBLEMBACKGROUND..............................................................................................................11.4. FOURIER-E.................................................................................................................................3
2. PROBLEMSTATEMENT............................................................................................................3
3. PROJECTAIM/RATIONALE......................................................................................................4
4. PROJECTAPPROACH,SCOPEANDDELIVERABLES....................................................................5PROJECTSCOPE......................................................................................................................................6
5. LITERATUREREVIEW...............................................................................................................75.1 EXACTMETHODS.........................................................................................................................8
5.1.1 MathematicalProgramming..........................................................................................85.1.2 DynamicProgramming...................................................................................................8
5.2 HEURISTICMETHODS..................................................................................................................95.2.1 LocalSearch-Hill-Climbing............................................................................................95.2.2 LocalSearch–Hill-ClimbingwithRandomRestart.......................................................105.2.3 LocalSearch-SimulatedAnnealing..............................................................................105.2.4 LocalSearch-TabuSearch...........................................................................................105.2.5 GeneticAlgorithm.........................................................................................................10
5.3 CONCLUSION............................................................................................................................14
6. PROBLEMINVESTIGATION....................................................................................................15
7. SOLUTIONDEVELOPMENT....................................................................................................187.1 INPUT.....................................................................................................................................187.2 PROCESS.................................................................................................................................207.3 OUTPUT..................................................................................................................................24
8. SOLUTIONANDSOLUTIONVALIDATION...............................................................................26
9. PROPOSEDIMPLEMENTATION..............................................................................................29
10. CONCLUSION.....................................................................................................................31
11. BIBLIOGRAPHY..................................................................................................................32
12. APPENDICES........................................................................................................................AAPPENDIXA:SIGNEDSPONSORSHIPFORM................................................................................................AAPPENDIXB:COMPLETEPYTHONCODING..................................................................................................B
RESOURCESCHEDULINGALGORITHM
FORMAINTENANCEPLANNING
iv
LISTOFFIGURESFigure1:AnillustrationofthehighlevelprocessCompanyXYZusestosatisfytheircustomers.........2
Figure2:Demonstrationofunevenworkloaddistribution...................................................................2
Figure3:CurrentsituationatCompanyXYZversuswhatamaintenanceplanwillhelpachieve..........4
Figure4:MapshowingthelocationsofCompanyXYZ'scustomersintheGautengregion..................6
Figure5:Representationofaroutingproblem.....................................................................................7
Figure6:Demonstrationofalocalmaximumbeingreachedratherthantheglobalmaximum...........9
Figure7:Demonstrationsofcommoncrossoveroperators................................................................12
Figure8:Demonstrationoforder1crossover.....................................................................................13
Figure9:AnexampleofanemployeejobsheetcreatedbyFourier'smodel......................................15
Figure10:Chartshowingcostofscheduleover80weeks..................................................................16
Figure11:Chartscomparinggeneratedschedulesof2employees....................................................16
Figure12:Thebasicconceptualmodelprocesswhichwillbefollowed..............................................18
Figure13:Previewofimportantaspectsofdatabase.........................................................................18
Figure14:Databasewhichgroupsdevicescommontoaspecificlocation.........................................19
Figure15:GeneticAlgorithmmethodology.........................................................................................20
Figure16:Representationofanindividualsolution............................................................................20
Figure17:Flowchartdemonstratingthelogicbehindthefitnessfunction........................................21
Figure18:Previewofasolutioninexcelformat..................................................................................25
Figure19:Graphsdepictingtheimprovementofsolutionswitheverynewgeneration....................26
Figure20:Comparisonofworkingdaysofinitialandfinalsolutionsforaparticularemployee.........27
LISTOFTABLESTable1:GeneticAlgorithmMethodology............................................................................................11
Table2:ComparisonofmethodsforsolvingTSP.................................................................................14
Table3:Comparisonofbestinitialsolutionandbestfinalsolutions..................................................27
Table4:Samplescheduleforanindividualemployee.........................................................................29
Table5:Samplescheduleforaspecificday.........................................................................................29
RESOURCESCHEDULINGALGORITHM
FORMAINTENANCEPLANNING
1
1. INTRODUCTIONANDBACKGROUND
1.1. THESERVICEINDUSTRY
Therehasbeenarapidgrowthintheserviceindustryoverthelastdecade.Thisisduetothefactthat
companies are recognizing the benefits of outsourcing activities that are not part on their core
functions (Linton, 2012). Outsourcing services such as accounting, IT or maintenance allows a
company to concentrate on the activities thatwillmake themmoney. Companies that provide a
serviceworkinverydifferentwaytomanufacturingcompaniesaspeoplearetheessenceandcoreof
thebusiness (Dorne,2008).Employeesworking inservicesareusuallynotconfinedtoaparticular
facility; rather they travel to provide their services across geographical areas. Unlike the
manufacturing industry, services cannot build up an inventory during times where there is less
demand–itneedstobemetasitisrequired.Thisplacesagreatimportanceonservicemanagement
aswellasthelogisticsofhavingtherightstaffmembersattherightplaceandattherighttimein
ordertosatisfycustomerdemand.
1.2. COMPANYXYZ
Thecompanyforwhichthisprojectwillbeundertakenwouldliketoremainconfidentialandsofor
the purposes of this project, it will be referred to as ‘Company XYZ.’ Company XYZ is a national
maintenance company to which numerous enterprises all over South Africa outsource their
maintenance.
Employeesarehiredtotraveltocustomerstoperformscheduledmaintenanceonawiderangeof
electricaldevicessuchasairconditioners,computers,telecoms,serversetc.Scheduledmaintenance
involvesplanningtomaintaindevicesormachinesatregular,predeterminedintervals.Thisincludes
activitiessuchasinspections,adjustments,regularservicesandplannedshutdowns(O'Brien,2017)in
ordertopreventmachinesfrombreakingdown.
1.3. PROBLEMBACKGROUND
AscanbeseeninFigure1,employees(resources){R1;R2;…;RN}travelfromtheirbranches{B1;B2;
…;BN}tocustomers’premises{PR1;PR2;…;PRN}wheretheelectricaldevices{ED1;ED2;…;EDN}on
whichtheyarerequiredtoworkarekept.Eachelectricaldevicehasitsownservicetime.Inasingle
dayemployeesmayberequiredtotraveltomultiplelocationstoperformservices.Aworkdayofan
employeewillthusconsistoftheirtraveltimeplusthetimetheyspendworkingonelectricaldevices.
RESOURCESCHEDULINGALGORITHM
FORMAINTENANCEPLANNING
2
FIGURE1:ANILLUSTRATIONOFTHEHIGHLEVELPROCESSCOMPANYXYZUSESTOSATISFYTHEIRCUSTOMERS
Customer’spremisesaregeographicallyfarfromanotherandthereforeroutesneedtobecarefully
consideredso thatemployeescanmaximize their timespentworkingand reduce travel costsand
overtime.Afull-timeemployeeshouldideallywork40hoursperweek(8hoursperday),butthisis
rarelythecase.Inoneweekanemployeemaywork50hoursandwillhavetobepaidovertime.Inthe
nextweekhemayonlywork30hours,butwillstillhavetobepaidforafull40hours’worthofwork
becausehewasavailable.ThetotalworkloadortheresourceutilisationofCompanyXYZistherefore
unevenlydistributed,asdemonstratedinthefigurebelow:
FIGURE2:DEMONSTRATIONOFUNEVENWORKLOADDISTRIBUTION
RESOURCESCHEDULINGALGORITHM
FORMAINTENANCEPLANNING
3
1.4. FOURIER-E
Fourier-E(partofFourierApproach) isan IndustrialEngineeringconsultingcompanyspecialising in
theareasofDecisionSupport,CashManagement,OperationalDesignandSupplyChainEngineering.
CompanyXZYhasbeenaclientofFourier’sformanyyears.In2009FourierwashiredtohelpCompany
XYZintheallocatingofmaintenancetasksinordertosmoothoutresourceutilisation,andthenonce
againin2012tobuildapilotmodelforoneregioninwhichtheyoperatedwhichminimisedtravelin
addition to allocating maintenance tasks to smooth resource utilisation. In 2016 this model was
executedacrossallmaintenancetasksandresourcesoverallregions inSouthAfrica.Fourier-Ewill
thereforebeveryusefulinprovidingdataforthisproject.
2. PROBLEMSTATEMENTCompanyXYZhasthelogisticalproblemofdecidingwhichjobsneedtodone,whentheyneedtobe
done,atwhichcustomerpremisesandbywhichemployees.CompanyXYZrequiresasystemwhich
plansstaffinginsuchawayastobalancetheworkloadsoftheiremployees,reducecostsandmeet
customerdemand.
