Application for Prior Environmental Clearance Proposed Integrated Project of 3.6 MTPA Clinker 5.5 MTPA Integrated Cement Plant 75 MW Captive Power Plant (CPP) at Sedam Rural, Taluka - Sedam & Proposed 5.0 MTPA Limestone Mining at Village : Tilkur & Hebal, Taluka : Sedam Dist: Gulbarga, Karnataka Project Proponent: Reliance Cement Company Private Limited G-Block, 2nd Floor, 3rd Wing, Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India) Tel: 022 3038 5765, Fax: 022 3038 5563

Upload: others

Post on 20-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Application for

Prior Environmental Clearance Proposed Integrated Project of 3.6 MTPA Clinker

5.5 MTPA Integrated Cement Plant

75 MW Captive Power Plant (CPP) at

Sedam Rural, Taluka - Sedam &

Proposed 5.0 MTPA Limestone Mining at

Village : Tilkur & Hebal, Taluka : Sedam Dist: Gulbarga, Karnataka

Project Proponent:

Reliance Cement Company Private Limited G-Block, 2nd Floor, 3rd Wing,

Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India) Tel: 022 3038 5765, Fax: 022 3038 5563

Page 2: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Form -1 of proposed Greenfield integrated cement plant of 3.6 MTPA Clinker, 5.5 MTPA Cement, 75 MW CPP with 5.0 MTPA Limestone Mine

Page 2 of 51

APPENDIX- I

Form-1

I) Basic Information Sr. No.

Item Details

1 Name of the

project/s

M/s. Reliance Cement Company Pvt. Ltd.(RCC), a unit of

Reliance Group of Companies, has proposed to set up an

Integrated Greenfield Cement Plant having capacities of 3.6

Million Tonnes Per Annum (MTPA) Clinker, 5.5 MTPA Cement

Plant, 75 MW Captive Power Plant at Sedam Rural, Taluka:

Sedam along with 5.0 MTPA Limestone Mine at Villages: Tilkur &

Hebal, Taluka : Sedam, District: Gulbarga, Karnataka.

2 Sr.No. in the

schedule

Category – A,

Activity 1(a), 3(b) & 1(d)

3 Proposed capacity/

area/ length/

tonnage to be

handled/ command

area/ lease area/

number of wells to

be drilled

Production Capacity & Area

3.6 MTPA - Clinker

5.5 MTPA - Cement plant

75 MW – Captive power plant

5.0 MTPA- Limestone production

135 Ha (plant , CPP & township)

929.12 Ha- Mine Lease (ML) area

* 46.0 Ha- Rail & road corridor

* 24.0 Ha- OLBC

(*areas indicated are approximate. Final will be given in EIA after

detailed engineering)

Cost: `2600.00 Crores for Plant

`280.00 crores for Mining

Toposheet no: E43 R7 & E43 R8

Please refer: Annexure 1 : Index map, Annexure 2 : 10 Km.

Study area & Annexure 3: Layout of Plant

4 New/Expansion/ New project

Page 3: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Form -1 of proposed Greenfield integrated cement plant of 3.6 MTPA Clinker, 5.5 MTPA Cement, 75 MW CPP with 5.0 MTPA Limestone Mine

Page 3 of 51

Sr. No.

Item Details

Modernization

5 Existing Capacity/

Area etc.

Not applicable

6 Category of Project

i.e. ‘A’ or ‘B’

Plant: Category ‘A’ as proposed plant capacity is more than 1

MTPA under 3(b)

Mine: Category ‘A’ (as proposed Mining Lease is having an

extent of more than 50 Ha) under 1(a) type activity

7 Does it attract the

general condition?

If yes, please

specify.

No

8 Does it attract the

specific condition?

If yes, please

specify.

No

Page 4: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Form -1 of proposed Greenfield integrated cement plant of 3.6 MTPA Clinker, 5.5 MTPA Cement, 75 MW CPP with 5.0 MTPA Limestone Mine

Page 4 of 51

Sr. No.

Item Details

9 Location Plant co-ordinates: A: 17°12'42.87" N - 77°18'23.45" E

B: 17°12'42.38" N - 77°18'43.61" E

C: 17°12'4.18" N - 77°18'39.28" E

D: 17°11'11.93" N - 77°17'56.47" E

E: 17°11'11.93" N - 77°17'56.47" E

F: 17°11'32.55" N - 77°17'33.06" E

Toposheet no. E43 R8.

Location: Sedam Rural, Sedam Taluka, Gulbarga dist.

Mine co-ordinates: a) 17°13'15.98" N & 77°19'22.09" E

b) 17°14'23.23" N & 77°19'30.30" E

c) 17°14'50.09" N & 77°20'23.96" E

d) 17°15'17.55" N & 77°22'07.49" E

e) 17°14'59.49" N & 77°22'57.73" E

f) 17°14'30.71" N & 77°22'59.27" E

g) 17°14'0.16" N & 77°21'30.36" E

h) 17°13'58.57" N & 77°20'12.24" E

(Please refer Annexure 4: Google imagery)

Mine: Toposheet no. E43 R7 & E43 R8.

Mine lease is located at Tilkur & Hebal villages, Taluka: Sedam,

Dist: Gulbarga, State: Karnataka.

Page 5: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Form -1 of proposed Greenfield integrated cement plant of 3.6 MTPA Clinker, 5.5 MTPA Cement, 75 MW CPP with 5.0 MTPA Limestone Mine

Page 5 of 51

Sr. No.

Item Details

Plot / Survey /

Khasra No.

Survey Nos. of Plant (including Township and CPP) covering 135 Ha. 220, 221, 222, 223, 224,225, 226, 227, 228, 233,234, 235,236,

237, 238, 239, 242, 243,244, 245, 253, 254, 259, 260, 261, 262,

263, 264, 265, 266, 267, 273, 274, 275, 276, 277, 278, 279, 280,

281, 282, 283, 284, 285, 286, 287, 288, 289, 290, 293, 296, 301,

401, 402, 403.

Rail & road corridor: 46.0 Ha*

Over Land Belt Conveyor: 24.0 ha*

* Khasra numbers for external infrastructure (rail corridor,

approach road, Over Land Belt Conveyor) will be provided after

detailed engineering in final EIA.

Survey Nos. of Mine: Survey nos. of Tilkur village:

3 to 25, 27, 28, 6 to 86, 88, 90 to 92, 98 to 105, 109, 110, 112 to

128

Survey nos. of Hebal village:

4 to 36, 40, 46 to 59, 67 to 84, 87 to 99, 143

Village Plant: Sedam Rural and Mine: Tilkur and Hebal

Tehsil Sedam

District Gulbarga

State Karnataka

10 Nearest railway

station/airport along

with distance in km.

Plant: Nearest railway station Sedam is at ~ 2.0 Km. and

Kurgunta is at ~ 4.7 Km. Nearest airport Hyderabad is at 126 Km.

Mine: Nearest railway station Kurgunta is at ~ 3.6 km. Nearest

airport Hyderabad is at ~ 120 km.

11 Nearest Town, city,

District

Headquarters along

with distance in

kms.

Plant: Nearest Tehsil / Town Sedam is ~ 2 Km and City / Dist.

HQ: Gulbarga is ~ 52 Km.

Mine: Nearest Tehsil / Town Sedam is ~ 6.0 km and City / Dist.

HQ: Gulbarga is ~ 54 km.

Page 6: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Form -1 of proposed Greenfield integrated cement plant of 3.6 MTPA Clinker, 5.5 MTPA Cement, 75 MW CPP with 5.0 MTPA Limestone Mine

Page 6 of 51

Sr. No.

Item Details

12 Village Panchayats,

Zila Parishad,

Municipal

Corporation, Local

body (complete

postal addresses

with telephone nos.

to be given)

Zila Panchayat office, Gulbarga City

Tel: :08472-278666

Office of Deputy Commissioner and District Magistrate, Gulbarga

City (between Timmapuri Circle and Jagat Circle)

Tel: 08472-278601

13 Name of the

applicant

Dr.Hari Raj Dandi

14 Registered Address Reliance Cement Company Pvt. Ltd.

H Block, 1st floor, Dhirubhai Ambani Knowledge City,

Koparkhairane, Navi Mumbai – 400710.

15 Address for

correspondence

Reliance Cement Company Pvt. Ltd.

G Block, 2nd floor, 3rd Wing, Dhirubhai Ambani Knowledge City,

Koparkhairane, Navi Mumbai – 400710.

Name Dr.Hari Raj Dandi

Designation

Owner/Partner/CE

O)

Vice President – Business Development

Reliance Cement Company Pvt. Ltd.

Address G Block, 2nd Floor, 3rd Wing, Dhirubhai Ambani Knowledge City,

Koparkhairane, Navi Mumbai.

