registration and auditing for demand resources
TRANSCRIPT
O C T O B E R 3 0 , 2 0 1 3 | W E S T B O R O U G H , M A
Kristen Emmett
A N A L Y S T , D E M A N D R E S O U R C E A D M I N I S T R A T I O N
Registration and Auditing for Demand Resources
Douglas Smith M A N A G E R , D E M A N D R E S O U R C E A D M I N I S T R A T I O N
Michael J. Jaeger S E N I O R A N A L Y S T , D E M A N D R E S O U R C E A D M I N I S T R A T I O N
Agenda
2
Registration & Auditing for Demand Resources October 30, 2013
Welcome and Introductions
Registration & Auditing for Demand Resources REGISTRATION
Background and Definitions Systems and Interfaces
Break Demand Asset Registration
Registration Process Using CAMS Monthly Communication Model
LUNCH
AUDIT and TESTING
Demand Resource Audit Fundamentals Using the Audit and Testing Tool
Conclusion
Closing Remarks Evaluations
WELCOME AND INTRODUCTIONS
Linda S. Caldarella CUSTOMER SERVICE AND TRAINING
Course Goal
To provide an understanding of the requirements, processes, impacts, and tools associated with registering and auditing Demand Resources (DR) and Demand Assets that participate in New England wholesale markets.
4
Course Objectives
At the completion of this training, you will be able to:
• Register a new demand asset using Customer Asset Management System (CAMS)
• Map demand assets to resources
• Change or modify a registration
• Maintain or retire assets in CAMS
• Discuss auditing fundamentals and requirements
• Use the DR Audit and Testing Tool (A&TT) to satisfy audit requirements
5
Instructors
• Doug Smith, Manager
• Kristen Emmett, Analyst
• Mike Jaeger, Senior Analyst
Our instructors are members of the Demand Resource Administration Team within Market Operations at the ISO.
6
Disclaimer for Customer Training
ISO New England (ISO) provides training to enhance participant and stakeholder understanding.
Because not all issues and requirements are addressed by the training, participants and other stakeholders should not rely solely on this training for information but should consult the effective Transmission, Markets and Services Tariff (“Tariff”) and the relevant Market Manuals, Operating Procedures and Planning Procedures (“Procedures”).
In case of a discrepancy between training provided by ISO and the Tariff or Procedures, the meaning of the Tariff and Procedures shall govern.
7
Administrative Details
Fire escapes
Restrooms
Breaks
Evaluations
Training Manual
8
During Today’s Session…
9
Cell Phones and Laptops • Please turn cell phones and pagers to silent. • Please do not use laptops during the session.
Questions? • Questions may be asked during the presentation. A “Parking
Lot” is used to capture questions we cannot answer today. • Specific questions? Please ask during the Q&A section.
Training classes are not a Market or Reliability Committee meeting on the Market Rule. • This training is based on the current Market Rule. • Always review our website for the most current information.
Evaluation Module Title/Instructor Ensure you are completing the correct evaluation.
Length of Course Note the change in scale properties. For example, 1= Too short, 2 = Somewhat too short, etc.
Comments and suggestions Please keep text within the boundaries of the blue area. Text written outside this area will not be captured.
Bar Code Fields Please DO NOT alter any of the fields shaded in purple. These fields are necessary to read the evaluation data.
BACK FRONT
Your feedback is important to us. Please complete and hand
in your evaluation form after each presentation.
10
Customer Support
• Ask ISO – Self-service interface for submitting inquiries – Accessible through the SMD Applications Homepage – Requires a valid digital certificate with the role of Ask ISO/External User – Contact your Security Administrator for assistance
• Phone: 413-540-4220 – Monday through Friday, 7:30 A.M. to 5:30 P.M. Eastern Time – Recorded/monitored conversations
• Email: [email protected]
11
12
O C T O B E R 3 0 , 2 0 1 3 | W E S T B O R O U G H , M A
Kristen Emmett A N A L Y S T
Registration
Registration and Auditing for Demand Resources
Douglas Smith M A N A G E R
Topics
1. Registration 2. Auditing & Testing • Background and Definitions • System Interfaces
– Obtaining Application Access • Metering Configurations • Demand Asset Registration
– Asset Registration Timelines • Registration Process Using CAMS • Asset to Resource Mapping • Updating Information
– Creating Service Notes • Monthly Communication Model
• Auditing Fundamentals – Auditing Process
• Using the Audit & Testing Tool – Requesting and Audit – Audit Request Search – Audit Results – Other Audit Requests – Cancelling an Audit
2
Topics Not Covered
3
• Settlement Methodology - Forward Capacity Market
• Dispatch Processes - Demand Resource Operator Training
• Qualification Process
• Forward Capacity Auction
Home > Support > Training > Training Materials
BACKGROUND AND DEFINITIONS
Frequently Used Acronyms
5
DR MUI
RTDR
A&TT
CAMS Customer Asset Management System
Audit & Testing Tool
Demand Resource Market User Interface
Real-Time Demand Response SMS
RTEG
RTU
CFE
Remote Terminal Unit
Communications Front End
Settlement Market System
Real-Time Emergency Generation
FCM Forward Capacity Market DDE Designated Demand Entity
Governing Documents
• Transmission, Markets & Services Tariff – Section I – General Terms and Conditions
• Section I.2.2 – Definitions – Section III – Market Rule 1
• Section 8 – Demand Response Baselines • Section 13 – Forward Capacity Market • Appendix E – Demand Response
• ISO New England Manuals – M-RPA Registration and Performance
Auditing – M-MVDR Measurement and
Verification of Demand Resources – M-20 Forward Capacity Market (FCM) – M-28 Market Rule 1 Accounting
6
ISO New England Manuals Details
7
Name Content Highlights Registration Performance Auditing (M-RPA)
• Consolidates most registration and auditing requirements for different asset types
• Section 2.7 describes DR registration; Section 4 describes the DR auditing provisions
Measurement and Verification of Demand Resources (M-MVDR)
• Besides describing M&V methodologies and requirements for M&V plans, contains details on the metering configuration and requirements and other performance reporting protocols
Forward Capacity Market (FCM) (M-20)
• Provides certain details regarding the operation of the FCM, including details on DR
Market Rule 1 Accounting (M-28) • Includes data submission deadlines for DR
User Guides
CAMS User Guide for Demand Asset and Demand Resource Maintenance
Demand Resource Audit and Testing Tool (A&TT) User Guide
Demand Resource Market Interface User Guide
8
www.iso-ne.com
What is Demand Response?
• End-use customers temporarily reduce their electricity consumption in response to: – System reliability events – High wholesale prices – Performance audits
• End-use customers change their electricity consumption by: – Reducing load for a specific time period – Starting load reducing distributed generation – Shifting load to a different time period – Installing energy efficiency measures
9
What are Demand Resources?
Installed measures that result in verifiable reductions of end-use energy consumption that would otherwise have been produced by other capacity resources in the New England control area.