RESOURCESCHEDULINGALGORITHM
FORMAINTENANCEPLANNING
4
3. PROJECTAIM/RATIONALEThe aim of this project is to create amaintenance plan for Company XYZ which indicates which
resourceswillbeservicingwhichdevicesonwhichdays.AsseeninFigure3below,thisplanshould
optimizetheworkloaddistributionofemployeesaswellastheroutestheytraveleachdaysothat
customerscanbeservicedinthemostefficientwaypossible.Thiswill leadtotheimprovementof
customersatisfactionandthereductionofworkforcecosts(Dorne,2008)suchasovertimeandidle
time,aswellasfuelandvehiclemaintenancecosts.
CurrentSituation IdealSituation
Movingtowards
Employeesareworkingadifferent
numberofhourseachdayandsome
employeesareworkingmorehoursthan
others.
Employeesarescheduledinsuchaway
thattheirdaysaremoreorless8hours
andeachemployeehasroughlythesame
amountofworktodo.
Movingtowards
Currentroutesarecomplexandnot
muchthoughthasgoneintothem.
Employeesfindthemselvesgoingback
pastplacestheyhavealreadyvisited.
Routeshavebeenoptimizedtoreduce
traveltimeperdayandthustravelcosts
sothatemployeeshavemoretimeto
performtheirvalueaddingjobs.
FIGURE3:CURRENTSITUATIONATCOMPANYXYZVERSUSWHATAMAINTENANCEPLANWILLHELPACHIEVE
0
8
16
Hours
Days0
8
16
Hours
Days
RESOURCESCHEDULINGALGORITHM
FORMAINTENANCEPLANNING
5
4. PROJECTAPPROACH,SCOPEANDDELIVERABLESThissectionprovidesthegeneralapproachthatwillbetakeninthesolvingofCompanyXYZ’sproblem.
The problem that needs to be addressed and the solution that will presented is typical of an
OperationsResearchbasedproject. T.ATaha (1976)definesOperationsResearchas “…ascientific
knowledgethroughinterdisciplinaryteameffortforthepurposeofdeterminingthebestutilizationof
limitedresources,”whichiswhatthisprojectultimatelyaimstodo.AccordingtoWinston(2003)the
following seven-step model-building procedure should therefore be followed as an approach to
solvingthisOperationsResearchbasedproblem:
• Projectproposal• Literature
review
• Probleminvestigation• Existingmodelanalysis
• Conceptualmodel• Actualmodel
Phase1:FormulatetheProblemThisphasewillinvolvespeakingtotheemployeesfromFourier-EwhichwereinvolvedintheResource
AllocationProjectsandhavingthemexplainthebackgroundoftheproblem.Individualresearchwill
be conducted to gain enough information about the project so that a project proposal can be
completed.Anin-depthliteraturestudy(Section5)willthenbeundertakentoidentifywhatkindof
problemisbeingdealtwithaswellaswhatmethodsareavailabletosolveit.
Phase2:ObservetheSystemAsmentionedinSection1,Fourier-EhasperformedseveralprojectsatCompanyXYZandthushave
builtupalargedatabaseofinformationpertainingtotheoperationsofthecompany.Thisdatabase
willbeusedasthestartingpointforunderstandinghowthecompanyworksandhowallthedifferent
aspectsofthecompanyfittogetheri.e.regions,bases,customerpremises,resources,equipmentetc.
Amorein-depthdiscussionoftheproblemwillthenbepresented.Aspartoftheprobleminvestigation
(Section6),Fourier’sexistingmodelwillbeanalysedandthestrengthsandshortcomingsofitwillbe
discussed.
Phase3:FormulateaMathematicalModeloftheProblemA conceptualmodelwill bedesigned to showwhich inputs andoutputswill be required, and the
generalwayinwhichthemodelshouldworkwillbeexplained.Thefinalmodelwillthenbedeveloped
using knowledge and background gained from literature studies and Fourier’s model. The
developmentofthefinalmodelcanbefoundinSection7.
Modelformulation Systemobservation Problemformulation 11
22
3
RESOURCESCHEDULINGALGORITHM
FORMAINTENANCEPLANNING
6
• Verificationandvalidation
• Alternativescomparison
• Report• Presentation• Poster
• Implementationprocedure
• Recommendations
Phase4:VerifyandValidatetheModelTheactionsthatCompanyXYZshouldtakeinordertoverifyandvalidatethecompletedmodelwillbe
explained(Section8).
Phase5:SelectaSuitableAlternativeDifferent types of scheduling algorithms and linear programmingmethodswill be researched and
comparedwithoneotherinordertodetermineifanyaresuitablefortheapplicationatCompanyXYZ
or if something completely newneeds to be formulated. These comparisons can be found in the
literaturereview(Section5).
Phase6:PresentResultsandConclusionA final report, poster, and PowerPoint presentationwill be created to present the final proposed
maintenanceplanaswellashowitwasdeveloped.
Phase7:ImplementandEvaluateRecommendationsThe final report will include recommendations on how Company XYZ should go about the
implementationphaseiftheyweretoaccepttheproposedmaintenanceplan(Section9).
PROJECTSCOPE
Thereisalargeamountofdataavailabletouse.Thereare6regionsinSouthAfricainwhichCompany
XYZ operates and so it would be a
goodideatomodelonlytheGauteng
region initially. If the finalalgorithm
works effectively, it can then be
easily adapted to solve for other
regions in the future. The Gauteng
region has only one branch, which
employs36full-timetechnicians.The
companieswhichthisbranchservices
areshowninthemapalongside.
FIGURE4:MAPSHOWINGTHELOCATIONSOFCOMPANYXYZ'SCUSTOMERSINTHEGAUTENGREGION
Implementation&Recommendations
Results&Conclusion
Alternatives selection
Verification&Validation 6 5 4 7
RESOURCESCHEDULINGALGORITHM
FORMAINTENANCEPLANNING
7
5. LITERATUREREVIEWInthissectionaliteraturereviewisconductedtofindandunderstandtheorythatcouldbeappliedto
the problem at hand aswell as specific applications of this theory aboutwhich researchers have
writtenpapers.Thereareanumberofmethodsdiscussedbelow.Onemethodoracombinationof
thesedifferentmethodswillbeselectedtosolveCompanyXYZ’sproblem,basedontheirsuitability
totheproblemandthestudent’sabilities.
Theproblemathandhaselementsofbothschedulingandroutingbecausetasksandtechniciansneed
tobescheduled insuchawayastocompleteall thetasksrequestedbycustomers, inadditionto
determining efficient routeswhichminimise the costs associatedwith travelling to geographically
distributedcustomers.
Routingandschedulingproblemscanbepresentedasgraphicalnetworks(Hakseveretal.,2000).In
Figure5below,thecirclesarecallednodeswhichrepresentpickupand/ordeliverypoints.Node1
representsthedepotorhomebaseofthevehicles.The linesconnectingthenodesarecalledarcs
whichcanrepresentthetime,distanceorcostrequiredtotravelfromonenodetoanother.Thegoal
ofroutingandschedulingproblemsisusuallytominimizethistime,distanceorcostoftravelling.
FIGURE5:REPRESENTATIONOFAROUTINGPROBLEM
Numeroustypesofroutingandschedulingproblemsarementionedinliterature,eachhavingavariety
ofwaysinwhichtheycanbesolved.Theclassificationofaroutingandschedulingproblemdepends
oncharacteristicssuchassizeofthedeliveryfleet,wherethefleetishoused,capacitiesofthevehicles,
aswellasroutingandschedulingobjectives(Hakseveretal.,2000).
RESOURCESCHEDULINGALGORITHM
FORMAINTENANCEPLANNING
8
In the simplest andmostwell-known case of routing problems, theTravelling SalesmanProblem
(TSP),asinglevehicleisrequiredtovisitasetofnodes.Theoutputisaroutewhichbeginsandends
at thedepotwhichenables thevehicle tovisiteachnodeexactlyoncewhileminimizing travelling
distance. In the case of theMultiple Travelling Salesmen Problem (mTSP), a fleet of vehicles is
required tovisit a setofnodesandeachvehicle starts andendsat thedepot. Theobjective is to
determinearouteforeachsalesmansuchthatthetotaldistanceisminimizedandthateachcityis
visited exactly once by only one salesman. The Vehicle Routing Problem (VRP) expands on the
multiple traveling salesmanproblem. In this case thecapacityof thevehicles is restrictedand the
nodestobevisitedhavevaryingdemands.IntheChinesePostmanProblem(CPP),thedemandfor
service occurs on the arcs rather that at the nodes, for example street sweeping and newspaper
delivery.
