references - web viewthis instructional design project plan provides an opportunity to create a...
TRANSCRIPT
Running head: MILITARY FINANCIAL AID PROCESS 1
Military Financial Aid Process – Project Proposal
Jeanne Penta
Post University
EDU627
MILITARY FINANCIAL AID PROCESS – PROJECT PROPOSAL 2
Military Financial Aid Process – Project Proposal
Introduction
The Office of Student Finance at Post University has seen a lot of growth over the last
eight months, and two departments (Financial Aid Processors and Tuition Planners) have been
merged into one, Financial Aid Advising (FAA). In addition, the Office of Military Benefits has
been fully absorbed by FAA, and six new hires have been added to the department. Military
benefits are very different from traditional financial aid with more stringent rules and processes
(Tuition Assistance and Benefits, 2016). This has created a serious gap in knowledge and
experience needed to support the military students and their financial aid needs.
Opportunity
This instructional design project plan provides an opportunity to create a process that
takes a military (active, retired, veteran) student or eligible family member from inquiry to
enrollment. A Power Point training presentation will be created that will introduce the new
process and information regarding military student enrollment and tuition assistance programs
for each branch of the military. As a follow up to the presentation, an interactive classroom
module will be created using a web-based program called EasyGenerator. This technology
based, interactive training will include two fictional case study type scenarios which learners will
navigate through in order to connect the proper financial aid information to the “student”. Links
to proper documentation will be provided in the training module and will be used to educate all
current Financial Aid Advisors, as well as any new hires, on the new process and all benefit
information regarding military students.
MILITARY FINANCIAL AID PROCESS – PROJECT PROPOSAL 3
Stakeholders
Stakeholders are considered to be the people and organizations that have a vested interest
in this project (Cox, 2010, p. 7). The stakeholders that have been identified for this specific
project are the 12 military Admissions Counselors, Director of Military Admissions (Dan Stack),
28 Financial Aid Advisors, two Assistant Directors of Financial aid (Cheryl Wilde and Matt
Vining), Associate Director of Financial Aid (Mike Greer), Chief Finance Officer (Scott Allen),
President (Don Mroz), Vice President of Student Finance (Sharon Sweeney), and every military
student (enrolling and returning).
Project Proposal
This instructional Design Project Plan is an opportunity to determine a problem within
the current specs of the everyday duties of the Enrolling Financial Aid Advisors at Post
University and create a solution to that problem. Components of the project plan are described
by Cox (2010) as being, but not limited to, a project charter summary, scope statement, budget,
schedule and risk management plan. In addition, a Work Breakdown Structure (WBS) was
created in order to assemble and organize tasks based on the level of action needed to accomplish
them.
There are three task levels used in the WBS. The primary tasks (Level 1) are the overall
tasks that must be done in order to complete the project. These primary tasks can be completed
individually without access to any of the other tasks. Main tasks (Level 2) are necessary to
complete the primary task and are followed by Supporting tasks (Level 3) which are necessary
for completing the Main tasks (Cox, 2010). The WBS created for this project include all three
levels of tasks that will need to be completed in order to meet the desired goal, which is to bring
MILITARY FINANCIAL AID PROCESS – PROJECT PROPOSAL 4
conformity and structure to the enrollment process for potential, new and returning military
students at Post University.
Problem/Opportunity Definition
Recent cultural changes and restructuring of the Office of Student Finance have required
two separate departments to merge into one. As a result, a major insufficiency was discovered in
current staffing needs and this created a substantial need to fill those positions with a group of
new hires (Post University, 2014). In addition to merging and hiring, the military department,
which had previously worked solely with the military students, was disbanded and absorbed
among several different departments and took on new roles. A standard of practice or training
module had never been needed, so one was never created. The current outcome of this lack of
preparation is that of confusion, chaos and frustration on the parts of Military Admissions
Counselors, Financial Aid Advisors and the students trying to enroll in programs at Post
University.
