PROFILE COMPANY & PROJECT QUALITY CONTROL
HESCO JSC VIETNAM Milestone 10 Ha Noi - Ha Dong road Nguyen Trai street Tel: 84-4-38544883 E-mail: [email protected]
QUALITY CONTROL TEAMWORK
HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO) Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
Tel: 84-4-38544883 E-mail: [email protected]
Cha
pter
1
2
Project Quality Plan
Project Name: FLAP GATE VALVES AND STOPLOGS FOR TDC
Department: ISO & QUALITY CONTROL
Focus Area: PROJECT OF TDC IN HO CHI MINH CITY
Product-Process: DESIGN-MANUFACTURING-DELIVERY-INSTALLATION
Prepared By: M. Tech. LY THANH HA
Mobile 0912336758
Project Quality Plan Version Control
0BVersion 1BDate 2BAuthor 3BChange Description
8B1 9B10/09/08 10BM. Tech. LY THANH HA 11BN/A
HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO) Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
Tel: 84-4-38544883 E-mail: [email protected]
Cha
pter
1
3
Chapter 1 5
LEGAL DOCUMENTS 5
1.1 GENERAL INFORMATION 6
1.2 FINANCIAL DATA 9
1.3 ORGANIZATION CHART 10
1.4 KEY PERSONNEL 12
Chapter 2 14
PRODUCE PROCEDURES 14
2.2 FLAP GATE MANUFACTURING PROCEDURE 16
2.3 STOPLOG MANUFACTURING PROCEDURE 17
Chapter 3 18
PROJECT QUALITY CONTROL 18
3.1 PROJECT QUALITY PLAN PURPOSE 19
3.2 QUALITY MANAGEMENT METHOD 19
3.3 PROJECT QUALITY ASSURANCE 24
3.4 PROJECT QUALITY CONTROL 27
3.5 PROJECT AUDITS & QUALITY REVIEWS 29
3.6 MANAGEMENT ESCALATION PLAN 30
3.7 QUALITY TEAM ROLES & RESPONSIBILITIES 31
3.8 QUALITY PLAN AUDIT LOG 31
3.9 QUALITY PLAN APPROVALS 32
3.10 DESIGNATION PROCEDURE 33
Chapter 4 34
KEY PERSONELS FOR PROJECT 34
Chapter 5 36
EQUIPMENT FOR PROJECT 36
HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO) Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
Tel: 84-4-38544883 E-mail: [email protected]
Cha
pter
1
4
5.1 EQUIPMENT PROPOSED FOR THIS PROJECT 38
5.2 PICTURES 40
Chapter 6 43
EXPERIENCES FOR PROJECT 43
6.1 LIST OF CONTRACTS EXECUTED FOR 5 LAST YEARS 44
6.2. PRODUCT PICTURES 49
HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO) Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
Tel: 84-4-38544883 E-mail: [email protected]
Cha
pter
1
5
Chapter 1
LEGAL DOCUMENTS
HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO) Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
Tel: 84-4-38544883 E-mail: [email protected]
1.1
GEN
ERAL
INFO
RMA
TIO
N
6
1.1 GENERAL INFORMATION
1.1.1. Name of company: Hydraulic Equipment Joint Stock Company
(HESCO)
Address : Milestone 10, Nguyen Trai Street, Ha Noi-Ha Dong
Tel No. : 04.38544883
Fax No. : 04.38544422
Email : [email protected]
1.1.2. Period of development
Hydraulic Equipment Joint Stock Company was established in 1963 under old name being Hydraulic Equipment Repair Plant. In 1996 it is changed into Hydraulic Equipment Repair & Manufacture Company according to the Decision 117/QD/TC-CB-LD of Minister of Ministry for Agriculture and Rural Development dated 16th July 1996. On 27th December 2002 it is changed into Hydraulic Equipment Joint Stock Company according to the Decision 5984/QD/TC-CB-LD of Minister of Ministry for Agriculture and Rural Development
1.1.3. Main lines of Business
- Repair, fabrication, renew, manufacture of hydraulic equipment;
- Repair of pump, motor, construction equipment;
- Assembly, repair of electro-mechanical equipment of pumping station, hydro-power station, overhead crane, penstock (pressure pipeline) for hydraulic, agriculture, processing of product of agriculture and forestry;
- Construction and installation of small & medium pumping stations and hydro-power stations;
HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO) Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
Tel: 84-4-38544883 E-mail: [email protected]
1.1
GEN
ERAL
INFO
RMA
TIO
N
7
- Construction and installation of irrigation, agriculture & rural development Works;
- Construction of Works of supplying water, irrigation channels, dykes infrastructure development Works;
- Construction & installation low & medium voltage;
- Manufacture and installation of steel structure; workshop frame, microwave column, high tension column;
- Cast, zinc coating;
- Construction of hydropower works, rural infrastructure, civil works;
- Trade of house, hotel, tourist; hire of office, storing area, workshop;
- Local travel and tourist services;
- Consulting, design of mechanical equipment for hydraulic works, hydropower works
- Trade of materials as steel, industrial equipment, machines.