Fromthedescriptionsofthecasesabove,itappearsthattheMultipleTravellingSalesmanProblem
mostcloselyresemblestheproblemwithwhichCompanyXYZ is faced,becausetherearemultiple
techniciansbutthecapacitiesoftheirvehiclesarenotlimitedandthedemandfortheirserviceoccurs
onlyatthenodes.ApproachesforsolvingthemTSPabovecanbedividedintotwocategories:exact
algorithmsandheuristicalgorithms.
5.1 EXACTMETHODS
Thefollowingtraditionaltechniqueshavebeenusedtofindexactsolutionsforsmallproblemsbutas
thesizeofthesolutionspaceincreases,sodoestherunningtimeofthesealgorithms(Laporte,1992).
5.1.1 MATHEMATICALPROGRAMMING
Thereexistsawidevarietyofmathematicalprogrammingmethods,themostbasiconebeingLinear
programming(LP).This istheoptimisationofaprobleminwhichtheobjectiveandconstraintsare
linear. In integerprogramming (IP), variablesare restricted tobe integers.Whensomebutnotall
variablesarerestrictedtobeintegers,itisamixedintegerprogram(MIP)(Pinedo,2012).Inbinary
integerprogramming(BIP),eachvariablecanonlytakeonthevalueof0or1.Variousalgorithmsexist
tosolvetheTSPandvariationsofit.SomeincludetheBranch-and-pricealgorithmandtheBranch-
and-boundalgorithm.
5.1.2 DYNAMICPROGRAMMING
Dynamic Programming is very different to linear programming in that there is no standard
mathematicalformulationoftheproblem.Itis“amethodthatingeneralsolvesoptimizationproblems
thatinvolvemakingasequenceofdecisionsbydetermining,foreachdecision,subproblemsthatcan
RESOURCESCHEDULINGALGORITHM
FORMAINTENANCEPLANNING
9
be solved in like fashion, such thatanoptimal solutionof theoriginal problemcanbe found from
optimalsolutionsofsubproblems"(LewandMauch,2007).Dynamicprogramminghasoftenbeen
usedinthesolvingofTravellingSalesmanProblems(Laporte,1992)usingtheHeld-Karpalgorithm.
5.2 HEURISTICMETHODS
Whenthenumberofvariablesgetstoolarge,computershavedifficultyinfindinganexactsolution.
In thecaseof theTSPorvariantsof it, thedifficulties in solving thisproblemarise fromthe large
numberofpossibletours:thefactorialofthenumberofcitiestobevisited(Larranagaetal.,1999).In
thiscase,heuristicsmethodsshouldbeusedtofindgood, ifnotoptimal,solutionstotheproblem
(Winston, 2003). Reeves (1993) defines a heuristic as: “a technique which seeks good (i.e. near-
optimal)solutionsatareasonablecomputationcostwithoutbeingabletoguaranteeeitherfeasibility
oroptimality,oreveninmanycasestostatehowclosetooptimalityaparticularfeasiblesolutionis.”
Severalcommonheuristicapproachesarepresentedbelow:
5.2.1 LOCALSEARCH-HILL-CLIMBING
Hill-climbinginvolvesstartingatarandompointinthesearchspaceandthenlookingattheclosest
neighbour/candidatesolutions.Ifthevalueofaneighboursolutionisbettersolutionthanthecurrent
solution,thenitbecomesthecurrentnode.Iftheneighbourisnotabettersolution,thecurrentnode
remainsthesame.Theprocessloopsoverandoveruntilnobettersolutioncanbefoundi.e.alocal
maximum has been reached. It is possible to have more than one local optimum. In Figure 6,
dependingonthestartingposition,alocalmaximummaybereachedandthealgorithmwouldget
stuck,butitmaynotbetheglobalmaximumi.e.thebestsolution.Thisisoneofthemajordrawbacks
ofthehill-climbingalgorithm.
FIGURE6:DEMONSTRATIONOFALOCALMAXIMUMBEINGREACHEDRATHERTHANTHEGLOBALMAXIMUM.
RESOURCESCHEDULINGALGORITHM
FORMAINTENANCEPLANNING
10
5.2.2 LOCALSEARCH–HILL-CLIMBINGWITHRANDOMRESTART
Thisalgorithmfixestheproblemsassociatedwithhill-climbing.Thehill-climbingalgorithmisrununtil
alocalmaximumisfound.Itwillthenberunagainstartingfromadifferentrandompositioninthe
searchspace,whichpossiblyenablesanewlocalmaximumtobefound.Thisprocessisrepeatedand
eventuallythebestoptimumthatwasfoundwillbereturned.
5.2.3 LOCALSEARCH-SIMULATEDANNEALING
Thisalgorithmisbasedonthesameideaashill-climbingwithrestartbutitisdifferentinthesense
thattheneighbourchosenisnotalwaysanimprovementtothecurrentsolutioni.e.thealgorithm
maymove downhill. This is because it looks further than just the neighbour solution – it takes a
randomwalkinthesearchspacetoseeiftherearebettersolutionsbeyondlocalmaximumsinthe
hopes of discovering the global maximum i.e. searches getting stuck in at local maximums are
prevented.Simulatedannealingwasinspiredbymetallurgy’sannealingtechnique-amethodusedto
reducedefectsinametalbyusingheatingandcontrolledcoolingdownofthematerial.Thissearch
process is dependent on the variable ‘t’ or ‘temperature’. The algorithm begins with a high
temperature,and slowly coolsdown toa low temperature.Thehigher the t, themore the search
ignoreslocalmaximumswhilethelowerthet,themorethisalgorithmbehaveslikethenormalhill
climbingalgorithm.
5.2.4 LOCALSEARCH-TABUSEARCH
Unlike the above local search algorithms, Tabu searchmakes use ofmemorywhich enables it to
overcomelocalmaximums.ThisheuristiciscommonlyusedinthesolvingofmTSPs,TSPsandVRPs
(Uldall,TaarnhøjandVorts,2008).
5.2.5 GENETICALGORITHM
Geneticalgorithmswereinspiredbyprocessesobservedinbiologicalevolutionandnaturalselection.
In thisalgorithm,a solution toaproblemcanbeviewedasan individual andagroupof solutions
becomesapopulation.Somesortofobjectivefunction,calledthefitnessfunction,isusedtocompare
variousindividualsinapopulation.Inaniterativeprocess,newgenerationsareformedfromthebest
performing individuals in the previous generation as well as their offspring, while keeping the
populationsizeconstant.Newgenerationsarecreatedthroughselection,crossoverandmutationof
individualsfromthepreviouspopulation.
RESOURCESCHEDULINGALGORITHM
FORMAINTENANCEPLANNING
11
Potvin(1996)definesthestepstoasimple“pure”geneticalgorithmasfollows:
TABLE1:GENETICALGORITHMMETHODOLOGY
Step1.CreateaninitialpopulationofPchromosomes(generation0).
Step2.Evaluatethefitnessofeachchromosome.
Step3.SelectPparentsfromthecurrentpopulationviaproportionalselection
Step4.Chooseat randomapairofparents formating.Exchangebit stringswith theone-point
crossovertocreatetwooffspring.
Step5.Processeachoffspringbythemutationoperator,andinserttheresultingoffspringinthe
newpopulation.
Step6.Repeatsteps4and5untilallparentsareselectedandmated(Poffspringarecreated).
Step7.Replacetheoldpopulationofchromosomesbythenewone.
Step8.Evaluatethefitnessofeachchromosomeinthenewpopulation.
Step9.Gobacktostep3ifthenumberofgenerationsislessthansomeupperbound.Otherwise,
thefinalresultisthebestchromosomecreatedduringthesearch.
Someoftheconceptsmentionedabovearedescribedasfollows:
Fitness: In order to evaluate how effective a solution is, and to compare effectiveness between
solutions, a fitness function is required. In the case of a TSP, the shorter a solution’s total travel
distance,themoreeffectivethatsolutionis,andsothefitnessofthesolutionwouldbeafunctionof
thetotaldistancetravelled.
Selection:Theselectionprocessofageneticalgorithmdetermineswhichindividualsshouldmateand
produceoffspring for thenext generation. The aimof selection is to choose individualswithhigh
fitnessvaluesandtodiscardthepoorperformingones.However,thesebadindividualsshouldalso
haveachancetobeselectedbecausetheymayleadtousefulgeneticmaterial(RazaliandGeraghty,
2011).Variousselectionmethodsexist:
• Proportionalroulettewheelselectionselectsindividualsinproportiontotheirfitness,sothe
higheranindividual’sfitnessvalue,themorelikelyisitistobeselected(Luke,2013).