Proposed Solution
In order to solve the problem concerning the lack of knowledge and training regarding
military enrollment needs for financial aid and tuition assistance, it is proposed that a
compilation of required material will be collected and put together for every Financial Aid
Advisor to utilize (Tuition Assistance and Benefits, 2016). In addition, a training module will be
created that will explain the step-by-step process of moving military students from inquiry to
enrollment and registration, so that everyone has the same information and follows the same
process. This provides continuity for the student, the Admissions Counselor and the Financial
MILITARY FINANCIAL AID PROCESS – PROJECT PROPOSAL 5
Aid Advisor. This new process will also clear up the confusion that has slowed down
productivity immensely.
Scope
This project will be able to develop a standard practice process that will include
references to proper documentation submissions for enrolling students from every branch of the
military by the end of MOD 4 ( April 30,2017) at the cost of $1,150 and 32 combined man-
hours.
Budget
Man-hours and hourly wage were only calculated and included for those participants that
are not on salary as the assigned tasks are already part of their every-day work expectancies.
Instead, budget for the project was calculated by using the average hourly wage for those
involved and designated tasks to complete. This average hourly wage ($22/hour) was then
multiplied by the estimated time it would take to complete each supporting task, and a stipend of
$50 was added to cover the cost of printer ink and paper required to create the learning packets.
In addition, much of the programming and software needed to complete this project is already
being used by Post University and is currently covered in the annual budget for expenses.
Milestones
There are three major milestones which will be incorporated into the project. Collection
of all required documents will be completed by the end of week one. These documents are the
MILITARY FINANCIAL AID PROCESS – PROJECT PROPOSAL 6
basis for the project and are a requirement for any other part of the project to begin. Then, once
all required documents are collected, a flow chart will be created so that the new process can be
structured and organized in a way that maximizes optimal productivity. This should be
completed by the end of week three of the project as it will take more time to meet with directors
and trainers regarding best practices. Finally, since the scope of this project does not include all
of the unperceivable situations that may come up based on outliers that cannot be predicted.
Therefore, a FAQ wiki sheet will be created by the Post University IT department and uploaded
to the financial aid database folder that will allow for constant referencing and updates. This is
the fastest and most economical way to ensure that data in the training module remains current
and up-to-date.
Work Breakdown Structure
The following Work Breakdown Structure (Appendix A) will review the project scope
and subdivide the major aspects of the work into smaller, more manageable tasks (Cox, 2010).
The minimum requirements for this project are to include at least five major (level 1) task groups
that break down into no fewer than 30 main and supportive (level 2 and level 3) tasks.
Documented Actions
Task one (Level 1). Financial aid advisors (FAAs) are required to know which
documents are necessary to move forward with tuition assistance (TA) approval and registration.
These documents are provided to the Admissions Counselor from the student and then forwarded
on to the FAA to be verified. Many times the wrong document is submitted so FAAs need to be
aware of which documents are needed. In order to meet this task it is necessary to meet with
Admissions Counselors (Level 2 task) to go over the TA requirements for each branch of the
MILITARY FINANCIAL AID PROCESS – PROJECT PROPOSAL 7
military: Dan Stack, Army; Laura Stein, Navy/Marines; Stephanie LeBlanc, Coast Guard; Mike
Reid, National Guard; Tom Noonhan, Retired/Honorable discharge/Disabled Veteran. In
addition, meetings with previous military financial aid advisors (Level 2 task) to determine
which military websites can and cannot be used to verify the correct documents are being
submitted.
Task two (Level 1). A flow chart will be created in order to allow FAAs to follow a
student’s opportunity from inquiry to registration. It will be necessary to review and process
incoming documents in order to determine which form of payment is being used (TA voucher,
cash pay, FAFSA, tuition reimbursement through GoArmyEd). Once the payment type is
determined the process for checks and balances must be established. Jenzabar Bills (the billing
system Post University uses) must be checked to see if the enrolling student already has a
balance owed at the school. Level 2 and supporting tasks have been created to have Tom
Kavanagh (Team Lead) and Cheryl Wilde (Assistant Director) create a flow chart, welcome
email and student survey that will provide a clear process to be followed by all FAAs.