1.1.4. Charter capital:
- Charter capital : 12.000.000.000 VND
In which capital of the State is 5.520.000.000 VND
1.1.5. Main Managers
- Chairman : Le Van An
- Director : Nguyen Huy Quan
- Deputy Director (Technical management): Do Cong Ba
- Deputy Director (Financial management) : Tran Van Thai
- Head of Technical Department : Nguyen Thi Dao
- Head of Admistration & personnel dept : Nguyen Gia Cu
HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO) Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
Tel: 84-4-38544883 E-mail: [email protected]
1.1
GEN
ERAL
INFO
RMA
TIO
N
8
1.1.6. Time and experience of activities
Item No. Experience of activities Time
1 Repair, fabrication, renew, manufacture of hydro-mechanical equipment for irrigation and rural works
From 1976
2 Assembly, repair of electro-mechanical equipment of pumping station, hydro-power station, overhead crane, penstock (pressure pipeline) for hydraulic, agriculture, processing of product of agriculture and forestry
From 1980
3 Design, manufacture, installation of steel structure, hydro-mechanical equipment such as sluice gates, spillway radial gates, automatic gates, trash rake machine, penstock, lifting mechanism devices such as hoist, overhead cranes, gantry cranes with capacity from 10-100T for agriculture, irrigation, hydropower works
From 1990
Hanoi, dated 10th October, 2008
On behalf of Hesco
HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO) Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
Tel: 84-4-38544883 E-mail: [email protected]
1.2
FIN
AN
CIA
L D
ATA
9
1.2 FINANCIAL DATA 1.2.1. Summarize actual assets and liabilities in VND for last three years
Unit: Vietnam dong
Item Year 2004 Year 2005 Year 2006
1. Total Assets 38.814.761.493 60.669.679.051 80.804.094.781
2. Working Assets 34.661.413.974 33.879.000.121 57.450.543.907
3. Total Capital 32.126.502.310 53.176.901.077 59.254.970.203
4. Short Item liability 31.477.351.310 52.966.901.077 46.620.417.320
5. Total revenue 27.971.394.177 39.251.965.284 53.662.985.053
6. Profit before taxes 1.099.385.677 1.552.242.119 2.332.457.615
7. Profit after taxes 1.099.385.677 1.334.928.222 1.679.369.483
1.2.2. Total credit amount and name of Bank providing credit
1. Name of Banks providing credit:
- Thanh Xuan Industrial & Commercial Branch of Vietnam Bank
Address: 275 Nguyen Trai Street, Ha Noi City
- Exchange of Bank for Investment & Development of Vietnam
- Viet Nam International Bank, Ha Dong Branch
2. Total credit amount: 80.000.000.000 VND (Eighty billion Vietnam dong)
Hanoi, dated 10th October, 2008
On behalf of Hesco
HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO) Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
Tel: 84-4-38544883 E-mail: [email protected]
1.3
ORG
AN
IZA
TIO
N C
HA
RT
10
1.3 ORGANIZATION CHART
Organization apparatus of company includes:
- Five (05) departments:
+ Admistration & Personnel Department
+ Financial Department
+ Technical Planning Department
+ Business Department
+ ISO & Quality Control Department
- Five (05) factories
+ Mechnanical Factory No.1
+ Mechnanical Factory No.2
+ Mechnanical Factory No.3
+ Mechnanical Factory No.4
HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO) Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
Tel: 84-4-38544883 E-mail: [email protected]
1.3
ORG
AN
IZA
TIO
N C
HA
RT
11
+ Mechnanical Factory No.5
Total workforce of company is 234 persons. Professional staffs are 55 persons in which:
- Machine manufacture engineers : 23 persons
- Electrical engineers : 05 persons
- Construction, hydro-construction engineers : 09 persons
- Financial – economic bachelors : 15 persons
- Economic middle-ranking executive : 03 persons
- Technical workers : 179 persons
+ Turner, miller, planer, grinder : 19 persons
+ Fitter, caster, painters, forgers : 26 persons
+ Welders : 35 persons
+ Installer, mechanical repairer : 35 persons
+ Workers of electrical construction : 14 persons
+ Workers of construction and installation : 45 persons
of irrigation and hydropower project
+ Driver : 05 persons
Hanoi, dated 10th October, 2008
On behalf of Hesco
HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO) Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
Tel: 84-4-38544883 E-mail: [email protected]
1.4
KEY
PER
SON
NEL
12
1.4 KEY PERSONNEL
Position Full name
Date of
birth Experience
Years of experience in
proposed position
1. Managing Director
Nguyen Huy Quan
1959 General management in business of company
20
2. Deputy director
Do Cong Ba
1953 Being in charge of technique and production
25
2.1. Head of Technical planning dept
Nguyen Thi Dao
1952 - Managing in design and designing supervise. - Manage and coordinate material and equipment for the works
30
2.2. Production division
Manage directly in production
Director of Machnanical Factory No.1
Nguyen Hong Phu
1953 Being in charge of manufacture and installation of lifting equipment such as hoist, overhead crane, gantry crane,…etc
15
Director of Machnanical Factory No.2
Nguyen The Hieu
1973 Being in charge of manufacture and installation of types of gates as stoplog, spillway gates, automatic gates, flap gate, roller gates...etc
10
Director of Machnanical Factory No.3
Bui Van Hoa
1956 Being in charge of manufacture and installation of penstock (pressure pipeline)
20
Director of Machnanical Factory No.4
Nguyen Trong Lan
1959 Being in charge of manufacture and installation of electrical equipment as generator, lighting system, low and high voltage system for hydraulic works and hydropower works.
20
Director of Lai Quoc 1956 Being in charge of manufacture 13
HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO) Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
Tel: 84-4-38544883 E-mail: [email protected]
1.4
KEY
PER
SON
NEL
13
Position Full name
Date of
birth Experience
Years of experience in
proposed position
Machnanical Factory No.5
Sy and installation of equipment as trash rake machine, gates, agriculture equipment for food processing.