Pin Code 400710

E-mail [email protected]

Telephone No. 022 30385765 / Mobile: 74982 74826

Fax No. 022 30385563

16 Details of

Alternative Sites

examined, if any.

Location of these

sites should be

The proposed cement plant & CPP are falling in Sedam Rural

area. The selection has been done based on minimum impacts

on environmental recipients.

Three other alternative sites have been evaluated for plant area.

1: Between Hayal & Lahora villages.

Page 7: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Form -1 of proposed Greenfield integrated cement plant of 3.6 MTPA Clinker, 5.5 MTPA Cement, 75 MW CPP with 5.0 MTPA Limestone Mine

Page 7 of 51

Sr. No.

Item Details

shown on a

toposheet.

2: Between Satpataanhali & Yadahalli villages.

3: Between Hebal & Halkora villages.

Annexure 5: Map showing the location of proposed plant site and

alternative sites.

As mining is based on mineral availability, hence no other

alternate site is explored.

17 Interlinked Projects No.

18 Whether separate

application of

interlinked project

has been submitted

Not applicable.

19 It yes, date of

submission

Not Applicable

20 If no, reason Not Applicable

21 Whether the

proposal involves

approval/clearance

under:

(a) The Forest

(Conservation)

Act, 1980

(b) The Wildlife

(Protection)

Act, 1972

(c) The C.R.Z

Notification,

1991

No

No

No

22 Whether there is

any Government

Order/Policy

relevant/relating to

Industrial Entrepreneur Memorandum (no. 712/SIA /IMO/2011)

dated 03.03.2011 issued by Public Relation & Complaints

Section, Ministry of Commerce & Industry, Govt. of India attached

in Annexure 6.

Page 8: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Form -1 of proposed Greenfield integrated cement plant of 3.6 MTPA Clinker, 5.5 MTPA Cement, 75 MW CPP with 5.0 MTPA Limestone Mine

Page 8 of 51

Sr. No.

Item Details

the site Letter of Intent (LOI) issued by Office of the Director, Dept. of

Mines & Geology, Govt. of Karnataka vide letter no. DMG:

MLS:337 AML 2010:11-12 4584 attached in Annexure 7.

23 Forest land

involved (hectares)

Nil.

24 Whether there is

any litigation

pending against the

project and/ or land

in which the project

is propose to be set

up

Name of the

a. Court

b. Case No.

c. Orders/

directions of the

Court, if any and its

relevance with the

proposed project.

No.

II) Activity Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)

Sr. No.

Information/Checklist Confirmation

Yes / No

Details thereof (with approximate quantities/ rates, wherever possible) with source of

information data

1.1 Permanent or temporary

change in landuse, land

Yes Plant: Land requirement for the proposed

Page 9: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Form -1 of proposed Greenfield integrated cement plant of 3.6 MTPA Clinker, 5.5 MTPA Cement, 75 MW CPP with 5.0 MTPA Limestone Mine

Page 9 of 51

Sr. No.

Information/Checklist Confirmation

Yes / No

Details thereof (with approximate quantities/ rates, wherever possible) with source of

information data

cover or topography

including increase in

intensity of land use (with

respect to local landuse

plan)

Cement Plant is given below:

Cement Plant : 54 Ha

Plantation area : 45 Ha

CPP : 16 Ha

Township : 20 Ha

Total plant area : 135.00 Ha *Rail & road corridor : 46 Ha.

*OLBC : 24 Ha.

(*areas indicated are approximate. Final

will be given in EIA after detailed

engineering)

The land is mostly flat and consists of

local vegetation and there is no forest or

ecologically sensitive land within proposed

site.

No residential areas or habitation falls

within the proposed project area and

hence no displacement of habitats.

Mine: Land requirement for the proposed

project is given below:

Activity Area (Ha) Mine lease area 929.12

The land is mostly non-irrigated

agricultural. There is no forest or

ecologically sensitive area within

proposed site. No residential areas or

Page 10: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Form -1 of proposed Greenfield integrated cement plant of 3.6 MTPA Clinker, 5.5 MTPA Cement, 75 MW CPP with 5.0 MTPA Limestone Mine

Page 10 of 51

Sr. No.

Information/Checklist Confirmation

Yes / No

Details thereof (with approximate quantities/ rates, wherever possible) with source of

information data

habitation falls within the proposed project

area

With implementation of the proposed

project, the land use at the site will be

permanently changed to industrial

category.

1.2 Clearance of existing land,

vegetation and building?

No There are no existing structures,

vegetation in the project area.

No clearance of trees is required.

1.3 Creation of new land uses Yes Present land use will be changed with

construction of the Cement Plant and

mining (as per IBM approved mine

closure plan) to industrial.

1.4 Pre-construction

investigations e.g. bore

houses, soil testing.

Yes

The soil testing/investigation studies will

be carried out before commencement of

construction activities.

1.5 Construction works? Yes The following structures in cement plant

and CPP will be constructed :

Raw Mill

Coal Mill

Kiln

Clinker Cooler

Cooler ESP

Bag Houses

Raw Mill Silo

Pre Heater

Clinker Silo

Page 11: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Form -1 of proposed Greenfield integrated cement plant of 3.6 MTPA Clinker, 5.5 MTPA Cement, 75 MW CPP with 5.0 MTPA Limestone Mine

Page 11 of 51

Sr. No.

Information/Checklist Confirmation

Yes / No

Details thereof (with approximate quantities/ rates, wherever possible) with source of

information data

Cement mill

Coal handling plant

Ash handling plant

Fly ash silo

Compressor house

OLBC

CPP buildings

Air Cooled Condenser Building

Water and wastewater treatment

facilities

Township

Road and Buildings

Other constructions required, for

operation, utilities, offices and residence

etc

For mining, a site office, explosive

storage magazine, workshop, roads,

weigh bridge etc will be developed &

limestone crusher will also be installed.

1.6 Demolition Works ? No There will not be any demolition works.

1.7 Temporary sites used for

construction works or

housing of construction

workers?

Yes A temporary site office will be earmarked

during construction period in Plant sited

and one site office will be constructed for

monitoring mining & its allied activities in

ML area.

1.8 Above ground buildings,

structures or earthworks

including linear structures,

Yes For Plant: Limited excavation work will be carried

out for construction of the civil structures.

Page 12: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Form -1 of proposed Greenfield integrated cement plant of 3.6 MTPA Clinker, 5.5 MTPA Cement, 75 MW CPP with 5.0 MTPA Limestone Mine

Page 12 of 51

Sr. No.

Information/Checklist Confirmation

Yes / No

Details thereof (with approximate quantities/ rates, wherever possible) with source of

information data

cut and fill or excavations Some amount of levelling / grading

through cut and fill is required to make the

land suitable for construction.

Above ground structures include main

plant, service buildings etc.

For Mine: Site office for monitoring mining & its

allied activities, first-aid station, crusher

plant, workshop, belt conveyors, rest

shelter, toilets/urinals within the ML area.

1.9 Underground works

including mining or

tunnelling?

No There will not be any underground works

in plant area.

Opencast mechanized mine will be

developed.

1.10 Reclamation works?

Yes Earmarked Plant area will be permanently

changed to industrial purpose.

Mined out area will be reclaimed and

rehabilitated as per Mining Plan and Mine

Closure Plan approved by Indian Bureau

of Mines (IBM).

1.11 Dredging? No Not envisaged.

1.12 Offshore structures? No Not envisaged.

1.13 Production and

manufacturing Process?

Yes The production capacity of the proposed

cement plant is given below:

Production Capacity

3.6 MTPA - Clinker

5.5 MTPA - Cement plant

75 MW – Captive power plant

Page 13: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Form -1 of proposed Greenfield integrated cement plant of 3.6 MTPA Clinker, 5.5 MTPA Cement, 75 MW CPP with 5.0 MTPA Limestone Mine

Page 13 of 51

Sr. No.

Information/Checklist Confirmation

Yes / No

Details thereof (with approximate quantities/ rates, wherever possible) with source of

information data

The brief process description of cement

plant along with process flow diagram is

enclosed as Annexure 8. Mine: Opencast mechanized mining will be

adopted for the mining.

Production of Limestone: 5.0 MTPA.

The brief process description of mining

and mineral processing are enclosed as

Annexure 9.

1.14 Facilities for storage of

goods or materials?

Yes Plant Temporary Storage Facilities will be

provided within the plant premises during

construction phase.