10
Passive Demand Resources (Passive) Active Demand Resources (Active)
• Non-dispatchable • Include On-Peak and Seasonal Peak
Demand Resources • May include energy efficiency
programs or distributed generation projects
• Designed to reduce loads when dispatched
• Can reduce load based on system conditions or ISO instructions
• Include Real-Time Demand Response (RTDR) and Real-Time Emergency Generation (RTEG) resources
On-Peak Demand Resources
11
• On-Peak Demand Resources provide their load reduction during the following hours: – Summer On-Peak Hours 1:00-5:00 p.m.
• non-holiday weekdays in June, July, and August – Winter On-Peak Hours 5:00-7:00 p.m.
• non-holiday weekdays in December and January
• Designed for non-dispatchable measures that reduce load across predefined hours (e.g., lighting, motors, etc.)
Seasonal Peak Demand Resources
• Seasonal Peak Demand Resources must reduce load during non-holiday weekdays when the real-time hourly load is equal to or greater than 90% of the most recent “50/50” System Peak Load Forecast for the applicable summer or winter season
• Designed for non-dispatchable, weather-sensitive measures such as energy efficient HVAC systems
12
Real-Time Demand Response (RTDR) Resources
13
Activation
• RTDR resources will be activated when ISO implements Operating Procedure 4 (OP-4) Action 2 during the Operating Day
• Communications will be received electronically through the CFE/RTU
For information purposes only, ISO provides a forecast of RTDR activation at the Demand Resource level beginning at ~1700 and potentially revised ~1900 on the day before the Operating Day. This is published in the DR MUI.
Dispatch Instructions
Upon receipt of ISO Dispatch Instructions*, RTDR resources must: • Curtail electrical usage (or increase distributed
generator output) within 30 minutes of receiving a Dispatch Instruction
• Continue curtailing usage until receiving a release/recall Dispatch Instruction to restore electrical usage
* Based on location and MW needed
RTDR Assets are eligible to participate in Transitional Demand Response pursuant to Appendix E of Market Rule 1
Real-Time Emergency Generation Resources RTEG
14
Activation
• RTEGs will be activated when ISO implements OP-4 Action 6 during the Operating Day
• This is the first voltage reduction
action step in OP-4, such that operation of these units typically is compliant with environmental regulations
• Communications will be received electronically through the CFE/RTU
Dispatch Instructions
Upon receipt of ISO dispatch instructions (at the location and for the amount needed), RTEG resources must: • Be permitted for emergency use only
by federal, state, or local environmental regulations
• Move electrical usage from grid to emergency generator within 30 minutes of receiving a dispatch instruction
• Continue operating emergency generation until a release/recall dispatch instruction is received to restore electrical usage
Dispatch Zones
• RTDR and RTEG aggregations and activations take place at the Dispatch Zone level
• 19 Dispatch Zones
15
Bangor Hydro
Vermont
Northwest Vermont
Maine Bangor Hydro
New Hampshire
Western MA
Vermont
Western CT
Springfield MA
Northern CT
Central MA
Norwalk-Stamford Eastern CT
Rhode Island
Lower SEMA
SEMA Boston
North Shore Seacoast
Portland ME
What is Registered?
16 M-RPA
Facility Physical location, representing a metered end-use customer, with a single Retail Delivery Point
CAMS
Measure Installed product, equipment, system, or service that is used to obtain reductions in end-use demand
Examples include: distributed generators, lighting controls and manufacturing process that could be shut down
CAMS
Asset Combination of one or more measures with the same Demand Resource type and metering configuration
CAMS
Resource Combination of Assets within a single Dispatch or Load Zone which, when combined, meet the Resource CSO
Forward Capacity Tracking System (FCTS)
Resources, Assets, and Measures
• Resources are made up of one or more Assets – For dispatchable resources (RTDR and RTEG) assets are typically
planned load reductions or increments of distributed generation at a end-use customer facility.
– For passive resources (On-Peak and Seasonal Peak) assets are generally energy efficiency or load management portfolios or individually metered non-dispatchable distributed generators.
• Assets are made up of one or more Measures – Allows similar measures to be aggregated into assets in some cases,
but this functionality is rarely utilized at present other than for energy efficiency projects.
17
Demand Resources to Demand Assets Relationship
18
Lead Market Participant
Resource A
Resource B
Demand Assets
Asset 1
Asset 2
Asset 3
Demand Resources (RTDR or RTEG)
...now add in Measures
19
Lead Market Participant
Demand Resources (RTDR or RTEG)
Resource A
Resource B
Demand Assets
Asset 1
Asset 3
Asset 4
Measures
Measure 1
Measure 2
Measure 4
Measure 3
Relationship of RTUs, Demand Resources, and Active Demand Assets
20
Demand Designated Entity (DDE)
Dispatched Measured
Lead Market Participant
Resource A
Resource B
Asset 1
Asset 2
Asset 3
Demand Resources (RTDR or RTEG)
Demand Assets
Active Demand Resource Object Model
21
Demand Designated Entity (DDE)
Measures
Facility 1
Measure 1
Facility 2
Measure 2
Facility 3
Measure 3
Measure 4
Resource A
Resource B
Asset 1
Asset 3
Asset 4
Demand Resources
(RTDR or RTEG)
Demand Assets
Demand Resources to Passive Assets Relationship
22
Lead Market Participant
Demand Resources
Resource C
Resource D
Passive Assets
Project 1
Program 2
Program 3
23
Demand Registration Roles and Responsibilities Lead Market Participant
• Initiates customer acquisition and aggregation • Assumes market obligation with the ISO
– Takes on FCM Capacity Supply Obligation (CSO) – Receives ISO revenues and charges
• Manages customer asset registration with ISO • Designates DDE • Requests Demand Resource audits
• Assigns (maps) assets to Demand Resources to meet CSO • Has financial and contractual obligation with the customer • Updates ISO Operations on resource capabilities
24
Demand Registration Roles and Responsibilities Demand Designated Entity (DDE)
• Transmits asset real-time interval data from the customer meter to ISO through an RTU interface
• Updates monthly communication model with ISO
• Transmits OP-4 Real-Time Dispatch Instructions to Assets
• Coordinates curtailment by activating specific assets at specific curtailment levels
• Reviews, validates, and corrects meter data within ISO deadlines
25
DDE may be the Lead Market Participant or an agent contracted by the Lead Market Participant
Demand Registration Roles and Responsibilities ISO New England
• Organizes the FCM and sets rules under Federal Energy Regulatory Commission (FERC) jurisdiction
• Reviews and approves asset registration requests
• Updates and provides a monthly operations model • Validates asset interval data submitted by the DDE
• Reviews monthly performance values and supporting documentation
• Processes performance audit requests • Coordinates DR performance audits
• Evaluates DR performance during Real Time Events
26
Demand Registration Roles and Responsibilities Host Participant
• May allow or prohibit registration of Demand Resources in territory
• Assists ISO in determining correct PNode location for assets with a maximum interruptible capacity of 1MW or greater
27
PNode A physical location within the bulk power system from which a demand asset is electrically fed.