3. Deputy director
Tran Van Thai
1949 Being in charge of finance 25
4. Administration division
Nguyen Gia Cu
1956 Being in charge of administration and personnel of company
30
Hanoi, dated 10th October, 2008
On behalf of Hesco
HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO) Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
Tel: 84-4-38544883 E-mail: [email protected]
Cha
pter
2
14
Chapter 2
PRODUCE PROCEDURES
HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO) Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
Tel: 84-4-38544883 E-mail: [email protected]
PRO
DU
CE P
ROCE
DU
RES
15
2.1 CAST IRON MOLDING PROCEDURE
HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO) Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
Tel: 84-4-38544883 E-mail: [email protected]
2.2
FLA
P G
ATE
MA
NU
FACT
URI
NG
PRO
CED
URE
16
2.2 FLAP GATE MANUFACTURING PROCEDURE
HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO) Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
Tel: 84-4-38544883 E-mail: [email protected]
2.3
STO
PLO
G M
AN
UFA
CTU
RIN
G P
ROCE
DU
RE
17
2.3 STOPLOG MANUFACTURING PROCEDURE
HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO) Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
Tel: 84-4-38544883 E-mail: [email protected]
Cha
pter
3
18
Chapter 3
PROJECT QUALITY CONTROL
HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO) Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
Tel: 84-4-38544883 E-mail: [email protected]
PRO
JECT
QU
ALI
TY C
ON
TRO
L
19
3.1 PROJECT QUALITY PLAN PURPOSE The purpose of this Quality is:
- To provide the guidelines and methods necessary for planning, organizing, implementing, monitoring and auditing the Quality Program.
- To ensure that all activities for which HESCO and TDC is responsible are constructed, inspected, tested and maintained in compliance with the contractual scope of works and applicable documents.
- To achieve this objective, the methods and controls described in this Quality Assurance Manual are established. They are implemented at predetermined points, as necessary to prevent, detect and correct deficiencies and to document achieved quality.
- To discover and prevent unsatisfying points (flaws) in producing process, makr sure that all products which are supplied for the project to meet the quality according to the annouced standards.
3.2 QUALITY MANAGEMENT METHOD Quality management method is the way to manage, operate labours, equipment, materials in our company to implement checking, making reports of product quality in the project according to the issued standards.
Managing project quality requires an approved quality plan encompassing three major quality processes defined in Section 3.1. The quality plan is developed and approved during the project planning phase to confirm major deliverables/milestone acceptance criteria and manage approved project processes.
3.2.1. Quality Plan Processes
• Quality Assurance
Quality assurance activities focus on the processes being used to manage and deliver the solution to evaluate overall project performance on a regular basis. Quality assurance is a method to ensure the project will satisfy the quality standards and will define and record quality reviews, test performance, and customer acceptance.
• Quality Control
HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO) Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
Tel: 84-4-38544883 E-mail: [email protected]
3.2
QU
ALI
TY M
AN
AG
EMEN
T M
ETH
OD
20
Quality control activities are performed continually to verify that project management and project deliverables are of high quality and meet quality standards. Quality assurance also helps uncover causes of unsatisfactory results and establish lessons learned to avoid similar issues in this and other projects.
• Project Deliverables and Processes Acceptance Criteria
Project team members and key stakeholders agree at the project planning stage on formal project processes and major deliverable acceptance criteria that will be used to evaluate final deliverable results before the results are formally approved.
3.2.2. Project Overview
Waste water treament project in Ho Chi Minh City, Thi Nghe sluice, includes 43 rectangular flap gates from 0,8m x 0,8m to 3,0m x 2,5m. The least weight of gate is 784,3kg and most weight is 7625, 5kg. The biggest overall dimension of valves is 3465 x 3514 x 830mm. Total weight of flap gate valve is 154.263kg. All flap gate valves are designed according to AWWA C501-80 standard.
The project also includes stoplogs made from stainless steel ASTM A276 from 6 to 12mm thickness. All stoplogs is complexed from 2 to 5 logs with the maximum dimension is 3144x505, and the biggest weight of log is 389kg.
Hesco will make a system for testing, checking all process from buying materials, machining, assemblying, installation at factories, and test according to the following flowchart:
HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO) Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
Tel: 84-4-38544883 E-mail: [email protected]
3.2
QU
ALI
TY M
AN
AG
EMEN
T M
ETH
OD
21
HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO) Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
Tel: 84-4-38544883 E-mail: [email protected]
3.2
QU
ALI
TY M
AN
AG
EMEN
T M
ETH
OD
22
3.2.3. Quality Standards
Applied standard for flap gates:
1. ASTM A126 – Standard Specifications of cast iron, class B
2. ASTM B21 C464 – Standard Specifications of Neoprene and NBR seals
3. ASTM B584 C865 – Standard Specifications of Copper Alloy Sand Castings For General
Applications
4. ASTM A276 – Standard Specifications of type 316 stainless steel, ANSI/AWWA C501-80 –
AWWA standard for gates
a. Design standards
b. Reference materials
c. Equipment
d. Paint
e. Manufacture
f. Checking, testing
g. Installation
h. Transportation
Applied standard for stoplogs:
5. ASTM B21 C464 – Standard Specifications of Neoprene and NBR seals
6. ASTM A276 – Standard Specifications of Stainless steel
7. ANSI/AWWA C501-80 – AWWA standard for sluice gates
i. Design standards
j. Reference materials
k. Equipment
l. Paint
m. Manufacture
n. Checking, testing
o. Installation
p. Transportation
HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO) Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
Tel: 84-4-38544883 E-mail: [email protected]
3.2
QU
ALI
TY M
AN
AG
EMEN
T M
ETH
OD
23
3.2.4. Quality Tools
To ensure quality for the project, we use the following tools:
1. Sonic tester for welding
2. Welding ruler
3. Stainless steel tape ruler 5m long
4. Calipper 0,02mm accuracy class
5. Palme 0,01mm accurecy class
6. Adjustment ruler
7. Leakage test bench for flap gates and stoplogs which are design for the project only
3.2.5. Quality Manager’s Responsibilities
HESCO has adopted, and is committed to a quality system with the aims to conform to contractual requirement and providing consultant with confidence that the products and services provided are fit for their intended purpose.