During normal operation, for raw material

and final product storage, silos and

covered sheds will be utilised. The

blending and clinker silos will be built,

details of storage capacity are mentioned

below:

Material Storage Capacities (Metric T)

Limestone 1,60,000

Blending Silo 60,000

Clinker 10,00,000

Gypsum 8,000

Coal 60,000

Page 14: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Form -1 of proposed Greenfield integrated cement plant of 3.6 MTPA Clinker, 5.5 MTPA Cement, 75 MW CPP with 5.0 MTPA Limestone Mine

Page 14 of 51

Sr. No.

Information/Checklist Confirmation

Yes / No

Details thereof (with approximate quantities/ rates, wherever possible) with source of

information data

Captive Power Plant

Coal Yard : 1,00,000 Metric Tonnes

Mining: Top soil and overburden will be stored at

earmarked sites and reused for backfilling

of mined out pits. Mined out limestone will

be sent to crusher for further processing.

Cement 30,000

Fly Ash 10,000

1.15 Facilities for treatment or

disposal of solid waste or

liquid effluents?

Yes Plant: During construction phase Solid waste: Waste generated during the

construction phase like construction

debris and concrete waste etc will be

recycled and reused for levelling.

Liquid effluents: The domestic waste

which will be generated during

construction phase will be disposed off in

a properly designed soak pits without

impacting surrounding environment.

During operation phase Solid waste:

Dust collected from air pollution control

equipment will be 100% recycled back in

cement manufacturing.

Waste such as refractory bricks from

pyro-processing will be given back to

refractory manufacturers for recycling.

Page 15: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Form -1 of proposed Greenfield integrated cement plant of 3.6 MTPA Clinker, 5.5 MTPA Cement, 75 MW CPP with 5.0 MTPA Limestone Mine

Page 15 of 51

Sr. No.

Information/Checklist Confirmation

Yes / No

Details thereof (with approximate quantities/ rates, wherever possible) with source of

information data

Waste like used batteries will be sold to

authorized recyclers.

Solid waste in the form of sludge, which

will be generated from the sewage

treatment plant, will be dried and used as

manure for green belt and plantation

purpose.

Liquid waste: Domestic waste water

from plant & residential colony will be

treated in STP & treated water will be

used in plant and greenbelt area.

CPP: Solid waste: Bed ash and fly ash will be

generated from the proposed coal based

captive power plant. All flyash generated

from the CPP will be utilized for

manufacturing the PPC. The bed ash

generated will be utilized for the

backfilling of mined out pits, road making,

levelling and filling of low lying areas.

Mining: Solid waste:

Overburden generated from mines will be

used for levelling of ground, construction

of road and crusher ramp etc and for

backfilling during initial years.

Top soil will be preserved for greenbelt

Page 16: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Form -1 of proposed Greenfield integrated cement plant of 3.6 MTPA Clinker, 5.5 MTPA Cement, 75 MW CPP with 5.0 MTPA Limestone Mine

Page 16 of 51

Sr. No.

Information/Checklist Confirmation

Yes / No

Details thereof (with approximate quantities/ rates, wherever possible) with source of

information data

development.

Liquid effluents:

No waste water will be generated during

mining activities except domestic waste.

The same will be treated in septic tank /

soak pits.

For Plant & Mine: Used oil will be stored / sold to authorized

dealer as per statutory norm.

1.16 Facilities for long term

housing of operational

workers?

Yes A town ship will be provided for workers

and employees near to the project site.

1.17 New road, rail or sea traffic

during construction and

operation?

Yes Manpower and material during

construction & operations will be

transported through the existing road

network.

1.18 New road, rail, air

waterborne or other

transport infrastructure

including new or altered

routes and stations, ports,

airports etc.?

No The site will be well-connected through

existing road and rail network for

transporting clinker and finished products.

1.19 Closure or diversion of

existing transport routes or

infrastructure leading to

changes in traffic

movements?

No No change in major road network is

envisaged. Small village road will be

diverted after due approval from

concerned authority.

New railway connectivity will be installed

for transportation of raw material and

finished product.

Page 17: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Form -1 of proposed Greenfield integrated cement plant of 3.6 MTPA Clinker, 5.5 MTPA Cement, 75 MW CPP with 5.0 MTPA Limestone Mine

Page 17 of 51

Sr. No.

Information/Checklist Confirmation

Yes / No

Details thereof (with approximate quantities/ rates, wherever possible) with source of

information data

1.20 New or diverted

transmission lines or

pipelines?

Yes There will be few transmission lines to be

diverted after due permission from

concerned Govt. agency.

1.21 Impoundment, damming,

culverting, realignment or

other changes to the

hydrology of watercourses

or aquifers?

Yes There will be no change in impoundment,

damming, culverting, realignment or other

changes to the hydrology of watercourses

or aquifers.

1.22 Stream crossings? No There are no streams passing through

Plant and ML area.

1.23 Abstraction or transfers of

water from ground or

surface waters?

Yes Plant: The water required for the proposed plant

operations will be 4750 KLD which will be

sourced from Ground water / surface

water.

Plant – 2750 KLD

CPP – 1500 KLD

Colony – 500 KLD

Mine: The water requirement for proposed mine

will be 250 KLD. Source will be ground or

surface water in initial year.

After creation of mine pits, rainwater will

be collected in mine pits. The same will

be used for mining operation.

Please refer water balance: Annexure 10 & 11.

Page 18: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Form -1 of proposed Greenfield integrated cement plant of 3.6 MTPA Clinker, 5.5 MTPA Cement, 75 MW CPP with 5.0 MTPA Limestone Mine

Page 18 of 51

Sr. No.

Information/Checklist Confirmation

Yes / No

Details thereof (with approximate quantities/ rates, wherever possible) with source of

information data

1.24 Changes in water bodies or

the land surface affecting

drainage or run-off

No Not envisaged

A well planned storm water drainage

network has been developed within the

Plant and Mine site.

1.25 Transport of personnel or

materials for construction,

operation or

decommissioning?

Yes During Construction Phase of plant, the

manpower and the material for

construction will be sourced from the

surrounding areas.

Existing / augmented roads and other

infrastructure will be used for the

transportation of material and personal

during construction and operation phase.

1.26 Long-term dismantling or

decommissioning or

restoration works?

Yes Plant machineries & equipments will be

decommissioned and commissioned in

due course of time as & when required.

Mine will be systematically closed as per

decommissioning plan to be prepared for

one year prior to the mine closure, and as

per Final Mine Closure Plan approved by

IBM.

1.27 Ongoing activity during

decommissioning which

could have an impact on the

environment?

No Nil.

1.28 Influx of people to an area in

either temporarily or

permanently?

Yes Proposed manpower requirement Plant: During Construction

Page 19: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Form -1 of proposed Greenfield integrated cement plant of 3.6 MTPA Clinker, 5.5 MTPA Cement, 75 MW CPP with 5.0 MTPA Limestone Mine

Page 19 of 51

Sr. No.

Information/Checklist Confirmation

Yes / No

Details thereof (with approximate quantities/ rates, wherever possible) with source of

information data

Approx. employment of 110 direct & 2000

indirect employees preferably from local

areas.

During operation

Approx. employment of 225 direct & 390

indirect employees preferably from local

areas.

Mine: Approx. employment of 110 direct & 45

indirect employees preferably from local

areas.

1.29 Introduction of alien

species?

No Not envisaged.

1.30 Loss of native species or

genetic diversity?

No Not envisaged.

1.31 Any other actions? No Not envisaged.

2.0 Use of Natural resources for construction or operation of Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply).

2.1 Land specially undeveloped

or agricultural land (ha)

Yes Plant area (including Township & CPP in Ha. : Govt.land: 3.683 Ha

Patta land (agricultural & non irrigated) :

131.317 Ha

Forest land: Nil

Rail & road corridor: 46 Ha*

Over Land Belt Conveyor: 24 Ha*.

*Detail landownership for Rail corridor, approach road and OLBC will be given after detail survey.

Page 20: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Form -1 of proposed Greenfield integrated cement plant of 3.6 MTPA Clinker, 5.5 MTPA Cement, 75 MW CPP with 5.0 MTPA Limestone Mine

Page 20 of 51

Sr. No.

Information/Checklist Confirmation

Yes / No

Details thereof (with approximate quantities/ rates, wherever possible) with source of

information data

Mine: Tilkur Govt. land: 8.023 Ha.

Inam Land: 4.573 Ha.

Patta / Non-irrigational / Agricultural land:

383.471 Ha.

Hebal Govt. land: 23.917 Ha.

Inam Land: 6.131 Ha.

Patta / Non-irrigational / Agricultural land:

503.005 Ha.

Total Mine Lease area : 929.12 Ha. 2.2 Water (expected source &

competing users) unit KLD

Yes Plant: During construction phase water

requirement will be 1500 KLD

& during operation phase water required

for the proposed plant operations will be

4750 KLD which will be sourced from

ground water as well as surface water

after getting necessary permission from

concerned authority.

