Commercial Confidential Presentation to: Quad-generation from Landfill Gas at a Commercial Greenhouse 31 January 2014 Presented by: Alakh Prasad, President & CEO Quadrogen Power Systems, Inc.

Upload: trinhdiep

Post on 02-Aug-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

Commercial Confidential

Presentation to:

Quad-generation from Landfill Gas at a Commercial Greenhouse

31 January 2014

Presented by: Alakh Prasad, President & CEO

Quadrogen Power Systems, Inc.

Commercial Confidential

Quadrogen Overview

Quadrogen has developed proprietary biogas clean-up technology and H2 Booster technology with support from NRC-IRAP.

The full-scale sub-megawatt class biogas clean-up unit has been in operation for more than 2 ½ years at OCSD WWTP, California.

Received the Purchase Order for US $ 1.0 million to clean-up biogas for a project in Wyoming, USA.

A $7.5million Quad-generation Demonstration project using landfill gas is in progress. The project is supported by SDTC, BC ICE Fund, BCBN, BC Investment Agriculture Foundation and NRC-IRAP.

Multiple sites under consideration for projects in Europe.

2 February 2014 2

Commercial Confidential

The Problem

2 February 2014 3

Silica deposits in engine from siloxanes in fuel

Biogas:50 - 60% Methane35 - 40% Carbon Dioxide0-11% Nitrogen

Case Study:Landfill Gas Cogeneration7.4 MWe installed capacity1.3 ¢/kWh maintenance cost< 70% availability of engines Annual Loss of Revenue:$1.62 million@ 70% avail. and 10 ¢/kWh

Biogas is green but not clean

Biogas Contaminants: SiloxanesSulfur SpeciesHalogen SpecieVOCsWaterOxygen

High maintenance, reduced revenues, reduced possibilities

Commercial Confidential

Critical link in the bioenergy value chain

2 February 2014 4

Near term broad market applications

Organic waste

Quadrogen Gas

Cleaning

Organic waste

Gas Recovery

Gas Cleaning

Combined Power and Heat

CO2

Fertilization for Greenhouses

Liquid Bio-fuels(Bio-refinery)

Bio-methane

Commercial Confidential

Critical part of gasification technology

2 February 2014 5

Mid-term market applications

Organic waste

Combined Power and Heat

Liquid Fuels

Petroleum Coke

Biomass

Plastics

MSW

Gas Cleaning

Low Cost Feed

Gasification

Gas Cleaning

Raw Syngas

Clean Syngas

Commercial Confidential

C3P Technology

62 February 2014

Water and contaminants separated via refrigeration- uses no adsorption media

Raw Biogas

Capture PolishingCondensing

Organic sulfur and other species converted to known set of compounds

Conversion

Known species adsorbed on unique high-capacity media

Final chemisorption step polishes biogas of contaminants to trace levels(< 30 ppbv)

Ultra-Clean Biogas

Commercial Confidential

Quadrogen system at Orange County WWTP, California

72 February 2014

Quadrogen Gas Clean‐up System Installed

Commercial Confidential

Integrated Biogas Clean-up System (IBCS)

2 February 2014 8

Commercial Confidential

Biogas Clean-up system at OCSD WWTP in California

2 February 2014 9

Commercial Confidential

Quadrogen System at OCSD WWTP, California

102 February 2014

Successfully meeting stringent requirements since June 2011

Commercial Confidential

Biogas Clean-up System Performance at OCSD WWTP

11

* Volume basis; siloxane species analyzed: D4, D5, D6, L2, and L3 to 100 ppbv detection limit

2 February 2014

ppbv level clean-up Longer life

Reliable ultra-clean and lower O&M cost

Commercial Confidential

15,000+ hours of operation of Biogas Clean-up at OCSD WWTP

2 February 2014 12

No breakthrough yet and no maintenance required

Commercial Confidential

15,000+ hours of operation of IBCS at OCSD WWTP

Performance Since June 2011, the system has been running successfully. The unit has accumulated more than 15,000 hours of operation

at OCSD and processed more than 18 million cubic feet of biogas. We continue to receive data from FuelCell Energy, Inc.

