Rehabilitation of the I-81 Bridges

over

Oneida Lake & Erie Canal

Sam Anthony P.E., F.ASCE,

Erdman Anthony, Rochester, NY

Page 2: Rehabilitation of the I-81 Bridges over Oneida Lake & Erie

Project Location

• 15 Miles North of

Syracuse

Page 3: Rehabilitation of the I-81 Bridges over Oneida Lake & Erie

Bridge History

• 1958 Construction Begins

• 1961 Opened to traffic

• Longest Prestressed Concrete Superstructure

(at time of construction)

• Summers, Munniger and Molke, Consulting Engineers

• Terry Contracting, Inc., Long Island City, NY

• 2000 Major Rehabilitation – concrete overlay

• 2011 Emergency Repair – external post tensioning added

• 2012 NYSDOT retains Erdman Anthony to perform in-depth structural

evaluation

• NYSDOT video documentary of design and construction:

Page 4: Rehabilitation of the I-81 Bridges over Oneida Lake & Erie

3

Page 5: Rehabilitation of the I-81 Bridges over Oneida Lake & Erie

Unique Bridge Features

• 70ft – 320 ft – 70 ft span configuration

• Cantilever girders extend 70ft beyond piers

• 232 ft Drop-In girders

• 38 ft solid counterweight in each flank span

• Longitudinal & transverse post-tensioning

Page 6: Rehabilitation of the I-81 Bridges over Oneida Lake & Erie

Interlocking “finger” connection

5

Plan View of Girders

Plan View of Girders with Diaphragms

ABUT PIER MIDSPAN

Page 7: Rehabilitation of the I-81 Bridges over Oneida Lake & Erie

6

Cantilever Girders

Page 8: Rehabilitation of the I-81 Bridges over Oneida Lake & Erie

Counterweight

Page 9: Rehabilitation of the I-81 Bridges over Oneida Lake & Erie

8

Drop-in Girders

Page 10: Rehabilitation of the I-81 Bridges over Oneida Lake & Erie

Bearings-on-diaphragms

9

Page 11: Rehabilitation of the I-81 Bridges over Oneida Lake & Erie

Longitudinal post tension

10

Cantilever – Interior Girder

Cantilever – Exterior Girder

Drop-In Girder

Page 12: Rehabilitation of the I-81 Bridges over Oneida Lake & Erie

Typical Post Tensioning Detail

11

Page 13: Rehabilitation of the I-81 Bridges over Oneida Lake & Erie

External post tension

12

Page 14: Rehabilitation of the I-81 Bridges over Oneida Lake & Erie

External post tension

13

Page 15: Rehabilitation of the I-81 Bridges over Oneida Lake & Erie

Erdman Anthony Scope of Work

1. In-depth Inspection

a. Phase 1: 100% Hands On

b. Phase 2: Non Destructive Inspection

c. Phase 3: Localized Destructive

2. Structural Analysis

3. Rehabilitation Plans, Specs and Estimate

14

Page 16: Rehabilitation of the I-81 Bridges over Oneida Lake & Erie

15

Erdman Anthony – Phase 1 - Visual Inspection