Task three (Level 1). A training module will be required to educate all participating
FAAs on the new process which will also include accurate information and documents, as well
as resources to refer to when questions arise. A compatible program or application is required
for easy development of the training module (Main task – Level 2). Supporting tasks needed to
complete the main level task include recruiting Rebecca Zinser in the Instructional Design
department at Post University to create a fun and interactive training module that includes all of
the information collected in the first two Level 1 tasks. She will also be asked, as a supporting
task, to create and put together a training packet that will include copies of all the required
MILITARY FINANCIAL AID PROCESS – PROJECT PROPOSAL 8
documents and vouchers for each military branch. FAAs will keep these packets at their desks
for future reference and guidance.
Task four (Level 1). Once the training module has been created, it is up to the Assistant
Director, Cheryl Wilde, the Associate Director, Mike Greer, and the Director, Bob Andruk to
ensure that all FAAs have access to this training. Cheryl Wilde will be assigned the task of
breaking up the FAAs into three, manageable groups (Level 2 task). Smaller groups will allow
for fast, effective training sessions while still leaving coverage for normal work related duties
within the department. Invitations to each training session will be distributed via Microsoft
Outlook (Level 2 task) and will require a confirmation reply from each participating FAA.
Task 5 (Level 1). Since it will be extremely difficult to anticipate every single scenario
and uncovered situation, there is a need to establish a way in which FAAs can ask questions, or
seek answers to things that may come up that were not in the training. Therefore, the IT
department at Post University, headed by Sanjeev and Mike Bocchino, will create an FAQ wiki
sheet that can be accessed via the F: drive. A contact person will be designated to keep
information up-to-date and accurate based on any new situations or government procedural
changes. In addition, a task (Level 3) has been established that will have Mike Greer, Cheryl
Wilde and Bob Andruk create a survey that will be completed by all FAAs after completing the
training module. This will help determine if there are any shortfalls or missed information that
should be added to future training sessions with new hires in the Financial Aid office.
Project Responsibilities (Appendix A)
Cox (2010) discusses the importance of distributing project information to stakeholders
and keeping them informed throughout the process. This includes making stakeholders aware of
project team members, their responsibilities, the planned schedule and how it affects the budget
MILITARY FINANCIAL AID PROCESS – PROJECT PROPOSAL 9
and other components of the project. In order to keep the project on schedule and minimize
budget overages a spreadsheet is needed to define specific tasks and responsibilities which have
been assigned to each project team member. This should help alleviate any miscommunications
and reduce confusion while also holding each member accountable for his or her specific tasks.
Stakeholder Analysis (Appendix B)
The process of identifying stakeholders and the interests they represent in regards to the
project, as well as the power they possess in inhibiting or supporting the project’s progress is
known as stakeholder management (Stakeholder Assessment and Management, 2017). The
stakeholders for this project hold a critical role and make a significant impact, so a stakeholder
analysis will be an effective tool in ensuring that all groups have an understanding of the
perspectives and concerns of the project. Trust and credibility are key factors throughout the
process, therefore analysing and presenting data to stakeholders is critical to maintain value in
the project.
Communication Plan (Appendix C)
Communication should be effective and is always an essential part of a project (Cox,
2010). It has already been determined that communication is a major weakness within this
particular project plan, so it was determined that a communication plan was necessary. There is
a process established that will help to ensure that the project information is collected and
retrieved in a timely and appropriate manor. This plan includes information regarding the who,
what, when and where of the project so that everyone involved knows exactly what is expected
of them and when.
MILITARY FINANCIAL AID PROCESS – PROJECT PROPOSAL 10
Conclusion
In conclusion, this Instructional Design Project Plan has revealed a problem/opportunity
within the current process and procedures currently used in the Office of Student Finance by
Financial Aid Advisors. Upon completion, this project plan will provide a flow chart process for
FAAs to follow, collect and distribute all documentation forms that should be used by each
branch of the military, adequately train all FAAs and financial aid personnel on the standard
process and best practices, as well as provide a centralized, accessible database for continuous,
real-time updates to this process. The return on investment this project will bring will far
outweigh the low cost of $1,150 and 32 man-hours to complete it. Instead, of the haphazard
free-for-all there is currently, there will be a structured, easy-to-follow process which will save
time and money wasted on misinformation.