• Inrankbasedroulettewheelselection,solutionsareorderedaccordingtotheirfitnessvalues
andselectionprobabilitiesarecalculatedforeachsolutionbasedontheirranksrelativetothe
population rather than on their fitness value. This selection method is therefore not
influenced by extremely high performing individuals, like the proportional roulette wheel
selectionis.
RESOURCESCHEDULINGALGORITHM
FORMAINTENANCEPLANNING
12
• Tournament selection is the most popular method due to its efficiency and simple
implementation (Razali and Geraghty, 2011). k individuals are randomly chosen from the
populationandtheindividualwiththebestfitnessvaluewins.Thelargerthevalueofk,the
greater chance for loss of diversity in new generations (Blickle and Thiele, 1995). This is
because poor performing individuals are unlikely towin large tournaments and therefore
don’tgetachancetobeselectedformating.Smallervaluesofkgivemostindividualsachance
to be selected and thus preserve genetic diversity. In a study performed by Razali and
Geraghty(2011),itwasfoundthattournamentselectiongavebetterresultsthanproportional
roulettewheelforallsizesofproblemsthatweretested.Itwasalsoeasiertoimplementthan
therankbasedroulettewheelselectionmethod.
Crossover:CrossoveristheGeneticAlgorithm’sdistinguishingfeature(Luke,2013).Thebestfeatures
oftheparentschosenfromtheselectionsteparecombinedtocreateoffspring.Therearethreewell-
knowncrossovermethods,whichareillustratedinFigure7.
• One-pointcrossover:arandomnumberischosenbetween0andthelengthofthesolution
whichisthecutpoint.Thechildwillcontainthevaluesupuntilthecutpointfromparent1,
andthevaluesafterthecutpointinparent2.
• Two-pointcrossover:Thismethodbreaksupthesolutionat2points,creatingasectionwhich
isswappedwiththesectioncreatedfromtheotherparent.
• Uniformcrossover:Thismethodselectsrandompositionsinboththeparentstoswaptheir
genes.
FIGURE7:DEMONSTRATIONSOFCOMMONCROSSOVEROPERATORS
RESOURCESCHEDULINGALGORITHM
FORMAINTENANCEPLANNING
13
WhenapplyingthepuregeneticalgorithmtoaTSP,aproblemisencounteredwhenusinganyofthe
aforementionedcrossovermethods.Afterapplyingacrossover,somecitiesmayappearmorethan
onceintheoffspringcreated,makingtheminfeasiblesolutionsi.e.thechildisnotapermutationof
itsparents.Potvin(1996)describesthe‘order1crossover’method(asillustratedinFigure8)which
overcomesthisissue.Theaimofthistechniqueistopreservetheorderingofthelocationsfromboth
parentsanditworksinthefollowingway:
1. Selectarandompartofthechromosomefromparent1byrandomlychoosing2cutpoints
2. Dropthispartdowntochild1andmarkouttheselocationsfromparent2
3. Add the remaining values fromparent2 to the child in theorder inwhich theyappear in
parent2,startingafterthesecondcutpoint
4. Ifasecondchildisrequired,swapparent1andparent2andgobacktostep1.
FIGURE8:DEMONSTRATIONOFORDER1CROSSOVER
Mutation:Inordertomaintaingeneticdiversitythroughgenerations,amutationofsomeindividuals
shouldoccurwithasmallprobability.Mutationpreventsthealgorithmfromgettingstuckatalocal
optima(Larranagaetal.,1999).Examplesofmutationmethodsinclude:
• Swapping:2locationsinthechromosomearerandomlyselectedandthenswapped.
• Scrambling:Twocutpointsarerandomlyselected,andthelocationswithinthetwocutpoints
arerandomlypermuted
Elitism:Thisconceptisoftenusedingeneticalgorithmstoensurethatthebestperformingindividuals
(theelites)appearinfuturegenerations.Howeverthistechniquemaycauseprematureconvergence
ifnotkeptincheck(Luke,2013).
AccordingtoPinedo(2012),usinggeneticalgorithmsisadvantageousbecausetheyareeasilycoded
andgivegoodsolutions,buttheircomputationtimecanbelongerthanotherheuristicapproaches.
RESOURCESCHEDULINGALGORITHM
FORMAINTENANCEPLANNING
14
5.3 CONCLUSIONThe problemwithwhich Company XYZ is faced can be classified as a type of Travelling Salesman
Problem. A variety of exact and heuristic methods exist to solve these problems, which are
summarisedandcomparedbelow:
TABLE2:COMPARISONOFMETHODSFORSOLVINGTSP
Method Advantages Disadvantages
Mathematicalprogramming
ManyformulationsofTSPhavebeenfound
AlmostimpossibletofindoptimalsolutionforlargeproblemsLongrunningtime
Dynamicprogramming
ExistingHeld-Karpmethodfoundinliterature
LongrunningtimeDifficulttodevelopcodeHighmemoryusage
Hill-climbing Verysimplealgorithm Highchanceofgettingstuckatlocaloptima
Hill-climbingwithrandomrestart
Localoptimacanbeavoided Ifrandomrestartpointsareclose,samelocaloptimumwillcontinuallybereached
Simulatedannealing
EasilycodedLocaloptimacanbeavoided
Canbeslow,especiallyifcostfunctionisexpensivetocomputeSimpler,fastermethodsexistCannottellifsolutionisoptimal
Tabusearch Localoptimacanbeavoided OnlyworksindiscretespacesRequiresalotofmemoryCannottellifsolutionisoptimal
Geneticalgorithm EasilycodedKnowntohaveproducedgoodsolutionsLocaloptimacanbeavoidedAlotofliteraturefound
LongerrunningtimesthanotherheuristicapproachesCannottellifsolutionisoptimal
Becauseitissuchalargeproblem,heuristicsappearstobethebestwayoffindingavalidsolution.
GeneticAlgorithmisaneffectivemethodwhichhascommonlybeenusedtosolveTSPs.Thegenetic
algorithmtechniquesfoundcanbeadaptedforthespecificuseofthesolvingCompanyXYZproblem.
RESOURCESCHEDULINGALGORITHM
FORMAINTENANCEPLANNING
15
6. PROBLEMINVESTIGATIONBefore Fourier-E’s intervention, Company XYZ had no specialized programming or algorithmic
methodstouseintheschedulingoftheiremployees.Eachdayamanually-createdjobsheetwasgiven
toanemployeewhowouldthenhavetovisitandserviceeachoftheservicerequestsinthatday.If
anotherjobcameup,itwouldsimplybeaddedontopofthepile.Thismeantthatnothoughtwent
intotheroutingortheorderinwhichjobsshouldbedoneandsotherewasalotoftravellingback
and forth. This lead to employees working overtime which became costly for Company XYZ. As
mentionedinthebackgroundoftheproblem,resourceutilisationwasalsounbalanced.Someweeks,
anemployeewouldworkmuchlongerhoursthaninotherweeks.Theseissuesleadtotheneedfor
consulting Fourier-E to performa resourceplanningproject. From2009, Fourier-E hasworkedon
buildingmodelstoimprovemaintenancetaskallocation,smoothoutresourceallocationandminimise
traveltimesforCompanyXYZ.Theirfinallinear-programmingmodelwasusedtoscheduleemployees
overan80-weekperiod forall the regions inwhichCompanyXYZworked. Its logicworked in the
followingway:
1. Aresourceisselected
2. Aparticularweekisselected
3. Thesitewiththemostequipmentisselectedtobeservicedfirstinthisweek
4. Thereafter,theclosestsitewiththemostequipmentisselected
5. Thetimeavailableischeckedtoseeiftheresourcecanperformtheservice
6. Theequipmenttobeservicedisselected,orderedbypriority,andtimeavailable
7. Themaintenanceplanofthecurrentequipmentisupdated
Theoutputofthemodelisanemployeejobsheetwhichincludedthefollowinginformation:
• Resourcenumber
• Weeknumber
• List of equipment
tobeserviced
• Totaltraveltime
• Totaltasktime
• Totaltime
FIGURE9:ANEXAMPLEOFANEMPLOYEEJOBSHEETCREATEDBYFOURIER'SMODEL
RESOURCESCHEDULINGALGORITHM
FORMAINTENANCEPLANNING
16
Agraphhasbeencreatedtoshowthecostsassociatedwiththeuseofthemodelledscheduleover
the80-weekperiod.Thischartillustratestheimbalanceofworkloadoverthe80weeks.Therearestill
periodswithhighutilisationofemployeesandperiodswherethereisverylittleutilisation.
