8/2/2020 12:02:41 PM bkloss W:\Highway\Bridge\Standards\Pedestrian Tunnels\EnglishSignedPedestrianTunnel.dgn PT G1-20 11x17_pdf.pltcfg
Highway Division
PT G1-20General Notes
Index &
Index for Pedestrian Tunnel Standards:
Supplemental Specifications and Special Provisions.
General Supplemental Specifications, Developmental Specifications,
Highway and Bridge Construction, current series, plus applicable
Iowa Department of Transportation Standard Specifications for
Construction:
AASHTO LRFD Bridge Design Specifications, 8th Ed., Series of 2017.
Design:
Concrete in accordance with AASHTO LRFD Section 5, f'c = 4.0 KSI.
Reinforcing steel in accordance with AASHTO LRFD Section 5, Grade 60.
the AASHTO LRFD Bridge Design Specifications, 8th Ed., Series of 2017:
Design stresses for the following materials are in accordance with
Pedestrian Tunnel Standards
Reinforced Concrete
Specifications:
Design Stresses:
General Notes: General Notes Continued:
Pedestrian Tunnel Textured Concrete
Aesthetic Treatment General Notes
Safety Rail Details
Safety Rail Details
Pedestrian Tunnel Bell Joints
Pedestrian Tunnel Bell Joints
Flared Wing Headwall Quantity Tabulation
Flared Wing Headwall Wing Layouts & Cross Section Details
Flared Wing Headwall Apron Layout & Curtain Wall Details
Flared Wing Headwall Dimension Plan & Table
Tunnel Details 14'-0" x 12'-4"
Tunnel Details 12'-0" x 12'-4"
Tunnel Details 12'-0" x 11'-4"
Typical Tunnel Details
Index & General Notes
PT-AD 2-20
PT-AD 1-20
PT-SR 2-20
PT-SR 1-20
PT-CBJ 2-20
PT-CBJ 1-20
PT-FWH 0-4-20
PT-FWH 0-3-20
PT-FWH 0-2-20
PT-FWH 0-1-20
PT-RCB 14-12-20
PT-RCB 12-12-20
PT-RCB 12-11-20
PT G2-20
PT G1-20
2"
culvert is not to a full inch
" if overall height of the213" or 3
2"
" to near transverse reinforcing bar213
" to near transverse reinforcing bar412
2" except
Bar Size Number
Minimum Splice Length 20"
4
24"
5
29"
6
34"
7
English Size
Bar Designation 13
4
16
5
19
6
22
7
25
8
29
9
EN
GLIS
H_L
RF
D_SIG
NE
D_P
ED
ES
TRIA
N_T
UN
NE
L_S
TA
ND
AR
DS.D
GN -
PT G
1-2
0 -
THIS S
HE
ET IS
SU
ED 08-2
020
3. Approved Equal
2. Grace Construction Products Bituthene 3000 (Below Grade)
1. W.R. Meadows Mel-Rol
following is a listing of approved waterproof membrane:
recommendations. Omit waterproof membrane when bell joints are used. The
a Manufacturer's approved adhesive in accordance with the Manufacturer's
construction joints in the slab and walls. Waterproof membrane shall be installed with
23. Waterproof membrane shall be applied to the outside face of the transverse
replaced at no cost to the State.
placement. Bentonite waterstop that has swelled prior to concrete placement shall be
22. Bentonite waterstop shall be protected from exposure to moisture prior to concrete
3. Approved Equal
2. Henry Hydro-Flex
1. Greenstreak Swellstop
following is a listing of approved bentonite waterstop:
approved adhesive in accordance with the Manufacturer's recommendations. The
and bottom of the walls. Bentonite waterstop shall be installed with a Manufacturer's
21. Bentonite waterstop shall be applied to the longitudinal construction joints at the top
3. Approved Equal
2. Southern Waterstops 25RCB
1. Greenstreak #738
The following is a listing of approved PVC waterstop:
Manufacturer's recommendations. Omit PVC waterstop when bell joints are used.
walls, and floor. PVC waterstop shall be installed in accordance with the
20. PVC waterstop shall be applied to the transverse construction joints in the slab,
19. All dimensions are in feet and inches unless otherwise noted or shown.
slab reinforcing steel, if applicable, shall be included in the final plans.
18. If 0' of fill is specified, details for paving notch and reference to epoxy coating of
a maximum of 10 degrees from vertical.
stated otherwise. In addition, the bevel used on the keyway shall be limited to
17. Keyway dimensions shown on the plans are based on nominal dimensions unless
and the headwall apron and wingwall shall be 2"x6".
16. Keyway size shall be 2"x4" except the keyway between the barrel floor and wall
15. All beveled keyways shall be centered.
14. All construction joints shall be formed with a beveled keyway except at bell joints.
deformed reinforcement unless otherwise noted or shown.
13. All reinforcing bars and bars noted as dowels supplied for this structure shall be
reinforcing bars, and is equivalent to the bar diameter in millimeters.
following "bar designation". The "bar designation" is the stamped impression on the
inch diameter bar). English reinforcing steel received may display the85 (5a1 is
12. These pedestrian tunnel standards label all reinforcing steel with English notation
Transverse
Vertical bottom
Vertical top
End clearances:
Bottom of floor
Top of floor
Edge clearances:
11. Reinforcing bar clearances will be as follows:
This splice, if used, will be at the Contractor's expense.
option as follows:
10. The vertical bars in the walls may be spliced above the footing at the Contractor's
Grade 60 reinforcement.
accordance with the Standard Specifications. The design stresses are based on
9. The reinforcement supplied for this structure shall be Grade 60 reinforcement in
Contractor's option with Engineer's approval.
8. The permissible construction joint at the top of the walls may be lowered at the
the broom finish by waiting until surface has sufficiently set before application.
other covers during the initial curing period. Ensure that coverings will not damage
the broom finish by using additional curing methods that include fabric, plastic, or
accordance with Section 2301.03,K,2, of the Standard Specifications. Do not damage
surface, apply white pigmented liquid curing compound to the sidewalk in
formed to ensure correct line and grade. Following broom finishing of the sidewalk
of Article 2511.03,B,5,b, of the Standard Specifications. Sides of footing are to be
2511.03,B,3,b, of the Standard Specifications and meet the smoothness requirements
7. Floor of barrel shall receive a broomed finish meeting the requirements of Article
the construction joints.
6. Except for dowel bars 5r1 in slab, longitudinal reinforcing is not to extend thru
be 2" unless otherwise noted.
5. The clear distance from face of concrete to near edge or end of reinforcing bar to
3'-0" in either direction as outlined in the Standard Specifications.
4. All slab and floor reinforcing steel is to be supported at intervals of not more than
Class 2 exposure condition is utilized for the slab design in 0' fill instances.
conditions except:
3. The reinforced concrete pedestrian tunnel sections are designed for Class 1 exposure
Horizontal earth pressure, EHmax = 0.060 kcf max, EHmin = 0.030 kcf.
2. Vertical earth pressure, EV=0.120 kcf.
and earth fills of varying heights.
1. The reinforced concrete pedestrian tunnel sections are designed for HL-93 live load
Cast-In-Place Standard Design - Walkways and Trails
Pedestrian Tunnel
Reinforced Concrete
August, 2020
LA
TE
ST
RE
VISI
ON
DA
TE
AP
PR
OV
ED
BY
BRI
DG
E
EN
GI
NE
ER
Highway Division
8/2/2020 12:02:43 PM bkloss W:\Highway\Bridge\Standards\Pedestrian Tunnels\EnglishSignedPedestrianTunnel.dgn PT G2-20 11x17_pdf.pltcfg
m1 & m2 Bars
k1 & k2 Bars
a1 Bars
�m9 Bar
�k9 Bar
m2 Bars
k2 Bars
a1 Bars
�m9 Bar
�k9 Bar
�m9 Bar
�k9 Bar
k1 Bars
a1 Bars
m1 Bars
Var.
Var.
Var.