SYSTEMS AND INTERFACES Obtaining Application Access
Systems & Interfaces Used
29
• Asset registration • Remote Terminal Unit (RTU) • Customer registration
• Lead Market Participants (LP) • Demand Designated Entities (DDE)
Customer & Asset Management System
(CAMS)
• 5-minute telemetered data • Dispatch Instructions
Communications Front End (CFE)/Remote
Terminal Unit (RTU)
• 5-minute meter data for initial baseline calculation • 5-minute meter data corrections • DR availability information
Demand Resource Market User Interface (DRMUI)
Systems & Interfaces Used
30
• Hourly facility meter data for facilities capable of pushing back power to the grid not otherwise reporting data through CFE/RTU
• Hourly generation output for passive DG
Settlement Market System (SMS)
• System used to store meter data and calculate the baselines for active resources
• Transparent to external users • Receives meter data from CFE/RTU and DRMUI
Baseline Telemetry System (BLTS)
• Track DR audit requests and corresponding audit results • Support business processes and workflows associated
with DR • Allows users to be in the know by providing transparency
and timely delivery of DR performance information
Auditing & Testing Tool (A&TT)
Single Sign On (SSO) Applications
• Valid Digital Certificate required to access SMD Applications – Digital Certificate issued by ISO New England – Contact Customer Support to apply for a Digital Certificate
• Digital Certificates grant access to the SSO page – Security Administrators responsible for assigning access at
appropriate level for individual Digital Certificates
• Standard Market Design (SMD) Applications Home Page – SSO page: https://smd.iso-ne.com/
31
Access Rights for SMD Applications Security Administrator Role
Security Administrator (SA) for your company:
• Manages access to all ISO systems – Not sure who is your company SA? Contact ISO Customer Support
• Uses CAMS to manage user access to all ISO SMD applications – Contact your SA to obtain appropriate user access
32
Access Rights to ISO New England Systems
33
Task Role Application Role System
Asset Registration Lead Participant
External Demand Asset Maintainer CAMS
Asset-to-Resource Mapping Lead Participant
External Demand Asset Maintainer CAMS
Resource-to-DDE Designation Lead Participant
External Resource Maintainer CAMS
RTU-to-Resource Assignment DDE External Customer Maintainer CAMS
5 Minute Meter Data download and correction upload
Meter Reader
Meter Reader Read/Write DR MUI
Hourly Meter Data Submittals Meter Reader
Metering and Daily Tag SMS
Facility Verification Host Participant
External Host Participant Viewer CAMS
34
METERING CONFIGURATIONS
Metering Configurations Section Overview
• Six different metering configuration types allowed
• Determining the appropriate configuration and submitting the required data and information is very important – Taking time to understand this material will help you avoid major
pitfalls
• For assistance, please refer to the M-MVDR and do not hesitate to create an Ask-ISO ticket if more help is needed.
36
Overview of the Configurations
• Facility Metered Load (FML) is the electricity used at a facility purchased from the grid
• Total Facility Load (TFL) is the total electricity used at a facility inclusive of that purchased from the grid and that produced by on-site Distributed Generation (DG)
• Only one asset at a facility can use either TFL or FML-based metering configurations – TFL and FML metering configurations cannot coexist at a facility
Refer to Manual M-MVDR for metering configuration details
37
TFL = FML + Distributed Generation
Types of Metering
38
A Load reduction only with no Distributed Generation (DG) at the facility
B Distributed Generation output directly metered
C Distributed Generation used to reduce load at the asset • Real-Time Emergency Generation Assets only
D Load reduction with directly metered Distributed Generation used at another on-site asset • With Distributed Generation behind the facility meter
E Distributed Generation used to reduce load at the asset and directly metered Distributed Generation used at another on-site asset • Real-Time Emergency Generation Assets only • With additional Distributed Generation behind the facility meter
F Load Reduction pursuant to a Measurement and Verification Plan • Includes Statistical Sampling
Meter Configuration Matrix
39
Meter Config Description Data
Required Baseline DR Type
A Load reduction only with no DG Load FML RTDR
B DG Output Directly Metered Gen
(plus Load if facility can push back)
Gen for RTDR, N/A for RTEG
RTDR, RTEG, On-Peak &
Seasonal Peak
C DG used only to reduce load (applies to RTEG only)
Load FML RTEG
D Load reduction with directly metered DG at another on-site asset
Load & Gen TFL RTDR
E DG used to reduce load with other on-site directly metered DG
Load & Gen TFL RTEG
F Load reduction pursuant to an M&V Plan (including statistical sampling)
M&V Plan Samples as
Gen N/A On-Peak &
Seasonal Peak
For RTDR and RTEG Assets, real-time 5 minute interval data is required
(A) Load Reduction Only With No DG at the Facility
RTDR
• M1 required to submit 5-Minute telemetry through CFE/RTU
• Customer Baseline (CB) is calculated and based on M1 (FML)
• Average Hourly Load Reduction (HR) is CB-M1
40
Facility RTDR
Asset 123
M1
(B) DG Output Directly Metered
• RTDR, RTEG – M1 required to submit 5-Minute
telemetry through CFE/RTU. Average Hourly Output (HR) is M1
– If pushback is possible, M2 required to submit hourly data through SMS or 5-Minute data through CFE/RTU
• On-Peak, Seasonal Peak – M1 required to submit hourly data
through SMS, though M&V requirement is to have at least 15 minute interval data. HR is M1
– If pushback is possible, M2 required to submit hourly data through SMS
– No CB calculated
41
Facility
M2
M1
DG Asset 456
(C) DG Only Used to Reduce Load at the Asset
• This metering configuration only applies to the RTEG DR Type where the EG is the only measure at the facility
• M1 required to submit 5-Minute telemetry through CFE/RTU
• CB is calculated and based on M1 (FML)
• HR is CB – M1
• From a data stream, CB and HR perspective, this metering configuration is like “Load Reduction Only with no DG at the facility” (A)
42
Facility
M1
RTEG Asset 456
(D) Load Reduction Only With Directly Metered DG Used to Reduce Load at Another On-Site Asset
RTDR – Asset 123 • M1 and M2 required to submit 5-
Minute telemetry through CFE/RTU. • CB is calculated and based on
M1 and M2 (TFL) • HR is CB – TFL
RTDR/RTEG/On-Peak/Seasonal Peak – Asset 789 • Uses the MC of “DG Output Directly
Metered” (B) noted earlier • For RTEG, MC of “DG only Used to
Reduce Load at the Asset ” (C) at the Asset would not be allowed for this facility as there is another measure
43
Facility
M1
M2
DG Asset 789
RTDR Asset 123
(E) DG Used to Reduce Load at the Asset and Directly Metered DG at Another On-Site Asset
RTEG Only • M1, M2 required to submit
5-Minute telemetry through RTU • CB is calculated and based on M1
and M2 (TFL) • HR is CB – TFL
44
Facility
M1
M2
DG Asset 789
DG Asset 456
(F) Load Reduction Pursuant to M&V Plan
On-Peak, Seasonal Peak • Asset 789 submits demand reduction
values across performance hours in each month
• No CB is calculated
45
Facility Passive
Asset 789
Changes to Metering Configurations
• Once established, the metering configuration of a measure can only change with the addition of another measure at the same facility or when directly metering RTEG that was formerly DG used to reduce load
• Upon receipt of a second measure registration, ISO will coordinate the metering configuration change with the Lead Market Participant(s)
46
Metering Configuration Considerations
• Beginning with full integration of RTDR with the energy market (planned for June 2017), TFL configuration goes away in all cases except when there is an RTDR and RTEG at the same facility – Only one RTDR type asset will exist behind a retail delivery point
• Metering and FML based performance at the Retail Delivery Point is required – This is required now for assets participating in Transitional
Demand Response
• Consideration should be given to utilizing Retail Delivery Point metering for any new assets being registered
47
48
Let’s take a short break…
49
DEMAND ASSET REGISTRATION
What is the purpose of Demand Asset Registration?