High level of performance being maintained exceeding the customer target.

> All Sulfur species < 25 ppbv> All Siloxanes below non detectable level (< 100 ppbv)> All VOCs below non detectable level (< 10 ppbv)> All halides below non detectable level (< 10 ppbv)

No major maintenance work has been done on the system yet.

2 February 2014 13

Commercial Confidential

Gas Clean-up system for 1.2 MW Engine in Nanaimo

2 February 2014 14

Landfill Gas Clean-up System Inert Gas Generator System for regeneration of media bed

• Capacity to process landfill gas 1000 Nm3/hour

• Regenerative media bed

18 feet (L) x 7.5 feet (W) x 9.5 feet (high)** excluding exhaust pipe and Inert Gas GeneratorWith Inert Gas Generator height is 16 feet

Expected Delivery Date: 30 March 2014

Commercial Confidential

Quad-generation Demo Project in Delta, BC

2 February 2014 15

Commercial Confidential

Quadrogen Technologies for Quad-generation Demo Project

2 February 2014 16

Commercial Confidential

Proposed Demonstration Project in Delta, BC

172 February 2014

Demonstration Project Site

All Village Farms Greenhouses > 100 acres

Commercial Confidential

Proposed Project Site

2 February 2014 18

~ 80’ x 80’ project footprintLFG pipeline extension

Commercial Confidential

Quad-generation Project Kick Off12 Feb 2013

192 February 2014

Commercial Confidential

Quad-generation Project - Site

202 February 2014

Commercial Confidential

Material and Energy Flow

2 February 2014 21

Inputs Landfill Gas: ~ 100 standard cubic feet per minute

(MAXIM pipeline carries up to 3,300 scfm) Air: ~2,500 lb/hr Water: ~ 1 gallon per minute for fuel cell

Outputs Up to 300 kW electrical, 0.36 GJ/hr thermal, 100 kg/day of renewable

hydrogen, produced on demand Fuel cell exhaust: ~ 75% N2, 13% CO2, 8% O2, 4% steam

(negligible NOx, SOx, CO, PM10, VOCs) Condensate from LFG: ~ 0.25 gallons per hour, collected in above-grade

tanks emptied periodically by a liquid-waste services contractor. LFG contaminants adsorbed on long-lasting media (2+ yrs), then spent

media is vacuumed into a solid waste truck for off-site recycling or disposal.

Commercial Confidential

NOx and SOx emissions

2 February 2014 22

54500.016DFC Fuel Cell –CHP 80% efficiency

96700.016DFC Fuel Cell 47% efficiency

1,24400.467Small Gas Turbine (250 kW)

1,86200.490Microturbine (60 kW)

2,0179.214.200Average US Fossil Fuel Plant

CO2(lb/MWh)

SOX(lb/MWh)

NOX(lb/MWh)

54500.016DFC Fuel Cell –CHP 80% efficiency

96700.016DFC Fuel Cell 47% efficiency

1,24400.467Small Gas Turbine (250 kW)

1,86200.490Microturbine (60 kW)

2,0179.214.200Average US Fossil Fuel Plant

CO2(lb/MWh)

SOX(lb/MWh)

NOX(lb/MWh)

NOx and SOx are negligible compared to conventional technologies

Commercial Confidential

Syngas - Nexterra Project at UBC

2 MWe CHP Project at UBC. Started in June 2012

Quadrogen to provide syngas clean-up system with H2 Booster

2 February 2014 23

Commercial Confidential

Projects under Development

2 February 2014 24

Contaminant Removal CO2 Separation

N2Separation

Vehicles

PipelineBiogas

Robust, high efficiency biomethane upgrading System

Target flow rate 300 scfm(500 Nm3/hr)

Commercial Confidential

Follow up, Questions

2 February 2014 25

Quadrogen Power Systems, Inc.# 1154 - 4250 Wesbrook Mall

Vancouver, BCCanada V6T 1W5

www.quadrogen.comPhone: (604) 221 7170