It is part of HESCO‘s consolidation and constant development to carry out and maintain quality to effect client’s expectation of optimum price, timely delivery and fulfillment of contractual specification.
The policies and guidelines described in this manual are mandatory.
The Management is responsible for Quality Assurance irrespective of whether quality specialists of quality section are established. In arriving at decisions, the quality and personal integrity of staff are of fundamental importance and management shall ensure that each person:
- Everyone understands that quality assurance is important.
- Know how to assist in the achievement of adequate quality. Is stimulated and encourage doing so.
- This Quality Assurance Manual has been accepted and approved by the Management.
- The leader of Quality Control for the project is M. Tech. Lee Thanh Ha who have 15 experienced years in water hydraulic products.
- The leader of Manufacturing Control, Supervisor is The Chief of Engineer, Mr. Ta Khac Ap, who is 30 experienced years in manufacturing, machining, design, testing…water hydraulic product.
- A process of manufacturing will deliver to a team leader in factories who is a supervisor directly through the process, checking, testing for each part.
HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO) Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
Tel: 84-4-38544883 E-mail: [email protected]
3.3
PRO
JECT
QU
ALI
TY A
SSU
RAN
CE
24
3.3 PROJECT QUALITY ASSURANCE Quality assurance helps to establish if a deliverable is acceptable based on the processes used to create it. Quality assurance processes are used to evaluate overall project performance frequently and to determine that quality reviews were held, deliverables tested, and customer acceptance acquired.
3.3.1. Quality Assurance Procedures
HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO) Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
Tel: 84-4-38544883 E-mail: [email protected]
3.3
PRO
JECT
QU
ALI
TY A
SSU
RAN
CE
25
3.3.2 Project Monitoring Processes
After signing the contract with sub-contractor or supplier, project manager will set up a detail project quality control from buying materials, step-by-step, to machining, installation to each team. Each procedure will give responsibilities of team, personels and interlink together.
- Team of material for buying and pre-test materials, making plan to buy materials
- Team of pre-machining or welding for preparing raw foils, plates,sheets according detail drawing
- Team of machining to milling surfaces of cast iron pieces, pivotlugs, link arm
- Team of assemblying to assemble parts becomes complete products
- Team of test for testing leakage and making certificates, 3rd test certificates
- Team of quality control
- Team of logistics for transportation, insurance and delivery the goods
3.3.3. Project In-Process Quality Monitoring
A store keeper will check input importing materials
- by tools with accurrecy 0, 05 for plates or sheets:
o Width, length, thickness, certifacate of origin, certificate of content
- by visual with/whitout ruler on surfaces for cast iron:
o Surfaces of cast iron pieces, geometric telorances, clearances of contact surfaces
- by supersonic tester for important pices from cast iron:
o Internal structure of pivotlugs
- by palme 0,02mm; calip up to 0,01mm for machining parts:
o Surfaces of machined parts
- by calibrator, lamp:
o Clearances of seating faces and seats, seals and seats
- by test bench with pumps, valves
o Leakage of complete flap gates, stoplogs
- by thickness tester:
HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO) Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
Tel: 84-4-38544883 E-mail: [email protected]
3.3
PRO
JECT
QU
ALI
TY A
SSU
RAN
CE
26
o Painting layer thickness, adhension of painting by A-X cutting method
Acceptant test for input materials:
1. Stainless steel ASTM A276
For example:
Engineer will check the equivalent code of stainless steel material baesd on certificates which are notarised by suppliers or contractor:
AS2837-1986-316L; AISI TYPE 316L; BS970-316 S11 & S13; ASTM A276-316L
W.Nr 1.4404 X2CrNiMo17 13 2; W.Nr 1.4435 X2CrNiMo 18 14 3
The contents are follows:
Content C Si Mn Ni Cr Mo Ni P S
Min (%) 0 0 0 10 16 2 0 0 0
Max (%) 0,03 1 2 14 18 3 0,1 0,045 0,03
Every procedure will be the same for other materials and parts
2. ASTM A126 – Standard Specifications of cast iron, class B
3. ASTM B21 C464 – Standard Specifications of Neoprene and NBR seals
4. ASTM B584 C865 – Standard Specifications of Copper Alloy Sand Castings For General Applications
5. ASTM A276 – Standard Specifications of type 316 stainless steel,
6. ASTM B21 C464 – Standard Specifications of Neoprene and NBR seals
7. ASTM A276 – Standard Specifications of Stainless steel
Acceptant test for welding:
1. ASME
Acceptant test for leakage measurement:
8. ANSI/AWWA C501-80 – AWWA standard for sluice gates
HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO) Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
Tel: 84-4-38544883 E-mail: [email protected]
3.4
PRO
JECT
QU
ALI
TY C
ON
TRO
L
27
3.4 PROJECT QUALITY CONTROL
3.4.1. Project Deliverables
Testing is includes test of materials, welding submerge and/or electrodes and/or wires, cast iron pieces, telorances, bolts, clearances, seals, leakages, surfaces quality, thickness of paint, adhension of painting according to the following table:
Milestone Deliverable
Test of plates / sheets for a lot of container
• Checking namplates, sign, certificates of contents, origin.
• Checking thickness with symmetric telorances.
• Making test content to ASTM standards, a sample per a lot.
Test of welding submerge, electrodes, wires
• Weight of welding electrodes to discover humidity content
• Codes of wires, electrodes.
• Status of welding material pakages.
Test of cast iron pieces • Quantitive analysys of content before refining cast iron.
• Checking flaws of cast iron pieces.
• Checking telorances to machine.
Test of telorances, geometric parameters
• Cheking thichness of covers, seat, seating faces with symmetric telorances.