• Verify Lead Market Participant’s ability to reduce electricity consumption by obtaining the necessary information about the measures
• Identify location of end-use customer
• Record how facility plans to reduce electricity consumption
•
51
What is Registered?
52 M-RPA
Facility Physical location, representing a metered end-use customer, with a single Retail Delivery Point
CAMS
Measure Installed product, equipment, system, or service that is used to obtain reductions in end-use demand
Examples include: distributed generators, lighting controls and manufacturing process that could be shut down
CAMS
Asset Combination of one or more measures with the same Demand Resource type and metering configuration
CAMS
Resource Combination of Assets within a single Dispatch or Load Zone which, when combined, meet the Resource CSO
Forward Capacity Tracking System (FCTS)
Registration Process Status/State Definitions
State What it means
Received New registration submitted
Review in Progress ISO review of the registration in progress
Pending Customer Action Identification of an issue that ISO needs resolved by the Customer
Approved Registration approved by ISO
Rejected Submission denied by ISO • Service Notes explaining the basis of the rejection are included
Canceled Identifies to ISO that submission is withdrawn
Retired Terminal state once the asset is removed
Ready to Respond Asset satisfied all requirements and is ready to respond to events once incorporated into the communication model
53
Registration Process Reaching the Ready to Respond State
• Measure(s) mapped to the Demand Asset must be approved by ISO – Recent utility bill required for approval
• Meters must be installed and operational – Lead Participant must verify meter install by updating flag in CAMS
• A baseline must be established for Demand Assets that require a baseline – Ten consecutive business days of data needed to establish baseline
• RTDR assets and RTEG assets require a PNode assignment – Provides operations with information about where the asset is
connected to the grid – Assets with MIC 1 MW or greater must have PNode verified by
Host Participant
54
Active Asset Registration Timeline
• Memorandum sent to LPs and DDEs on the first Friday of each month outlining registration, baseline and mapping deadlines.
• Objective is to have active Demand Assets reviewed, approved, and baselines built (where applicable) in time for the monthly communication check-out process
• New Demand Assets must: – Allow ISO seven full business days to review submittal (applies to passive assets also) – Be approved, and have a baseline built when needed, before the monthly
communication model deadline
• Baseline Data – Window for submitting data starts as early as ten business days prior to
the registration submittal
• Communication Data Model – Monthly communication check-out process begins seven calendar days (T-7) prior
to the first of the following month. Assets not ready to respond prior to this deadline will be reviewed for inclusion in next month’s model.
55
Asset Registration Timeline Sample
56
October, 2013
10/1/2013 Tuesday
10/31/2013 Thursday
Friday, 10/25/2013 0:00 (T-7):
CAMS data model is
finalized (No further changes are
allowed)
Friday, 10/18/2013:
Deadline to Submit New Demand Assets for
11/1/2013, submittals beyond this date are not guaranteed to be ready
for 11/1/2013
Wednesday, 10/23/2013 (T-9):
Deadline for Meter Data submissions to build a baseline,
where one is required
57
REGISTRATION PROCESS USING CAMS
SMD Applications Home Page Accessing CAMS
59
Click here to
get started
Contact your security administrator for proper CAMS access rights.
CAMS Home Screen
60
Click on the ASSETS tab to reach the Demand Asset
Measure Search screen
CAMS Search Screen
61
Click the Enroll New Measure button to begin the registration process
using CAMS Enroll Measure Wizard
Demand Resource Types
62
This is the start of the Enroll Measure Wizard DR Category
Registration process flow and data requirements are dependent upon whether the Demand Asset is: • Active • Passive
DR Type • Real Time Demand Response • Real Time Emergency Generation • On Peak • Seasonal Peak
DR Sub-Type Applicable if the DR Category is Passive: • Program • Project
Requested Effective/Operational Date: Must be the first day of a future month
Participate in Price Responsive Demand Program*: Only available to Real Time Demand Response Assets. * also known as Transitional Demand Response
Transitional Demand Response Conditions
• Used interchangeably with Price Demand Response
• In order for a RTDR asset to participate, the following conditions must be met: – Maximum Interruptible Capacity must be equal or greater
than 0.1 MW – Maximum Load must be equal to or greater than 0.1 MW – Asset must be measured at individual end-use customer
Retail Delivery Point
63 Market Rule Section 1
Retail Delivery Point (RDP) Point at which host participant meters the end-use customer for metered service. (or) Interconnection between end-use customer and the grid.
Distribution Company Enter Details
64
Distribution Company is filtered by the Service
Address State field
Retail Account ID and Utility Meter Number formats are: • Unique to each distribution company • Not all distribution companies require a utility meter number • Meter number is required only if asset is participating in
Transitional Demand Response
Submittal of Facility Information
• Required for all Demand Assets except for On-Peak and Seasonal Peak Program Demand Assets that have selected program as the DR subtype
• Service address determines: – Facility location (latitude and longitude) – Closest PNode (geographically)
• PNode location determines Metering Domain, Load Zone and Dispatch Zone
65
Facility Information
• New facility address information must be specific to the physical service address and not a billing address
- OR -
• Select Existing Service Address – A dropdown box will appear when
a retail account of an existing facility is entered on the Distribution Company screen
66
Location Confirmation • Confirmation screen is presented to the user upon determination of the
PNode and relevant location information
• If the address does not standardize well, or coordinates and PNode appear to be incorrect, notify ISO by Service Note
67
General Measure Information
68
Reduction Method Load Reduction or Start Generator
Metering Configuration Selection options will be determined based on the DR Type and Reduction Method
Meter Installed and Operational (MIO) • Asset status will not change to Ready to
Respond if MIO flag is “No” • Noting the Meter is Installed and
Operational is an affirmation by the LMP that the appropriate metering and end-to-end communications per the requirements in M-MVDR are operational
Passive Measure Information
69
12 months of performance estimates
• Starting month based on requested operational date the user enters
Additional months can be added by selecting the sign
Generator Measure Information • Maximum Generation
The nameplate rating of the generator
• Typical Load on the Generator Generator output during normal operations across performance hours
• Firm Load In the context of DR registration is the load at the facility that cannot be interrupted
• Push Back Capable Flag Established by evaluating a facility's ability to synchronize with the grid during performance hours, breaker status during event hours, or other considerations such as a facility’s interconnection agreement
• Hourly Load Data Submitted via SMS for facilities that do not have other Demand Assets that already report the facility load
70
Generator Measure Information (cont.)