There is no guarantee that any project plan will run perfectly, however, proper planning
and communication can help to eliminate surprises and complications that can slow down or add
cost to a project. It is important to ensure that all stakeholders and team members communicate
and understand their roles so that they can help to maintain the required timeline for completion
of the project.
MILITARY FINANCIAL AID PROCESS – PROJECT PROPOSAL 11
References
Cox, D. (2010). Project Management Skills for Instructional Designers: A Practical Guide. Bloomington: IUniverse.
Post University. (2014, September 6). Retrieved from Peterson's College Search: http://www.petersons.com/college-search/post-university-000_10000680.aspx
Stakeholder Assessment and Management. (2017). Retrieved from MITRE: https://www.mitre.org/publications/systems-engineering-guide/enterprise-engineering/transformation-planning-and-organizational-change/stakeholder--assessment-and-management
Tuition Assistance and Benefits. (2016). Retrieved from Post University - Military: http://post.edu/military/tuition-and-aid/tuition-assistance
MILITARY FINANCIAL AID PROCESS – PROJECT PROPOSAL 12
As part of the requirements for this Part 3 submission, a page has been created in the Personal
Learning Environment site and can be viewed at this web address:
https://myschoolshed.wordpress.com/instructional-design-final-project-plan-edu627/
MILITARY FINANCIAL AID PROCESS – PROJECT PROPOSAL 13
Appendix A
Defining Project Responsibilities
PERSONNEL
Military Admissions
Military Financial
Aid
Post University
IT Dept
Enrolling Financial
Aid
Instructional Design
Dept
Office of
Student Finance
TASKS/ACTIVITIES
Get Army GAE/TA requirements and documentation needed for submission
Dan
Stack
Get Navy/Marines requirements and documentation needed for submission
Laura
Stein
Get Coast Guard requirements and documentation needed for submission
Stephani
LeBlanc
Get Retired military requirements and documentation needed for submission
Tom
Noonha
nGet National Guard and Reservists TA information and documentation needed for submission
Mike
Reid
Determine which websites are needed to verify admissions documents submitted
Amanda
Tiscia
Confirm password access for all FAAs Sanjeev
MILITARY FINANCIAL AID PROCESS – PROJECT PROPOSAL 14
Differentiate which documents are required for which branch of military
Kim
Guerret
teDemonstrate where to find the information on the website to compare to the documents submitted in order to verify they match.
Amanda
Tiscia
Verify ITE is completely filled out with appropriate payment method (TA, Cash pay, FA, TR)
Tom
Kavanau
ghConfirm TA voucher is approved or denied Tom
Kavanau
ghConfirm GAE website shows registration of the correct class showing on the ITE and has been approved
Tom
Kavanau
ghCheck Jenzabar Bills for back balance and check off the TP approval box in CRM
Cheryl
Wilde
Set task in CRM as follows: MOD>TA Type Requested>Yes or No> Name of class registering for
Cheryl
Wilde
MILITARY FINANCIAL AID PROCESS – PROJECT PROPOSAL 15
Create welcome email to be sent to new enrolling students that explains the remaining steps based on the specific need of the student and their military affiliation
Cheryl
Wilde
create a process flow chart that provides a visual map of what should be done and when
Cheryl
Wilde
Create a survey that allows students to provide information about the process and offer any suggestions for improvement
Cheryl
Wilde
Using the chosen application, create a fun and interactive training module that includes all othe information collected
Rebecca
Zeiser
Put together a training packet that includes all TA documents, flow chart, and step-by-step process for FAAs to keep handy at their work stations
Rebecca
Zeiser
Break FAAs up into three groups to make for smaller training sessions while still having staff available for daily tasks.
Cheryl
Wilde
Send outlook invites to designated training module session (there will be three)
Cheryl
Wilde
MILITARY FINANCIAL AID PROCESS – PROJECT PROPOSAL 16
establish an FAQ wiki sheet online that can be accessed through the F:drive and shared and updated as needed
Sanjeev
and
Mike
Bocchin
oestablish a point of contact that can be used to monitor and update the FAQ as needed based on new scenarios that arise
Sanjeev
and
Mike
Bocchin
oCreate a survey for FAAs to complete after the training to determine the success and best practices of the training module as well as anything that can be improved or updated
Mike
Greer
and
Bob
Andru
k
MILITARY FINANCIAL AID PROCESS – PROJECT PROPOSAL 17
Appendix B
Stakeholder Analysis
The purpose of stakeholder analysis is to inform the project manager and sponsor who should contribute to the project, where barriers might be, and the actions that need to be taken prior to detailed project planning.