FIGURE10:CHARTSHOWINGCOSTOFSCHEDULEOVER80WEEKS
Thechartsbelowcomparetheschedulesoftwoemployees.Theredlinerepresentstheemployees’
available time towork in aweek. The charts clearly show that employees are still not being fully
utilized, and their schedules have not balanced their workloads over the 80-week period. Also
Resource3755927hasamuchbusierschedulethanResource1212551,eventhoughhe/shehasless
timeavailabletowork.
FIGURE11:CHARTSCOMPARINGGENERATEDSCHEDULESOF2EMPLOYEES
0
20000
40000
60000
80000
100000
Weeks
AllResources
SumofTimeCost SumofReturnTravelTime SumofTotalTimeCost
0
200
400
600
800
1000
1200
1400
1600
1800
2000
Weeks
Resource1212551
0
200
400
600
800
1000
1200
1400
1600
1800
2000
Weeks
Resource3755927
RESOURCESCHEDULINGALGORITHM
FORMAINTENANCEPLANNING
17
ThemodelworksforCompanyXYZandtheyarecurrentlyusingittoautomatetheirscheduling
processbutthereisstillthereismuchroomforimprovement.Fourier’smodelcanthereforebe
usedasabaseonwhichtoimproveinordertosolvetheproblemsofCompanyXYZ.Thefollowing
considerationshavebeenmaderegardingthecurrentandpotentialmodel:
• Linear programmingwas used to create Fourier’smodel. Because of the large number of
variablesandconstraints,thismodeltookdaystosolve,whichmakesitimpracticaltouseon
adailyorweeklybasis.Literaturerevealsthatmetaheuristicsisausefultoolinsolvinglarge,
complexproblemsandsothisshouldbeimplementedinthenewmodel
• Fourier’smodelworkedintermsofweeks.Thisallowsforthefreedomofrefiningtheweekly
scheduleifemergenciesneedtobeaccommodated.However,dailyschedulingprovidesmore
accuratetraveltimesandsoitshouldbeincorporatedintothenewmodel
• Themodelcreatedastaticplanfor80weeks.Inthislongtimeframe,alotcanhappenand
changewhichmakesthislongtermplanimpractical.Ifchangesshouldoccur,oremergency
servicesneedtoscheduled,thenthemodelshouldbeabletoreorganiseexistingschedules.
• Therobustnessofthescheduleneedstobeconsidered.Isitbettertohavearoughplanwhich
guidesemployeesbuttheycanmakechangesiftheyneedto,ortohaveaverydetailedplan
whichanemployeehastostickto?
• Emergencybreakdownsorissuescanhappenatanypointintime,whichthemodelneedsto
take intoaccount. Is itbetter tohave forexample7resourceswith100%utilisationanda
separateteamtodealwithemergencies,ortohave10resourceswith75%utilisationsothat
theyareavailablewhenemergenciesoccur?
Allthesepointswillbeconsideredinthedevelopmentofthefinalmodel,whichispresentedinthe
followingsection.
RESOURCESCHEDULINGALGORITHM
FORMAINTENANCEPLANNING
18
7. SOLUTIONDEVELOPMENTThissectiondescribesthechosenalgorithmanditsdevelopmentindetail.
FIGURE12:THEBASICCONCEPTUALMODELPROCESSWHICHWILLBEFOLLOWED
7.1 INPUTTheDatabase
ThedevicedatabaseisanexcelspreadsheetcontaininginformationabouteachdevicethatCompany
XYZisrequiredtoservice.Thisdatabasewillbeconvertedintoacsvfiletobeusedasaninputtothe
algorithm. Important attributesof eachequipmentwhich thealgorithmwill use in its calculations
includethedevice’sidentificationnumber,servicetime(minutes),aswellasitslongitudeandlatitude.
Apreviewofthisdatabaseisshowninthefigurebelow:
FIGURE13:PREVIEWOFIMPORTANTASPECTSOFDATABASE
Thereare20379electricaldevicesinthedatabasethatneedtobeserviced.IntheTravellingSalesman
Problem,thenumberofpossibleroutesisafactorialofthenumberofcitiestovisit.Ifeachelectrical
deviceweretobetreatedasacity,therewouldbe20378!=8.02E+78968routestoconsider.
Manyofthedevicesare locatedinthesamebuildings,andsotosimplifytheproblemslightly,the
electricaldevicesinthedatabasewillbeorderedaccordingtotheircoordinates.Devicesinthesame
locationswillthenbegroupedtogether,andanewinputcsvfilewillbecreatedsuchastheonein
Figure14usingasimplePythonprogram.Thiswillensurethatwhencreatingrandomindividualsfor
RESOURCESCHEDULINGALGORITHM
FORMAINTENANCEPLANNING
19
the population, devices in the same location will not be separated, and the algorithm will then
optimizedistancesbetweenlocationsratherthandistancesbetweenthedevicesthemselves.
FIGURE14:DATABASEWHICHGROUPSDEVICESCOMMONTOASPECIFICLOCATION
Afterapplyingthegroupingprogramthereare7778locations,labelled1to7778,whichmeansthere
arenowonly7778!=3.74E+26887routestoconsider.
Assumptions
Thefollowingassumptionswillbeapplicableinthebuildingofthegeneticalgorithm:
• 36full-timetechniciansarecurrentlyemployedbyCompanyXYZ
• TechniciansworkMondaythroughFriday
• Techniciansshouldworkroughly8hoursperday
• Alltechnicianshavetherequiredskillstoserviceanyelectricaldevice
• Techniciansdriveatanaveragespeedof70kmperhour(vehiclesmakeuseofmainroads
wherepossible)
• Techniciandrivesbacktodepotaftertheirlastjobinaday
• Servicingofadevicehastobecompletedthedayitwasstarted
• Servicingofanydevicerequiresonlyonetechnician
• Straightlinedistancesareusedbetweentwolocations
RESOURCESCHEDULINGALGORITHM
FORMAINTENANCEPLANNING
20
7.2 PROCESSThegeneticalgorithmwillbebuiltinPython3.6usingthemethodologybelow,adaptedfromTable1
toapplytoaMultipleTravellingSalesmanProblem.EachstepoftheGeneticAlgorithmwillthenbe
described inmoredetail.Notethatthecompletepythoncodingforthealgorithmcanbefound in
AppendixB.
FIGURE15:GENETICALGORITHMMETHODOLOGY
1. Generateinitialpopulation
Firstly,thesolutiontotheproblem(chromosome)willberepresentedasalistoflocationIDs,inwhich
eachlocationrepresentsthedevicesitholds.Eachlocationislistedexactlyonce.Thissatisfiesthefirst
objectiveofthemodel:tosatisfyallcustomerdemand.i.e.serviceeachdeviceonce.
1 2 3 … 7776 7777 7778
FIGURE16:REPRESENTATIONOFANINDIVIDUALSOLUTION
Now,Algorithm1generatesapopulationbytakingthisinitialsolutionasaninputandcreating100
randompermutationsofit:
RESOURCESCHEDULINGALGORITHM
FORMAINTENANCEPLANNING
21
Algorithm 1: Population Input: Initial solution (ind) Output: Population consisting of s permutations of initial solution def population(ind, s): return [random.sample(ind, len(ind)) for i in range(s)]
2. Evaluatefitnessofeachindividualofthepopulation
Inordertocomparethesedifferentsolutionsanddeterminewhicharebetterthanothers,afitness
functionisrequired.Goingbacktotheproblemstatement,themainobjectivesofthemodelareto1)
reducetraveltimesand2)evenoutworkloaddistribution.Thefitnessfunctionthereforeneedstobe
comprisedoftwoelements:1)totaldistanceofthescheduleand2)thetotaldeviationfrom8hours
ofworkingtimeperresourceperday.Thisfitnessfunctionwilltakeanindividualsolutionasaninput,
and return that solution’s totaldistanceanddeviation.The flowdiagrambelowdemonstrates the
logicbehindthefitnessfunction:
FIGURE17:FLOWCHARTDEMONSTRATINGTHELOGICBEHINDTHEFITNESSFUNCTION
RESOURCESCHEDULINGALGORITHM
FORMAINTENANCEPLANNING
22
Firstly, the travel time to the first location listed in the solution from thedepot is calculated.The
followingalgorithmwillbeusedtocalculatethestraightlinedistancesbetween2locations,andthen
bemultipliedbythespeedofthevehicletofindthetraveltime:
Algorithm 2: Distance Input: Origin coordinates and destination coordinates Output: Straight line distance in km between 2 input locations def distance(origin, destination): lat1, lon1 = origin lat2, lon2 = destination radius = 6371 dlat = radians(lat2 - lat1) dlon = radians(lon2 - lon1) a = sin(dlat / 2) * sin(dlat / 2) + cos(radians(lat1)) * cos(radians(lat2)) * sin(dlon / 2) * sin(dlon / 2) c = 2 * atan2(sqrt(a), sqrt(1 - a)) d = radius * c return d
Ifthereisenoughtimeleftinthedayfortheresourcetodrivethereandperformtheservicing,then
theresourcewill traveltothat location.Thetraveltimeandservicingtimesarethenaddedtothe
totalworkinghours,andthetotaldistancefortheschedule isupdated.Whenthere isnotenough
timeleftinthedayforaresourcetodrivetoalocation,hewilldrivebacktothedepot,andthena
newresourcewillbeselectedtotraveltothatlocation.Onceall36resourcesareusedupinaday,a
newdaybeginswithresource1.