For registrations that are based on load reduction but also have a generator at the facility:
• Metering configuration should be Load Reduction – DG used to reduce load at another on-site Asset
• Choose “Yes” for additional generation at the facility that is not associated with any measure
• Enter characteristics of the generator located at the facility
71
Measure Contact Information
72
One primary contact must be identified
Click here to add more contacts
Completing Enroll Measure Wizard
• Affirm that measure is not registered and receiving compensation in any other market
• Create an asset name and choose a meter reader from the dropdown menu
• Click submit to send the registration to ISO for review and approval
73
After Submittal
• Notifications and Messages – Host Participant via e-mail – Meter Reader via e-mail – Lead Participant via on-screen message
• Review Process – Seven (7) full business days to review – Automated email messages will be sent to Lead Participant as the
measure moves through each state of the approval process – Timing of approval
• Actives - always the 1st of the month • Passives - as of the system date
74
75
ASSET TO RESOURCE MAPPING
Demand Asset to Demand Resource
• Demand Resource is an aggregation of one or more assets
• Assets must be mapped to a Demand Resource of the same DR type
• Effective date of mappings are on monthly boundaries for actives and current date for passives
• Active assets are mapped to Demand Resources in the same Dispatch Zone and Passive assets are mapped to Demand Resources in same Load Zone
77
Demand Resources
Resource A
Resource B
Demand Assets
Asset 1
Asset 3
Asset 4
Mapping to Commercial vs. Non-Commercial Resources
• If Lead Participant has multiple resources of the same DR type within a dispatch zone, the new asset must first be mapped to an undersubscribed commercial resource. – Commercial resource has a defined audit record – Undersubscribed means the audit values of the assets mapped
to the resource do not meet or exceed the maximum Net CSO of the resource
• Why? To prevent return of FA to a non-commercial resource when a commercial resource may be short of obligation
78
Demand Asset to Demand Resource Mapping
79
Mappings are viewed from the Demand Asset View under the Resource to Asset Mapping tab
Mappings are managed by selecting the Resource Mappings button: • Create new mappings • Remove existing mappings
Demand Asset to Demand Resource New Mapping
80
Date Effective: • Must be the first of a month • Defaults to the earliest possible month
Select the Map button to create new mappings
Unmap Demand Asset from Demand Resource
81
Warning message appears to okay or cancel the action.
Click the Unmap button to remove existing asset mappings from the resource.
Unmap Demand Asset from Demand Resource
• Asset may be unmapped from a Demand Resource – Effective dates are on monthly boundaries for active
(the first day of the month) – System date for passive – Sum of audited contributions from assets mapped to resource cannot
fall below the resource’s net CSO in any capacity commitment period
• New assets and unmapped assets can be mapped within a CCP and for future CCPs – Assets with no current mappings (i.e., mappings are future dated)
are able to change their future mapping
82
DDE for Demand Resource Designation
• Lead Market Participant must designate a DDE for each Real-Time Demand Response and Real-Time Emergency Generation Resource
• Lead Market Participant must choose this designation in CAMS so assets can be included in communication model
• DDE designation and RTU assignment do not apply to On-Peak and Seasonal Peak Resources
83
Demand Designated Entity (DDE)
Resource A
Resource B
Demand Resources
Home Screen
84
To map a DDE to a resource, click the
RESOURCES tab
Resource Search Criteria
85
Enter the resource ID you want to map to the DDE
Next screen shows the search results
Demand Resource Search Results
86
Click on the Resource ID number to select a resource and move to the next screen
123465 xxxxxxxx xxxxxxxxxxxxxx
Resource to DDE Designation
87
Select the Map button to create a new mapping
Resource to DDE Designation, continued
88
Select the DDE from the drop down menu Date Effective
must be the 1st of the month
RTU to Demand Resource
• DDEs can only assign a RTU to a Demand Resource where they have been designated the DDE by a Lead Market Participant
• RTU must be assigned to a Demand Resource to be included in the communications model
• Only RTUs registered by the DDE in accordance with Appendix F of ISO Operating Procedure 18 are available for assignment
• RTU assignments do not apply to On-Peak and Seasonal Peak Resources
89
Demand Designated Entity (DDE)
Resource A
Resource B
Demand Resources
RTU to Resource Assignment
90
To map the RTU to a resource, click RTU
Select and click a Resource ID to move to the next screen and continue the assignment
RTU to Resource Assignment, continued
91
When changing DDEs, all resource to DDE and DDE to RTU mappings must be completed for the new DDE
Choose an Effective Date, then click Next • Must be the first of a month • If the current date is within the T-7 window, the date
will default to the first day of the following month
Select the Map button to create a new mapping
Effective date chosen will be populated. Choose RTU from drop down, then click Submit.
92
UPDATING INFORMATION
Asset/Measure Updates
• Future updates are restricted to the first of a month for all assets and measures
• Lead Participant is able to backdate updates to maximum generation, maximum load, and maximum facility load within the open data resubmission windows – Data must be refreshed after ISO approval of these updates
• Updates of RTDR and RTEG assets and measures must be submitted prior to the T-7 window
• Updates of On-Peak and Seasonal Peak assets can be submitted at any time
• Attributes requiring ISO approval will be marked with a “Flag” icon
94
Measure Update
95
Enter an effective date for the update that is the first day of a future month or a prior date that is inclusive of open data reporting windows. Then click the Submit button.
96
Measure Update Screen Example
Creating a Service Note in CAMS
97
Tool for tracking correspondence related to asset registration. Click here to add a Service Note
Add Service Note Details
98
Displays automatically to ISO and Lead Participant. Indicate display to others listed, as appropriate, by checking the active box(es)
Enter comments here
Click here to attach a file
Viewing Service Notes
99
To view notes, click the Service Notes tab
Service Notes Details
100
Allows you to filter service notes viewed
Uploaded files shown here
Demand Asset Retirement
• To retire an Demand Asset, all measures mapped to the asset must be retired first
• Asset status will be set to retired automatically after all underlying measures are retired
• ISO may retire any Demand Asset in the Ready to Respond state and unmapped from a Demand Resource for longer than one month Note: All mapped measures may also be retired
101
102
MONTHLY COMMUNICATION MODEL
Monthly Model Update Process Overview
• At the start of each month the real time communication systems need to be updated to reflect new resources and assets – All changes in CAMS that have been reviewed and approved by the
cutoff date will be included (T-7)
• Monthly update process updates the configuration of: – ISO Communications Front Ends (CFEs) – ISO Energy Management System (EMS) and other back-end systems – DDE RTU
104
Monthly Model Update Process Matrix
105
Fixed Dates Steps
D - (1 month and 8 days)
Last model cutoff
CAMS updates
ISO CAMS update review process
D - 8 days
D - 7 days
D
Model change cutoff Test system updated and new Extensible Markup Language (XML) files distributed DDE test RTU configuration
Test RTU update verification process
ISO deployment of new model to the production systems
DDE production RTU update with the new model
Common Mistakes
• Recent utility bill not provided
• Distribution company chosen during registration does not match the utility bill
• Metering Configuration chosen does not coincide with other measures at the facility
• Maximum Interruptible Capacity exceeds Maximum Facility Load
106
107
APPENDIX Registration Checklists
RTDR and RTEG Registration Checklist
109
RTDR and RTEG Registration Checklist
Measure
Has the PNode been determined?