Plant – 2750 KLD

CPP – 1500 KLD

Colony – 500 KLD

Mine: Ground water / Surface water after getting

approval from concerned authority.

Quantity: 250 KLD.

Page 21: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Form -1 of proposed Greenfield integrated cement plant of 3.6 MTPA Clinker, 5.5 MTPA Cement, 75 MW CPP with 5.0 MTPA Limestone Mine

Page 21 of 51

Sr. No.

Information/Checklist Confirmation

Yes / No

Details thereof (with approximate quantities/ rates, wherever possible) with source of

information data

Water balance diagram is attached as

Annexure 10 & 11.

2.3 Minerals (MT) Yes-Plant

No-Mine

The Raw Material required for the

proposed Cement plant and CPP:

Material Quantity (MTPA)

Source

Limestone 5.0 Captive Mines

/ Outsource

Bauxite 0.15 Purchased

Laterite 0.2 Purchased

Iron ore

/ blue

dust/mill

scale

0.15 Purchased

Coal 1.6

Collieries of

Coal India /

Imported Coal

Gypsum 0.275 Rajasthan

Fly ash 1.8

CPP and /or

nearby power

plant

* The above quantities are indicative and may vary by +/-20% considering their purity/moisture levels and availability from time to time during actual operation. Mine: There is no mineral requirement for

mining operation.

2.4 Construction material – Yes Construction material such as sand, steel,

Page 22: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Form -1 of proposed Greenfield integrated cement plant of 3.6 MTPA Clinker, 5.5 MTPA Cement, 75 MW CPP with 5.0 MTPA Limestone Mine

Page 22 of 51

Sr. No.

Information/Checklist Confirmation

Yes / No

Details thereof (with approximate quantities/ rates, wherever possible) with source of

information data

stone, aggregates, and/soil

(expected source-MT)

aggregates etc will be used during

construction period.

However, the quantification of these

materials will be done during detailed

engineering stage.

These materials will be sourced from

nearby areas.

2.5 Forests and timber (source-

MT)

No No forest or timbers will be used for any

construction activity.

2.6 Energy including electricity

and fuels (source,

competing users) Unit: fuel

(MT), energy (MW)

Yes

Plant: During construction phase: Power requirement for cement plant: 3

MW.

During operation phase: Total Power requirement for entire project

is ~75 MW.

Diesel: Storage tank: 20 KL for plant.

Coal: CPP : 0.6 MTPA

Cement Plant : 1.0 MTPA

For emergency requirement, it is

proposed to install DG set, for black start

of CPP. (3 MW and 1 MW).

Mine: During operation phase:

Power requirement for mines: 3 MW.

Diesel: 8 KLD.

Storage tank : 80 KL for mine

For emergency requirement, it is

proposed to install DG set.

Page 23: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Form -1 of proposed Greenfield integrated cement plant of 3.6 MTPA Clinker, 5.5 MTPA Cement, 75 MW CPP with 5.0 MTPA Limestone Mine

Page 23 of 51

Sr. No.

Information/Checklist Confirmation

Yes / No

Details thereof (with approximate quantities/ rates, wherever possible) with source of

information data

2.7 Any other natural resources

(use appropriate standard

units)

No Not envisaged.

3.0 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health

3.1 Use of substances or

materials, which are

hazardous (as per MSIHC

rules) to human health or

the environment (flora,

fauna, and water supplies)

Yes For Plant and Mine: HFO and LDO / HSD/FO shall be used

as secondary fuel for start up.

Oil & Battery

HWM &Tr Rules- 2008 & Batteries

(Management and Handling) Rule, 2001

will be followed.

Mine: Ammonium Nitrate as blasting ingredients

in mines.

3.2 Changes in occurrence of

disease or affect disease

vectors (e.g. insect or water

borne diseases)

No Proper hygiene condition will be

maintained.

3.3 Affect the welfare of people

e.g. by changing living

conditions?

Yes Direct and indirect employment avenues

will be created due to project, which

would improve the living conditions of the

people. Socio- economic measures taken

up as per approved CSR plan.

The area will also be benefited due to

development of better infrastructure,

health care, educational facilities and

Page 24: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Form -1 of proposed Greenfield integrated cement plant of 3.6 MTPA Clinker, 5.5 MTPA Cement, 75 MW CPP with 5.0 MTPA Limestone Mine

Page 24 of 51

Sr. No.

Information/Checklist Confirmation

Yes / No

Details thereof (with approximate quantities/ rates, wherever possible) with source of

information data

other community development activities to

be undertaken by the project authorities.

3.4 Vulnerable groups of people

who could be affected by the

project e.g. hospital patients,

children, the elderly etc.,

No Not envisaged

3.5 Any other causes No Not envisaged

4.0 Production of solid wastes during construction or operation or decommissioning (MT/month)

4.1 Spoil, overburden or mine

wastes

No-Plant

Yes-Mine

No overburden from cement & CPP.

Mine: Overburden or mine wastes will be stored

at the earmarked site and used for

backfilling.

Detail quantity will be furnished in EIA

report.

4.2 Municipal waste (domestic

and or commercial wastes)

Yes The domestic effluent will be generated

and treated in STP. The sludge

generated will be used as organic

manure in horticulture. The treated water

will be used in greenbelt, plantation, dust

suppression.

As such there will be no sewage sludge

generated from mine.

4.3 Hazardous wastes

(as per hazardous waste

management rules)

Yes The Hazardous Waste will be handled as

per HWM & Tr Rules- 2008.

Waste oil and grease generated will be

Page 25: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Form -1 of proposed Greenfield integrated cement plant of 3.6 MTPA Clinker, 5.5 MTPA Cement, 75 MW CPP with 5.0 MTPA Limestone Mine

Page 25 of 51

Sr. No.

Information/Checklist Confirmation

Yes / No

Details thereof (with approximate quantities/ rates, wherever possible) with source of

information data

disposed off through authorized

recyclers.

Used batteries will be disposed off as per

Batteries Management & Handling Rule-

2001.

4.4 Other industrial process

wastes

No Nil.

4.5 Surplus product No Nil.

4.6 Sewage sludge or other

sludge from effluent

treatment

Yes Plant: The sludge generated from township

STP will be used as manure for

plantation purpose.

Mine: As such there will be no sewage sludge

generated from mine. Domestic effluent,

if any, will be treated in soak pit.

4.7 Construction or demolition

wastes

Yes Plant: Construction waste material will be

generated which will be used for filling

and levelling of low lying area.

Mine: Nil.

4.8 Redundant machinery or

equipment

No Not envisaged

4.9 Contaminated soils or other

materials

No Not envisaged

4.10 Agricultural wastes No Not envisaged

4.11 Other solid wastes Yes Plant: Waste generated from dust collecting

Page 26: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Form -1 of proposed Greenfield integrated cement plant of 3.6 MTPA Clinker, 5.5 MTPA Cement, 75 MW CPP with 5.0 MTPA Limestone Mine

Page 26 of 51

Sr. No.

Information/Checklist Confirmation

Yes / No

Details thereof (with approximate quantities/ rates, wherever possible) with source of

information data

system will be 100% recycled back to

process. While domestic solid waste will

be composted. STP sludge will be used

as manure.

Scrap from stores / workshop is

envisaged during the operational phase

of the plant. This will be given to

authorized recyclers.

CPP: Fly ash generated in Power plant will be

utilised for cement manufacturing and

Bed ash will be utilized for road making,

levelling/filling of low lying areas and

backfilling of mined out pits.

Mine: Nil.

5.0 Release of pollutants or any hazardous, toxic or noxious substances to air (kg/hr)

5.1 Emissions from combustion

of fossil fuels from stationary

or mobile sources

Yes Emission during operation of cement

manufacturing and during operation of

diesel driven HEMM etc during mining are

envisaged.

Details of emission and impact will be

provided in EIA report.

5.2 Emission from production

processes

Yes Plant: ≤ 50-mg/Nm3 of dust emissions (PM) are

envisaged from the stacks attached to

cement mill and packing plants. Gaseous

emissions are envisaged from the

Page 27: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Form -1 of proposed Greenfield integrated cement plant of 3.6 MTPA Clinker, 5.5 MTPA Cement, 75 MW CPP with 5.0 MTPA Limestone Mine

Page 27 of 51

Sr. No.

Information/Checklist Confirmation

Yes / No

Details thereof (with approximate quantities/ rates, wherever possible) with source of

information data

process, major pollution control devices

considered.

CPP: ≤ 50 mg/Nm3 dust emissions are

envisaged from the power plant.

Details of emission will be provided in

EIA report. CPCB fugitive emission control

guidelines will be adopted.

Mine: Fugitive dust will be generated from

mining activities and adequate mitigation

measures will be taken.