D D
D D D
"214"2
14
"214 "2
14
"214 "2
14
"214 "2
14
"214
"214
3"
3"
3"
3"
3"3"
3"
3"
3"
3"
3"
3"
3"
3"
3"
3"
3"
3"
3"
3"
3"
Weight (LB)No.Span
15
13
14'-0"
12'-0"
55
47
m2
a1
�m9m2
k2
�k9
a1
k2
Keyway
2"x4" Beveled
�m9
�k9
¡ Pedestrian Tunnel ¡ Pedestrian Tunnel
�m9
�k9
a1
k2
m1
a1
m2
¡ Pedestrian Tunnel
a1
m1
k1
a1
Keyway
2"x4" Beveled
k1
m1
See table for number required and total weight.
barrel joints, except joints with bell joints.
spacing required in slab at all culvert
One set of 5r1 x 3'-6" dowel bars @ 1'-0"
Outside Face
��PVC WaterstopCentered Over Joint
��1'-6" Wide Waterproof Membrane,
Keyway
Beveled 2"x4"
Keyway
Beveled 2"x4"
Centered Over Joint
��1'-6" Wide Waterproof Membrane,��PVC Waterstop
Outside Face
Keyway
Beveled 2"x4"
��PVC Waterstop
Top of Floor
PT G2-20Details
Typical Tunnel
End Section Plan ViewStandard Section Plan View
Standard Section Plan View
Joint Detail
Floor Construction
Joint Detail
Wall Construction
Joint Detail
Slab Construction
Floor
Bottom
Slab
Top
Floor
Slab
Floor
Top
Slab
Bottom
barrel section sheets.
conjunction with dimensions and quantities for
Dimensions listed on this sheet to be used in
Note:
backface of parapet.
shall extend at least to the
All longitudinal barrel steel
Note:
(Keyway is to be omitted when bell joints are used)
(Keyway is to be omitted when bell joints are used)
(Keyways not shown)
are omitted.
identify when the k9 and m9 bars
pedestrian tunnel barrel standards
k2 and m2 bars touch or lap. The
unless the horizontal legs of the
in the top slab and bottom floor
�The k9 and m9 bars are to be placed
membrane when bell joints are used.
Omit PVC waterstop and waterproof
��Note:
repeats in 3'-0" intervals.
and vertical reinforcing steel spacing
as typical because all transverse
29', and 26'. These lengths are shown
Typical for lengths of 38', 35', 32',
Note:
Const. Jt.
5r1 Bars - One
EN
GLIS
H_L
RF
D_SIG
NE
D_P
ED
ES
TRIA
N_T
UN
NE
L_S
TA
ND
AR
DS.D
GN -
PT G
2-2
0 -
THIS S
HE
ET IS
SU
ED 08-2
020
Cast-In-Place Standard Design - Walkways and Trails
Pedestrian Tunnel
Reinforced Concrete
August, 2020
LA
TE
ST
RE
VISI
ON
DA
TE
AP
PR
OV
ED
BY
BRI
DG
E
EN
GI
NE
ER
Highway Division
8/2/2020 12:02:45 PM bkloss W:\Highway\Bridge\Standards\Pedestrian Tunnels\EnglishSignedPedestrianTunnel.dgn PT-RCB 12-11-20 11x17_pdf.pltcfg
DBars
7
6
"415
"214
D=
H
V
Dimensions
Fill S H A B DC Size Sp.
a1
SizeL
b1
Sp. No. Size Sp. No.
e1
Sp.Size
e2
No. Size Sp. No.
f1
No.Sp.Size
f2
Size Sp.
k1
L
Bar List
Size Sp. L
k2
H V
k9
Size L Size Sp.
m1
L
m2
Size Sp. L H V Size
Quantities
Concrete (CY/FT)
Slab Floor
m9
L (LB/FT)
Steel
TotalWalls
--
--
---
---
---
---
--
--
12'-010-12
0 12'-0 13.5 14.5 11 9 4 12 13'-2 6 44 5 12 11 16 10 13 16 10 8 12 13'-6 6 9 12'-0 8'-0 4'-0 7 9 14'-0 6 9 19'-7 8'-0 11'-7 0.614 0.637 0.745 1.996 291.58
1 12'-0 12.5 14 11 9 4 9 13'-1 6 44 5 12 11 16 10 13 16 10 7 9 13'-6 6 9 11'-11 8'-0 3'-11 7 9 14'-0 6 9 19'-7 8'-0 11'-7 0.571 0.615 0.745 1.931 296.18
2 12'-0 8.5 10.5 11 9 4 12 12'-5 6 44 5 12 11 16 10 13 17 8 8 9 13'-6 7 9 10'-2 6'-2 4'-0 7 13'-6 7 6 14'-0 7 9 16'-4 5'-1 11'-3 7 14'-0 0.400 0.460 0.745 1.605 340.34
3 12'-0 8 10.5 11 9 4 12 12'-5 6 44 4 12 11 17 8 13 16 8 8 9 13'-6 7 9 8'-11 5'-0 3'-11 7 13'-6 6 6 14'-0 7 9 16'-0 4'-9 11'-3 7 14'-0 0.379 0.460 0.745 1.584 310.53
4-6 12'-0 8 10.5 11 9 4 12 12'-5 6 44 4 12 11 15 8 13 14 8 8 9 13'-6 6 6 8'-1 4'-6 3'-7 6 13'-6 7 6 14'-0 6 6 15'-8 4'-5 11'-3 6 14'-0 0.379 0.460 0.745 1.584 327.63
7-9 12'-0 8.5 11 11 9 4 12 12'-6 6 44 4 12 11 13 8 13 13 8 7 6 13'-6 6 6 7'-8 4'-1 3'-7 6 13'-6 7 6 14'-0 6 6 15'-5 4'-1 11'-4 6 14'-0 0.400 0.483 0.745 1.628 329.32
9.5 12.5 11 9 4 12 12'-8 6 44 4 12 11 12 8 13 12 8 7 6 13'-6 6 6 7'-8 3'-10 6 13'-6 8 6 14'-0 6 6 15'-3 3'-10 11'-5 6 14'-0 0.443 0.549 0.745 1.737 346.29
13-15 12'-0 10.5 13 11 9 4 9 12'-10 6 44 4 12 11 13 8 13 17 6 7 6 13'-6 7 9 8'-2 4'-1 4'-1 7 13'-6 8 6 14'-0 7 9 15'-2 3'-8 11'-6 7 14'-0 0.486 0.571 0.745 1.802 344.92
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
412
12
12
12
12
12
12
12
11'-4
11'-4
11'-4
11'-4
11'-4
11'-4
11'-4
11'-4
3'-10
Spacing
4e2 Bar
Spacing
4f2 Bar
"C"
" Clr.
41
2
Clr."
21
3
"S" = 12'-0"
"A"
"H" = 11'-4"
"B"
2" 6"
6"
11"
20 Spa.
@ 6" Sta
ggered;
4b1 Bars
5"
3"
1'-0"10 Spa. @ 1'-0" 4f1 Bars1'-0"
1'-0"10 Spa. @ 1'-0"; e1 Bars1'-0"
Construction Joint
PermissibleSlab
4e2
k1 e1
(Typ. Top of Walls)
Bentonite Waterstop
4b1
(Typ. Bottom of Walls)
with Bentonite Waterstop
2"x6" Beveled Keyway
m1Floor
4f2
4a1
4b1
4f1 m2
k2
12-11-20
PT-RCB
Bent Bar Details
12'-0" x 11'-4"
Tunnel Details
12'-0" x 11'-4" Barrel Section
Notes:
Variable Dimensions and Quantities for 12'-0" x 11'-4" Barrel Sections
k2 & m2
D = pin diameter.
All dimensions are out to out.
Note:
list are in feet and inches
4. Dimensions "S", "H", "L", and "V" listed in the bar
the bar list are in inches.
3. Dimensions "A", "B", "C", "D", and "Sp." listed in
low fill situations.
2. Horizontal legs for the k2 and m2 bars may lap in
conjunction with Sheet PT G2-20.