Has the meter been installed and is it operational?
Has the baseline been built where required?
Has ISO approval been completed?
Demand Asset Has Demand Asset been mapped to a Demand Resource?
Demand Resource
Has Demand Resource been mapped to a DDE?
Has the DDE mapped an RTU to the Demand Resource?
On-Peak and Seasonal Peak Project Registration Checklist
110
On-Peak and Seasonal Peak Project Registration Checklist
Measure
Has the PNode been determined?
Has the Meter been installed and is it operational?
Has ISO approval been completed?
Demand Asset Has Demand Asset been mapped to a Demand Resource?
On-Peak and Seasonal Peak Program Registration Checklist
111
On-Peak and Seasonal Peak Program Registration Checklist
Measure
Has the meter (M&V Plan) been installed and is it operational?
Has ISO approval been completed?
Demand Asset Has Demand Asset been mapped to a Demand Resource?
O C T O B E R 3 0 , 2 0 1 3 | W E S T B O R O U G H , M A
Michael J. Jaeger S E N I O R A N A L Y S T , D E M A N D R E S O U R C E A D M I N I S T R A T I O N
Audit and Testing
Registration and Auditing for Demand Resources
Course Objectives
At the completion of this training, you will be able to:
• Register a new demand asset using Customer Asset Management System (CAMS)
• Map demand assets to resources
• Change or modify a registration
• Maintain or retire assets in CAMS
• Discuss auditing fundamentals and requirements
• Use the DR Audit and Testing Tool (A&TT) to satisfy audit requirements
2
Topics
1. Registration 2. Auditing & Testing • Background and Definitions • System Interfaces
– Obtaining Application Access • Metering Configurations • Demand Asset Registration
– Asset Registration Timelines • Registration Process Using CAMS • Asset to Resource Mapping • Updating Information
– Creating Service Notes • Monthly Communication Model
• Auditing Fundamentals – Auditing Process
• Using the Audit & Testing Tool – Requesting an Audit – Audit Request Search – Audit Results – Other Audit Requests – Cancelling an Audit
3
DEMAND RESOURCE AUDITING FUNDAMENTALS
Auditing Fundamentals Purpose
Demand Resources are audited to:
• Establish the Demand Reduction Value (DRV) for a demand resource
• Verify commercial operation of a demand resource – Audit required prior to release of financial assurance – Must be performed no later than the first month for which the
demand resource has a CSO, or the month following the proposed Commercial Operation Date, whichever is earlier
• ISO determines that the demand resource DRV may not be credible, therefore a Level 1 or Level 2 audit may be conducted (more later)
5
Auditing Fundamentals
• Audits are requested by a Lead Market Participant via the DR Audit and Testing Tool (A&TT)
• RTDR and RTEG Resource Audits are conducted by electronic dispatch of all scheduled Resources by the Control Room Operator
• Resources must be audited at least twice per commitment period – Once each season during performance months
• Demand Resource audits have one hour minimum duration, after 30 minute ramp period – Typically audits expected to run for about 65 to 75 minutes – Actual audit durations may be longer, based on control room needs
6
Auditing Fundamentals Seasonal Audit
• Required to be conducted in performance months of: – June, July or August (Summer) – December or January (Winter)
• Used to demonstrate resource capability
• Used to establish Forward Capacity Market performance and settlement in some circumstances
7
Participants may request an audit via DR-ATT, or, if no audit was conducted before the last month of a season, one will be requested by the DR-ATT on the Participant’s behalf
Auditing Fundamentals Commercial Operation Audit (COA)
• Used to demonstrate commercial operation status of a resource, or an increase of incremental capacity since its last seasonal audit
• Lead Market Participants can request a COA via the DR-ATT
8
A COA requested during a seasonal performance month meets the seasonal auditing requirements for that season
Auditing Fundamentals Specific to RTDR & RTEG
• Concurrent audit requirement – If a single facility includes RTEG and RTDR assets, audits of resources
those assets are mapped to must be performed concurrently – Avoids double counting of loads curtailed for RTDR measures
that are also fed from the emergency generator
• Once RTDR or RTEG resource audit request is submitted, the DR-ATT software: – Checks associated facilities for any assets of the other type at the
same facility, and if found, – Creates a corresponding “Concurrent” audit request for the other
resource
9
Could result in more than one additional audit request
Auditing Fundamentals Specific to RTDR and RTEG, continued
• What is a new asset?
• “New Asset” audits may be requested to demonstrate incremental capacity additions to a resource provided by individual new assets to the resource
• System will determine the new assets for the resources based on the season
10
Auditing Fundamentals Specific to RTDR and RTEG, continued
• The entire resource will be dispatched, but only new assets to the resource: – Are expected to perform, and – Generate audit results
• Concurrent audit checks are not performed for “New Asset” requests
• Performance will be calculated for all new assets
11
Note: By default a whole resource audit will be conducted unless a new asset audit is specified
Auditing Active RTDR and RTEG Assets
• Date and time of demand resource audits unannounced until start of audit event
• Dispatch instructions triggered by an audit include a MW value for the net CSO in effect for the month when the audit is conducted – MW value is the minimum level of expected performance – Exception: New asset audits where performance expected only
from new assets
• Lead Market Participants are encouraged to deploy all active and ready-to-respond Demand Assets during a full resource audit
• Electronic dispatch instructions will indicate the dispatch is an audit
12
Audit may start at any time during an hour and last at least 1 hour* after the 30 minute ramp period. *Typically lasts more than an hour.