• Checking roughness of seating faces, machined faces of covers…not under Rz80; bushes is not under Rz40, clearances of link arm and pivotlugs/link arms and cover holes up to 0,1mm accuracy, dimensions between bolt holes not up to 0,1mm.
Test of bolts • Checking the length of bolts, clearances bolts and screws, quantity, types for each product.
Test of seals • Checking material certificates
• Checking co-linear of seals not bigger than 0,5..1mm/m depending on each length
Test of leakage through welding line
• Checking leakage of complete flap gate valves or stoplogs+groove not exceed 0,02Lpm/m (0,1 gpm/ft)
HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO) Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
Tel: 84-4-38544883 E-mail: [email protected]
3.4
PRO
JECT
QU
ALI
TY C
ON
TRO
L
28
Milestone Deliverable
• Checking dimension of width, length of welding line according to ASME section XIII
Test of blasting method • Checking quality of surfaces after sand blasting spray process exceed Sa2.5;
• Checking by compararative method with sample according to BS7079 part A1 supplement 1: 1989.
Test of paint thickness • Checking the thickness of dryed paint layer according to SSPC-PA2 or ISO 2808
Test of adhension of painting • Checking by A-X cutting method and sticking-plater tape 30x75mm according to ASTM-D 3359-2
3.4.2. Project Quality Control Procedures
List the major quality control activities and processes that this project will include:
- Test procedures for materials
- Test procedures for welding
- Test procedures for sand blasting
- Test procedures for painting
- Test procedures for supersonic test of welding
- Test procedures for leakage
- Procedures for package or transportation
- Procedure for installation
- Procedure for test at side
3.4.3. Project Deliverables Test & Acceptance Process
The planned test and acceptance processes that will be used to validate project deliverable quality, and these processes will verify deliverable quality.
- Test of materials:
o Test stainless steel materials, welding rod/wires/flux, paint with certificates from suppliers or sub-contractor;
HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO) Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
Tel: 84-4-38544883 E-mail: [email protected]
3.5
PRO
JECT
AU
DIT
S &
QU
ALI
TY R
EVIE
WS
29
o Test certificates by Hesco for non-standard products buy from market.
- Test of cast iron pieces:
o Test mechanical and/or chemical properties of cast iron;
o Quality certificates for all cast iron parts;
- Test of dimensions:
o Internal test report of dimensions, telorances of mechanical parts after machining;
o Assembly test report of complete part units
- Test of welding:
o Test report of ultrasonic result
o Final test report for mechanical properties of welding
- Test of paint and/or sand blasting works:
o Test report of adhension of painting by A-X cutting method
o Report of cleaning result, final painting
3.4.4. Project Deliverables Acceptance Criteria
The deliverable quality acceptance criteria based on quality standards for project deliverables as the criteria will be used in acceptance testing. The standards of criteria will be used to assess project quality:
- Test of steel mechanical properties according to ISO 6892-1998;
- Test of steel chemical properties according to ASTM E415-95;
- Mechanical test according to AWS D1.1.;
- Cleaness test of steel sheet according to ISO 8501-1-1988;
- Test for manufacturing and assemblying of stoplogs and flap gates according to AWWA C501-80;
- Ultrasonic test for welding according to ASTM section XIII;
- Leakage test according to AWWA C501-80 section 7;
3.5 PROJECT AUDITS & QUALITY REVIEWS Identifying of the project quality audits and reviews that will be performed. The results of these audits and reviews will be factored into project planning and implementation. The process of lessons-learned reviews and those lessons can benefit the project team as the project continues.
HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO) Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
Tel: 84-4-38544883 E-mail: [email protected]
3.6
MA
NA
GEM
ENT
ESCA
LATI
ON
PLA
N
30
4BProject Quality Audit Review 5BPlanned Date
6BQuality Review Auditor 7BComments
12BManufacturing flap valves and stoplogs from 0,8x0,8 to 1,2x1,2m 13BFoundry 14BMachining 15BAssemblying 16BFinishing 17BTest
18B3 month ARO
19BProject manager 20BQC leader 21BHead of Technical Department
22BManufacturing flap valves and stoplogs from 1,5x1,5 to 3x2,5m 23BFoundry 24BMachining 25BAssemblying 26BFinishing 27BTest
28B5 month ARO
29BProject manager 30BQC leader 31BHead of Technical Department
3.6 MANAGEMENT ESCALATION PLAN The plan for escalating unresolved quality noncompliance issues up the management chain. The standard initial level of escalation is from the project manager to their immediate manager.
Escalation Level Management Title Name
Mechanical engineer
Ordering of raw materials,welding materials
Metallurgy engineer
Test and receiving cast iron pieces from Minh Bach foundry company
Mechanical engineer
Machining parts of flap gates
Forming parts of stoplogs
Mechanical engineer
Order of standard procducts: bolts, screws, seals
Mechanical engineer
Assemble of flap gate units and logs
Mechanical engineer
Finishing of flap gate valves and stoplogs
Mechanical Test
HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO) Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
Tel: 84-4-38544883 E-mail: [email protected]
3.7
QU
ALI
TY T
EAM
RO
LES
& R
ESPO
NSI
BILI
TIES
31
Escalation Level Management Title Name
engineer
3.7 QUALITY TEAM ROLES & RESPONSIBILITIES Identifying of quality-related responsibilities of the project team and list specific task-related quality responsibilities, including responsibility for specific acceptance tests and project audits.
Project Team Role QA Responsibilities QC Responsibilities
QC Team Test of input raw materials
QC Team Test of cast iron pieces
QC Team Ultrasonic test
QC Team Test of telorances
QC Team Leakage test
QC Team leader Finishing test
3.8 QUALITY PLAN AUDIT LOG List all quality-related issues and resolutions resulting from quality plan audits and reviews.