1. Dimensions listed on this sheet to be used in
EN
GLIS
H_L
RF
D_SIG
NE
D_P
ED
ES
TRIA
N_T
UN
NE
L_S
TA
ND
AR
DS.D
GN -
PT-R
CB 12-1
1-2
0 -
THIS S
HE
ET IS
SU
ED 08-2
020
Cast-In-Place Standard Design - Walkways and Trails
Pedestrian Tunnel
Reinforced Concrete
August, 2020
LA
TE
ST
RE
VISI
ON
DA
TE
AP
PR
OV
ED
BY
BRI
DG
E
EN
GI
NE
ER
Highway Division
Cast-In-Place Standard Design - Walkways and Trails
Pedestrian Tunnel
Reinforced Concrete
August, 2020
8/2/2020 12:02:46 PM bkloss W:\Highway\Bridge\Standards\Pedestrian Tunnels\EnglishSignedPedestrianTunnel.dgn PT-RCB 12-12-20 11x17_pdf.pltcfg
DBars
7
6
"415
"214
D=
H
V
S H A B C D
12'-0
12'-0
12'-0
12'-0
12'-0
12'-0
12'-0
12'-0
---
---
---
--
--
--
--
--
---
---
12 356.16
12'-4
12'-4
12'-4
12'-4
12'-4
12'-4
12'-4
12'-4
Fill
Dimensionsa1 b1 e1 e2 f1 f2 k1 k2 k9 m1 m2 m9
Size Sp. L Size Sp. No. Size Sp. No. Size Sp. No. Size Sp. No. Size Sp. No. Size Sp. L Size Sp. L H V Size L Size Sp. L Size Sp. L H V Size L
Quantities
Concrete (CY/FT)
Slab Floor Walls Total (LB/FT)
Steel
Bar List
0 15 12 9 4 9 14'-3 4 6 48 5 12 11 4 16 10 4 12 13 10 8 12 13'-8 6 9 12'-1 8'-1 4'-0 7 9 14'-2 6 9 20'-9 8'-1 12'-8 0.623 0.667 0.887 2.177 307.92
1 14.5 12 9 4 9 14'-1 4 6 48 5 12 11 4 16 10 4 12 13 10 7 9 13'-8 6 9 12'-0 8'-1 3'-11 7 9 14'-2 6 9 20'-8 8'-1 12'-7 0.580 0.645 0.887 2.112 306.53
2 10.5 12 9 4 9 13'-5 4 6 48 5 12 11 4 16 10 4 12 13 8 8 9 13'-8 7 9 11'-5 7'-5 4'-0 7 6 14'-2 7 9 17'-7 5'-4 12'-3 7 14'-2 0.407 0.466 0.887 1.760 364.21
3 10.5 12 9 4 9 13'-5 4 6 48 4 12 11 4 17 8 4 12 13 8 8 9 13'-8 6 6 8'-10 5'-3 3'-7 6 13'-8 6 6 14'-2 6 6 17'-1 4'-10 12'-3 6 14'-2 0.386 0.466 0.887 1.739 336.29
4-6 10.5 12 9 4 9 13'-5 4 6 48 4 12 11 4 16 8 4 12 13 8 6 6 13'-8 6 6 8'-5 4'-10 3'-7 6 13'-8 7 6 14'-2 6 6 16'-11 4'-8 12'-3 6 14'-2 0.386 0.466 0.887 1.739 339.03
7-9 11 12 9 4 9 13'-6 4 6 48 4 12 11 4 14 8 4 12 13 8 7 6 13'-8 6 6 7'-11 4'-4 3'-7 6 13'-8 7 6 14'-2 6 6 16'-8 4'-4 12'-4 6 14'-2 0.407 0.488 0.887 1.782 349.61
10-12 12.5 12 9 4 9 13'-8 4 6 48 4 12 11 4 13 8 4 12 13 8 7 6 13'-8 6 6 7'-10 4'-2 3'-8 6 13'-8 7 6 14'-2 6 6 16'-8 4'-3 12'-5 6 14'-2 0.451 0.555 0.887 1.893 349.39
13-15 13 12 9 4 13'-10 4 6 48 4 12 11 4 18 6 4 12 13 6 7 6 13'-8 6 6 3'-10 6 13'-8 8 6 14'-2 6 6 16'-4 3'-10 12'-6 6 14'-2 0.494 0.578 0.887 1.959
13.5
12.5
8.5
8
8
8.5
9.5
10.5
4
4
4
4
4
4
4
4 16
16
18
16
15
14
13
18 7'-8 3'-10
Spacing
4e2 Bar
"A"
"B"
Spacing
4f2 Bar
"C"
" Clr.
41
2
Clr."
21
3
"S" = 12'-0"
"H" = 12'-4"
6"
6"
2"
1'-0"10 Spa. @ 1'-0"; e1 Bars1'-0"
11"
22 Spa.
@ 6" Sta
ggered;
4b1 Bars
5"
1'-0"10 Spa. @ 1'-0"; 4f1 Bars1'-0"
3"
Construction Joint
PermissibleSlab
4e2
k1 e1
4b1
k2
(Typ. Top of Walls)
Bentonite Waterstop
4a1
4b1
(Typ. Bottom of Walls)
with Bentonite Waterstop
2"x6" Beveled Keyway
m1Floor
4f2m24f1
12-12-20
PT-RCB
12'-0" x 12'-4"
Tunnel Details
Bent Bar Details
k2 & m2
D = pin diameter.
All dimensions are out to out.
Note:
Variable Dimensions and Quantities for 12'-0" x 12'-4" Barrel Sections
12'-0" x 12'-4" Barrel Section
Notes:
list are in feet and inches
4. Dimensions "S", "H", "L", and "V" listed in the bar
the bar list are in inches.
3. Dimensions "A", "B", "C", "D", and "Sp." listed in
low fill situations.
2. Horizontal legs for the k2 and m2 bars may lap in
conjunction with Sheet PT G2-20.
1. Dimensions listed on this sheet to be used in
EN
GLIS
H_L
RF
D_SIG
NE
D_P
ED
ES
TRIA
N_T
UN
NE
L_S
TA
ND
AR
DS.D
GN -
PT-R
CB 12-1
2-2
0 -
THIS S
HE
ET IS
SU
ED 08-2
020
LA
TE
ST
RE
VISI
ON
DA
TE
AP
PR
OV
ED
BY
BRI
DG
E
EN
GI
NE
ER
Highway Division
Cast-In-Place Standard Design - Walkways and Trails
Pedestrian Tunnel
Reinforced Concrete
August, 2020
8/2/2020 12:02:47 PM bkloss W:\Highway\Bridge\Standards\Pedestrian Tunnels\EnglishSignedPedestrianTunnel.dgn PT-RCB 14-12-20 11x17_pdf.pltcfg
DBars
D=
H
V
8
7
6
6"
"415
"214
S H A B C DFill
Dimensionsa1 b1 e1 e2 f1 f2 k1 k2 k9 m1 m2 m9
Size Sp. L Size Sp. No. Size Sp. No. Size Sp. No. Size Sp. No. Size Sp. No. Size Sp. L Size Sp. L H V Size L Size Sp. L Size Sp. L H V Size L
Quantities
Concrete (CY/FT)
Slab Floor Walls Total (LB/FT)
Steel
Bar List
0 14'-0 12'-4 14 15.5 12 9 6 9 14'-4 4 6 48 5 12 13 4 15 12 4 12 15 4 15 12 7 9 15'-8 6 9 13'-2 9'-1 4'-1 7 9 16'-2 6 9 20'-1 7'-5 12'-8 6 16'-2 0.731 0.785 0.887 2.403 360.18
1 14'-0 12'-4 13.5 15 12 9 9 14'-3 4 6 48 5 12 13 4 15 12 4 12 15 4 16 12 7 9 15'-8 6 9 13'-1 9'-1 4'-0 7 9 16'-2 6 9 20'-5 7'-9 12'-8 6 16'-2 0.707 0.760 0.887 2.354
2 14'-0 12'-4 9 11 12 9 4 12 13'-6 4 6 48 6 12 13 4 15 10 4 12 15 4 13 10 7 6 15'-8 6 6 9'-8 6'-1 3'-7 6 15'-8 7 6 16'-2 6 6 17'-9 5'-5 12'-4 6 16'-2 0.485 0.556 0.887 1.928 394.08
3 14'-0 12'-4 8.5 10.5 12 9 4 12 13'-5 4 6 48 4 12 13 4 13 10 4 12 15 4 17 8 7 6 15'-8 8 9 9'-9 5'-5 4'-4 8 15'-8 7 6 16'-2 8 9 17'-4 5'-1 12'-3 8 16'-2 0.460 0.531 0.887 1.878 418.66
4-6 14'-0 12'-4 8.5 11 12 9 4 12 13'-6 4 6 48 4 12 13 4 16 8 4 12 15 4 16 8 7 6 15'-8 7 6 8'-10 4'-11 3'-11 7 15'-8 7 6 16'-2 7 6 17'-2 4'-10 12'-4 7 16'-2 0.460 0.556 0.887 1.903 430.05
7-9 14'-0 12'-4 10 12.5 12 9 4 12 13'-9 4 6 48 4 12 13 4 15 8 4 12 15 4 15 8 7 6 15'-8 6 6 8'-4 4'-7 3'-9 6 15'-8 8 6 16'-2 6 6 17'-0 4'-7 12'-5 6 16'-2 0.534 0.633 0.887 2.054 388.84
10-12 14'-0 12'-4 11 13.5 12 6 4 6 13'-11 4 6 48 4 12 13 4 13 8 4 12 15 4 13 8 8 6 15'-8 7 6 8'-6 4'-3 4'-3 7 15'-8 8 6 16'-2 6 6 16'-9 4'-3 12'-6 6 16'-2 0.583 0.683 0.887 2.153 445.66
13-15 14'-0 12'-4 12 14.5 14'-1 4 6 48 4 12 13 4 13 8 4 12 15 4 13 8 8 6 6 6 6 8 6 6 6 12'-7 6
--
--
---
---
12.5 6 4 6
5
15'-9 8'-4 4'-2 4'-2 15'-9 16'-3 16'-9 4'-2 16'-3 0.637 0.738 0.924 2.299 426.87
343.34
Spacing
4e2 Bar
Spacing
4f2 Bar
"A"
"B"
"C"
" Clr.
41
2
Clr."