Auditing Active RTDR and RTEG Assets, cont’d
• ISO Control Room may extend or terminate an audit at any time due to system conditions
• If the duration of an audit event includes a partial hour, the average load reduction or average output calculations will account for only intervals where a dispatch was in effect
13
ISO Initiated Audits
Level 1 Audit
• Establishes the audit results by conducting a review of records of the demand asset or demand response asset to verify that the reported measures have been installed and are operational
Level 2 Audit
• Establishes the audit results by on-site field visit, to verify installation and performance of measures in the demand asset
14 Market Rule III.13.6.1.5.4.5. Additional Audits
Auditing Fundamentals Ways to Satisfy the Seasonal Audit Requirement
15
Audit and Testing Tool
Customer Request
Real-time dispatch, if the real time event meets eligibility
Qualifying Dispatch
Audit and Testing Tool automatically requests an audit for all resources not audited by: - August 1st (summer)
or - January 1st (winter)
Automatic Request
Auditing Fundamentals Operating Procedure No. 4 (OP4)
OP4 - Action 2 and 6 (OP4 A2/6) events can be used “as a seasonal audit” if the event meets eligibility requirements: • Resource dispatched at 100% of its maximum Net CSO for the
season effective for at least an hour
• Simultaneous (concurrent) audit (RTEG/RTDR) requirements are met
• If a dispatch event OP4 A2/6 is selected as audit, the audit period will be the first 12 intervals (following the 30 minute notice) of the 100% Net CSO dispatch period
• If OP4 A2 and A6 are both dispatched, the audit period will be the first 12 intervals of the simultaneous dispatch of the 100% Net CSO dispatch period
16
Auditing Fundamentals Values
• Performance of the resource is the simple sum of the performance values of the mapped assets – Resources with no mapped assets will have a null
or zero value – Performance for RTDR/RTEG resources is based on load
compared with an adjusted baseline
• Seasonal Peak and On-Peak Resources submit performance directly, either through CAMS or SMS, and ISO determines an audit value
17
Auditing Passive Assets
Monthly Data Submission • Non-DG assets: Lead Market Participant for an On-Peak and Seasonal Peak
Demand Resource reports the monthly energy reductions and output (MWh) coincident with On-Peak or Seasonal Peak Hours to ISO
• Data submittal window runs from the beginning of the obligation month until 13:00 on the third business day following the obligation month for initial settlement
• Distributed Generators (DG) report performance data through the SMS user interface, by submitting meter reads, less any parasitic loads (subject to ISO review and audit)
18
Timing of DR Capacity Audits All active audits will be conducted during hours consistent with the
performance hours of the applicable DR type illustrated in this chart.
19
DR Type Performance Hours
RTDR Hour Ending (H.E.) 8:00–23:00, M-F, non-Demand Response holidays
RTEG H.E. 8:00-19:00, M-F, non-Demand Response holidays Note: ISO will use best efforts to avoid air quality action days.
On-Peak H.E. 14:00-17:00 (summer), H.E. 18:00-19:00 (winter), M-F, non-holidays
Seasonal Peak ≥ 90% of the most recent 50/50 system peak load, M-F, non-holidays
Example
• Notification dispatch 6:30 • Audit performance period 7:00 • Audit ends 8:15
Auditing Process Based on DR Type
Active Assets (RTDR and RTEG)
• Similar to typical activation by dispatch zone
• Can be requested as: – Whole Resource
• Concurrent Resources – New Asset Audit
Passive Assets
• Monthly performance values data in CAMS or use of DG meter data
• Can be requested as: – Whole Resource only
20
Auditing Process Overview
• Establish Need
• Request
• Schedule and Conduct
• Results – Initial – Resettlement
21
Lifecycle of an Audit - Process Overview
22
Establish Need for Audit
• Commercial Operation Audit
• New Asset Audit • Seasonal DRV
Audit
FCTS
Lead Participant
Schedule and Conduct Audit (20 day window)
• Dispatch for Active
• Analysis & Supp Doc for Passive
A&TT CFE/RTU
CAMS SMS
ISO
• Calculate DRV • Settlement • Performance
May use Audit values
SMS
ISO
Audit Results • Approve • Defer • Fail
• Initial (Approve or Defer) • Final (Approve or Fail)
A&TT CAMS
ISO
Determine Commercial Operation
• CODp (FCTS) • FA Return
FCTS FAM
ISO
Request/ Cancel Audit
Start Date Audit
A&TT
Lead Participant
ISO trigger establishes
a need for Audit
ISO
Dispatch Received
Asset Review In Progress
Initial Review Complete
Final Review Complete
Pending
Active DR Audit Lifecycle Example
23
May June July August/ Sept October
Submitted on 05/31/2013
or up to 6 mos. earlier
(12/01/2010)
06/01/2013 Requested Audit
Window Start
BD = Business Days (using Settlement Holidays) Non-DR Holiday BD = Business Days (excluding DR Holidays)
Audit Date 6/20/2013
ISO Audit Window 20 non-DR Holiday BD
6/29/2013 Audit
Window End
Initial Approval 14 BD
2.5
BD
Initial Data Corrections due
June 23, 2013 @ 1:00 p.m.
Initial Audit Results Published
July 11, 2013
July 12, 2013 Window opens for meter data corrections (day after monthly bill issuance)
Final Review 14 BD
Final Audit Results Published in A&TT October 28, 2013
7/1/2013
Data Reconciliation 70 calendar days
Final Data Corrections due by October 09, 2013 @ 5:00 p.m.
24
USING THE AUDIT AND TESTING TOOL
DR Audit & Testing Tool (A&TT) Purpose
• Track DR audit requests and corresponding results
• Support business processes and workflows associated with DRs – Audits – Data validation and quality
• Allow users to be “in the know” providing transparency and timely delivery of DR performance information – DR Lead Participants – Demand Designated Entities – ISO’s Demand Resource Administration (DRA) group
• Monitor/track performance of demand resources and demand assets
26
A&TT
Audit Requests
• Request can be made six months in advance using the A&TT and Lead Participant specifies date the audit window opens
• ISO has 20 business days starting with the specified date to conduct the audit
• Requests must be made for passive resources as well
27
If a Lead Participant does not request an audit for resources by 12:00 a.m. August 1 or January 1, the A&TT creates an audit request on the customer’s behalf
Audit Request Cancellations
• Audit Requests can be cancelled by the Lead Participant any time prior to the dispatch except where audits are required to occur before the end of seasonal performance periods (August, January).