Quality Review Date
Activity Reviewed Issue Resolution
32B7-10 days after sign the contract/order/renew-order
33BChecking materials: stainless steel, welding flux, wires, rods…
34BCertificates for stainless steel, welding flux, wires, rods… 35BStore reports for materials. 36BTest report and results
- 37BChecking certificates - 38BChecking outside - 39BChecking dimensions - 40BTest sample for a lot - 41BChecking mechanical,
chemical properties
42B11-15 days after sign the contract/order/renew-order
43BChecking cast iron pieces
44BDimensions 45BFlaws 46BTest report for cast iron pieces
- 47BChecking by ruler, tape, palme…
- 48BUltrasonic checking
49B16-30 days after sign the contract/order/renew-order
50BChecking machined cast iron parts
51BDesign dimensions 52BTelorances 53BRoughness
- 54BChecking by palme 1:50 for outside dimension, holes
55B31-40 days after sign the
56BChecking units after assemble
57BAssemblying dimensions
- 59BChecking by ruler class II, palme 1:50, samples,
HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO) Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
Tel: 84-4-38544883 E-mail: [email protected]
3.9
QU
ALI
TY P
LAN
APP
ROVA
LS
32
Quality Review Date
Activity Reviewed Issue Resolution
contract/order/renew-order
58BLinear dimensions, co-linear dimensions of faces, seating faces, covers, holes of covers
calibation plates - 60BRotating cover and seating
faces
61B41-45 days after sign the contract/order/renew-order
62BLeakage test 63BAWWA standard 64B≤ 0,01 gpm/m seal 65B≤ 0,02 Lpm/m seal
- 66BTest bench with pump, tank, valves
67BFinising surface before painting
68B≥ Sa 2.5 - 69BTest by compared samples
70BProtection layer 71BAdhension of painting up to 4A according to ASTM-D3359-2 72BThickness ≥ 300 micron after drying
- 73BTest by A-X cutting method and electromagnetic tester
74BPackaging and handling before transportation
75BCovering all machined faces, seals, fixing plates 76BMaking robust for all parts, units, valves, stoplogs before transportation
- 77BChecking tensions of packages
3.9 QUALITY PLAN APPROVALS
Prepared by ____________________________________________________ Project Manager
Approved by ___________________________________________________ Project Sponsor
___________________________________________________ Executive Sponsor
_______________________________________________ Client Sponsor
HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO) Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
Tel: 84-4-38544883 E-mail: [email protected]
3.1
0 D
ESIG
NA
TIO
N P
ROCE
DU
RE
33
3.10 DESIGNATION PROCEDURE
HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO) Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
Tel: 84-4-38544883 E-mail: [email protected]
Cha
pter
4
34
Chapter 4
KEY PERSONELS FOR PROJECT
HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO) Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
Tel: 84-4-38544883 E-mail: [email protected]
35
4.1 KEYPERSONEL FOR PROJECT
Position Full name
Date of
birth Main Duty
Years of experience in
proposed position
Deputy director Do Cong Ba
1953 - General management 25
Chief of Engineer
Ta Khac Ap
1952 - Managing in design and designing supervise - Manage and coordinate material and equipment for the works - Machining production and supervisor
30
Cast Iron Expert Nguyen Van Minh
1972 - Cast iron production - Quality control for cast iron
16
Design Leader M. Tech. Lee
Thanh Ha
1973 - Quality control leader - Quality control for machining, assemblying, testing, transportation, installation, erection at site
15
Director of Mechanical Factory No.2
Nguyen The Hieu
1973 - Welding management and materials for welding - Standardization
15
Senior Quality Control
Nguyen Van Luc
1973 - ISO expert 15
HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO) Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
Tel: 84-4-38544883 E-mail: [email protected]
Cha
pter
5
36
Chapter 5
EQUIPMENT FOR PROJECT
HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO) Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
Tel: 84-4-38544883 E-mail: [email protected]
EQ
UIP
MEN
T FO
R PR
OJE
CT
37
HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO) Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
Tel: 84-4-38544883 E-mail: [email protected]
5.1
EQ
UIP
MEN
T PR
OPO
SED
FO
R TH
IS P
ROJE
CT
38
5.1 EQUIPMENT PROPOSED FOR THIS PROJECT
Item No.
Name of equipment Capacity Q’ty Manufacture‘s country
1. Vertical lathe 1516-2611 40kW 01 Poland
2. Bending machine WE67Y-600/6000 30kW 01 China
3. Shearing machine QC11Y-16x600 22kW 02 China
4. Lathe T6M20 10kW 01 Vietnam
5. Oil Country lathe Mazak 3000 10kW 01 Japan
6. Lathe 1D6 2M 2895 4,5kW 01 China
7. Lathe T6M12 3,7kW 02 Vietnam
8. CNC turning lathe 600x1300, A35N 14kW 01 Japan
9. Lathe TUD-40-216 10kW 01 Poland
10. Horizontal milling machine 6M83 14,7kW 01 Poland
11. Milling machine FU315 8kW 01 German
12. Vertical milling machine X51 6,2kW 01 China
13. Horizontal milling machine 3x2m table 14,5kW 01 Poland
14. Multi-function drilling machine 2A592 1,7kW 01 Vietnam
15. Vertical drilling machine Z525-261 2,8kW 01 China
16. Semi-automatic welding machine SAF 400 18,5kW 01 Korea
17. DC welding machine 18kW 04 Vietnam
18. DC welding machine (One pliers) 15kW 02 America
19. Welding generator EW190 7KVA 01 Japan
HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO) Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
Tel: 84-4-38544883 E-mail: [email protected]
5.1
EQ
UIP
MEN
T PR
OPO
SED
FO
R TH
IS P
ROJE
CT
39
Item No.