21
3
"H" = 12'-4"
"S" = 14'-0"
2"
6"
6"
1'-0"12 Spa. @ 1'-0"; e1 Bars1'-0"
11"
22 Spa.
@ 6" Sta
ggered;
4b1 Bars
5"
3"
1'-0"12 Spa. @ 1'-0"; 4f1 Bars1'-0"
Construction Joint
PermissibleSlab
4e2
k1 e1
4b1
k2
(Typ. Top of Walls)
Bentonite Waterstop
4a1
4b1
(Typ. Bottom of Walls)
with Bentonite Waterstop
2"x6" Beveled Keyway
m1
4f2
Floor
m24f1
14-12-20
PT-RCB
14'-0" x 12'-4"
Tunnel Details
Bent Bar Details
k2 & m2
D = pin diameter.
All dimensions are out to out.
Note:
Variable Dimensions and Quantities for 14'-0" x 12'-4" Barrel Sections
14'-0" x 12'-4" Barrel Section
Notes:
list are in feet and inches
4. Dimensions "S", "H", "L", and "V" listed in the bar
the bar list are in inches.
3. Dimensions "A", "B", "C", "D", and "Sp." listed in
low fill situations.
2. Horizontal legs for the k2 and m2 bars may lap in
conjunction with Sheet PT G2-20.
1. Dimensions listed on this sheet to be used in
EN
GLIS
H_L
RF
D_SIG
NE
D_P
ED
ES
TRIA
N_T
UN
NE
L_S
TA
ND
AR
DS.D
GN -
PT-R
CB 14-1
2-2
0 -
THIS S
HE
ET IS
SU
ED 08-2
020
LA
TE
ST
RE
VISI
ON
DA
TE
AP
PR
OV
ED
BY
BRI
DG
E
EN
GI
NE
ER
Highway Division
8/2/2020 12:02:49 PM bkloss W:\Highway\Bridge\Standards\Pedestrian Tunnels\EnglishSignedPedestrianTunnel.dgn PT-FWH 0-1-20 11x17_pdf.pltcfg
S x H
U
T
R
P
G3
G2
G1
E
D
A 37'-0"
30'-6"
30'-6"
"4311
40'-1"
34'-0"
29'-0"
29'-0"
"8330'-9
37'-0"
32'-6"
32'-6"
"4311
40'-1"
8'-6"
1'-0"
"2135'-0
36'-10"
1'-2"
11"
9'-3"
"8332'-5
"8538'-1
1'-2"
1'-0"1'-0"
1'-2"
"8538'-1
"8334'-5
9'-3"
14' x 12'-4" 12' x 12'-4" 12' x 11'-4"
4
1
1
4
A
U
E
A
P
DS
D
P
U3"
Paving Notch
2'-0"
1'-3"9"
Parapet
1'-0"
3"
"E" Joint
¡ Pedestrian Tunnel
0-1-20
PT-FWHHeadwalls
Flared Wing
Dimension Table
Plan View
Notes:
0° SKEW location of certain dimensions tabulated.
2. See Sheets PT-FWH 0-2-20 & PT-FWH 0-3-20 for
Specifications, and Design Stresses.
1. See Sheet PT G1-20 for General Information,
EN
GLIS
H_L
RF
D_SIG
NE
D_P
ED
ES
TRIA
N_T
UN
NE
L_S
TA
ND
AR
DS.D
GN -
PT-F
WH 0-1-2
0 -
THIS S
HE
ET IS
SU
ED 08-2
020
Cast-In-Place Standard Design - Walkways and Trails
Pedestrian Tunnel
Reinforced Concrete
August, 2020
LA
TE
ST
RE
VISI
ON
DA
TE
AP
PR
OV
ED
BY
BRI
DG
E
EN
GI
NE
ER
Highway Division
8/2/2020 12:02:50 PM bkloss W:\Highway\Bridge\Standards\Pedestrian Tunnels\EnglishSignedPedestrianTunnel.dgn PT-FWH 0-2-20 11x17_pdf.pltcfg
G3
G1
G3
G2
T
3" Clr.
Min.
Clr.
"4
33
3" Clr.U
+3"
9" 1'-3"
5t1
& 4t2
@ 1'-3"
U+
3"
9" 1'-3"
2'-0"
3'-6"
T3'-6" -
T
6" 6m3 @ 1'-0" 6"
4d3
@ 1'-6"
1'-6"
4d1
@ 1'-6"
1'-6"
4d3
@ 1'-6"
6"
2'-0
"
1'-6
"
1'-0
"
14'-0"
5c5 @
1'-0" B.
F.V.
6c6 @
1'-0" B.
F.V.
4c2 @
1'-0" F.
F.V.
21'-0"
4c1 @
1'-0" F.
F.V.
6"
9"
9"
6f2
@ 1'-0"
1'-0"
6f1
@ 1'-0"
6f2
@ 1'-0"
1'-0"
3" 9" 6m1 @ 9" 3"
6"
6"
4i1
@ 6"
4i1
@ 6"
1'-6"
Pay Limit.
Class 20 Excav.
Typ.
2'-9"
S x H Quantity (CY)
12' x 11'-4"
12' x 12'-4"
14' x 12'-4"
8.9
9.3
9.8
5t1
4t2
5p1
5p2
Sidewalk Slab
"E" Joint
5t1
5p2
4t2
5p1
of Parapet
Back face
4d2
4d3
6m3
4d1 6c7
6m3Tunnel
¡ Pedestrian
5c5
6c6
4c3
4c1 or 4c2
Back Face Wingwall
Front Face Wingwall
Footing
4d1
4d3
5c4
4d2
of Parapet
Back Face
6f3
6f2
6f1
6m1
6m26f1
6f2
Footing
Back Face Wingwall
Front Face Wingwall
6f3
(Parapet)
j1
(Parapet)
4i1
6m1
Tunnel
¡ Pedestrian
Paving Notch
Back ofGround
Existing
Headwalls
Flared Wing
0° SKEW0-2-20
PT-FWH
Notes:
3. For dimension table see Sheet PT-FWH 0-1-20.
wing for all headwalls.
2. Wingwall bars consistently referenced from end of
sizes of headwalls in this standard.
1. Bar spacings and positions shown are similar for all
Paving Notch Details
SectionPlan
Reinforcing Bars
Plan View - Bottom of Apron
(Paving Notch Not Shown for Clarity)
Reinforcing Bars
Plan View - Top of Apron
(Paving Notch Not Shown for Clarity)
Class 20 Excavation
Paving Notch
for Paving Notch
Class 20 Excavation
EN
GLIS
H_L
RF
D_SIG
NE
D_P
ED
ES
TRIA
N_T
UN
NE
L_S
TA
ND
AR
DS.D
GN -
PT-F
WH 0-2-2
0 -
THIS S
HE
ET IS
SU
ED 08-2
020
Cast-In-Place Standard Design - Walkways and Trails
Pedestrian Tunnel
Reinforced Concrete
August, 2020
LA
TE
ST
RE
VISI
ON
DA
TE
AP
PR
OV
ED
BY
BRI
DG
E
EN
GI
NE
ER
Highway Division
8/2/2020 12:02:51 PM bkloss W:\Highway\Bridge\Standards\Pedestrian Tunnels\EnglishSignedPedestrianTunnel.dgn PT-FWH 0-3-20 11x17_pdf.pltcfg
(Typ.)
2" Clr.
1'-0"
2'-0"
"H
2"
2'-0
T
"S"
Clr."
21
3Clr."
41
2
Top of
Apron
4'-0"±
R
P
T
3" Clr.
10" Clr.
3" Clr.
3'-0"
4b2
@ 1'-0"
1'-0"
1'-4"
1'-0"
6"
5c5 @ 1'-0"1'-6"
6c6 @ 1'-0"14'-0"
H2'-0"
4c1 @ 1'-0"
4c2 @ 1'-0"21'-0"
1'-8"
5b4
@ 1'-0"
2'-0"
1'-0"
1'-4"
1'-0"
1'-1
"
6"
2"
4"
4"
Min.
6" 2'-6"
2'-6"
Min.
6"
6"
6"8
73
12
873
12
Fence Anchor
5fa Galv. Steel 6s2
4c1
5b4 5b3
6s34c1
4c24c3
5b4
6s1
6s2
6s3
B.F.H.
4b
5c B.F.V.F.F.V.
4c
F.F.H.
5b
6f3
6f2
6f1
6m3
6m1
4d1 4d2
Waterstop (Typ.)
With Bentonite
2"x6" Beveled Keyway
Top of Parapet
Top of Opening
Construction Joint
Permissible Top of Opening
Top of Parapet
Bentonite Waterstop When Used
Construction Joint, Include
Alternate Permissible
When Used
Include Benonite Waterstop
Permissible Construction Joint,
4i1 @ 6"
j1
5fa
6s2
5c5
6c64b1
6c6
5c5
6s1
4b2
6c7
4b2
5c4
Headwalls
Flared Wing
0° Skew
Notes:
0-3-20
PT-FWH
Section thru Parapet
Typical Section - Near Center of Apron
Typical View - Front Face Reinforcing
Typical View - Back Face Reinforcing
Top of Wingwall Details
2. For dimension table see Sheet PT-FWH 0-1-20.
of headwall in this standard.