• For RTDR Resources and RTEG Resources, if the cancellation request is not received in time to cancel the dispatch, then the LP has the option to reverse the cancellation request by informing ISO within two business days following the audit
• Reversing a cancellation – LP submits a request to [email protected] asking that the cancellation
be reversed – If reversed, performance during the audit is evaluated and recorded as if the
cancellation request was never received
28
29
Up Next…
30
Create a placeholder slide for going to application
Overview of Audit and Testing Tool
(A&TT)
SMD Applications Home Page
31
Click here to
get started
Logging into the A&TT Default LP View
32
Default View is the HOME tab
33
Seven Main Tabs 1. Home: Provides a dashboard view of audit requests
2. Resource: Provides detailed Demand Resource information pertinent to audits
3. Asset: Provides detailed Demand Asset audit information
4. Audit Requests: Provides access to each audit request and relevant details
supporting each audit
5. Asset Results: Provides searchable asset results
6. Qualifying Events: Allows LP to request an eligible or qualifying event be used as an audit
7. Flagged Assets: Allows LP and DDE to see any assets flagged for their review, due to potential or reported problems with data quality
A&TT General Features
1. Many of the data grids are downloadable
2. Data grid customizable so that fields can be added or removed
3. Columns are sortable
4. Results are paginated when it exceeds a certain number of rows
34
1
3
4
2
Requesting an Audit Overview
• Requestor must be an authorized user in CAMS and have LP Maintainer access for A&TT – DDE can only view requests once made by the LP
• Pending audit request windows cannot overlap with a new request window – Applies to both new asset and whole resource audits
• Depending on the requested window start date, audits requested for the current month may be postponed to the subsequent month if less than 20 business days remaining in the month
35
Submitting an Audit Request
• Access and log into the DR Audit & Testing Tool
• Two ways to request an audit – Bulk Method to filter for corresponding list of resources
and select the one(s) to audit (with the same audit request date) – Request the audit from the Demand Resource view
• New Asset Audit Button only available during the last 7 days of a month, and only for resources with new assets
36
Bulk Method in A&TT Audit Request Steps
37
Click on the Resource tab and enter search criteria Step 1
Select the appropriate resources using the checkbox Step 2
Click the Request Audit button Step 3
Review and revise (if needed) the Audit Window Start Step 4
Add a Comment if needed Step 5
Select the Submit button Step 6
If successful, a confirmation box appears Step 7
Bulk Method Steps
38
Click on the Resource tab and enter search criteria Step 1
Enter search criteria here to filter/narrow
resources returned from search
If fields are left blank, all resources will be returned after clicking the Submit button
Request Audit Button
39
Using the checkbox, select the
appropriate resources for
the audit
Click the Select ALL button to choose all
resources in the page displayed
Click the Request Audit button to request an audit for the selected
resources
2. Select the appropriate resources using the checkbox - if more than one page repeat this step for each 3. Click the Request Audit button
Steps 2 & 3
Audit Window Start
40
Review and, if needed, revise the Audit Window Start date
This warning message appears when the start
date entered is outside of the auditing period.
Review and revise (if needed) the Audit Window Start Step 4
Add comments here, as appropriate
New Asset Audit Request Button
41
Select the appropriate resource, then click the Submit New Asset Audit Request button to request an audit for a new asset
New Asset Audit Confirmation
42
New Asset Audit Confirmation/Submit screen
shows the list of Asset IDs expected to perform, and
does not allow for the selection of request window
start dates
Comment / Submit
43
Review the Resources listed here
Add any comments
needed
Click the Submit button
Steps 5 and 6 5. Add a Comment if needed 6. Select the Submit button
Confirmation Message
44
If successful, this Confirmation Message is provided and dashboard reflects new requests
If successful, a confirmation box appears Step 7
How do I find an Audit Request in
A&TT?
45
Searching for Audit Requests
46
Enter Resource Characteristics,
if desired
Enter Audit Request
Characteristics, if desired
Enter Audit Request Dates,
if desired
47
View list of Audit Requests meeting search criteria, navigate to Detailed Audit Request or Resource Information
Searching for Audit Requests Results
Navigates to Audit Request details
Directs user to Resource information
Actual: Actual Audit Date MIC: Total registered max interruptible capacity CSO: Capacity obligation for the month corresponding to the Window Start date
Viewing Audit Request Information Specific Demand Resource
48
Resource information
displays here
Audit Request
information displays
here Tabbed details provide supporting information for the audit request
Audit Request Details Who, What, When
49
Demand Resource Capacity Supply Obligation CSO, Net CSO, by Month
50
Real-Time Dispatch Information Available
51
Dispatch Tab Replaced with Event Data Available the next morning
52
Detailed Asset Results
53
Average Interrupted MW can be selected to display the detailed interval data for that row’s Demand Asset. Click on a value to move to the next screen
Asset Result Interval Data By Asset
54
Tracking the Status of Audit Requests
• Lead Participants and Demand Designated Entities can view Asset Results in the A&TT
• Dashboard view will provide the status of open audit requests – Pending – Dispatch Received – Asset Review In Progress – Initial Review Complete – Final Review Complete
55
What information is available on
resources and assets?
56
Accessing Demand Resource Information
57
FCTS and CAMS are system of record
Enter search criteria, if any
Tabs Provide More Resource Details
58
Resource information displayed is based on the selected “as of date” in relation to the DRV audit periods (where applicable)
Accessing Demand Asset Information
59
Enter search criteria, if any
Accessing Demand Asset Information (cont.)
60
ID and Name navigate to Demand
Asset details
Directs user to Resource
information
Demand Asset Information
61
Display of all asset information available in A&TT, including last audit results and effective date.
How do I find my audit results?
62
Asset Results Summary Filter
63
Enter search criteria, if any, then click Submit
Asset Results Summary
64
Average Interrupted MW can be selected to display the detailed interval data for that row’s Demand Asset
Asset Result Interval Data By Asset
65
DR Qualified Events
• DR Qualified Events are those where normal dispatch conditions are such that audit requirements are satisfied
• DR Qualified Events are displayed for the customer to decide whether to accept it or dismiss it as an audit
• Customers have 7 calendar days from the dispatch day to make the election
66 Market Rule 1 Section III.13.6.1.5.4.3.3.
Use of Event Performance Data to Satisfy Audit Requirements for RTDR and RTEG
DR Qualified Events Summary Filter
67
Enter search criteria, if any, then click Submit
DR Qualified Events View
68
Click Approve or Dismiss after reviewing each event. Select: • Approve to use the value as an
audit. • Dismiss or do nothing if you do not
want the value used as an audit.
Flagged Assets Tab
• Currently, the planned ‘flagged asset’ functionality of A&TT is handled using other communications between ISO and Participants/DDE’s
• DRA group reviews meter data – On regular basis – Identify assets and operating days that appear to
have meter data quality issues
• Problematic assets are tracked, and feedback from Participants and DDE’s requested
69
How do I cancel an audit request?
70
Cancelling Audits
• Any time prior to actual initiation of the customer requested audit, the LP may request cancellation of the audit
• Once an audit is initiated, customers can view information regarding the dispatch in the A&TT – Start of an audit disables the ability to cancel an audit request
71
Cancelling Requested Audit
72
Click the Cancel Request button to cancel for this resource
Cancel – Are You Sure?
73
Click Yes if you want to proceed with the cancellation request.
Cancellation Confirmed
74
This is the confirmation message for the successful audit request cancellation.
Status is shown as cancelled
Up Next …
75
A&TT CAMS
Customer Asset Management System (CAMS)
76
SCC is a mislabel of sorts; however it represents the audit results of the specific demand asset.
CAMS will continue to show audit results data associated with a Demand Asset
Asset Results from A&TT
Asset Results from A&TT
Customer Asset Management System (CAMS)
77
CAMS can help you tie audit values to other registration data; export function helpful
Search criteria entered
Click Submit
Customer Asset Management System (CAMS)
78
CAMS CSV Demand Asset Export includes audit result information from A&TT for a given “As of Date”
Summary
You are able to: • Register a new demand asset using the Customer Asset
Management System (CAMS) • Map demand assets to resources • Change or modify a registration • Maintain or retire assets in CAMS • Update information in CAMS • Create Service Notes • Discuss auditing fundamentals and requirements • Use the DR Audit and Testing Tool (A&TT) to satisfy
audit requirements
79
80
81