Name of equipment Capacity Q’ty Manufacture‘s country
20. Welding machine 23550 18kW 01 Vietnam
21. Welding generator - Japan 10KVA 01 Japan
22. Vertical lathe 3,5mHx3,7m dia. 4,5kW 02 Poland
23. Compressor 2907 3,5kW 01 German
24. Compressor 100 HP2 - 163229 7,5kW 01 Italy
25. CNC plasma cut. machine 3000x12000mm 4kW 01 Japan
26. Overhead crane 10T 01 Vietnam
27. Overhead crane 5T 03 Vietnam
28. CNC Milling machine H500xW700xL400 01 Japan
29. Manual overhead crane 3T 01 Vietnam
30. Hoist 10T 02 Vietnam
31. Heat treament equipment 5 tons/lot 01 China
32. Electric foundry equipment 15 tons/lot 01 China
33. Medium frequency foundry 0,5T/1T/1,5T 03 China
34. Uninterrupted cast iron foundry 8T 01 USA
35. Spectrometer Fison ARL2460 01 Swiss
36. Metal blasting line 01 USA
Hanoi, dated 10th October, 2008
On behalf of Hesco
HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO) Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
Tel: 84-4-38544883 E-mail: [email protected]
5.2
PIC
TURE
S
40
5.2 PICTURES
Pic 1. Hydraulic bending machine WE67Y-600/6000, China 2006
Pic 2. Hydraulic shearing machine QC11Y-16x600, China 2006
Pic 3. CNC plasma cutting machine 3000x12000mm, Maxigraph Japan 2006
HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO) Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
Tel: 84-4-38544883 E-mail: [email protected]
5.2
PIC
TURE
S
41
Pic 4. Vertical lathe 3,5mHx3,7m dia., Poland 1981
Pic 5. Horizontal milling machine 3x2m table, Poland 1981
Pic 6. CNC vertical milling machine H500xW700xL400 table
HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO) Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
Tel: 84-4-38544883 E-mail: [email protected]
5.2
PIC
TURE
S
42
Pic 7. Oil Country lathe Mazak 3000, Japan 1981
Pic 8. CNC turning lathe 600x1300, IKEGAI A35N, Japan 1981
HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO) Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
Tel: 84-4-38544883 E-mail: [email protected]
Cha
pter
6
43
Chapter 6
EXPERIENCES FOR PROJECT
HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO) Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
Tel: 84-4-38544883 E-mail: [email protected]
EXP
ERIE
NCE
S FO
R PR
OJE
CT
44
6.1 LIST OF CONTRACTS EXECUTED FOR 5 LAST YEARS
Name of contract Customer Completion
time Place
Manufacture, transport and installation of 06 sets of sluice gate for An Tho sluice and 04 sets of gate for Cau Cat sluice.
Bac Hung Hai Hydraulic Works Exploitation
Company
8/2001 Hai Duong
province
Manufacture and installation of 01 set of radial gate BxH = (10x5,5)m for Thanh Lanh reservoir – Vinh Phu
Hydraulic project Management Board 404
3/2001 Vinh Phu
Manufacture and installation of 03 sets of gate and hoisting equipment for Tan Lap sluice
PMB – Thai Binh Agriculture & Rural development Dept.
10/2001 Thai Binh
Design, manufacture and installation of gates for Huong river’s sluice
Thanh Ha Hydraulic Works Exploitation
factory
2001 Hay Duong
Manufacture and installation of gates for Lan sluice
Nam Thai Binh Hydraulic Works Exploitation
Company
2001 Thai Binh
Manufacture and installation of hydro-mechanical equipment including 03 sets of gate and electrical system for Long Tuu Bac Ha sluice
Long Tuu PMB 2002 Ha Bac
Manufacture and installation of 01 set of radial gate and stop log lowering equipment for Phu Hoa reservoir
PMB 408 2002 Quang Binh
Manufacture and installation of 01 set of radial gate and electrical system, transformer for Ai Tu reservoir
PMB 408 2002 Quang tri
Manufacture and installation of flat gates and 06 sets of 20VD2 screw
Thai Binh Hydraulic Construction Company
2002 Thai Binh
HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO) Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
Tel: 84-4-38544883 E-mail: [email protected]
6.1
LIS
T O
F CO
NTR
ACT
S EX
ECU
TED
FO
R 5
LAST
YEA
RS
45
Name of contract Customer Completion time
Place
hoist for Nhu Trac sluice
Manufacture and installation of 03 sets of radial gate for Sao river’s sluice
Nghe An hydraulic Construction Electrical mechanical company
5/2003 Nghe An
Supply and installation of equipment for Sa Vang sluice including 04 sets of radial gate.
PMB of Hydraulic Construction Works
8/2002 Quang Binh
Construction of mechanical items of spillway under Dong Tron reservoir – Phu Yen including 03 sets of radial gate and 03 sets of flat gate
PMB 414 5/2003 Phu Yen
Manufacture and installation of 03 sets of radial gate and low and high voltage system for Bao Van sluice
PMB 406 4/2003 Thanh Hoa
Manufacture and installation of gate and hoisting for Hoai river’s dam
PMB – Thai Binh Agriculture & Rural development Dept.