1. Bar spacing and positions shown are similar for all sizes
EN
GLIS
H_L
RF
D_SIG
NE
D_P
ED
ES
TRIA
N_T
UN
NE
L_S
TA
ND
AR
DS.D
GN -
PT-F
WH 0-3-2
0 -
THIS S
HE
ET IS
SU
ED 08-2
020
Cast-In-Place Standard Design - Walkways and Trails
Pedestrian Tunnel
Reinforced Concrete
August, 2020
LA
TE
ST
RE
VISI
ON
DA
TE
AP
PR
OV
ED
BY
BRI
DG
E
EN
GI
NE
ER
Highway Division
8/2/2020 12:02:52 PM bkloss W:\Highway\Bridge\Standards\Pedestrian Tunnels\EnglishSignedPedestrianTunnel.dgn PT-FWH 0-4-20 11x17_pdf.pltcfg
Apron �
Wingwalls
Parapet ¬
"43D=3
"43D=3
D=3"
1'-4"
5"
"43D=3
"21D=4
"21D=4
"8
31'-7
"21
5'-3
"2
11'-7
"819"16
75'-0
"21D=2
2'-3"
2'-11"
D=2""2
14
1'-6"
1'-11"
"214
2'-4"
2'-10"
"21D=4
"43D=3
10,221 LBReinf. Steel
ConcreteOne Headwall
Quantities
Estimated
9642 LB 8467 LB
59.5 CY69.2 CY72.9 CY
47.8
23.2
1.9
44.2
23.2
1.8
39.5
18.3
1.7
23
23
2
4
4
3
4
35 Var.
1
46 Var.
4
25
2
14 Var.
14
12 Var.
6
8
2
44
68 Var.
2
2
30 Var.
70 Var.
20 Var.
2
18 Var.
2
2
26
26
2
4
4
3
4
38 Var.
1
50 Var.
4
29
2
16 Var.
16
12 Var.
6
10
2
50
74 Var.
2
2
36 Var.
76 Var.
22 Var.
2
20 Var.
2
2
25
25
2
4
4
3
4
38 Var.
1
50 Var.
4
25
2
16 Var.
14
12 Var.
6
8
2
50
74 Var.
2
2
36 Var.
76 Var.
22 Var.
2
20 Var.
2
2
No.Wt.Length
14' x 12'-4"
No.ShapeLocation
12' x 12'-4"
Length Wt. No. Length
12' x 11'-4"
Wt.Bar
4t2
5t1
6s3
6s2
6s1
5p2
5p1
6m3
6m2
6m1
9ji
4i1
6f3
6f2
6f1
4d3
4d2
4d1
6c7
6c6
5c5
5c4
4c3
4c2
4c1
5b4
5b3
4b2
4b1
5fa
Bar
4t2
5t1
6s3
6s2
6s1
5p2
5p1
6m3
6m2
6m1
7ji
4i1
6f3
6f2
6f1
4d3
4d2
4d1
6c7
6c5
5c5
5c4
4c3
4c2
4c1
5b4
5b3
4b2
4b1
5fa
Bar
4t2
5t1
6s3
6s2
6s1
5p2
5p1
6m3
6m2
6m1
7ji
4i1
6f3
6f2
6f1
4d3
4d2
4d1
6c7
6c6
5c5
5c4
4c3
4c2
4c1
5b4
5b3
4b2
4b1
5fa
132
140
137
225
46
101
137
1075
49
1878
213
118
130
509
1025
170
176
285
53
789
1003
11
18
295
448
558
91
345
58
6
127
135
137
225
46
94
129
961
46
1727
112
102
130
509
897
186
176
228
53
789
1003
11
18
295
448
558
91
345
58
6
117
124
120
206
46
90
122
846
44
1526
110
102
114
417
783
159
154
199
50
694
887
11
17
235
390
475
80
292
51
6
7'-7
5'-2
43'-2
37'-6
7'-8
32'-2
32'-10
9'-7 to 28'-1
32'-10
15'-10 to 34'-2
15'-8
6'-1
40'-11
35'-2
7'-2 to
2 Each
40'-3
36'-2
6'-2 to
2 Each
41'-5
40'-3
17'-9
10'-6
18'-10
7'-2 to
2 Each
5'-2
13'-9
15'-0
9'-6 to
2 Each
14'-10
2'-10 to
2 Each
39'-10
8'-10 to
2 Each
41'-3
39'-9
11'-11 to
2 Each
41'-2
2'-10
7'-7
5'-2
43'-2
37'-6
7'-8
30'-2
30'-10
7'-7 to 26'-1
30'-10
13'-10 to 32'-2
13'-8
6'-1
40'-11
35'-2
7'-2 to
2 Each
40'-3
38'-2
8'-2 to
2 Each
41'-5
40'-3
17'-9
10'-6
18'-10
7'-2 to
2 Each
5'-2
13'-9
15'-0
9'-6 to
2 Each
14'-10
2'-10 to
2 Each
39'-10
8'-10 to
2 Each
41'-3
39'-9
11'-11 to
2 Each
41'-2
2'-10
7'-7
5'-2
39'-11
34'-3
7'-8
28'-8
29'-4
7'-7 to 24'-7
29'-4
13'-8 to 30'-6
13'-6
6'-1
37'-10
31'-10
7'-10 to
2 Each
37'-3
34'-10
4'-10 to
2 Each
38'-4
37'-3
16'-9
10'-6
17'-10
7'-2 to
2 Each
5'-2
5'-2
14'-0
9'-6 to
2 Each
13'-10
2'-10 to
2 Each
36'-9
8'-10 to
2 Each
38'-2
36'-8
11'-11 to
2 Each
38'-1
2'-10
"433'-2
- 3'-4"
Length
3'-4"
"4
39
"433'-2
- 3'-4"
Length
3'-4"
"4
39
"433'-2
- 3'-4"
Length
3'-4"
"4
39
"21D=4
"8
51'-7
"875'-0
- 5'-4"
Length
5'-4"
- 4'-0"
Length
4'-0"
- 4'-0"
Length
4'-0"
8"
1'-7"
1'-4"
2'-6"
Paving Notch, Hoops
Paving Notch, Vertical
Wing Slope, F.F.
Wing Slope, Both F.
Wing Slope, Both F.
Paving Notch, Horizontal
Paving Notch, Horizontal
Apron, Trans., Bott.
Apron, Trans., Top
Apron, Trans., Top
Parapet, Horizontal
Parapet, Vertical
Apron, Longit., Top
Apron, Longit., Top
Apron, Longit., Top
Apron, Longit., Bott.
Apron, Longit., Bott.
Apron, Longit., Bott.
Wingwall, B.F.V.
Wingwall, B.F.V.
Wingwall, B.F.V.
Wingwall, B.F.V.
Wingwall, F.F.V.
Wingwall, F.F.V.
Wingwall, F.F.V.
Wingwall, F.F.H.
Wingwall, F.F.H.
Wingwall, B.F.H.
Wingwall, B.F.H.
Fence Anchor (Galv.)
D=2"
Headwalls
Flared Wing
0° Skew0-4-20
PT-FWHAll dimensions are out to out. D = pin diameter.
Note:
Headwall Notes:
8. Dimensions are in feet and inches unless otherwise noted or shown.
of feet necessary to meet these requirements.
beyond back of parapet. The "Length" column reflects total number
estimated to project into end section of barrel a minimum of 2'-5"
back of parapet (into end of barrel). Longitudinal bars "d" and "f"
7. Horizontal tails of bars "b" & "s" estimated to extend 2'-5" beyond
6. Concrete quantities are estimated from back of parapet.
of vertical bars shall be 3 inches.
2" unless otherwise noted or shown. Clearance to the bottom ends
5. Clear distance from face of concrete to near reinforcing bar is to be
the Standard Specifications.
at intervals of not more than 3'-0" in either direction as outlined in
4. All slab and apron reinforcing steel is to be supported by bar chairs
grade.
3. The sides of the apron are to be formed to ensure correct line and
2. This headwall is based on a 3:1 slope normal to centerline of roadway.
Design Stresses.
1. See Sheet PT G1-20 for General Information, Specifications, and
4b1 & 4b2
5fa
5b3 & 5b4
6f36s1
6s3 5t1
4t2
6c6 & 6c7
5c55c4
Reinforcing for One Headwall 0° Skew
4i1
not equal.
quantities for transition where apron and floor thickness are
� Assumes apron and floor are equal thickness, adjust concrete¬ Includes top of wingwall quantities.
Lengths shown for bars over 40'-0" long do not include lap.
Weight of bars over 40'-0" long includes an allowance of 2'-5" for lap.