• 100% Hands-on Inspection

• Regions of concrete deterioration

• Exposed & broken tendons

Page 17: Rehabilitation of the I-81 Bridges over Oneida Lake & Erie

16

Phase 1 - Scupper Inventory

Bridge Girder Span Scpr Notes

Likely

Tendon

Corrsn

NB 1 1 1 Cracks in web, delams in chamfer and soffit yes

2 No Delams noted no

2 3 Delam soffit only no

4 Delam soffit only no

10 Cracks and Delam in Web yes

11 Delam in Web yes

3 12 Wet concrete no

13 Major delams, possible broken tendon yes

6 1 1 Small Delam in web no

2 Delam soffit only no

2 3 Delams in Deck Soffit no

4 No Significant Delams noted no

10 Crack in chamfer, minor web delam, exposed stirrup no

11 No Delams noted no

3 12 Minor Delam in web no

13 Web delams, spalled concrete over tendon yes

SB 1 1 1 Cracks and Delam in Web yes

2 Some Delam in Web and Chamfer yes

2 3 Minor Delam in Deck Soffit no

4 Cracks and Delams in web and chamf. yes

10 No Delams noted no

11 No Delams noted no

3 12 Web delams, exposed stirrup yes

13 Major delams, broken tendon yes

6 1 1 Crack and Delam in Web - Imm. Spall yes

2 Minor Delam in Deck Soffit only no

2 3 No Delams noted no

4 Spall and Broken tendons yes

10 Delams in Web - top and bot. yes

11 Delams in Web yes

3 12 Start of web delams yes

13 Crack in web no

Page 18: Rehabilitation of the I-81 Bridges over Oneida Lake & Erie

Phase 1 - Added wearing surface

17

Page 19: Rehabilitation of the I-81 Bridges over Oneida Lake & Erie

18

Phase 2: Half Cell Potential [HCP]

RESULTS: Northbound – G1 – Inside Face – near scupper 12

Pier 2

(north)

Tendon (Typ)

Chamfer

Bottom of Deck Slab (unrolled)

> 90% probability

corrosion occurring

> 90% probability NO

corrosion occurring

corrosion uncertain

Page 20: Rehabilitation of the I-81 Bridges over Oneida Lake & Erie

2 - Ultrasonic Shear Wave Tomography [UST]

• Completed by CTL Group

• Low frequency (20 to 100 kHz)

multifunctional phased array

ultrasonic system

• Used to evaluate grout integrity

for select longitudinal and

transverse tendons.

• Data assembled and plotted

graphically to allow 3D

interpretation.

Page 21: Rehabilitation of the I-81 Bridges over Oneida Lake & Erie

20

2 - Ultrasonic Shear Wave Tomography [UST]

RESULTS: SB/G6/P2 @ possible tendon void

UST SCANNER

Web: 21” (533mm)

Cover

2.5”

(65mm)

Depth into Girder

Possible

Tendon Void

Page 22: Rehabilitation of the I-81 Bridges over Oneida Lake & Erie

21

2 - Ultrasonic Shear Wave Tomography [UST]

RESULTS: Southbound – G6 (East Fascia) @ North Pier

C/L North Pier

Main Span

Foam Void (Typ)

Tendon (Typ)