6/2003 Thai Binh
Manufacture and installation of gate and hoisting for Nghi Quang sluice
PMB of repairing Nghi Quang sluice
8/2003 Nghe an
Manufacture and installation of electro-mechanical equipment for Trau river’s reservoir: sets of radial gate, trash screen, pipe line, electric pulley + hoist
PMB of Ninh Thuan Rural Infrastructure
branch
8/2004 Ninh Thuan
Construction of Iaring Channel includes gates, 02 sets of screw hoist V1, pipelines,
PMB 412 6/2004 Gia Lai
Manufacture and installation of intake basin, pressure pipelines, downstream discharge gate, hoist, crane 12T
Dong Son Investment & Construction JSC
12/2004 Son La
Manufacture of 06 sets of control Construction & 12/2004 Ha Noi
HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO) Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
Tel: 84-4-38544883 E-mail: [email protected]
6.1
LIS
T O
F CO
NTR
ACT
S EX
ECU
TED
FO
R 5
LAST
YEA
RS
46
Name of contract Customer Completion time
Place
gate under the routes from Lang Ha - Thanh Xuan – Ha Noi
Mechanical Factory No.3
Manufacture and installation of hydro-mechanical equipment: Radial gates, automatic gates, generator, crane 40T for Do Diem Sluice – Ha Tinh
5/2006 Ha Tinh
Manufacture, transport and installation of sluice gates, screw hoist (01 set screw hoist V5 + 01 set of screw hoist VD30) for Vinh Son hydropower project
Lung Lo Construction JSC
11/2005 Phu Yen
Manufacture and installation of mechanical equipment includes lock gates, 04 sets of screw hoist V3, and 04 sets of screw hoist V5 for Nhue river irrigation system.
Nhue river Hydraulic Works Exploitation
Company
4/2005 Ha Tay
Manufacture and installation of hydro-mechanical equipment for Ho Ho hydropower project including gates and electrical hoist 45T, crane, hoist, electrical pulley, hydraulic control system
North Electrical development & Investment Jsc
4/2007 Quang Binh
Manufacture and installation of intake gates, discharge gates for Khe Dien hydropower Project
Ba river Electrical development & Investment Jsc
11/2005 Da nang
Manufacture and installation electro-mechanical equipment for Hiep Thuan Intake sluice – Day river key Works: Intake gates and electrical system
PMB 401 3/2006 Ha Tay
Manufacture of 02 sets of radial gate BxH=(15 x 16,82) for Ba Ha river hydro-power Project – Phu Yen
Ba Ha river hydro-power Jsc
10/2006 Phu yen
HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO) Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
Tel: 84-4-38544883 E-mail: [email protected]
6.1
LIS
T O
F CO
NTR
ACT
S EX
ECU
TED
FO
R 5
LAST
YEA
RS
47
Name of contract Customer Completion time
Place
Repair and improvement of key works of Minh Cam reservoir: Gates and screw hoist
Quang Binh PMB of Hydraulic Construction
Works
7/2006 Quang Binh
Manufacture and installation of hydro-mechanical equipment: gates, trash rake machine, hoist for Phu Mau hydro-power Project
Tan An Co.Ltd 1/2007 Lao Cai
Supply and installation of hydro-mechanical equipment for Coc Dam Hydropower Project: Gates and lifting equipment
Hoang Son Construction Co.Ltd
9/2007 Lao cai
Construction of mechanical equipment for spillway – Rao Da reservoir: gates, trash screen, hoist
Hydraulic construction & Investment Management
Project Board No.5
6/2008 Quang Binh
Manufacture, installation of gates, hoist for Ha Dong regulator – Nhue river irrigation system
Ha Dong PMB of Regulator Construction
8/2007 Ha Tay
Supply, manufacture and installation of mechanical equipment for sluice, spillway and electrical system for lighting, operation – Buk Ha reservoir
Hong river Construction Corporation
8/2007 Dak Lak
Supply and installation of hydro-mechanical equipment for Phu Mau 1 Hydro-power Project: Gates, pressure basin, penstock
Tan An Co. Ltd 11/2007 Lao Cai
Manufacture and installation of 04 sets of flat gate, 04 sets of hoist 10T for Phu Sa irrigation Works
Son Tay Phu Sa Hydraulic Company
5/2008 Son tay
Manufacture and installation of lock gates and low voltage for Cau Hoi irrigation Sub-project
Ninh Binh PMB of Flood protection
4/2008 Ninh Binh
HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO) Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
Tel: 84-4-38544883 E-mail: [email protected]
6.1
LIS
T O
F CO
NTR
ACT
S EX
ECU
TED
FO
R 5
LAST
YEA
RS
48
Name of contract Customer Completion time
Place
Supply and installation of hydro-mechanical equipment for Muong Sang Hydro-power Project: Repaired gates, flat gates, trash screen, crane 30T
Muong Sang Hydro-power Jsc
9/2007 Lao cai
Supply and installation of hydro-mechanical equipment for Krong H’nang Hydro-power Project: Intake gates, flow gates, hydraulic control equipment
Ba river Hydro-power Jsc 7/2008 Da nang
Manufacture and installation of hydro-mechanical equipment for spillway No.1 and intake sluice under Da Ban irrigation system: Radial gates, repair gates, cranes…
Hydraulic construction & Investment Management
Project Board No.7
1/2008 Khanh Hoa
Hanoi, dated 10th October, 2008
On behalf of Hesco
HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO) Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
Tel: 84-4-38544883 E-mail: [email protected]
6.2
. PRO
DU
CT P
ICTU
RES
49
6.2. PRODUCT PICTURES
Pic 1. Radial gates for reservoir
Pic 2. Stoplogs for hydropower
Pic 3. Flap gates for waste water treatment
HYDRAULIC EQUIPMENT JOINT STOCK COMPANY (HESCO) Address: Milestone 10 – (Ha Noi - Ha Dong) Nguyen Trai street
Tel: 84-4-38544883 E-mail: [email protected]
6.2
. PRO
DU
CT P
ICTU
RES
50
Pic 4. Round flap gate 3D-model
Pic 5. Rectangular flap gate 3D-model
Pic 6. Stoplog gate 3D-model
Pic 7. Stoplog guide 3D-model