QA Network Manual
8/17/2019 QANet Manual
http://slidepdf.com/reader/full/qanet-manual 2/24
1.2.
3.
4.
Attention
The contents of the textbooks are strictly confidential and need special care for handling.1.DENSO affiliated company internal use only.
2.Disclosure to outside is strictly prohibited.3.Copy and/or reproduction is prohibited.
4.Must be returned when the textbook become unnecessary.
8/17/2019 QANet Manual
http://slidepdf.com/reader/full/qanet-manual 3/24
8/17/2019 QANet Manual
http://slidepdf.com/reader/full/qanet-manual 4/24
[Table of Contents]
Releasing of QA Network Manual
1. What is QA Network?
1-1 Purpose
1-2 Application Example
1-3 Effect of the QA Network
2. How QA Network is Utilized at Denso
2-1 Concept
2-2 Why is QA Network Necessary?
2-3 Applications and Methods
2-4 Participating Members
2-5 How the Target Assurance Rank Should be Viewed
2-6 Applying the Concept to Suppliers & Customers
2-7 Effect of QA Network
2-8 Cautionary Points at Implementation
3. Implementing QA Network
3-1 Procedures for Implementation
3-2 Key-points for Implementation and How to Fill Out (example)
[Procedure 1] Preparation before implementation
[Procedure 2] Process Names, Part Number Description
[Procedure 3] Evaluation Standards, Target Ranks, establishing Overall judging Chart
[Procedure 4] Organization of Processes and Description
[Procedure 5] Selection and Description of Production Assurance Items, Function (quality),and Critical Control Designation
[Procedure 6] Selection and Description of Previous defects
[Procedure 7] Extraction of Problematic Processes and Use of Legend “ ”
[Procedure 8] Selection of Process for Escape (defect) Prevention and Use of Legend “ ”[Procedure 9] Examine and Document the Rank for Current Defect Prevention & “Escape Prevention”
[Procedure 10] Examine and Document the Target Assurance Rank
1
3
9
8/17/2019 QANet Manual
http://slidepdf.com/reader/full/qanet-manual 5/24
What is QA Network?
1-1 Purpose
The QA Network is a tool that illustrates the relation of assurance items/production assurance
items (or defect item) and production processes in a matrix format, by which the ranking
evaluation (to evaluate assurance level) for defect and escape prevention is done against the
production assurance items (or defect item). The purpose is to allow you to foresee potential
defects which may occur during production stage and to find out weak areas (where assurancelevel is low) that may allow defects to escape to the following processes, including customers.
This will make the proper control/management and process Kaizen possible.
A general format used for the QA Network is shown in Fig1-1.
Building thickness on Core
Annealing defect
Slotting measurementPerformance
Drop
PerformanceDrop
StartFailure
PerformanceDrop
PerformanceDrop
StartFailure
StartFailure
PerformanceDrop
1
1
1
1
1
1
1
1
1
1
1
Groove measurement
Internal Processes
F u n c t i o n s ( C h a r a c
t e r i s t i c s )
Production
AssuranceItems
P r e v i o u s D e f e c t s ( M t h / D a y )
S h a f t C u t t i n g ( # 1 )
S h a f t C u t t i n g ( # 2 )
A s s e m b l y I n s p e c t i o )
T a r g e t A s s u r a n c e R a n k
C u r r e n t A s s u r a n c e R a n k
Contents Due
Date
Countermeasure
A s s u r a n c e R a n k ( A f t e r K
a i z e n )
Processes
Rank Evaluation
Fig. 1-1 QA Network
Kaizen
Action
1-2 Application Examples
The following are the situations where QA Network is most often utilized:
(1) When Assuring New Processes and Modifying Processes
Wh bli hi (li ) ki d i h h li d fi h i
QA Network Manual
8/17/2019 QANet Manual
http://slidepdf.com/reader/full/qanet-manual 6/24
(2) Improving the Level of Existing Processes
For the processes (line) that are already established, check the assurance level of those processes
vs. production assurance items (or potential defect items). The QA Network can be used to screen
out some of the weak areas in the processes where assurance level is low.
Through this activity, you will be able to perform process diagnosis on A-rank quality items and
other production assurance items (quality items). Not only does it prompt for Kaizen that
improves the process level, but also prevents the same type of quality problems from recurring.
1-3 Effect of the QA Network
(1) The types of defects that occur during production (condition in which the assurance items
are not satisfied), assurance level of the processes themselves, and the processes that will
prevent defects from escaping, will be defined, so that escaping of defects are prevented
beforehand.
