QA/QC PRESENTATIONCANADOIL FORGE
World Class Provider Of Piping Solutions www.canadoilgroup.com
MORE THAN 35 YEARS EXPERIENCE
• Canadoil Forge LTD has the facilities and resources to perform all in house manufacturing processes
• Strategically located closer to end-user markets enabling us to offer products and services effectively across regions
World Class Provider Of Piping Solutions www.canadoilgroup.com
CANADOIL FORGE LTD PRODUCTS
ELBOWS TEES BARRED TEES TRANSITION PIECES
REDUCERS CAPS
World Class Provider Of Piping Solutions www.canadoilgroup.com
REGISTERED QUALITY MANAGEMENTSYSTEMS
ISO 9001-2008 / ISO 9001-2015RÉGIE DU BATIMENT DU QUÉBEC CERTIFICAT
FOR CONSTRUCTION OF PRESSURE VESSELS
CNSC NUCLEAR SUBSTANCES & RADIATIONDEVICE LICENSE
World Class Provider Of Piping Solutions www.canadoilgroup.com
DESIGN PROOF TEST
All manufactured Butt-Weld Fittings are covered by an approved Proof Test Report
We have CRN’s for every Canadian Province including ABSA
We also manufacture fittings to Clients’ technical agreements which might have more stringent design criteria then our proof test results
World Class Provider Of Piping Solutions www.canadoilgroup.com
CANADOIL FORGE IS COMMITTED TO STRINGENTQUALITY CONTROL PROCESSES AND
PROCEDURES
We’ve developed a solid Manufacturer Procedure Specifications (MPS) document which demonstrates our QC procedures for every manufacturing process and their control points.
Each MPS is adapted to the applicable manufacturing standard (CSA or MSS) and Client’s specification(s).
Our Inspection and Test Plans(Manufacturer/ Client/ TPI) sets out clearly what inspection activities are required to be done during different manufacturing or QC processes.
The Inspection Activities consists of:
Monitoring/ Review/ Witnessing/ Hold Points
ITPs are currently requested from end users and distributors
World Class Provider Of Piping Solutions www.canadoilgroup.com
IDENTIFICATION / TRACEABILITYInspection & Approval of
Incoming Raw material
Internal Identification and
Unique traceability Number
QC Daily verification of welding instructions
against shop traveller
QC Daily verification of H.T. instructions
against shop traveller Carrying out of 100% Destructive and Non-
Destructive testing
Carrying out of 100% Dimensional & Visual
Inspection
QC verification of stamp marking and
tagging
QA approval of complete certification
package
TRACEABILITY
World Class Provider Of Piping Solutions www.canadoilgroup.com
INCOMING RAW MATERIALINSPECTION
Verification that the received Plate chemistry is within the limits of our internal restricted plate chemistry instructions
Actual thickness measurement of each plate is verified by QC at its reception
An internal Heat number is given to each Mill Heat / per thickness received
A product analysis is conducted on each heat to validate the mill ladle analysis.
World Class Provider Of Piping Solutions www.canadoilgroup.com
UNIQUE TRACEABILITY NUMBERS
• All butt-weld fittings are given, from the start of the manufacturing process, a sequential piece number, called Serial Number which can be traced back up to the raw material.
• The radiography number is, also, a unique identification that can also be used for traceability purposes.
World Class Provider Of Piping Solutions www.canadoilgroup.com
CONTROL OF OUR HEAT TREATMENTPROCESS
Heat Treatment is done by Trained Operators H.T. Operators validate that the H.T. instructions stated
on shop traveller are in accordance with the H.T. procedure and “Standardization H.T Dwell Time” Table
H.T. Travellers are filled out with the following points:• Indication of number of fitting(s)/lot, • Their location in furnace, • The position of the test coupons, • The temperature of the water basin before and after quench • The travel time between furnace and water basin for each fitting• Time maintained under the agitated water for each fitting
World Class Provider Of Piping Solutions www.canadoilgroup.com
CONTROL OF OUR HEAT TREATMENTPROCESS (CON’D)
QC Technician validates daily that the H.T. Operators have followed the H.T. instructions (Verification of H.T. Charts, H.T. Travellers, Required Mechanical Tests...etc.)
QC Technician enters in an electronic database the actual H.T. parameters for every fitting in furnace lot
Production / Quality departments have in time information on each fitting that has undergone the H.T. process
World Class Provider Of Piping Solutions www.canadoilgroup.com
CLIENTS SPECIFICATIONS EXCEEDINGMANUFACTURING STANDARDS REQUIREMENTS
Request for Pre-production meetings Approval of Raw Material Reports, Drawings and
WPS/PQRs prior to the manufacturing commencement Review/Approval of Production and QC procedures A more restrictive chemistry and maximum C.E.% Test coupons/heat code in every furnace lot Witnessing of Furnace Loading and Quenching operations
by a TPI Request H.T. Travellers & Charts in final documentation
World Class Provider Of Piping Solutions www.canadoilgroup.com
CLIENTS SPECIFICATIONS EXCEEDINGMANUFACTURING STANDARDS REQUIREMENTS
(CONT’D)
MT, PT and/or UT on Bevel ends, base material or welds Witnessing of NDE and/or NDT by a TPI Distributed Hardness tests taken on Base Material, Weld
and HAZ Maximum limits on yield & tensile tension tests Minimum values on average & individual Impact test
results Final Documentation package released by TPI
World Class Provider Of Piping Solutions www.canadoilgroup.com
THANK YOU !