Notes:
Bent Bar Details
EN
GLIS
H_L
RF
D_SIG
NE
D_P
ED
ES
TRIA
N_T
UN
NE
L_S
TA
ND
AR
DS.D
GN -
PT-F
WH 0-4-2
0 -
THIS S
HE
ET IS
SU
ED 08-2
020
Cast-In-Place Standard Design - Walkways and Trails
Pedestrian Tunnel
Reinforced Concrete
August, 2020
LA
TE
ST
RE
VISI
ON
DA
TE
AP
PR
OV
ED
BY
BRI
DG
E
EN
GI
NE
ER
Highway Division
8/2/2020 12:02:54 PM bkloss W:\Highway\Bridge\Standards\Pedestrian Tunnels\EnglishSignedPedestrianTunnel.dgn PT-CBJ 1-20 11x17_pdf.pltcfg
Bill of Reinforcing Steel 14' x 12'-4" 12' x 12'-4" 12' x 11'-4"
Location Shape No. Length Weight No. Length Weight No. Length Weight
Total Weight (LB)
Total Concrete (CY) 9.9 9.2 8.9
16
16
44
8
4
4
14
14
42
8
4
4
14
14
40
8
4
4
6z
6y2
6y1
6w3
6w2
6w1
Bar
Bottom & Floor
Bottom
Top & Sides
Walls
Floor & Walls
Slab & Walls
1196
81
196
481
130
153
155
1234
81
196
505
142
154
156
1325
92
228
529
142
166
168
Bell Joint Quantites (CY)Barrel Dimension
Size
Barrel
A B C Footing Walls Slab
3.002
2.677
2.652
3.426
3.426
3.140
3.497
3.118
3.089
14' x 12'-4"
12' x 12'-4"
12' x 11'-4"
Min.
Lap
6w3
6w2
6w3
6w1
1
1
6
5
12"
10.5"
10.5"
14.5"
13"
13"
12"
12"
11"
3'-10"
9'-6"
8'-0"
11'-10"
27'-8"
28'-0"
3'-10"
9'-4"
8'-0"
11'-10"
25'-8"
26'-0"
3'-10"
9'-4"
8'-0"
10'-10"
25'-6"
25'-10"
S + 2C
0.5S + 6" 0.5S
AH = Heig
ht
B
H + A
H + A + B
0.5S + 6"
S + 2C + 6"
13 Spa. (H = 12'-4")
H + A + B
H + A
BH
A
C0.5
S0.5
S + C + 3"
S + 2
C + 6"
S = Span
Sid
es C
Top A
"431
"432
" Clr.
21
3
" Clr.
41
2
C
"414
"414
Slab
Floor
H -
6"
¬ "4
1B + 1'-0
"2
110
"4
31'-7
S + 2C + 2'-6"
No. Spa. = S + 1
Bars 6y1 @ 1'-0" C-C
1'-3"
3"
3"
4"
H + A + B + 2'-9"
12 Spa. (H = 11'-4")
Bars 6y1 Spaced
@ 1'-0"
5"
Lap
2'-5"
Lap
2'-5"
1'-6"
C-C; No. Spa. = S + 1
Bars 6y2 & 6z @ 1'-0"
S + 2C + 2'-6"
1'-3"2'-6"
1'-3"1'-3"
1'-3"
1'-6"
1'-3"2'-6"
1'-3"1'-3"
1'-3"
3"
1'-3"
1'-6"
B
1'-3"2'-6"
1'-1"
1'-6"
1'-3"2'-6"
5"1'-2"
1'-3"
1'-3"
5"
1'-3"
Length - 10'-0"
5'-0"
4'-10"
5'-0"
4'-10"
Length - 9'-8"
2'-5"
2'-5"
1'-9"
2'-1"
"431'-72'-3"
2'-6"
2'-4
"
2'-5" 1'-0"
1'-0"
2'-2"
"21D=4
"21D=4
"21D=4
"21D=4"2
1D=4
Construction Joint
Permissible
6w1
6w3
6y1
Joint Filler
" Resilient21
(See Barrel)
Keyway
6y2 & 6z
6w2
6w1
6w3
6w2
6y2
Joint (See Sheet PT- CBJ 2-20)
Permissible Construction
6z
6w2
6y1
Joint Filler
" Resilient21
6w1
6y1
6y1
Joint Filler
" Resilient21
6w1
6w26y2 & 6z
6y1
or 6w3
6w1
Joint Filler
" Resilient21
6y1
Joint Filler
" Resilient21
6z 6y2
6w2
Joint (See Sheet PT-CBJ 2-20)
Permissible Construction
1-20
PT-CBJ
Bell Joints
Pedestrian Tunnel
Notes:
Est. of Quantities - One Joint
Concrete Placement Bent Bar Details
Bottom - Bars 6y2 & 6z
Top & Sides - Bars 6y1
Plan View
Longitudinal Section
Section Thru Barrel
Joint Detail
¬ 1.3 times vertical dimension.
All dimensions are out to out. D = pin diameter.
Note:
6. Barrel floor bars m1 & m9 are to be shortened 6" in length at bell joints.
Stresses.
5. See Sheet PT-RCB G1-20 for General Information, Specifications, and Design
Specifications of I.D.O.T.
4. Material and construction to be in accordance with the current Standard
outside of bar, except as noted.
3. All bar lengths are estimated with a 2" clearance from concrete edge to
quantities accordingly for slab, wall, and floor thicknesses other than shown.
2. Change lengths of bars 6w1, 6w2, 6z, and adjust reinforcing steel and concrete
sheets.
conditions, can be found on the reinforced concrete pedestrian tunnel detail
(A, B, and C, respectively). Values for these dimensions, under varying fill
1. Dimensions and quantities shown are based on slab, floor, and wall thicknesses
6z
6w1, 6w2 & 6w3
6y1 6y2
EN
GLIS
H_L
RF
D_SIG
NE
D_P
ED
ES
TRIA
N_T
UN
NE
L_S
TA
ND
AR
DS.D
GN -
PT-C
BJ
1-2
0 -
THIS S
HE
ET IS
SU
ED 08-2
020
Cast-In-Place Standard Design - Walkways and Trails
Pedestrian Tunnel
Reinforced Concrete
August, 2020
LA
TE
ST
RE
VISI
ON
DA
TE
AP
PR
OV
ED
BY
BRI
DG
E
EN
GI
NE
ER
Highway Division
Cast-In-Place Standard Design - Walkways and Trails
Pedestrian Tunnel
Reinforced Concrete
August, 2020
8/2/2020 12:02:55 PM bkloss W:\Highway\Bridge\Standards\Pedestrian Tunnels\EnglishSignedPedestrianTunnel.dgn PT-CBJ 2-20 11x17_pdf.pltcfg
10"
10"
6"
6"
6z Bar
or Approved Equal
Bentonite Waterstop
Phase � Bell Joint Floor
6y2 Bar
Phase � Bell Joint Floor
Beveled Keyway
2" x 6"
Waterstop
Bentonite 2" x 6" Keyway
and Barrel Floor
Phase � Bell Joint
Phase � Bell Joint Floor
6w2 Barsand Barrel Floor
Phase � Bell Joint
Joint Floor
Phase � Bell
6w2 Bars
Beveled Keyway
2" x 6"
and Barrel Floor
Phase � Bell Joint
6y2 Bar
Phase � Bell Joint Floor
6z Bar
or Approved Equal
Bentonite Waterstop
A A B B
Bell Joints
Pedestrian Tunnel
2-20
PT-CBJ
PLAN VIEW - PHASE � PLAN VIEW - PHASE �SECTION A-A
SECTION B-B
NOTES:
BELL JOINT AT FLOOR
BELL JOINT AT FLOOR
( Showing Phase � of Floor Bell Joint Construction )and Barrel Floor Construction )
( Showing Phase � of Floor Bell Joint
PT-CBJ 1-20.
5. For details and dimensions of the bell joint refer to Sheet
and location noted before placing the concrete.
4. A 2" x 6" beveled keyway will be formed to the distance shown
3. The cost of the waterstop is considered incidental to the project.
concrete.
2. Reinforcing steel will be placed prior to placing the Phase � construction joint as shown.
to construct the floor of the bell joint with a permissible
1. The details shown on this sheet are an option for the contractor
EN
GLIS
H_L
RF
D_SIG
NE
D_P
ED
ES
TRIA
N_T
UN
NE
L_S
TA
ND
AR
DS.D
GN -
PT-C
BJ
2-2
0 -
THIS S
HE
ET IS
SU
ED 08-2
020
LA
TE
ST
RE
VISI
ON
DA
TE
AP
PR
OV
ED
BY
BRI
DG
E
EN
GI
NE
ER
Highway Division
Cast-In-Place Standard Design - Walkways and Trails
Pedestrian Tunnel
Reinforced Concrete
August, 2020
8/2/2020 12:02:57 PM bkloss W:\Highway\Bridge\Standards\Pedestrian Tunnels\EnglishSignedPedestrianTunnel.dgn PT-SR 1-20 11x17_pdf.pltcfg
Headwall "E" "F" "G" "H" "J" "K"
S + 2C = Parapet Length
4 Post Spa. @ "E" = "F"
"G" Post Spa. @ "H" = "J"
1'-0
"16
15
3'-3
"K"
P
8" 8"
= 2'-11"
5 Spa.
@ 7"
3'-6"
7"
5"
6"
3'-6"
14'-0" x 12'-4"
12'-0" x 12'-4"
12'-0" x 11'-4"
1'-0"
10
10
9
14'-8"
12'-8"
12'-6"
"413'-8
"413'-8
3'-9"
"8110
"8110
"2110
"2136'-10
"2136'-10
33'-9"
3'-8"
3'-2"
"213'-1
7"
7"
7"
7"
7"
7"
873
12
" Dia. Drain Hole (Typ.)83
Post at Rail Connection (Typ.)
