Copyright 2017 Logic PD, Inc. All Rights Reserved. Confidential. 1 Copyright 2017 Logic PD, Inc. All Rights Reserved. Confidential. Redesigning the stage-gate transition process The three questions every stage gate review must answer, the three cognitive biases that stand in your way, and the three simple changes that can fix it.

Upload: others

Post on 05-Apr-2022

5 views

Category:

Documents


0 download

TRANSCRIPT

Copyright 2017 Logic PD, Inc. All Rights Reserved. Confidential.

1

Copyright 2017 Logic PD, Inc. All Rights Reserved. Confidential.

Redesigning the stage-gate transition processThe three questions every stage gate review must

answer, the three cognitive biases that stand in your

way, and the three simple changes that can fix it.

Copyright 2017 Logic PD, Inc. All Rights Reserved. Confidential.

2

The Product Review Board process:A tale of two meetings

• The “Transition Planning” meeting:

– Regularly fails to address critical issues

– Often lacks complete attendance

– Risks ending without complete alignment

• The “Emergency Review” meeting that follows:

– Raises the critical issues not discussed months

earlier (when they could have been more cost-

effectively addressed)

– Leads to frustration in the gap in expectations for

product functionality and financial performance

– Often ends in damaged internal relationships that

do not bode well for the next product

introduction

Copyright 2017 Logic PD, Inc. All Rights Reserved. Confidential.

3

Impacts of poor transitions

Poorly Received Products

Lost Revenue & Market Share

Reduced Market Perception

Damaged Organizational

Culture

Copyright 2017 Logic PD, Inc. All Rights Reserved. Confidential.

4

Root cause: PRB fantasy versus reality• The Stage Gate Process In Theory:

– Creates alignment between multiple stakeholders

– Coordinates expertise across the organization

– Provides a “single source of truth” for the product

development process

• The Stage Gate Process In Practice:

– Confuses stakeholders and diffuses accountability

– Encourages the “silo-ing” of expertise into

specific functional groups who “check the boxes”

versus cooperating and coordinating efforts

– Almost never represents truth (people don’t want

to “write it down” and be wrong)

Copyright 2017 Logic PD, Inc. All Rights Reserved. Confidential.

5

Focus: There are only three questions

• User desirability:

– Does the product still meet a customer need, or

has the market shifted since we started

development?

• Technical feasibility:

– Is the product still not only technically feasible,

but operationally feasible as well?

• Business profitability/viability:

– Can we still make money doing this?

Copyright 2017 Logic PD, Inc. All Rights Reserved. Confidential.

6

If it’s that easy, why aren’t we doing it?

The Sunk Cost Fallacy. The Misconception: You make rational decisions based on the future value of objects, investments and experiences. The Truth: Your decisions are tainted by the emotional investments you accumulate, and the more you invest in something the harder it becomes to abandon it.

Information bias is a type of cognitive bias, and involves a distorted evaluation of information. An example of information bias is believing that the more information that can be acquired to make a decision, the better, even if that extra information is irrelevant for the decision.

The framing effect is an example of cognitive bias, in which people react to a particular choice in different ways depending on how it is presented; e.g. as a loss or as a gain. People tend to avoid risk when a positive frame is presented but seek risks when a negative frame is presented.

1

2

3

Copyright 2017 Logic PD, Inc. All Rights Reserved. Confidential.

7

PRB Rx, Step 1: Redesign the meetings

• The idea:

– Realign the structure of each stage gate meeting

to formally address each of the three critical

questions

– Every stage gate must answer all three

• In practice:

– Force the categorization of all meeting topics into

one of three categories: Desirability, Feasibility,

or Viability

– The process own checks to ensure all areas are

covered at every stage gate meeting (no

exceptions and no “passes” because it is “just a

technical meeting”)

Copyright 2017 Logic PD, Inc. All Rights Reserved. Confidential.

8

Redesigned Process Example:This product is ready for transfer to manufacturing…

• User desirability:

– Do our Hipster Life Hackers still want to do their

own “lawn mower conversion”?

• Technical feasibility:

– Does our near-shore supplier actually have the

welding equipment needed and the expertise to

use it?

• Business profitability:

– Are there enough “hipster life hackers” to make it

profitable to build these?

Copyright 2017 Logic PD, Inc. All Rights Reserved. Confidential.

9

PRB Rx, Step 2: Opt-in versus opt-out

• The idea:

– Change PRB meetings from an opt-out to an opt-

in process

– In other words, you must have permission to

continue (not an objection to stop)

• In practice:

– Make the funding contingent on an affirmative

blind vote by all stakeholders

Copyright 2017 Logic PD, Inc. All Rights Reserved. Confidential.

10

Redesigned Process Example:This product is ready for transfer to manufacturing…

• The Opt-In Vote Tally:

– Design NO

– Engineering YES

– Manufacturing YES

– Supply Chain NO

– Finance NO

– Sales NO

– Marketing YES

End Result: Preliminary decision, discontinue

development.

Copyright 2017 Logic PD, Inc. All Rights Reserved. Confidential.

11

PRB Rx, Step 3: Hire an independent arbitrator

• The idea:

– An outside arbitrator helps your organization

avoid uncomfortable office politics and see

through cognitive biases

• In practice:

– Hire an outside arbitrator with expertise in the

specific transition points in question

– Avoid hiring the same arbitrator throughout

(they will develop their own biases)

Copyright 2017 Logic PD, Inc. All Rights Reserved. Confidential.

12

Redesigned Process Example:This product is ready for transfer to manufacturing…

• The arbitrator’s ruling: NO

– Design NO

– Engineering YES

– Manufacturing YES

– Supply Chain NO

– Finance NO

– Sales NO

– Marketing YES

End Result: Discontinued development, but the

Engineering, Manufacturing and Marketing groups felt heard

and validated and are ready for the next project.

Copyright 2017 Logic PD, Inc. All Rights Reserved. Confidential.

13

Most products fail.

Don’t make it harder

on yourself!