Report copyright - 1. INTRODUCTION AND EXPLANATORY NOTES, DEEP ...and the pipe was raised to 132.5 meters below the mud-line for logging. But a sediment bridge at 185 meters prevented logging. RESPONSIBILITIES
Please pass captcha verification before submit form