Notethatthe‘istheretimetotraveltolocationandservicedevices’decisionblockdoesnotcheckif
thereisalsotimetodrivebacktothedepotonceservicingiscomplete.Thismeansthatthedriveback
tothedepotmaycauseanemployee’sdaytorunover480minutes.Whenaresourcedrivesbackto
the depot, his total time, service time and travel time for that day are printed. This is when the
deviationofthescheduleiscalculated:
𝐷𝑒𝑣𝑖𝑎𝑡𝑖𝑜𝑛 = (,-./010230456)8
91:;0where‘count’isthetotalnumberofschedulescreated.
3. Copyelitestonewgeneration
Thisprocesswillbedescribedinstep7
RESOURCESCHEDULINGALGORITHM
FORMAINTENANCEPLANNING
23
4. Selectparentswithtournamentselection
Tournamentselectionwillbeusedasthemethodofselectingparentsforbreeding.Randomlyselect
kindividualsfromthepopulationandreturnthebestperformingindividualfromthisgroup.
Algorithm 3: Selection (Tournament selection) Input: Population (P) and tournament size (k) Output: Winning individual of the tournament def selection(P, k): best = null for i in range(1, k): ind = random individual in P if (best == null) or fitness(ind) > fitness(best): best = ind return best
5. Crossoverselectedparentstocreatechildren
Orderonecrossoverwasselectedasthemethodofperformingacrossovertopreventinvalidsolution
frombeingcreated.
Algorithm 4: Crossover (Order one) Input: Two individual parents, p1 and p2 Output: Child containing characteristics from both parents, with no location repetitions def crossover(p1, p2): r1 = random number between 0 and length of length of parents r2 = random number between 0 and length of length of parents child = list with length equal to length of p1 Copy elements between r1 and r2 from p1 to child, in same positions as p1 y = List holding elements of p1 which are not in child yet Order the elements in y according to their order in p2 Copy remaining elements into child according to their order in p2 starting after r2 return child
6. Mutatesomeindividualsinnewgeneration
Algorithm 5: Mutation (Swapping) Input: An individual (ind) Output: Individual with 2 locations swapped around def mutation(ind): x = random integer between 0 and length of individual y = random integer between 0 and length of individual ind[x], ind[y] = ind[y], ind[x] return ind
RESOURCESCHEDULINGALGORITHM
FORMAINTENANCEPLANNING
24
7. Newgeneration
An‘evolve’functioniscreatedbycombiningselection,crossoverandmutation.Theindividualsofthe
populationwill be sorted according to their fitness values. The top 20%of thepopulationwill be
copied to the next generation as they are [Step 3: Copy elites to new generation]. Next, random
individualswillbechosenfromthecurrentgenerationtoproduce2children.Theelitesmayalsobe
selectedforbreeding.Oncecrossoveroccurs,theremaybeachancethatthechildrenaremutated.
Thisprocesswillloopthroughuntilthenextgenerationislargeenough.
Algorithm 6: Evolution Input: Population (P) sorted in order of fitness, mutation probability (m), elitist percentage (r) Output: New population def evolve(P, m = 0.01, r = 0.2): retain_length = length of P * r parents = P[:retain_length] parents_length = length of parents desired_length = length of P - parents_length children = [] while length of children < desired_length: p1 = selection(p, 3) p2 = selection(p, 3) if p1 is not the same as p2: child1 = crossover(p1, p2) child2 = crossover(p2, p1) append child1 to parents append child2 to parents for i in parents: if m > randomly generated number between 0 and 1: mutate(i) sort individuals in parents according to fitness return parents
7.3 OUTPUT
Theevolutionfunctionwillberun100timestoproduce100generations.Thebestperformingsolution
of the 100th generation will be exported as a csv file and analysed. The solution indicates which
resourceswillbeperformingservicesonwhichdevices,onwhichday,howlongtheirdaywillbeand
whatproportionsof itwillbespenttravellingandactuallyperformingtheservice. Apreviewofa
solutioncanbeseeninthefollowingfigure:
RESOURCESCHEDULINGALGORITHM
FORMAINTENANCEPLANNING
25
FIGURE18:PREVIEWOFASOLUTIONINEXCELFORMAT
Theoutputwillalsoshowhowmanydayswillberequiredtocompleteservicingofallelectricaldevices
aswellastheschedule’stotaldistancetravelledandtotaldeviation.
RESOURCESCHEDULINGALGORITHM
FORMAINTENANCEPLANNING
26
8. SOLUTIONANDSOLUTIONVALIDATIONThissectionpresentsthefinalsolutionaswellashowCompanyXYZshouldgoabouttheprocessof
verifyingandvalidatingthefinalmodel.
Graphshavebeencreatedtoshowhowboththetotaldistanceandtotaldeviationofthesolutions
decreased with every new generation created. Both the best and worst fitness values of each
generationwereplotted,ascanbeseeninthegraphsbelow:
FIGURE19:GRAPHSDEPICTINGTHEIMPROVEMENTOFSOLUTIONSWITHEVERYNEWGENERATION
Toshowhowthegeneticalgorithmperformed,thebestsolutionofthefinalgenerationiscompared
with the best solution of the initial generation in Table 3 on the following page:
……………………………………………………..
316497.06
312328.59
308000
310000
312000
314000
316000
318000
320000
1 5 9 13 17 21 25 29 33 37 41 45 49 53 57 61 65 69 73 77 81 85 89 93 97
TotalD
istance(km)
Generation
TotalDistance
Best Worst
142.51
140.45
138139140141142143144145
1 5 9 13 17 21 25 29 33 37 41 45 49 53 57 61 65 69 73 77 81 85 89 93 97
StandardDeviatio
n
Generation
Deviation
Best Worst
RESOURCESCHEDULINGALGORITHM
FORMAINTENANCEPLANNING
27
TABLE3:COMPARISONOFBESTINITIALSOLUTIONANDBESTFINALSOLUTIONS
InitialSolution FinalSolution
Totalovertime 91.206hours 91.296hours
Totalidletime 13872.654hours 13669.592hours
Totaldistance 316843.8km 312328.59km
Totaldeviation 142.86minutes 140.45minutes
Daystocomplete 189days,36resources 189days,7resources
Overtimehoursincreasedonlyveryslightlybutidletimehasdecreasedby203hours.Thishasallowed
theservicingofallthedevicestotakeplacein189days,usingonly7resourcesonthe189thdayrather
thantheinitial36.Thegraphsbelowshowarandomlyselectedemployees’workinghoursoverthe
periodoftheschedules.Theaveragelengthofaworkingdayhasincreasedfromtheinitialsolutionto
thefinalsolutionwhichmeansthatthedaysforthisemployeearemorefulli.e.thereislessidletime.
FIGURE20:COMPARISONOFWORKINGDAYSOFINITIALANDFINALSOLUTIONSFORAPARTICULAREMPLOYEE
353.1
0
100
200
300
400
500
600
1 7 13 19 25 31 37 43 49 55 61 67 73 79 85 91 97 103
109
115
121
127
133
139
145
151
157
163
169
175
181
187
Lengthofw
orkingday(m
inutes)
Day
InitialSolution
359.7
0.0
100.0
200.0
300.0
400.0
500.0
600.0
1 7 13 19 25 31 37 43 49 55 61 67 73 79 85 91 97 103
109
115
121
127
133
139
145
151
157
163
169
175
181
187
Lengthofw
orkingday(m
inutes)
Day
FinalSolution
RESOURCESCHEDULINGALGORITHM
FORMAINTENANCEPLANNING
28
Therehasbeenareductioninthedeviationsfroman8-hourworkingday,butthereisstillvisiblyalot
of idletime.Thiscanbeusedtothecompany’sadvantage-anyemployeewithfreetimeontheir
schedulecanbeput“oncall”foranyemergenciesthatmayoccur.
