resilient city

45
RESILIENT CITY Challenge & Opportunity North Jakarta Case By : Heru Budi Hartono, SE, MM North Jakarta Mayor

Upload: phungminh

Post on 16-Jan-2017

226 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: RESILIENT CITY

RESILIENT CITY Challenge & Opportunity North Jakarta Case

By :

Heru Budi Hartono, SE, MM

North Jakarta Mayor

Page 2: RESILIENT CITY

North Jakarta’s Map

2

Page 3: RESILIENT CITY

Definition

A city that supports the development of greater resilience in its

institutions, infrastructure, and social and economic life. Resilient cities reduce vulnerability to extreme events and respond creatively to economic, social and environmental change in order to increase their long-term sustainability. Resilient city activities are sensitive to distinctive unique local conditions and origins. Efforts undertaken to prevent crisis or disaster in one area should be designed in such a way as to advance the community’s resilience and sustainable development in a number of areas. As such, resilient cities define a comprehensive ‘urban resilience’ concept and policy agenda with implications in the fields of urban governance, infrastructure, finance, design, social and economic development, and environmental / resource management.

source : Resilient Communities Program Concept 2002

3

Page 4: RESILIENT CITY

- Prone to flooding

- High population of poor people

- Open character of waste comunication = hard

This condition causes the city to be vulnerable

4

Page 5: RESILIENT CITY

Three approaches in addressing vurnerabilities in the tough city concept :

a. Mitigation : an adjustment which risk reduction capacity of the object

b. Adaptation : an adjustment (self) towards risk adjusted hazards and vurnerabilities that exist in the object

c. Innovation : a time frame for the implementation of activities that are considered “new” in the handling of the real risks beyond the capacity of existing habits on the object.

5

Page 6: RESILIENT CITY

6

Page 7: RESILIENT CITY

Uncontrollable

Carbon Emission

Dedicated Development Programmes 2013-2017

1. Development of mass transportation; BRT, MRT, and LRT

2. Flood prevention: reservoirs, lakes, rivers normalization, development of pumping station system, dykes, infiltration wells, and multi-purpose deep tunnel

3. Development of public housing: budget apartments integrated with supporting facilities such as market, health and sports facilities

4. Development of open green space

5. Empowerment and rearrangement of street vendors

6. Improvement on education: 12-year mandatory education and application of the Jakarta Smart Card

7. Improvement on health: application of the Jakarta Health Card

8. Preservation of culture: development of the Betawi cultural centre, revitalization of the Old Town (Kota Tua) of Jakarta

9. Improvement of public services: excellent service application in district and sub-district offices, online tax and license application systems, one stop service

Mitigation

7

Page 8: RESILIENT CITY

LINGKUP PELAYANAN KETATAKOTAAN - Pengukuran Situasi Tanah - Ketetapan Rencana Kota - Konsultasi Rencana Tata Letak Bangunan - Pematokan Untuk Penerapan Rencana Kota - Survey Dan Perencanaan Trace Jalur Jalan Jembatan, Saluran Dan Utilitas - Persetujuan Prinsip Penyesuaian Koefisien Lantai Bangunan (KLB) - Surat Izin Penunjukkan Penggunaan Tanah (SIPPT) - Surat Persetujuan Prinsip Pembebasan Lokasi/Lahan (SP3L)

STANDAR PELAYANAN KETATAKOTAAN - Penerbitan Ketetapan Rencana Kota (KRK) : - Luas Sampai Dengan 500 M2 Di Kecamatan - Luas Lebih Dari 500 M2 Di Suku Dinas Tata Ruang (Kota) - Luas Lebih Dari 5000 M2 Harus Dilakukan Dengan Proses SIPPT (Gubernur)

PENERBITAN RENCANA TATA LETAK BANGUNAN (RTLB) : - Luas Sampai Dengan 2500 M2 Di Suku Dinas Tata Ruang (Kota) - Luas Lebih Dari 2500 M2 Di Dinas Tata Ruang

PENERBITAN KRK DI KECAMATAN, TANPA RENCANA TATA LETAK BANGUNAN (RTLB): - Pengukuran Tidak Lebih Dari 7 Hari Kerja - Penyelesaian KRK Tidak Lebih Dari 2 Hari Kerja