Wet drilling will be adopted; water

sprinkling will be done on blasted

material before loading. The haulage

road will be kept in wet condition.

Sprinkling arrangement will be made

during unloading material in crusher.

Limestone crusher will be attached to the

adequate capacity of dust collection

system to maintain the emission ≤ 50-

mg/Nm3.

Adequate mitigation measures will be

adopted to control fugitive emissions at all

probable sources.

CPCB fugitive emission control guidelines

will be adopted.

Page 28: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Form -1 of proposed Greenfield integrated cement plant of 3.6 MTPA Clinker, 5.5 MTPA Cement, 75 MW CPP with 5.0 MTPA Limestone Mine

Page 28 of 51

Sr. No.

Information/Checklist Confirmation

Yes / No

Details thereof (with approximate quantities/ rates, wherever possible) with source of

information data

5.3 Emissions from materials

handling including storage

or transport

Yes Plant & CPP Adequate mitigation measures will be

adopted to control emissions from material

handling at storage.

Details of emission, impact and EMP will

be provided in EIA report.

Mine: Adequate precautionary measures will be

adopted to control emissions from material

handling at storage.

Adequate preventive measures will be

taken during loading - unloading, storage

& transportation of minerals &

overburden.

5.4 Emissions from construction

activities including plant and

equipment

Yes Fugitive dust, SO2, NOX, CO emissions

are envisaged from the vehicular

movement during construction period.

However, they are localized and

temporary in nature.

Details of emission, impact and EMP will

be provided in EIA report.

5.5 Dust or odours from

handling of materials

including construction

materials, sewage and

waste

Yes Adequate mitigation will be taken to

control dust emission.

There will be no odour generation.

5.6 Emissions from incineration

of waste

No Not Applicable.

5.7 Emissions from burning of No Not Applicable.

Page 29: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Form -1 of proposed Greenfield integrated cement plant of 3.6 MTPA Clinker, 5.5 MTPA Cement, 75 MW CPP with 5.0 MTPA Limestone Mine

Page 29 of 51

Sr. No.

Information/Checklist Confirmation

Yes / No

Details thereof (with approximate quantities/ rates, wherever possible) with source of

information data

waste in open air (e.g. slash

materials, construction

debris)

5.8 Emissions from any other

sources

No Not Applicable.

6.0 Generation of Noise and vibration, and emissions of Light and heat

6.1 From operation of

equipment e.g. engines,

ventilation plant, crushers

Yes Plant & CPP: Noise will be generated from various

activities. Adequate measure will be

taken to control the noise level.

Regular maintenance of the equipment

will help in reducing these noise levels.

Acoustic enclosures, necessary PPEs

will be provided to concerned persons.

The green belt development will be

proposed in the plant premises as per

CPCB guidelines.

Mine: Noise will be generated from shovels,

dumpers, drills, dozers, and blasting,

crushing, mechanical transportation.

Periodic maintenance of HEMM will be

taken up to minimize noise pollution.

Multiple delay non electric initiation

system of blasting technique will be

adopted to control noise level & ground

vibration.

6.2 From industrial or similar

processes

Yes

Page 30: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Form -1 of proposed Greenfield integrated cement plant of 3.6 MTPA Clinker, 5.5 MTPA Cement, 75 MW CPP with 5.0 MTPA Limestone Mine

Page 30 of 51

Sr. No.

Information/Checklist Confirmation

Yes / No

Details thereof (with approximate quantities/ rates, wherever possible) with source of

information data

Acoustic enclosures, necessary PPEs

will be provided to concerned persons.

The green belt development will be

proposed at the periphery of mines.

Regular maintenance of the equipment

and vehicle will help in reducing noise

levels.

6.3 From construction or

demolition

Yes Noise will be generated during

construction activities.

Regular maintenance of the equipment

will help in reducing these noise levels.

6.4 From blasting or piling

No –

Plant

Yes -

Mine

Plant & CPP: Not Applicable.

Mine: Noise will be generated from blasting.

Multiple delay non electric initiation

system of blasting technique will be

adopted to control noise level & ground

vibration.

Ground vibration study will be conducted

& it will be recorded at each blasting

through Minimates.

Acoustic enclosures, necessary PPEs

will be provided to concerned persons.

The green belt development will be

proposed at the periphery of mines.

6.5 From construction or Yes Plant & CPP:

Page 31: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Form -1 of proposed Greenfield integrated cement plant of 3.6 MTPA Clinker, 5.5 MTPA Cement, 75 MW CPP with 5.0 MTPA Limestone Mine

Page 31 of 51

Sr. No.

Information/Checklist Confirmation

Yes / No

Details thereof (with approximate quantities/ rates, wherever possible) with source of

information data

operational traffic

Noise will be generated during RCC

work.

Noise is envisaged from the traffic during

construction phase.

Noise will be from HEMM and

transportation.

Mine: Noise is envisaged from the traffic during

both construction & operation phase.

Noise will be from HEMM and

transportation. All HEMM will be

equipped with silencers. Crusher area

will be enclosed and green belt will be

developed around it.

6.6 From lighting or cooling

systems

No Not envisaged.

6.7 From any other sources No Not envisaged.

7.0 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal wasters or the sea

7.1 From handling, storage, use

or spillage of hazardous

materials

No There will not be any contamination due

to hazardous waste handling. The

Hazardous Waste will be handled as per

HWM&Tr Rules- 2008.

7.2 From discharge of sewage

or other effluents to water or

the land (expected mode

and place of discharge)

No The project will be operated on “Zero

Discharge” concept.

No contamination of ground water or land

is envisaged.

7.3 By deposition of pollutants

emitted to air into the land or

Yes The incremental ground level

concentrations of air pollutants (dust) will

Page 32: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Form -1 of proposed Greenfield integrated cement plant of 3.6 MTPA Clinker, 5.5 MTPA Cement, 75 MW CPP with 5.0 MTPA Limestone Mine

Page 32 of 51

Sr. No.

Information/Checklist Confirmation

Yes / No

Details thereof (with approximate quantities/ rates, wherever possible) with source of

information data

into water be well within the permissible limits.

Hence, minimum impact is anticipated.

7.4 From any other sources No Not envisaged

7.5 Is there a risk of long term

build up of pollutants in the

environment from these

sources?

No Not envisaged. However, periodical

monitoring would be done of air, water &

soil of surroundings so that timely

mitigation can be undertaken.

8.0 Risk of accidents during construction or operation of the project, which could affect human health or the environment

8.1 From explosions, spillages,

fires etc from storage,

handling, use or production

of hazardous substances

Yes Plant & CPP: Required precautionary measures will be

envisaged. Factory Act, 1947 will be

complied with.

Mine: Two numbers of explosive storage

magazine, each 5 Tonnes capacity, will

be constructed.

Explosives will be procured, stored,

handled and consumed as per Explosive

Act & Rules.

Blasting will be carried out by

experienced foremen and blasters under

the supervision of Blasting In-charge.

Precautionary & controlled measures will

be taken up as per Explosive Rules and

Page 33: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Form -1 of proposed Greenfield integrated cement plant of 3.6 MTPA Clinker, 5.5 MTPA Cement, 75 MW CPP with 5.0 MTPA Limestone Mine

Page 33 of 51

Sr. No.

Information/Checklist Confirmation

Yes / No

Details thereof (with approximate quantities/ rates, wherever possible) with source of

information data

Metalliferous Mines Regulation / DGMS

guidelines.

8.2 From any other causes No Not envisaged.

8.3 Could the project be

affected by natural disasters

causing environmental

damage (e.g. floods,

earthquakes, landslides,

cloud burst etc)?

No The project site falls in Zone-II as per IS

1893 (Part-I): 2002. Hence, seismically it

is a stable zone.

Not envisaged for flood considering HFL

of Kagina river. HFL of Kagina river will

be considered during designing period.

Page 34: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Form -1 of proposed Greenfield integrated cement plant of 3.6 MTPA Clinker, 5.5 MTPA Cement, 75 MW CPP with 5.0 MTPA Limestone Mine

Page 34 of 51

9.0 Factors which should be considered (such as consequential development)

which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality

9.1 Lead to development of

supporting, facilities,

ancillary development or

development stimulated

by the project which

could have impact on the

environment e.g.:

Supporting

infrastructure (roads,

power supply, waste

or waste water

treatment, etc)

Housing development

Extractive industries

Supply industries

Other

Yes

Yes

No

No

Yes

Yes

Proposed plant will result in considerable

growth of service sector, which will lead

to supporting ancillary development in

the region.

These facilities will be developed.

A full-fledged township, comprising of

houses, guest house, school, shopping

centre, club, etc. will be provided.

--

Potential for development of small

vendors namely workshops / fabrication

shops / hardware / rubber items /

automobile repairs etc.

