railway project_work phase activities
DESCRIPTION
Block Diagram showing logical activitiesTRANSCRIPT
Sheet1SYSTEM SET UP & INITIAL PLANNINGPRELIMINARY ENGINEERING & PROJECT PLANNINGDETAILED ENGINEERING & PLANNINGPROCUREMENTPROJECT EXECUTION, MONITORING & CONTROLTESTING & COMMISSIONINGO&MDLP-CLOSE OUT
PHASE A DESIGN (DEDC)Requirements, EIRR / IRR modelCivil Design - MEP Design -ArchRolling Stock, Ops PlanSystems (HAZOP / SA)Costs / ScheduleEIA / GEOTECH etcQA & EDMSHSEPMS / PMM ProceduresSTAKEHOLDERSBASELINE PROGRAMMEPROJECT SCHEDULEBOT EVALUATION REPORTREVIEW OF DESIGN SCHEDULE/METHODLAND ACQUISITIONBOT REVIEWROLLING STOCK REVIEWSYSTEMS ASSURANCE / HAZOPDEDC INTERACTIONCONTRACT PACKAGING / CONTRACT TYPESPROCUREMENT REVIEWPROCUREMENT STRATEGYRISK ASSESSMENTS AND APPRECIATION / MITIGATIONPROJECT DEVELOPMENT & IMPLEMENTATION STRATEGYINCEPTION REPORTBASELINE PROGRAMME DEVELOPMENTMaster Schedule,Design Delivery,ProcurementKey DatesMilestonesContract Requirements for M&CPMC design review & inter-action. Monitoring & Control roleCHANGE CONTROL / ConfigurationInterfacesCONSTRUCTION ASPECTSTemporary WorksTraffic / Rail diversionsLand TakeAccessCamps / UtilitiesConstructability - sequences / constraintsInterfacesCOST / BUDGET ESTIMATE DEVELOPMENT
BOQ, Lump Sum Items, Payment conditionsALIGNMENT / PACKAGES / SCOPE / INTERFACES / RISKSREVIEW OF PHASE AINITIAL VALUE ENGINEERING WORKSINSURANCE /BOND/ WARRANTY NEEDSPQ DATA / PROJECT DATA / SCOPEMARKET TESTING, EOI, MEETINGSPQ CRITERIA & ELIGIBILITY HURDLECONTRACT DOCUMENTATION PREPARATIONPQ EVALUATIONREFINEMENT OF PROGRAMME & BUDGET, CONTRACT PACKAGINGDEVELOPMENT OF ADVANCE WORKS PROJECTSPROGRAMME AND COSTS FOR EMPLOYER SUPPLIED ITEMSSYSTEMS ASSURANCE / INTERFACE MANAGEMENT (Physical Interfaces)MONITORING & CONTROL OF DESIGN AND AWARDED CONTRACTS - Change & Configuration ManagementPMC design review & inter-action. Monitoring & Control role. ID other design works required.Systems Assurance needsFINALISE VALUE ENGINEERING WORKSREVIEW OF PHASE BPQ PROCESSEVALUATIONSHORTLIST
TENDER DOCUMENT PREPARATIONDOCUMENTS, SELECTION & AWARD OF CSC (Construction Supervision Consultant)ISSUE TENDER DOCUMENTS - TENDER REVIEW & EVALUATION PROCESS, RECOMMENDATIONS TO SARCONTRACT AWARD (Issue drawings Good for Construction)CIVIL WORKS / RAILWAY SYSTEMS / MATERIAL SUPPLY / ROLLING STOCK (INTERFACES)HSE
PUBLIC RELATIONS
STAKEHOLDER MANAGEMENT
LAND ACQUISITIONSCHEDULE & COST MANAGEMENTBaseline, EV, Variance, Reporting, Claims
CONTRACT ADMINISTRATION - Variations, Claims, Notifications, PaymentPMC as ENGINEERCONSTRUCTION MANAGEMENT
Reports, Performance, Metrics, Interfaces, Offshore / Offsite Inspections, Variations, SafetyChange / claims / RecordsInterfacesCONTRACTORS / SUPPLIERSMethodsTemporary WorksMaterialsQA/QCLogistics, Labour, Plant & EquipmentContract AdminReportsSYSTEMS ASSURANCE & RAILWAY SAFETY
V&V Process, Documentation, Configuration, ChangesCONSTRUCTION SUPERVISION CONSULTANT
Site Supervision and interaction with Contractor and PMCReports & Records
Approvals / Sign off (Liability & accountability)DESIGN MANAGEMENT
Temporary WorksRFIsD&B ReviewsVariations / ClaimsSafetySystems / ManualsChange / ConfigurationCO-ORDINATED INSTALLATION PROGRAMMETRIAL RUNNING / SAFETY CERTIFICATIONT&C CERTIFICATION / AS-BUILTS / TAKING OVER CERTIFICATION / STATEMENT ON COMPLETION/ AS-BUILTS / TEST RUNNINGTESTING & COMMISSIONING / MANUALS / OPERATOR INVOLVEMENT ( RAILWAY SAFETYDEFECTS LIABILITY PERIOD (Periodic (3 month) Inspections +Actions as req'd)OPERATIONS & MAINTENANCEFINAL ACCEPTANCE AND PAYMENT CERTIFICATIONPHASE B DESIGNCivil DesignMEP DesignRolling StockSystemsCosts / ScheduleV&V, SYSTEMS ASSURANCE
Sheet2
Sheet3