Pelayanan Ketatakotaan

8

Mitigation

Page 9: RESILIENT CITY

RENCANA LOKASI PENATAAN KAMPUNG TAHUN 2014 (70 LOKASI)

JAKARTA UTARA

No Wilayah

Kecamatan Kelurahan RW

1 Penjaringan Penjaringan 01

07

08

2 Pademangan Pademangan Barat 02

013

3 Tanjung Priok Papango 08

Warakas 012

Tanjung Priok 015

4 Koja

Rawa Badak Selatan 01

Tugu Utara 013

5 Cilincing Kali Baru 04

05

Cilincing 04

Semper Barat 04

Total Unit 1770

9

Mitigation

Page 10: RESILIENT CITY

PEMBANGUNAN RUMAH POMPA WADUK PLUIT Merupakan hibah Pemerintah Jepang dengan pelaksanaan tahun 2012 – tahun 2014

Page 11: RESILIENT CITY

11

Page 12: RESILIENT CITY

12

Page 13: RESILIENT CITY

Kegiatan Penataan Kampung Adaptation

13

Page 14: RESILIENT CITY

KARTU JAKARTA SEHAT (KJS)

14

Adaptation

Page 15: RESILIENT CITY

15

Page 16: RESILIENT CITY

REVITALISASI WADUK PLUIT

Rumah Pompa

Pluit

Spillway

Pluit

Waduk

Pluit

Ring

Kanal

Penertiban

rumah2 liar di

sebelah kanan

dan kiri ring

kanal

Penertiban

rumah2 liar

Pompa Pluit

1. Pengembalian Kapasitas Waduk

Pluit: 20 M

2. Penambahan kapasitas pompa Pluit

Tengah

3.Penambahan kedalaman waduk

bertambah menjadi lima meter dari

sebelumnya hanya dua dua meter.

Innovation

16

Page 17: RESILIENT CITY

PENGERUKAN LUMPUR DAN PENANAMAN POHON DI WADUK PLUIT

Kondisi awal Waduk Pluit

Foto Udara Waduk Pluit

Kondisi pemukiman di

sekitar Waduk Pluit

WADUK PLUIT

Taman Waduk Pluit

Page 18: RESILIENT CITY

North Jakarta Development: Restoration of

the Pluit Reservoir (2)

Before restoration

Slums

Waste

Innovation

18

Page 19: RESILIENT CITY

North Jakarta Development: Restoration of

the Pluit Reservoir (3)

After restoration

Green open space

Decent and clean Tree planting

Dredging 19

Innovation

Page 20: RESILIENT CITY

North Jakarta Development: Restoration of

the Pluit Reservoir (4)

The Pluit Reservoir City Park today

20

Innovation

Page 21: RESILIENT CITY

RELOKASI KE RUMAH SUSUN PINUS ELOK

Page 22: RESILIENT CITY

WADUK RAWA KENDAL

Page 23: RESILIENT CITY

WADUK MARUNDA

Page 24: RESILIENT CITY

North Jakarta Development: the Penjaringan

City Park (1)

Before revitalization

After revitalization

Innovation

Page 25: RESILIENT CITY

North Jakarta Development: the Penjaringan

City Park (3)

Restoration activities

Innovation

Page 26: RESILIENT CITY

North Jakarta Development: the Penjaringan

City Park (2)

Before restoration

After restoration

Innovation

Page 27: RESILIENT CITY

NORMALISASI KALI ANGKE DAN KALI ADEM

Before

After

Page 28: RESILIENT CITY

Rusun Tzuchi Cengkareng

Rusun Tzuchi Muara Angke

Lomba Perahu Naga Kali Angke

Foto Udara Kali Angke

Page 29: RESILIENT CITY

29

North Jakarta Development : Normalization

Sentiong River Sunter

Innovation

Page 30: RESILIENT CITY

PENGOSONGAN KOLONG TOL SEPANJANG RUAS TANJUNG PRIOK - PENJARINGAN

Page 31: RESILIENT CITY

Perusakan Tiang Tol dan Penimbunan barang yang mudah terbakar yang dilakukan oleh warga kolong tol