(2) Using the Assurance Rank Chart to evaluate the quality assurance level of the process(line) objectively will make you realize which items need Kaizen effort.
(3) Getting Production Dept. (Parts Production Dept.) involved for the development of QA
Network will allow Production members to realize their roles, in terms of process quality.
This will also help you realize what the key-points are, in the aspect of management and
equipment maintenance. In addition, it could improve awareness of operators regarding
quality.
(4) To make it easier to understand, previously, we were relying on the know-how of process
engineers and experience of operators, so some oversight was inevitable. Use of matrix
will help reduce those incidents and allow members to conduct study more easily.
(5) Since it allows you to examine each Production Assurance Item through the entire
processes, you can find redundancy that may exist in the Inspection Processes (for Escape
Prevention), reduce number of inspections, and bring the processes to more reasonable
level.
QA Network Manual
8/17/2019 QANet Manual
http://slidepdf.com/reader/full/qanet-manual 7/24
2. How QA Network is Utilized at Denso
2-1 Concept
As for the QA Network, previously, the matrix (for Production Assurance Items & processes) used to bedeveloped only for problematic processes. Evaluating the assurance level of the processes, whereProduction Assurance Items apply, we will be able to set up “the net” so we can catch defects escaping tothe following processes.
On the other hand, our company has expanded the area of QA Network (the Quality Assurance Net), so wecan apply it from suppliers (who supplies necessary parts to us to build our products) to customers where
products are delivered. Furthermore, utilize a system diagram to define the flow of parts that go through
each of these phases, and then, define cause-and-effect relations of Production Assurance Items amongvarious different processes (suppliers, upstream processes, targeted process, downstream processes). Byestablishing such a network, you will be able to provide assurance on the Production Assurance Items from
beginning to the end.
Supplier Process
Sub-Assy Process
Supplier Process
Assembly Process
Customer
Part ProcessPart Process
Part Process
Supplier Process
Supplier Process
Supplier Process
Sub-Assy Process
Process
Process
Process
Process
Process
ProcessProcess
Process
Process
Process
Process
Q u a l i t y
A s s u r a n c e I t e m
Q u a l i t y
A s s u r a n c e I t e m
Q u a l i t y
A s s u r a n c e I t e m
Q u a l i t y
A s s u r a n c e I t e m
Q
u a l i t y
A
s s u r a n c e I t e m Q
u a l i t y
A s s u r a n c e I t e m
Q u a l i t y
A s s u r a n c e I t e m
Q u a l i t y
A s s u r a n c e I t e m
Q u a l i t y
A s s u r a n c e I t e m
Q u a l i t y
A s s u r a n c e I t e m
Q u a l i t y
A s s u r a n c e I t e m
3rd Tier Supplier 2nd Tier Supplier 1st Tier Supplier Denso Customer
SupplierA-a-aProcess Method
Supplier C-a-aProcess Method
Supplier A-aProcess Method
Supplier A-bProcess Method
Supplier B-aProcess Method
Supplier C-aProcess Method
Supplier D-aProcess Method
Supplier AProcess Method
Supplier BProcess Method
Supplier CProcess Method
Supplier DProcess Method
Part(Part#)
Part(Part#)
Part(Part#)
Part(Part#)
Part(Part#)
(1) Parts Flow on the System Diagram
(2) Assuring the “Production Assurance Items” Through QA Network From Beginning to End
QA Network Manual
8/17/2019 QANet Manual
http://slidepdf.com/reader/full/qanet-manual 8/24
* For example, we had an incident at Fuel Hose Manufacturing Process. The steps of Initial ControlSystem (from development stage to initial control stage) were followed and the Process FMEA wasintroduced as a preventive activity before the start of volume production. However, when time cameto predict defects, a wrong judgment was made. The judgment was that the threads used to reinforcethe hose could only break during the knitting process. Thus, no one could detect the fact that the broken threads problem still existed in the following processes: Conveyance, Adhesive Application,and Drying Process. Subsequently, this misjudgment led to a major quality problem.
Conversely, the QA Network allows you to examine every aspect in the whole manufacturing processes (from supplier to Receiving) especially where there are possibility for defects. Thus, it is
fairly easy to find defects even if they do not have the direct link to that particular process.In short, the Process FMEA focuses on examining quality concerns while building quality, whereasthe QA Network helps you examine the whole aspects, including any possibility for negative effectson quality, though criteria had already been met.From what we have discussed, it is essential to utilize not only the QA Network, but also ProcessFMEA when trying to attain certain quality criteria during the process designing stage.