Potential for service industries like poultry

& dairy farm, bakeries, plumbing,

carpenters, painting, electrical jobs and

other domestic helps and services.

9.2 Lead to after use of the Yes Plant & CPP:

Page 35: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Form -1 of proposed Greenfield integrated cement plant of 3.6 MTPA Clinker, 5.5 MTPA Cement, 75 MW CPP with 5.0 MTPA Limestone Mine

Page 35 of 51

site, which could have

an impact on the

environment

Impacts will be minimised by adopting

adequate control measures.

Mine: No major impacts are envisaged, mining

area will be reclaimed after excavation.

The disturbed land will be rehabilitated as

water bodies & plantation as per IBM

approved Mine Closure Plan.

9.3 Set a precedent for later

developments

Yes Community development activities &

ancillary industries would be developed.

9.4 Have cumulative effects

due to proximity to other

existing or planned

projects with similar

effects

No Not envisaged.

(III) Environmental Sensitivity

Sr. No. Areas Name / Identity

Aerial distance (within 15 km) Proposed project location

boundary

1 Areas protected under international

conventions, national or local

legislation for their ecological,

landscape, cultural or other related

value

Nil Nil

2 Areas which are important or

sensitive of ecological reasons –

wetlands, water courses or other

water bodies, coastal zone,

biospheres, mountains, forests

Nil Not applicable.

3 Areas used by protected, important

or sensitive species of flora or fauna

for breeding, nesting, foraging,

Maliwar -

RF

~ 13.3 km towards South-East

from Plant site

~ 10.0 km towards South-East

Page 36: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Form -1 of proposed Greenfield integrated cement plant of 3.6 MTPA Clinker, 5.5 MTPA Cement, 75 MW CPP with 5.0 MTPA Limestone Mine

Page 36 of 51

Sr. No. Areas Name / Identity

Aerial distance (within 15 km) Proposed project location

boundary

resting, over wintering, migration direction from Mine.

4 Inland, coastal, marine or

underground waters

Kagina

river

Kamlavati

nadi

~ 1.26 km towards North of Plant

~ Towards South direction and

adjoined to ML area.

~ 0.6 km towards West from

Plant

~4.5 km SW from Mine

5 State, national boundaries Andhra Pradesh – Karnataka Boundary.

Aerial distance of Plant & Mine nearest to Andhra Pradesh border is ~ 6.0 km. and 1.6 km. respectively.

6 Routes or facilities used by the public

for access to recreation or other

tourist, pilgrim areas

Nil

Not applicable

7 Defence installations Nil Not Applicable

8 Densely populated or built-up area Nil Nearest Tehsil: Sedam is at 2.0

km from Plant site and 6.0 km.

from Mine area.

9 Areas occupied by sensitive man

made land uses (hospitals, schools,

places of worship, community

facilities)

Yes Primary health centers and

schools exist in 10 km radius

area.

10 Areas containing important, high

quality or scarce resources

(ground water resource, surface

resources, forestry, agriculture,

fisheries, tourism, minerals)

Yes Limestone

11 Areas already subjected to pollution

or environmental damage. (those

where existing legal environmental

standards are exceeded)

Nil Nil in 10 km radius. Cement

companies such as CCI,

Kurgunta & Vasavadatta Cement

plants are situated nearly.

Page 37: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Form -1 of proposed Greenfield integrated cement plant of 3.6 MTPA Clinker, 5.5 MTPA Cement, 75 MW CPP with 5.0 MTPA Limestone Mine

Page 37 of 51

Sr. No. Areas Name / Identity

Aerial distance (within 15 km) Proposed project location

boundary

12 Areas susceptible to natural hazard

which could cause the project to

present environmental problems

(earthquakes, subsidence,

landslides, erosion, flooding or

extreme or adverse climatic

conditions)

No The area is not known for these

natural hazards. Seismically, this

area is categorized under Zone-II

as per IS-1893 (Part-1)-2002

and stable zone. Not envisaged

for flood considering HFL of

Kagina river. HFL of Kagina river

will be considered during

designing.

Page 38: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Form -1 of proposed Greenfield integrated cement plant of 3.6 MTPA Clinker, 5.5 MTPA Cement, 75 MW CPP with 5.0 MTPA Limestone Mine

Page 38 of 51

IV) Proposed Terms of Reference for EIA Studies

1.0. Proposed EIA Study The components of the EIA study will include:

Determination of baseline data using primary data generation and secondary data

available from various government published reports on air, meteorology, water, soil,

flora & fauna, socio-economics, infrastructure, sensitive areas (forests,

archaeological, historical etc);

Detailed description of all elements of the project activities during the pre-

construction, construction and operational phases. The elements to be analyzed will

include the infrastructures of the project including drainage features, roads, waste

collection, disposal and management and utility requirements.

Identifying the sources of pollution and assessing the impacts on the environment

due to proposed Lime Stone Mine.

Preparation of EIA and EMP documents with recommendations on preventive and

mitigative measures for limiting the impact on environment to the desired level during

various stages of project. Development of a suitable post study-monitoring program

to comply with various environmental regulations will also to be done; and

Risk Assessment (RA) and Disaster Management Plan (DMP) describing the

probable risks and preventive & precautionary measures to be followed in the event

of emergency situations such as accidents, fire etc.

2.0. Baseline Environmental Data Generation a. Ambient Air Quality (as per 18th Nov’2009 notification on CPCB National

Ambient Air Quality Standards)

Parameters

No. of Locations, Samples &

Frequencies as per

Approved TOR

Method

SO2 (µg/m3)

10, Twice a week for 13

-Improved West and

Gaeke

-Ultraviolent fluorenscence

NOx (µg/m3) -Modified Jacob &

Hochheiser (Na- Arsenite)

Page 39: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Form -1 of proposed Greenfield integrated cement plant of 3.6 MTPA Clinker, 5.5 MTPA Cement, 75 MW CPP with 5.0 MTPA Limestone Mine

Page 39 of 51

weeks of a season -Chemiluminescence

PM less than 10 µm

(24 hrly) (µg/m3)

-Gravimetric

-TOEM

-Beta attenuation

PM less than 2.5 µm

(24 hrly) (µg/m3)

-Gravimetric

-TOEM

-Beta attenuation

CO (1hrly - average)

(µg/m3)

Non Dispersive Infrared

(NDIR) spectroscopy

Heavy Metals like

As(ng/m3), Ni (ng/m3),

Pb(µg/m3)

AAS /ICP method after

sampling on EPM 2000 or

equivalent filter paper

Ozone (O3) (µg/m3) 8 hours / 1 hours UV photometric

Chemiluminescence

Chemical method

b. Meteorology

Parameters Methods

Wind Speed, Wind Direction, solar radiation,

Cloud Cover, Relative Humidity, Temperature,

and Rainfall.

As per CPCB guideline for

ambient air quality monitoring

c. Noise Level

Parameters No. of Locations, Samples,

Frequencies

Equivalent noise level (Leq) for day time and

night time.

10, once in a season, as per

CPCB guideline for ambient air

quality monitoring

Page 40: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Form -1 of proposed Greenfield integrated cement plant of 3.6 MTPA Clinker, 5.5 MTPA Cement, 75 MW CPP with 5.0 MTPA Limestone Mine

Page 40 of 51

d. Water Quality

Parameters No. of Locations, Samples,

Parameters as per IS-10500 and IS-2296. Total 10 number of samples

(minimum 3 for surface

water), once during the

season,

e. Soil Quality

Parameters No. of Locations, Samples, Frequencies

Texture, pH, salinity, electrical

conductivity, organic carbon, NPK, Na,

Mg,Ca,Cl, F etc Physico Chemical

analysis and relevant trace metals.

10 locations, once during a season

f. Land Use

Parameters No. of Locations, Samples, Frequencies

Land use as per the district census

handbooks and satellite imagery data.

Once during the study period

g. Geology and Hydrological aspects

Parameters No. of Locations, Samples, Frequencies

Detailed Hydrogelogical study will be

carried out for assessment of availability

of groundwater, determination of

aquifer, their nature & depth, impact of

groundwater due to project and

feasibility of rainwater harvesting.

-

h. Socio Economic and Health aspects

Parameters No. of Locations, Samples, Frequencies

Socio-economic and health aspects will

be done for study area.

Once during the study period

Page 41: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Form -1 of proposed Greenfield integrated cement plant of 3.6 MTPA Clinker, 5.5 MTPA Cement, 75 MW CPP with 5.0 MTPA Limestone Mine

Page 41 of 51

i. Ecological Studies (Terrestrial and Aquatic)

Parameters No. of Locations, Samples, Frequencies

Flora and fauna will be studied in 10 km

radius study area, once during the study

period. These studies will be based on

primary as well as secondary sources.