DAMPAK YANG DITIMBULKAN

TIANG TOL YANG DIRUSAK UNTUK DIAMBIL BESINYA

Page 32: RESILIENT CITY

KEBAKARAN KOLONG TOL MEI 2007

DAMPAK YANG DITIMBULKAN KEBAKARAN KOLONG TOL 7 AGUSTUS 2007

Page 33: RESILIENT CITY

KONDISI SETELAH PENGOSONGAN

Page 34: RESILIENT CITY

Kolong yang telah ditertibkan dan dikembangkan menjadi fasilitas umum

Page 35: RESILIENT CITY
Page 36: RESILIENT CITY
Page 37: RESILIENT CITY
Page 38: RESILIENT CITY
Page 39: RESILIENT CITY
Page 40: RESILIENT CITY

STADION TAMAN BMW

Kecamatan Tanjung Priok , Jakarta Utara

Page 41: RESILIENT CITY

PELAKSANAAN PENERTIBAN

24 AGUSTUS 2008

Page 42: RESILIENT CITY

42

PENERTIBAN PEDAGANG

KAKI LIMA

Page 43: RESILIENT CITY

REKLAMASI PT. Taman Harapan Indah ( Pantai Mutiara ) Perjanjian Kerjasama No. 05/SPK/1986 Tanggal 25 September 1986 antara BPL Pluit DKI Jakarta dengan PT. Taman Harapan Indah Reklamasi Seluas + 100 Ha

PT. Muara Wisesa Samudra ( Pantai Hijau ) Izin Prinsip Gubernur KDKI Jakarta No. 22224/VI/1987 Reklamasi Seluas + 54 Ha

PT. Bhakti Bangun Eramulia ( Pantai Mas ) Izin Prinsip Gubernur KDKI Jakarta No. 2296/-1.813 Tgl. 26 Juni 1992 Reklamasi Seluas + 88 Ha

PT. Ismac Izin Prinsip Gubernu KDKI Jakarta No. 3724/-1.711. Tahun 1992 Reklamasi Seluas + 21 Ha

PT. Pembangunan Jaya Ancol MoU No. 1121A Tahun 1995 669/DIR-EX/IX/1995 Tanggal 29 September 1995 Reklamasi Seluas + 20 Ha dan 40 Ha

PT. Dwi Marunda Makmur MoU No. 65A Tahun 1996 118A/Dir/DMM/VI/1996 Tgl 12 Juni 1996 Studi Lokasi Reklamasi + 220 Ha PT. Manggala Krida Yudha

MoU No. 1175 Tahun 1996 005/PK/MKY-BP/VIII/1996 Tgl 9 Agustus 1996 Reklamasi seluas + 375 Ha No. DA 219/02-DA/1997 002/DA/MKY-BP/IX/1997 Tgl : 16 – 09 - 1997

PT. Pelindo II Kontribusi 25% dari PT. MKY Reklamasi seluas + 125 Ha

PT. Pembangunan Jaya Ancol Izin Prinsip Gub. KDKI Jakarta No. 2976/-1.711.5 Tgl. 26 September 2000 Reklamasi Perairan Ancol Barat seluas 60 Ha

PT. Pembangunan Jaya Ancol Izin Prinsip Reklamasi Gubernur No. 1288/-1.711.5 Tgl. 17 Mei 2004 Reklamasi seluas 343 Ha

PT. Jaladri Kartika Ekapasi MoU No. 156 Tahun 1997 174/YKEP/VII/1997 Tgl. 7 Juli 1997 Reklamasi seluas + 200 Ha PT. Pembangunan Jaya Ancol

MoU No. 214A Tahun 1997 639/DIR-PJA/IX1997 Tgl. 16 September 1997 Reklamasi seluas + 340 Ha

BPL Pluit / PT. Jakarta Propertindo MoU No. 22 Tahun 1997 01/SEK.BP/NKI/1997 Tgl 24 Februari 1997 Reklamasi seluas + 294 Ha No. DA 220/03-DA/1997 01/PKS/1997 Tgl 16 – 01 -1997

PT. KAPUK NAGA INDAH MoU No. 589 Tahun 1997 051/KNI-SP/IV/1997 Tgl 11 April 1997 Reklamasi seluas + 674 Ha No. DA 162 Tahun 1997 094/KNI-SP/VII/1997 Tgl 28 – 7 - 1997

PT. Pembangunan Jaya Ancol MoU No. 3362A Tahun 1996 1096/DIR-PJA/II/1996 Tanggal 29 Februari 1996 Reklamasi Seluas + 42 Ha

Page 44: RESILIENT CITY

44

PETA JAKARTA

Page 45: RESILIENT CITY