Stakeholder Their interest or requirement from the project
What the project needs from them
Perceived attitudes and/or risks
Actions to take
Dan Stack(Director of Military Admissions)
A smoother transition from enrolment to registration
Information and communication between Admissions and Financial Aid
Lack of availability as the acting Director or Military admissions
Schedule short, frequent meetings through outlook
Cheryl Wilde(Assistant Director of Enrolling Fin Aid)
Less time spent fixing exception report errors and fielding questions from FAAs
Cooperation with retrieving information and providing access to password protected databases as needed
Very detail oriented, needs to know the why and the how
Keep open communication and constant updates
Matt Vining(Assistant Director of Returning Fin Aid)
More complete files being turned over to his subordinates from the enrolling FAAs
Patience and openness to new processes
Not always open to change and new processes, very numbers oriented
Keep communication open and provide analysis updates often
Mike Greer(Associate Director of Fin Aid)
Better metrics for enrolling students, fewer exception report errors to facilitate and monitor
Cooperation with retrieving information and providing access to password protected databases as needed, keep subordinates involved
Very numbers based, has difficulty seeing value in change and training
Keep communication open and provide analysis updates often
MILITARY FINANCIAL AID PROCESS – PROJECT PROPOSAL 18
Scott Allen(Chief Financial Officer)
Cost effective training that limits costly mistakes
Approval of budget affiliated with the project plan
Unknown at this time
Provide budget plan and cost analysis
Don Mroz(President)
A smoother and more positive student experience that is more in line with the new desired culture at Post University
Support and approval to meet accreditation guidelines
Unknown at this time
Provide communication regarding budget, timeframe and expected outcomes of the project
Sharon Sweeney(Vice President of Student Finance)
A more productive work flow process with higher productivity rates, better efficiency and higher metric achievements
Approval of compliance standards and requirements regarding privacy of military financial information
Very reluctant to share information across widespread areas
Constant communication and updates regarding information verification
MILITARY FINANCIAL AID PROCESS – PROJECT PROPOSAL 19
Appendix C
Military Financial Aid Process Communication PlanProject Manager: Jeanne Penta
This communication plan describes our strategy for keeping the project’s stakeholders sufficiently informed to avoid any disappointment regarding cost, schedule, or quality goals.
Stakeholder Information needs Frequency Medium Response
Dan Stack His role in the project plan
Timeframe allowed for his tasks
What information is requested from him
Daily at first, then weekly to keep him updated
1. Outlook meetings
2. email
Cheryl Wilde Her role in the project plan
Timeframe allowed for her tasks
What is required for all tasks assigned to her
Daily 1. Email (Daily)2. Outlook
meetings (weekly)
Matt Vining Status updates on the progress of the plan
When the project is ready to roll out
What to expect once the plan is completed
Weekly Email only
Mike Greer His role in the project plan
Timeframe allowed for his tasks
What is required for all tasks assigned to him
The progress of the project
Daily 1. Email (daily)2. Outlook
meetings (weekly)
MILITARY FINANCIAL AID PROCESS – PROJECT PROPOSAL 20
Any problems or delays
Any changes in cost/budget
Scott Allen Project plan introduction
Budget plans Any budget
changes throughout the project
Weekly Email only
Don Mroz Project plan introduction
Budget plans Projected
outcomes Benefits to the
university Updates to
schedule and budget as the project progresses
Weekly or even daily if required during changes in project plan
1. Email daily or weekly as needed
2. Regularly scheduled Outlook meetings (weekly is probably not required)
Sharon Sweeney
Project plan introduction
Budget plans Projected
outcomes Benefits to the
university Updates to
schedule and budget as the project progresses
Weekly 1. Email (daily)2. Outlook
meetings (weekly)