HasthegeneticalgorithmaddressedCompanyXYZ’sissues?
Thewaythealgorithmisbuiltdoesnotallowaresourcetotraveltolocationiftherewon’tbeenough
timetoservicethedevices,andsobyusingthisalgorithm,CompanyXYZcanautomaticallycutdown
ontheirovertimecosts.
Thealgorithmproducesdailyschedulesforeachemployeeratherthanweekly.Thismeansthatthe
travellingtimesaremoreaccurateandthescheduleismorespecific.
Thegeneticalgorithmproducesasolutionwithinhourswhilethelinearprogrammingmethodthat
wasbeingused tookdays.Thismeans that thecompanycanuse thealgorithm formoredynamic
planningbecause it ismoreefficientandeasiertokeepupwithcontinuouschanges. Ifanydevice
servicespopupthatwerenotinitiallyplannedfor,thealgorithmcanbereruntoaccommodatethese
devicesinamoreoptimalway.CompanyXYZcanrunthemodelitatthebeginningofeachweekto
createschedules,insteadoffollowingastatic80-weekplan.
SolutionValidation
The schedules produced by the genetic algorithm should be validated before the company starts
implementingthem.Thecompanycanputtogetheratestingteamforaweekortwowhichfollowthe
scheduleasitis,andthenreportbackanyissuestheymayhavehad.Parameterssuchastravelling
speed,andtimeinthedaymayhavetobeadjustedifemployeesfindthattheycannotmanagewith
thegivenschedule.Abenefitofusingthisalgorithmisthat itonlyrequiresPythonwhichisafree,
opensourceprogrammingsoftwareaswellasapersonwithabackgroundofcoding.Thecodecanon
acontinuousbasisbeeasilybeadaptedandmodified.
RESOURCESCHEDULINGALGORITHM
FORMAINTENANCEPLANNING
29
9. PROPOSEDIMPLEMENTATIONThecsvoutputfilethatwasproducedbythealgorithmcanbeusedinanumberofways.Firstly,the
exceltablecanbefilteredtoshowthescheduleofeachemployee.Resource17forexample,hasthe
followingschedulefortwoweeks:
TABLE4:SAMPLESCHEDULEFORANINDIVIDUALEMPLOYEE
Day Devices TotalTime Traveltime Servicetime
75
11296,11297,11298,11299,11300,11301,11302,11303,11304,11305,11306,11307,11308,11309,11310,11311,11312,11313,11314,11315,11316,11317,11318,11319,11320,11321,11322,11323,11324
431.9 20.0 411.9
76 10954,10955,10956,10957 400.0 20.0 38077 6121 395.5 80.5 31578 3480,3481,3482,3483 412.7 32.7 38079 7514,7515,7516,7517 398.4 18.4 38080 3306 354.8 39.8 31581 19914,19915,19916,19917 405.7 25.7 38082 5329 348.7 53.7 29583 10564 315.0 20.0 29584 20183 273.9 63.9 210
Theexceltablecanalsobefilteredtoshoweachday.ManagersofCompanyXZYcanusethistosee
whichoftheiremployeeswillservicingwhichdevices.Thetablebelowisasampleforsomeofthe
employeesonday1.
TABLE5:SAMPLESCHEDULEFORASPECIFICDAY
Resource Devices Totaltime Traveltime Servicetime13 ['[12086,12087,12088,12089]'] 401.9 21.9 38014 ['[2428,2429]'] 424.1 64.1 36015 ['[4276]'] 268.7 58.7 21016 ['[16432,16433]'] 422.8 32.8 39017 ['[13703,13704,13705,13706]'] 400.7 19.7 38118 ['[3946,3947,3948,3949]'] 438.4 58.4 38019 ['[2424]','[17003]'] 391.7 69.2 322.520 ['[18285]'] 331.5 16.5 31521 ['[19976,19977]'] 410.6 22.6 388
RESOURCESCHEDULINGALGORITHM
FORMAINTENANCEPLANNING
30
AsmentionedinSection8,thealgorithmmustfirstbeputtothetesttoensurethatitisbenefitting
thecompanyandthat theschedule ithasproduced isverifiedandvalidated.Oncethescheduling
methodhasbeenimplementedattheGautengbranchandusedforaperiodoftime,usersofthis
systemcanstartmakingsuggestionsandimprovements,andgetridofbugs.Thereafter,afinalised
algorithmcanbeadoptedbyotherregionsinthecountry.
RESOURCESCHEDULINGALGORITHM
FORMAINTENANCEPLANNING
31
10. CONCLUSIONCompanyXYZ ishaving troublescheduling their staffanddeterminingwhichroutes its technicians
shouldbetaking inordertosatisfycustomerdemand,while incurringminimalcosts.Thisproblem
wasaddressedbyconductingaliteraturereviewtodeterminewhattypeofproblemwasathandand
whatmethodshavebeendevelopedtosolvesimilarproblems.Theproblemcanbeclassifiedasatype
ofTravellingSalesmanproblem.ItwasfoundthattheGeneticAlgorithmprovestobeaveryuseful
efficientmethodofsolvingtheseproblems.UsingPython3.6,ageneticalgorithmwasbuiltandrun
100 times tocreate100generations.Witheachnewgeneration,abetter scheduling solutionwas
foundi.e.scheduleswhichreducedtraveldistancesandbalancedtechnicianworkloads.
And so, going back to the problem statement, has the developed solution met its objectives?
“CompanyXYZrequiresasystemwhichplansstaffinginsuchawayastobalancetheworkloadsof
theiremployees,reducecostsandmeetcustomerdemand.”Ageneticalgorithmhasbeencreated[a
systemwhichplansstaffing]which iterativelyreducessolutions’deviationfroman8hours’dayof
work[balanceworkloads]andtotaltravellingdistance,therebysavingonpetrol,vehiclemaintenance
costsandovertime[reducecosts].Thealgorithmensuresthateveryelectricaldevicewillgetserviced
[meetcustomerdemand].
Beforeanyschedule is implementedCompanyXYZshouldgothroughavalidationphasetoensure
thatassumptionsmade inthemodelaresuitable.Usingthegeneticalgorithmtocreateschedules
couldbeadvantageousforCompanyXYZbecauseitreducesovertime,plansdaily,andfindssolutions
quickly.
RESOURCESCHEDULINGALGORITHM
FORMAINTENANCEPLANNING
32
11. BIBLIOGRAPHYBlickle, T. and Thiele, L. (1995) ‘A Comparison of Selection Schemes used in Genetic Algorithms’,
EvolutionaryComputation,2(11),pp.311–347.doi:10.1162/evco.1996.4.4.361.
Dorne,R.,2008.ServiceChainManagement:TechnologyInnovationfortheServiceBusiness.s.l.:s.n.
Haksever,C.etal.(2000)VehicleRoutingandScheduling,ServiceManagementandOperation.
Kokemuller, N., n.d. Advantages & Disadvantages of a Part-Time Employees. [Online]
Available at: http://smallbusiness.chron.com/advantages-disadvantages-parttime-employees-
21870.html
[Accessed25March2017].
Laporte, G. (1992) ‘The traveling salesman problem: An overview of exact and approximate
algorithms’, European Journal of Operational Research, 59(2), pp. 231–247. doi: 10.1016/0377-
2217(92)90138-Y.
Larranaga, P. et al. (1999) ‘Genetic Algorithms for the Travelling Salesman Problem: A Review of
Representations and Operators’, Artificial Intelligence Review, 13(2), pp. 129–170. doi:
10.1023/A:1006529012972.
Lew,A.andMauch,H. (2007) ‘1 Introduction toDynamicProgramming’,Studies inComputational
Intelligence,38,pp.3–43.Availableat:www.springerlink.com.
Linton,I.,2012.TakingTechnologytotheMarket:AGuidetotheCriticalSuccessFactorsinMarketing
Technology.s.l.:GowerPublishing.
Luke,S.(2013)EssentialsofMetaheuristics.2ndedn,Optimization.2ndedn.doi:10.1007/s10710-
O'Brien, J., 2017. What is scheduled maintenance critical percent?. [Online]
Available at: https://www.fiixsoftware.com/blog/scheduled-maintenance-critical-percent/
[Accessed26March2017].