" Dia. Internal Drain Hole in 1615
& ¡ Rail Extension
Front Face Parapet
¡ Parapet & Posts Permissible Rail Splice
Post at Rail Connection (Typ.)
" Dia. Internal Drain Hole in 1615
Top of Wingwall
Match Slope of
to be Beveled to
Bottom of Posts
Top of Wingwall
¡ of Top Rail
¡ Post (Typ.)
¡ Pipe Rails (Typ.)
" Dia. Drain Hole (Typ.)83
Permissible Rail Splice
End of Wingwall
Safety Rail Details1-20
PT-SR
Notes:
Elevation View of Wingwalland Headwall
Partial End View of Parapet
Safety Rail Dimension Table
PT-RCB 14-12-20 For Dimensions C & S.
4. See Sheet PT-RCB 12-11-20, PT-RCB 12-12-20 or
3. See Sheet PT-FWH 0-1-20 for Dimension P.
and parapet and spaced as shown.
2. Post bases to be installed, centered on top of wingwalls
plans.
provided on the "Estimated Quantites Table" in the design
1. Total linear feet quantity of "Steel Pipe Pedestrian Handrail"
EN
GLIS
H_L
RF
D_SIG
NE
D_P
ED
ES
TRIA
N_T
UN
NE
L_S
TA
ND
AR
DS.D
GN -
PT-S
R 1-2
0 -
THIS S
HE
ET IS
SU
ED 08-2
020
LA
TE
ST
RE
VISI
ON
DA
TE
AP
PR
OV
ED
BY
BRI
DG
E
EN
GI
NE
ER
Highway Division
8/2/2020 12:02:58 PM bkloss W:\Highway\Bridge\Standards\Pedestrian Tunnels\EnglishSignedPedestrianTunnel.dgn PT-SR 2-20 11x17_pdf.pltcfg
"2
13
"2
13
"211"2
13"213"2
11
3'-6"
5 Spa.
@ 7" = 2'-11"
7"
10"
7"
Typ.
"41
10"
"2117""2
11
7"
"2
13
"2
13
10"
"4
3
7"
5"
6"
Rail Joint
"81
2"
4" 4"
2'-11"
I.D.) Standard Steel Pipe Rail
2" Dia. (2.38" O.D. - 2.07"
Steel Pipe Post
1.94" I.D.) Extra Strong
2" Dia. (2.38" O.D. -
" Dia. Drain Hole83
"41
I.D.) Standard Steel Pipe Rail
2" Dia. (2.38" O.D. - 2.07"
for Top Rail
Notch Top of Post
Strong Steel Pipe Post
1.94" I.D.) Extra
2" Dia. (2.38" O.D. -
Post Base Plate
Post at Rail Connection (Typ.)
" Dia. Internal Drain Hole in 1615
Standard Steel Pipe
2.07" I.D.)
2" Dia. (2.38" O.D. -
Drain Hole
" Dia.83
Standard Steel Pipe 5" Long
" Dia. (1.90" O.D. - 1.61" I.D.)211"8
1
Drain Hole
" Dia.83
Centerline Rail Joint
(Galvanized)
Rail Post Shim
" Slots1615
or Wingwall
¡ Parapet
Drill in Place
Stud Concrete Anchors,
" Steel43" Dia. Hole for 16
15
Extra Strong Pipe for Posts
2" Dia. (2.38" O.D. - 1.94" I.D.)
"x7"x10"43Plate
for Galvanizing
" Dia. Hole1615
Pedestrian Hand Rail Notes:
Safety Rail Details2-20
PT-SR
Pipe Handrail Details
Post Base Plate and Shim Details
process, shall be indicated on the shop drawings.
Drilled-in drain holes, to facilitate the hot dip galvanizing
Pipe handrail assembly to be galvanized after fabrication.
Note:
End Rail Details
Rail Joint Detail
as required.
shim at each rail post. Use
" galvanized steel161Provide
Note:
EN
GLIS
H_L
RF
D_SIG
NE
D_P
ED
ES
TRIA
N_T
UN
NE
L_S
TA
ND
AR
DS.D
GN -
PT-S
R 2-2
0 -
THIS S
HE
ET IS
SU
ED 08-2
020
7. Posts shall be set plumb.
6. Rail is to be centered along the ¡ of wingwalls and parapets.
pull out strength of 8000 pounds based on 4000 PSI concrete.
5. The stud concrete anchors shall be galvanized and have a minimum
4. No painting will be required.
to be true, smooth, and free of burrs or ragged edges.
3. Ends of rail sections are to be sawed or milled. All cut ends are
of ASTM A123.
galvanized, after fabrication, in accordance with the requirements
requirements of ASTM A36. Panels and end sections shall be
Type E or S, Grade B. Base plates and shims shall meet the
and extra strong steel pipe meeting the requirements of ASTM A53,
2. The material for tube rails, posts and splice tubes shall be standard
and Specifications.
and labor required to erect the rail in accordance with these Plans
material, including anchor bolts and shims, and all of the equipment
Pedestrian Handrail" shall be full compensation for furnishing all
basis measured end to end of rail. The price bid for "Steel Pipe
1. The steel pipe pedestrian hand rail is to be bid on a linear foot
Cast-In-Place Standard Design - Walkways and Trails
Pedestrian Tunnel
Reinforced Concrete
August, 2020
LA
TE
ST
RE
VISI
ON
DA
TE
AP
PR
OV
ED
BY
BRI
DG
E
EN
GI
NE
ER
Highway Division
8/2/2020 12:02:59 PM bkloss W:\Highway\Bridge\Standards\Pedestrian Tunnels\EnglishSignedPedestrianTunnel.dgn PT-AD 1-20 11x17_pdf.pltcfg
General Notes
Aesthetic Treatment
1-20
PT-AD
6.
5.
4.
3.
2.
1.
Tunnel Concrete Coating Notes:Concrete Form Liners:
General Notes for Textured
9.
8.
7.
6.
5.
4.
3.
2.
1.
Concrete Rustication:
General Notes for
6.
5.
4.
3.
2.
1.
Anti-Graffiti Coating Notes:
2.
1.
EN
GLIS
H_L
RF
D_SIG
NE
D_P
ED
ES
TRIA
N_T
UN
NE
L_S
TA
ND
AR
DS.D
GN -
PT-A
D 1-2
0 -
THIS S
HE
ET IS
SU
ED 08-2
020
be included in the bid item "Structural Concrete (RCB Culvert)".
All costs associated with concrete texturing and form liners are to
liners.
Do not use split, frayed, delaminated or otherwise damaged form
Specifications. Clean and repair form liner surfaces prior to use.
the strengths and cure times required by the plans and applicable
manufacturer’s recommendations after the concrete has achieved Strip formwork using techniques in accordance with liner
melt some form liner materials.
care to avoid damaging form liners. Overheating can warp or
If heating forms during cold weather construction, take special
of finished wall.
and accessories in stone pattern mortar joints and at high points
the portion permanently embedded in the concrete is less ties
If used, form ties shall be made of non-corrosive materials when
accordance with the form liner Manufacturer's recommendations.
material, and are non-staining. Apply release agent in
Verify that release agents used are compatible with form liner
correct, at his own cost, any surface defects.
marks to the satisfaction of the Engineer. The Contractor shall
shall be free of blemishes, surface voids and conspicuous form
with the balance of the surface texture. The completed surface
voids. Following removal of forms, finish minor defects to blend
features of the form liner in the final surface and to prevent
adequately vibrate concrete in order to maintain all intended
During loading of forms with concrete, take extra care to
of texture at cut edges of liners and to prevent mortar leakage.
means in order to maintain the appropriate depth and character
parallel to the curve. Use adequate blocking, sealing and other
Form liner edges following curves are to be cut cleanly and
Manufacturer's recommendations.
along main features of the pattern in accordance with
seams and form marks. When joints are unavoidable, make joints
concrete surface appear uniform and continuous without visible
liner joints to minimize pattern repeats and make the formed
to avoid visible pattern repeats. Match pattern features at form
including the shape, lines and dimensions shown in the plans and
designed to form surfaces conforming to the design intent
of the liner during loading of the forms. The liners shall be
liner Manufacturer, use structural backers to prevent deformation
causing concrete surface damage. If recommended by the form
liners shall easily attach to forms and be removable without
pressures without leakage or causing physical defects. Form
materials capable of withstanding anticipated concrete pour
made of high-strength urethane elastomer, plastic or flexible foam
Form the textured concrete surface using a form liner system
following:
accordance with the Standard Specifications for formwork and the
Work performed to create textured concrete shall be in
describing the features which incorporate textured concrete.