Once during the study period

j. Aesthetic / Cultural / Sensitive Aspects

Parameters No. of Locations, Samples, Frequencies

Identification of all historical/

archaeological

sites/cultural/religious/tourist

interests/defence installations in the study

area. Other sensitive locations such as

national park, sanctuary, important lakes,

biosphere reserves, within 15 km radius

will be identified

Once during the study period

k. Traffic Survey

Parameters No. of Locations, Samples, Frequencies

Traffic volumes will be measured once

during study period at three important

traffic intersections leading to the project

site to assess the traffic volumes.

once during study period

3.0 Identification of Sources of Pollution

a. Data Generation:

Identifying the sources of pollution of air, water, land and noise;

Quantifying the emissions from the pollution generating sources; and

Quantification of solid wastes and likely disposal methods will be suggested;

b. Sources of Pollution

The likely sources of air and water pollution will be identified and quantified;

Page 42: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Form -1 of proposed Greenfield integrated cement plant of 3.6 MTPA Clinker, 5.5 MTPA Cement, 75 MW CPP with 5.0 MTPA Limestone Mine

Page 42 of 51

The proposed pollution control measures envisaged in project area for fugitive

dust, noise pollution and other environmental effects of each project activities will

be assessed ;

The present and proposed changes in land use pattern will be identified; and

Suitable green belt development plan will be prepared.

Based on various project activities, the likely impact on the environment attributes

in project area will be identified by:

Estimating the air pollution levels for SPM, SO2 and NOx in the study area

Estimating the source emissions for each project specific pollutants;

Predicting the noise dispersions for all the noise generating sources;

Predicting the impact of wastewater discharges, if any;

Studying the short-term and long-term effects on sensitive targets like

endangered species, crops and historically/archaeologically important sites (if

any).

4.0. Environmental Impact Assessment The proposed project will have an impact on the environment. The parameters

likely to be affected are air quality, water quality, soil quality and noise levels etc on

account of gaseous emissions, liquid effluent discharges, resultant particulates,

generation of solid wastes etc will be discussed.

The baseline data generated from the above studies will be analyzed and

compared with applicable standards prescribed by the CPCB. By this means, the

impact whether positive or negative will be assessed and the environmental

attributes requiring special attention for mitigating the negative impact, if any, will

be identified. Also the areas, which fulfil the prescribed environmental norms and

not requiring further improvements, will be specified. Both short-term and long term

impacts particularly on sensitive targets such as habitat of endangered species of

wildlife or mines, crops, historically/culturally important sites/monuments, centres

with concentrated population in the study area will be established. Impact of the

fugitive emissions on terrestrial flora will be scientifically documented based upon

species composition of the area and their air pollution tolerance levels.

Page 43: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Form -1 of proposed Greenfield integrated cement plant of 3.6 MTPA Clinker, 5.5 MTPA Cement, 75 MW CPP with 5.0 MTPA Limestone Mine

Page 43 of 51

The impacts of project on various components of environment and the possible

mitigation measures for mitigating the negative impacts were described in the

following sections.

4.1 Impact on Land Use

Impact Assessment

The land use impacts due to proposed clinker plant will be identified in terms of local

land use planning efforts. The change in land use pattern of project site will also be

identified. This includes visual impact, impact on forest, impact due to industrial

growth and growth due to socio-economic factors.

Mitigation Measures

The mitigation measures will be addressed towards restoration of land disturbed by

the proposed project activities to the extent possible.

4.2.1.1.1 Impact on Ambient air Quality

Impact Assessment

Emission inventory will be carried in the study area. A computer based internationally

recognized equivalent mathematical air quality model will be used to predict the

concentration of SO2, NOx & SPM due to proposed project. The results will be

presented for short-term (24-hourly) concentrations in and around the project site.

The dispersion model results will be included in the report using isopleths or other

graphical methods, over laying a land use map of the surrounding area. The

predicted air quality results will be compared with existing regulations.

Mitigation Measures

Potential mitigation measures include the control measures at the source level. The

measures to control the fugitive dust emissions will also be suggested according to

guidelines of CPCB .

4.3 Impact on Noise

Impact Assessment: Sources of noise and its impact on the environment will be

addressed. The noise level at varying distances for multi-sources will be

predicted using Noise model. A comparison of measured noise (Leq) at

monitoring locations to that of predicted noise levels (Leq) will be made and

Page 44: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Form -1 of proposed Greenfield integrated cement plant of 3.6 MTPA Clinker, 5.5 MTPA Cement, 75 MW CPP with 5.0 MTPA Limestone Mine

Page 44 of 51

mitigatory measures will be recommended to conform to regulatory ambient air

noise standards.

Baseline noise levels in different zones like industrial, residential and silence areas

like hospitals, schools etc will be monitored. The potential noise level exposure will

be determined and evaluate for acceptable limits of exposure.

Mitigation Measures

The potential mitigation measures will be addressed to reduce noise levels by control

at source, isolation of high noise generating sources, use of protective measures

especially in high noise areas and development of green belt .

4.4 Impact on Ecology

Impacts on aquatic species especially during dry season will be assessed particularly

those which are endangered, if any. The parameters, which are of concern, are TSS,

TDS, heavy metals, oil and grease, pH and temperature. The assessment will also

include impacts of chlorinated organic chemicals. The impact of site preparation

activities involving site clearing, excavation, earth moving, dewatering or impounding

water bodies and developing burrow and fill areas will be assessed.

Recommendations will be made to mitigate such adverse impacts as soil erosion and

habitat loss. In addition, impact of fugitive emissions will be assessed on the

surrounding species of economic/genetic/biological importance.

4.5 Impact on Water Use

Impact Assessment

The impacts of the proposed project due to water usage and wastewater discharges

will be addressed covering the following:

Groundwater quality degradation due to likely solid waste disposal and sewage

disposal;

Agricultural productivity;

Habitat conditions; and

Recreation resources and aesthetics.

Mitigation Measures

The mitigation measures will be addressed ensuring the present and anticipated

future water requirements for various purposes. The measures also address the

Page 45: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Form -1 of proposed Greenfield integrated cement plant of 3.6 MTPA Clinker, 5.5 MTPA Cement, 75 MW CPP with 5.0 MTPA Limestone Mine

Page 45 of 51

need to maintain or improve the existing Class of Water (as per IS: 2296) to ensure

that the current/proposed uses are not impaired due to deterioration of the water

quality.

4.6 Impact on Water Quality

Impact Assessment of Ground and Surface water will be addressed.

Deterioration of Groundwater and surface water quality are not envisaged due to the

project activities.

Mitigation Measures

The mitigation measures including wastewater treatment and recycle will be

suggested.

4.7 Impact on Demography and Socio-Economics

Impact Assessment

On the basis of the information proposed to be collected and employment and other

potential for the benefits of surrounding community of the study area , the likely

socio-economic impacts of proposed project during construction ,operation and

post-project will be assessed in detailed .

Mitigation Measures

Strategies to mitigate the negative impacts, if any, due to the project will be

suggested.

4.8 Impact on Soil

Impact Assessment

Impact on soil will be assessed in view of change in land use pattern due proposed

mining operations. The overburden generated will be backfilled to restore the mined

out area for afforestation and agriculture purpose.

Mitigation Measures

Strategies to mitigate the negative impacts on soil due to disposal of solid

wastes/over burden, if any, due to the project activities will be suggested with a

emphasis on recycling of maximum solid wastes.

5.0 Environment Management Plan

Page 46: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Form -1 of proposed Greenfield integrated cement plant of 3.6 MTPA Clinker, 5.5 MTPA Cement, 75 MW CPP with 5.0 MTPA Limestone Mine

Page 46 of 51

A Rapid EIA Report based on three months field data generation will be prepared for

the purpose of getting clearance from MoEF. EIA/EMP will be prepared based on

one season data.

The Environment Management Plan (EMP) will include all the mitigatory measures

proposed under each significant environmental attribute. Further, a suitable green belt

development plan for the project site will be included in the EMP report.

6.0 Post Study Monitoring Plan The Post Project Monitoring (PPM) plan will be prepared considering the following:

i. The proposed pollution control measures for air, wastewater and solid waste

(hazardous/non-hazardous) disposal;

ii. Waste minimization, wastewater management, waste reuse and resource

recovery, waste segregation to make the treatment and disposal cost-effective;

iii. The monitoring requirements for ensuring the statutory as well as process data is

collected; and

iv. The organizational/institutional set-up required for effective environment

management plan implementation and post-project monitoring will be suggested

along with the budgetary requirements.