Possible Void Location

Page 23: Rehabilitation of the I-81 Bridges over Oneida Lake & Erie

22

Phase 3 - Videoscope

Page 24: Rehabilitation of the I-81 Bridges over Oneida Lake & Erie

23

Phase 3 - Videoscope – Drill 2B

Page 25: Rehabilitation of the I-81 Bridges over Oneida Lake & Erie

24

Phase 3 - Videoscope Results – Drill 2B

Page 26: Rehabilitation of the I-81 Bridges over Oneida Lake & Erie

25

Phase 3 - Videoscope Results – Drill 3B

Page 27: Rehabilitation of the I-81 Bridges over Oneida Lake & Erie

26

Phase 3 - Videoscope - Anchor

• Inspected 108 transverse tendon anchorages at diaphragm(s) A & D

• Conditions ranged from fair to poor

Page 28: Rehabilitation of the I-81 Bridges over Oneida Lake & Erie

27

Phase 3 - Videoscope Results – Anchor 1

Page 29: Rehabilitation of the I-81 Bridges over Oneida Lake & Erie

28

Phase 3 – Videoscope Results – Anchor 1

Page 30: Rehabilitation of the I-81 Bridges over Oneida Lake & Erie

29

Phase 3 - Window 7

Page 31: Rehabilitation of the I-81 Bridges over Oneida Lake & Erie

30

Phase 3 - Window 7 – Row 1

Page 32: Rehabilitation of the I-81 Bridges over Oneida Lake & Erie

31

Phase 3 - Window 7 – Row 2 - Interior

Page 33: Rehabilitation of the I-81 Bridges over Oneida Lake & Erie

32

Structural Analysis

Page 34: Rehabilitation of the I-81 Bridges over Oneida Lake & Erie

33

• 72 Steps in

Analysis

• All stress states

predicated on

previous step

• After 57 years,

pt losses are

close to

exhausted

• CSI Program

Updates

Problematic

Page 35: Rehabilitation of the I-81 Bridges over Oneida Lake & Erie

Cantilever PT Removals

34

Page 36: Rehabilitation of the I-81 Bridges over Oneida Lake & Erie

Cantilever PT Removals

35

Page 37: Rehabilitation of the I-81 Bridges over Oneida Lake & Erie

Drop In PT Removals

36

Page 38: Rehabilitation of the I-81 Bridges over Oneida Lake & Erie

Drop In PT Removals

37

Page 39: Rehabilitation of the I-81 Bridges over Oneida Lake & Erie

38

Page 40: Rehabilitation of the I-81 Bridges over Oneida Lake & Erie

39

Page 41: Rehabilitation of the I-81 Bridges over Oneida Lake & Erie

40

Page 42: Rehabilitation of the I-81 Bridges over Oneida Lake & Erie

41

Good News

No viable offsite

detours!

Page 43: Rehabilitation of the I-81 Bridges over Oneida Lake & Erie

42

Page 44: Rehabilitation of the I-81 Bridges over Oneida Lake & Erie

43

Page 45: Rehabilitation of the I-81 Bridges over Oneida Lake & Erie

44

Page 46: Rehabilitation of the I-81 Bridges over Oneida Lake & Erie

45

Page 47: Rehabilitation of the I-81 Bridges over Oneida Lake & Erie

46

Completed Bridge

Page 48: Rehabilitation of the I-81 Bridges over Oneida Lake & Erie

47

SB Bridge SB Bridge NB Bridge NB Bridge

W Fascia E Fascia W Fascia E Fascia

Elevation

Elevation

Deflection

Elevation

Deflection

Elevation

Deflection

Elevation

Deflection

Elevation

Deflection

Elevation

Deflection

Elevation

Deflection

Elevation

Deflection

Elevation

Deflection

Elevation

Deflection

Elevation

Deflection

Elevation

Deflection

Elevation

Deflection

Elevation

Deflection

Elevation

Deflection

*Deflection = Recorded Elevation - Baseline Elevation

Survey Deflection Monitoring Record Table

Outside

Temp, °FDate

Baseline Elevation

Recorded Elevations & Calculated Deflections*

Elevations (ft) and Deflections (in)

Measurement

Type

Owner’s Manual – Instrumentation – MISTRAS

Scenario Prestressing Wire Status Required Action

1Less than 21 breaks in the east fascia drop-in girder and

less than 21 breaks in the west fascia drop-in girder.No Action Required

222 or more wire breaks in the east or west fascia drop-in girder

(but not both).

Reduce Number of Lanes

to Two as per Figure 1

3 22 or more wire breaks in the east and west fascia drop-in girders. Close Bridge

Action Plan Summary

Page 49: Rehabilitation of the I-81 Bridges over Oneida Lake & Erie

PDH Questions1. “AS IS” condition, what girder controlled

the load rating?

The drop in fascia girder = 20 tons

2. What was the primary strategy to improve

rating?

Remove the 8” overlay weight. Put back

1.5” overlay. New rating = 38 tons.

3. How many wires need to break before

you have to worry?

2148

Page 50: Rehabilitation of the I-81 Bridges over Oneida Lake & Erie

49

Credits

NYSDOT Region 3 Nick DeCirce, PE Project Manager

NYSDOT Region 3 John Sexton, PE Regional Bridge

NYSDOT Main Office Matthew Royce, PE Emergency Repair

NYSDOT EIC Eric Sczerbaniewicz

Erdman Anthony Sam Anthony, PE Lead Structural

Erdman Anthony Bob Farrell, PE Sr. Structural

Steve Percassi, PE Sr. Structural

Joe Bechel, PE Sr. Structural

Erdman Anthony Drew Schwingel, EIT Structural

KPFF / CTL Chris Ligozio, PE Sr. Structural

Corven Engineering John Corven, PE Sr. Structural

Crane Hogan Frank Fisher Superintendent

Thanks for your attention.