See individual design sheets for specific notes and details
the bid item "Structural Concrete (RCB Culvert)".
All costs associated with concrete rustication are to be included in
correct, at his own cost, any surface defects.
marks to the satisfaction of the Engineer. The Contractor shall
shall be free from blemishes, surface voids and conspicuous form
order to match surrounding concrete when dry. Completed surface
coating, add white cement to the patching mortar to lighten it in
Standard Specifications. If surfaces will not receive a colored sealer
Patch voids, honeycomb areas, etc., in accordance with the
defects to achieve the rustication features as specified in the plans.
final concrete surface. Following removal of forms, repair all
preserve the shape, line and depth of all intended features in the
proper consolidation of concrete around all rustication inserts to
During loading of forms with concrete, take extra care to ensure
maintained in the final result.
the final shape, line, depth, and dimension of the features are
order to achieve the radius curve. This is acceptable, provided that
it may be necessary to use multiple layers of insert material in
For rustication features following the perimeter of rounded surfaces,
feature. Do not locate form ties within concrete rustications.
not create any change in alignment or shape of the rustication
shall be tightly joined so as not to allow gaps or leaks, and shall
minimum number of splice joints in their length. Splices, if used,
and dimensions shown in the plans. Create inserts using a
conforming to the design intent including the shape, lines, depths
The inserts shall be designed to form surfaces and features
to the surrounding concrete.
Leave inserts in place until they can be removed without damage
will permit them to remain in place when the forms are removed.
concrete surfaces shall be fastened to the forms in a manner that
rustication strips and other inserts for small recesses on exposed
inside surfaces of the forms. When steel forms are not used,
forms are used, rustication strips may be rigidly attached to the
leakage of concrete between the form and the insert. When steel
Rustication inserts shall easily attach to forms and shall not allow
presoaked prior to placement of concrete in the forms.
used, shall be free of warp, twist, checks or cracks, and shall be
concrete pour pressures without physical defects. Wood inserts, if
other nonporous material capable of withstanding anticipated
the rustication features may be made of wood, steel, plastic or
Strips and panels used as inserts within concrete forms to create
basis.
the bid item "Anti-Graffiti Coating" and is paid for on a square yard
the parapets. All costs for anti-graffiti coating shall be included in
Anti-graffiti coating is not required on the top horizontal surfaces of
vertical surfaces of the headwalls including the parapets.
pedestrian tunnel except the walking surface, and all exposed
Anti-graffiti coating shall be applied to all interior surfaces of the
accordance with the Manufacturer's recommendations.
be compatible with other concrete coatings used on the project in
Materials I.M. 491.23. Color shall be clear. Anti-graffiti coating must
material used shall be an approved type in accordance with
accordance with the "Special Provisions for Anti-Graffiti Coating" and
Anti-graffiti surface preparation and application shall be in
Concrete Coating”. vapor permeable masonry coating are to be included in the bid item “Structural All costs associated with surface preparation and application of 100% acrylic,
pavement. Take special care to avoid contamination of adjacent surfaces.
of the pedestrian tunnel, on the adjacent parapets, headwalls, or on the approach
No coating overspray or other contamination shall be allowed on the floor surface
“Developmental Specifications for Structural Concrete Coating”. Submit product specifications and color samples in accordance with the
shall be white matching SAE AMS-STD-595 color number 27925 (semi-gloss).
One color of concrete coating is to be used on the pedestrian tunnel. The color
Concrete Coating”. coating in accordance with the “Developmental Specifications for Structural Prior to Coating Application”. Apply 100% acrylic, vapor permeable masonry “Developmental Specifications for Concrete Surface Preparation and Testing Prior to concrete coating application, prepare surfaces in accordance with the
prior to receiving approval for use on the project.
Bridges and Structures Bureau, Ames, IA 50010. Do not order materials
E. Approved equal; submit product information to the Iowa DOT,
D. Edison Coatings Aqryl-X 200
C. Chemrex Inc. Thorosheen
B. Sherwin Williams A-100
A. TK Products Tri-sheen Acrylic
listed products:
The 100% acrylic, vapor permeable masonry coating shall be one of the following
vapor transmission in accordance with ASTM E96 or ASTM D1653.
permeable masonry coating. The coating used shall be certified to allow water
limits of the front face of parapets, shall be finished with a 100% acrylic, vapor
All interior surfaces of the pedestrian tunnel except the walking surface, to the
Cast-In-Place Standard Design - Walkways and Trails
Pedestrian Tunnel
Reinforced Concrete
August, 2020
LA
TE
ST
RE
VISI
ON
DA
TE
AP
PR
OV
ED
BY
BRI
DG
E
EN
GI
NE
ER
Highway Division
8/2/2020 12:03:01 PM bkloss W:\Highway\Bridge\Standards\Pedestrian Tunnels\EnglishSignedPedestrianTunnel.dgn PT-AD 2-20 11x17_pdf.pltcfg
Location Quantitiy (CY)
2.2
2.2
1.9
14' x 12'-4" Headwall
12' x 12'-4" Headwall
12' x 11'-4" Headwall
6"
6"
6"
3'-0"6"
3'-0"
Dimension "U"
Wall Thickness
Depth (Varies)
Textured Concrete
"43
"2
1" Draft
81
Depth
Texture
6"
Permissible Const. Jt.
Textured Concrete
" Beveled Strip43" x 4
3
Rustication Formed by
Textured Concrete
Pedestrian Tunnel
2-20
PT-AD
One Headwall
Textured Concrete -
" over the surface area of the wingwall.41of 1
Quantity is based on an average relief
Note:
A
AA
A
Typical Wingwall Elevation
Texture Mockup Panel Details
Section A-A
Textured Concrete Notes:
Texture Mockup Panel Notes:
be included in the price bid for "Structural Concrete (RCB Culvert)".
All costs associated with the textured concrete mockup panel(s) shall
been approved by the Engineer.
Begin textured concrete production work only after the mockup has
rejected, construct a new mockup panel as directed by the Engineer.
directions shall be centered within the panel. If the mockup panel is
casting process. A single mat of No. 5 reinforcing bars in two
the production work. Textured face shall be vertical during the
procedures, form liners, and concrete mixture(s) as are proposed for
Cast the mockup panel(s) on site, using the same forming methods,
See mockup details on this design sheet.
panel in accordance with the Standard Specifications and these plans.
Construct a 3-foot high, by 6-inch wide (Min.), by 3-foot long mockup
approved by the Engineer.
texture, a textured concrete mockup panel must be reviewed and
Prior to beginning any production concrete work that includes
4.
3.
2.
1.
regarding approved techniques and methods of concrete rustication.
Concrete Rustication" on Sheet PT-AD 1-20 for more information
shall also receive concrete rustication. See "General Notes for
4. The pedestrian tunnel headwall surfaces as designated in the plans
Bureau.
the Iowa Department of Transportation, Bridges and Structures
D. Other Manufacturers and patterns submitted to and approved by
C. Architectural Polymers (Pattern No. 911)
B. Fitzgerald Formliners (Pattern No. 17911)
A. Custom Rock International (Pattern Nos. 1203, 1208)
manufacturers:
3. Obtain texture form liner materials from one of the following
inches.21 and 22
1 Maximum depth of texture shall be between 1
Individual stone dimensions shall be between 3 and 42 inches.
stone masonry surface having stones of varying size and shape.
shall produce a textured effect of a realistic, random drystacked
2. The form liner used to produce the texture shown in the plan details
that includes texture.
approved by the Engineer before beginning production concrete work
liners. The textured concrete mockup panel must be reviewed and
sheet PT-AD 1-20 for more information regarding the use of form
plan. See "General Notes for Textured Concrete Form Liners" on
concrete surfaces of the pedestrian tunnel headwalls shown in this
1. This work consists of applying textured finishes on all designated
EN
GLIS
H_L
RF
D_SIG
NE
D_P
ED
ES
TRIA
N_T
UN
NE
L_S
TA
ND
AR
DS.D
GN -
PT-A
D 2-2
0 -
THIS S
HE
ET IS
SU
ED 08-2
020
Cast-In-Place Standard Design - Walkways and Trails
Pedestrian Tunnel
Reinforced Concrete
August, 2020
LA
TE
ST
RE
VISI
ON
DA
TE
AP
PR
OV
ED
BY
BRI
DG
E
EN
GI
NE
ER
Highway Division