Pinedo,M.L.(2012)Scheduling:Theory,Algorithms,andSystems.Fourth,Springer.Fourth.London.
doi:10.1007/s13398-014-0173-7.2.
Potvin, J.-Y. (1996) ‘Genetic Algorithms’, Annals of Operations Research, 63, pp. 339–370. doi:
10.1016/B978-0-12-804494-0.00010-3.
RESOURCESCHEDULINGALGORITHM
FORMAINTENANCEPLANNING
33
Razali,M.andGeraghty,J.(2011)‘Geneticalgorithmperformancewithdifferentselectionstrategies
in solving TSP’, World Congr. Eng., II(978-988-19251-4–5), pp. 4–9. Available at:
http://umpir.ump.edu.my/2609/.
Reeves, C. R., 1993.ModernHeuristics Techniques for Combinatorial Problems. London: Blackwell
ScientificiPublicaitons.
Uldall,C.P.,Taarnhøj,E.S.andVorts,S.(2008)TechnicianRoutingandScheduling.Denmark.Available
at:http://orbit.dtu.dk/getResource?recordId=211562&objectId=1&versionId=1.
Winston,W.(2003)‘IntroductiontoLinearProgramming’,inOperationsResearch:Applicationsand
Algorithms.4thedn,pp.49–125.
RESOURCESCHEDULINGALGORITHM
FORMAINTENANCEPLANNING
A
12. APPENDICES
APPENDIXA:SIGNEDSPONSORSHIPFORM
RESOURCESCHEDULINGALGORITHM
FORMAINTENANCEPLANNING
B
APPENDIXB:COMPLETEPYTHONCODINGimport math import csv import random import null daylength = 8 * 60 employed = 36 depot = -26.117920, 28.135320 speed = 70 / 60 with open("/Users/kirstenyoung/Google Drive/University/4th Year/BPJ/Data/CSVs/GroupedData.csv") as csvfile: ImportEquip = list(csv.reader(csvfile, delimiter=';')) eqtdetails = {} initialsolution = [] # Initial Solution def initialise(): counter = 0 for e in ImportEquip: counter += 1 initialsolution.append(counter) eqtdetails[counter] = e return initialsolution def devices(location): return eqtdetails[location][1] # Calculate distance between 2 equipment locations def d(origin, destination): lat1, lon1 = origin lat2, lon2 = destination radius = 6371 dlat = math.radians(lat2 - lat1) dlon = math.radians(lon2 - lon1) a = math.sin(dlat / 2) * math.sin(dlat / 2) + math.cos(math.radians(lat1)) * math.cos( math.radians(lat2)) * math.sin(dlon / 2) * math.sin( dlon / 2) c = 2 * math.atan2(math.sqrt(a), math.sqrt(1 - a)) d = radius * c return d # Return the coordinates of a device def coords(device): return float(eqtdetails[device][3]), float(eqtdetails[device][4]) # Return the service time of a device def serv(device): return float(eqtdetails[device][2]) # Rotate elements ina list def rotate(lst, x): lst[:] = lst[x + 1:] + lst[:x + 1] return lst
RESOURCESCHEDULINGALGORITHM
FORMAINTENANCEPLANNING
C
# Calculate the total distance of the schedule def fitness(solution): resource = 1 day = 1 timeleft = daylength totaltime = 0 distance = 0 depot = -26.117920, 28.135320 fromcoords = depot deviation = 0 count = 0 for i in solution: tocoords = coords(i) travel = d(fromcoords, tocoords) / speed service = serv(i) if (travel + service) > timeleft: travel = d(fromcoords, depot) distance += travel totaltime += travel / speed deviation += (daylength - totaltime) ** 2 count += 1 totaltime = 0 timeleft = daylength fromcoords = depot resource += 1 travel = d(fromcoords, tocoords) / speed if resource > employed: totaltime = 0 timeleft = daylength fromcoords = depot resource = 1 day += 1 travel = d(fromcoords, tocoords) / speed if (travel + service) <= timeleft and resource <= employed: totaltime += travel + service timeleft -= travel + service distance += travel * speed fromcoords = tocoords deviation += (daylength - totaltime) ** 2 standarddeviation = (deviation / (count + 1)) ** (0.5) return round(distance, 2), round(standarddeviation, 2) # Create a population of individuals def population(solution, size): return [random.sample(solution, len(solution)) for i in range(size)] # Calculate average fitness of a population def grade(pop): dis = 0 dev = 0 for i in pop: dis += fitness(i)[0] dev += fitness(i)[1] return round(dis / len(pop), 2), round(dev / len(pop), 2)
RESOURCESCHEDULINGALGORITHM
FORMAINTENANCEPLANNING
D
# Tournament selection def selection(pop, k): best = null for i in range(1, k): ind = pop[random.randint(1, len(pop) - 1)] if (best == null) or ind[0] < best[0]: best = ind return best # Crossover def crossover(parent1, parent2): l = len(parent1) # Get 2 random numbers between 0 and length of individual r1 = random.randint(0, l - 1) r2 = random.randint(0, l - 1) while r1 >= r2: r1 = random.randint(0, l - 1) r2 = random.randint(0, l - 1) # Create the child... initial elements are -1 child = [-1] * l # Copy elements between r1, r2 from parent1 to child for i in range(r1, r2 + 1): child[i] = parent1[i] # Create list to hold elements of parent1 which are not in child yet y = [0] * (l - (r2 - r1) - 1) j = 0 for i in range(0, l): if parent1[i] not in child: y[j] = parent1[i] j += 1 # Order of places is the same as the number of elements after r2 copy = parent2[:] rotate(copy, r2) # Order the elements in y according to their order in parent2 y1 = [0] * (l - (r2 - r1) - 1) j = 0 for i in range(0, l): if copy[i] in y: y1[j] = copy[i] j += 1 # Copy remaining elements into child according to their order in parent2 starting after r2 for i in range(0, len(y1)): ci = (r2 + i + 1) % l child[ci] = y1[i] return child # Mutate def swap(solution): x = random.randint(0, len(solution) - 1) y = random.randint(0, len(solution) - 1) solution[x], solution[y] = solution[y], solution[x] return solution
RESOURCESCHEDULINGALGORITHM
FORMAINTENANCEPLANNING
E
# Evolve the population def evolve(graded, mutate=0.01, retain=0.2): p = [x[1] for x in graded] retain_length = int(len(p) * retain) parents = p[:retain_length] parents_length = len(parents) desired_length = len(p) - parents_length children = [] while len(children) < desired_length: p1 = selection(p, 3) p2 = selection(p, 3) if p1 != p2: child1 = crossover(p1, p2) child2 = crossover(p2, p1) children.append(child1) children.append(child2) parents.extend(children) for i in parents: if mutate > random.random(): parents.remove(i) parents.append(swap(i)) graded = [((fitness(x)), x) for x in parents] graded = [x for x in sorted(graded)] fitnesses = [x[0] for x in graded] print(fitnesses[0],fitnesses[99]) return graded def output(solution): resource = 1 day = 1 schedule = [] timeleft = daylength totaltime = 0 traveltime = 0 servicetime = 0 FromCoords = depot for i in solution: ToCoords = coords(i) travel = d(FromCoords, ToCoords) / speed service = serv(i) if (travel + service) > timeleft: traveltime += d(FromCoords, depot) / speed totaltime += d(FromCoords, depot) / speed z = [] for j in schedule: z.append(devices(j)) print(str(day) + ";" + str(resource) + ";" + str(z) + ";" + str(totaltime) + ";" + str(traveltime) + ";" + str(servicetime))
RESOURCESCHEDULINGALGORITHM
FORMAINTENANCEPLANNING
F
totaltime = 0 traveltime = 0 servicetime = 0 timeleft = daylength schedule = [] FromCoords = depot resource += 1 travel = d(FromCoords, ToCoords) / speed if resource > employed: totaltime = 0 traveltime = 0 servicetime = 0 timeleft = daylength schedule = [] FromCoords = depot resource = 1 day += 1 travel = d(FromCoords, ToCoords) / speed if (travel + service) <= timeleft and resource <= employed: totaltime += travel + service timeleft -= travel + service traveltime += travel servicetime += service schedule.append(i) FromCoords = ToCoords z = [] for i in schedule: z.append(devices(i)) print(str(day) + ";" + str(resource) + ";" + str(z) + ";" + str(totaltime) + ";" + str(traveltime) + ";" + str(servicetime))
initial = initialise() p = population(initial, 100) pop = [((fitness(x)), x) for x in p] pop = [x for x in sorted(pop)] for i in range(100): pop = evolve(pop) print(output(pop[0][1]))