7.0 Disaster Management Plan & Occupational Safety A Disaster Management Plan (DMP) for dealing emergency situation arising due to

fire, explosion, leakages of oil, waste oil and other materials will be prepared. The

plans include safe storage, handling, transportation and use of hazardous

materials/wastes to be used or generated.

Occupational risk involved during construction and operation of the project will be

assessed and necessary safety and protective measures will be suggested. The

DMP include both onsite and off site emergency preparedness plans.The

components of the EIA study include:

Determination of baseline data using primary data generation and

secondary data available from various government published reports on

air, meteorology, water, soil, flora & fauna, socio-economics,

infrastructure, sensitive areas (forests, archaeological, historical etc);

Page 47: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Form -1 of proposed Greenfield integrated cement plant of 3.6 MTPA Clinker, 5.5 MTPA Cement, 75 MW CPP with 5.0 MTPA Limestone Mine

Page 47 of 51

Detailed description of all elements of the project activities during the pre-

construction, construction and operational phases. The elements

analyzed include the infrastructures of the project including drainage

features, roads, waste collection, disposal and management and utility

requirements;

Identification of the sources of pollution and assessing the impacts on the

environment due to proposed project;

Preparation of EIA and EMP documents with recommendations on

preventive and mitigative measures for limiting the impact on environment

to the desired level during various stages of project. Development of a

suitable post study-monitoring program to comply with various

environmental regulations; and

Risk Assessment (RA) and Disaster Management Plan (DMP) describing

the probable risks and preventive & precautionary measures to be

followed in the event of emergency situations such as accidents, fire etc.

Page 48: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Form -1 of proposed Greenfield integrated cement plant of 3.6 MTPA Clinker, 5.5 MTPA Cement, 75 MW CPP with 5.0 MTPA Limestone Mine

Page 48 of 51

Declaration I hereby give an undertaking that the data and information given in the application and

enclosures are true to the best of my knowledge and belief and I am aware that if any part of

the data and information submitted is found to be false or misleading at any stage, the

project will be rejected and clearance given, if any, to the project will be revoked at our risk

and cost.

Signature of the applicant With name and full address Dr.Hari Raj Dandi Vice President - Business Development Date: Place: NOTE: 1. The projects involving clearance under coastal Regulation zone Notification, 1991 shall

submit with the application a C.R.Z map duly demarcated by one of the authorized agencies, showing the project activities, w.r.t. C.R.Z (at the stage of ToR) and the recommendations of the State Coastal Zone Management Authority (at the stage of EC). Simultaneous action shall also be taken to obtain the requisite clearance under the provisions of the C.R.Z Notification, 1991 for the activities to be located in the CRZ.

2. The projects to be located within 10 km or the National Parks, Sanctuaries, Biosphere

Reserves, Migratory Corridors of Wild Animals, the project proponent shall submit the map duly authenticated by Chief Wildlife Warden showing these features vis-a-vis the project location and the recommendations or comments of the Chief Wildlife Warden thereon (at the stage of EC)."

3. All correspondence with the Ministry of Environment & Forests including submission of

application for TOR/Environmental Clearance, subsequent clarifications, as may be required from time to time, participation in the EAC Meeting on behalf of the project proponent shall be made by the authorized signatory only. The authorized signatory should also submit a document in support of his claim of being an authorized signatory for the specific project."

Page 49: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Form -1 of proposed Greenfield integrated cement plant of 3.6 MTPA Clinker, 5.5 MTPA Cement, 75 MW CPP with 5.0 MTPA Limestone Mine

Page 49 of 51

LIST OF ANNEXURES

Sr.No.

Annexure No.

Title

1. Annexure 1 Index map of Plant area

2. Annexure 2 10 Km. Study Area

3. Annexure 3 Tentative Layout of Integrated Cement Plant

4. Annexure 4 Google imagery showing coordinates

5. Annexure 5 Location of Proposed Plant & Alternate Sites

5. Annexure 6 Industrial Entrepreneur Memorandum

6. Annexure 7 Letter of Intent from Karnataka Govt.

7. Annexure 8 Process description - Cement Plant

8. Annexure 9 Process Description - Mining

10. Annexure 10 Water balance - Plant

11. Annexure 11 Water Balance - Mine

Page 50: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Annexure - 1 Index Map of Area

Page 51: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Annexure - 6 Industrial Entrepreneur Memorandum

Page 52: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Annexure- 7 Letter of Intent of Tilkur Hebal ML

Page 53: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Annexure - 8 Cement Plant - Process Description Cement manufacturing principally involves grinding and blending of raw materials in a

definite proportion - a material containing calcium oxide (such as limestone, chalk, marl) with

a siliceous material (such as clay, shale, sand) along with certain additive or corrective

materials (such as laterite) and then calcining the mixture at high temperatures in a kiln. The

resulting ‘clinker’ is cooled and then ground with gypsum to produce the finished product,

Ordinary Portland Cement (OPC). Gypsum is added to control the setting time of cement.

Portland Pozzolona Cement (PPC) is manufactured by adding approximately 30% fly ash to

clinker and gypsum during the grinding operation.

Dry process of cement manufacturing offers more advantages, particularly in fuel

consumption and is the most rational and logical choice. In the proposed plant, dry process

has been selected to manufacture clinker, which comprises of rotary kiln, preheater and

precalciner. The process flow sheet is presented in Figure given below:

Flow Diagram – Cement Plant

Lime stone from Quarry

Crushing of lime stone

Pre Heater Pre Calciner

Raw mill grinding

Raw meal storage

Cement storage silo

Coal mill Fine Coal storage

Kiln

Coal

Laterite, other additives/corrective materials

Clinker to Grinding unit

Dispatch of cement (Bags & bulk) and transport (Road & Rail)

Clinker

Gypsum Fly ash / Slag / MIC

Cement Mill

Alternate Fuel

Alternate fuel

Page 54: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Process Details – Captive Power Plant Captive Power Plant (CPP) Project As a part of this proposal, a coal based, thermal power plant of 75 MW capacity, which will

be located in the premises of Cement Plant is considered in the project. The production

facilities for following operations are considered in the scope of the CPP.

Fuel preparation

Boiler and Turbines

Flyash / bed ash collection, handling and storage

Fuel Preparation Coal is considered as fuel for thermal power plant. Raw coal is received by Wagons and

unloaded by Wagon tippler installed in Cement plant. It will be crushed and then conveyed

to the Coal stockpile area earmarked for CPP. Mechanised systems such as stacker

reclaimers will be considered for coal stacking and reclaiming. The Raw coal from stockpile

is conveyed to a secondary crushing plant (closed circuit crusher with a vibrating screen).

The required size of coal from the crusher plant will be conveyed to the coal hoppers in

thermal power plant for firing into the boilers. The boilers will also be designed to suit feeding

biomass/agriculture waste in a controlled way in future.

Boilers and Turbine Fluidized bed boilers are considered for generation of steam in the power plant. The fuel for

these boilers will be crushed and sized. The boiler will be provided with Electro Static

Precipitators for collection of dry flyash and to control the emissions levels below prescribed

limits. Steam turbine sets will be used for generation of electricity.

Air Cooled Condenser An efficient Air Cooled Condenser will be considered for cooling the water for recirculation in turbines.

Flyash Handling Plant Dry fly ash will be collected from ESP which will be conveyed through dense phase

pneumatic conveyor to the flyash silos. From silos, it will be conveyed through a pneumatic /

mechanical conveyor to the flyash silo in cement plant. The flyash generated will be used for

production of PPC. Provision will also be made below flyash silos for loading into bulkers.

Bed ash – The bed ash will be collected in the bottom of fluidized bed. The same will be

used in cement manufacturing & also disposed off for mine pit filling / leveling low lying

areas/construction of ramp roads etc.

Page 55: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Flow Diagram - CPP

Page 56: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Annexure - 9

Method of Mining

Top soil removal

Drilling by hydraulic rigs

Controlled blasting

Loading by excavator / loader

Transportation

Size reduction by crusher

Dispatch to plant

Page 57: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Stages of Mineral Processing

Overburden Removal Limestone

Drilling (after removal of top soil)

Drilling (after removal of top soil & overburden)

Blasting Blasting

Loading by shovel Loading by shovel

Transportation by dumpers Transportation by dumpers

Dump site located within ML Area Limestone Crusher

To Cement Plant

Page 58: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Annexure - 10

Water Balance - Plant

Page 59: Reliance Cement Company Private Limitedenvironmentclearance.nic.in/writereaddata/form-1/... · Dhirubhai Ambani Knowledge City, Koparkhairane Navi Mumbai-400710, Maharashtra(India)

Mines 250 KLD

Dust Suppression 120 KLD

Green Belt 100 KLD

Domestic 30 KLD

Sock Pit 10 KLD

Annexure - 11 Water Balance - Mine