“Improving the Quality Assurance Level by Utilizing ‘The Assurance Net’” by Yasuhiko Seki,The 30th Q-S National Convention for Collection of Works Pg. 95 through Pg., Japan StandardsAssociation, May 15 through 16, 1996.
2-3 Applications and Methods
In Chapter 1, two different cases were discussed to explain how the QA Network is typically utilized.At our company, we are recommending to introduce both the QA Network and Process FMEA whenthe volume production starts to show some stability as the diagram 2-2 shows. These tools are moreeffective at this point. In other words, when setting up or changing the processes for new parts, theProcess FMEA is introduced and the processes are set up at an early stage of the production preparation to build quality, then the QA Network is introduced once the actual processes have been
physically established. At this time, closely observe the manufacturing flow and check the process tosee if the defects are not escaping to the following processes. Conduct Kaizen activities to make surethat the defects are fully contained.
Fig. 2-2 How QA Network is Used
StepDesign
Proto
Production Preparation
Process
Planning
Process
DesigningPilot Run
Volume
Production
1st Quality
Assurance
2nd Quality
AssuranceProcess
FMEA
Process
Control Chart
Work & Check
Instruction Sheet
QA Network
QA Network Manual
8/17/2019 QANet Manual
http://slidepdf.com/reader/full/qanet-manual 9/24
2-5 How the Target Assurance Rank Should be Viewed
At our company, we have classified Critical Ranks for quality control, in order to prevent major
defects from occurring, using DDS1308 (Critical Control Manual).
Based on this concept, the Target Assurance Ranks on the QA Network’s production assurance ranks
are classified into three different ranks as Table 2-1 illustrates.
Furthermore, ranks of the Critical Control Symbol (other than above) can be determined by first
examining the company standards, and the responsible department establishes the ranks.
Table 2-1 Target Rank Table
Classification Rank
S E F
S E F Critical
General
A
B
C
*As for “S”, it gets the highest priority in trying to meet the target rank.
2-6 Applying the Concept to Suppliers & Customers
(1) Applying the Concept to Suppliers
As discussed previously, the purpose of the QA Network is to evaluate the whole manufacturing
processes (from suppliers to customers).
Here, we are going to discuss how the concept of QA Network can be introduced to suppliers, as
well as customers.
In order to ensure overall product quality, which includes suppliers’ quality, our company also needs
to check and make sure that quality is maintained well, and the escape prevention is put in place at
supplier side. Thus, we are strongly encouraging our suppliers to also utilize the QA Network the
ti th t hi h l l f lit d ti b f th t th d
QA Network Manual
8/17/2019 QANet Manual
http://slidepdf.com/reader/full/qanet-manual 10/24
8/17/2019 QANet Manual
http://slidepdf.com/reader/full/qanet-manual 11/24
Now, in order to completely eliminate defects at the time of delivery (@Finished Vehicle Inspection)
at customer site, we need to define the inspections items, as well as the defect types together with
Engineering and QA Department. Then, any contributing factors have to be eliminated (Root-cause)
As part of QA Network, in order for anyone to understand the relation of inspection items and
Production Assurance Items, which are used at Finished Vehicle Inspection, “O”is placed. Also, to
make assurance level clear for each inspection item, the item that received the worst rank in the
current assurance ranks (from Production Assurance Items) is selected as the assurance level for that
inspection item. (Fig. 2-5)
For defects found at Receiving of Finished Vehicle Inspection, most are functional defects and
likely to directly impact the vehicle performance. Thus, we need to set and control the target rank
as “A-rank” with the premise that not one defect will be allowed.
B
Production Assurance Items
Assurance Items
Assurance Items
FollowingProcesses
I
n s p e c t i o n I t e m a
T a r g e t A s s u r a n c e
R a n k
C u r r e n t A s s u r a n c e
R a n k
I
n s p e c t i o n I t e m b
I
n s p e c t i o n I t e m c
Put “O” on related item
Fill out the worst value from CurrentAssurance Rank that might have impacton the evaluation of inspection items.
A
BNo Need to
C Improve
Target
Assurance Rank
Defect Prevention Rank
1 2 3 4
Need to
Improve
Table 2-2
QA Network Manual
8/17/2019 QANet Manual
http://slidepdf.com/reader/full/qanet-manual 12/24
*By making cause-and-effect relation among Production Assurance Items through the whole
processes (from suppliers to customers), you will be able to maintain the standardized Target
Assurance Rank through the entire processes (suppliers to customers).
*Not only is the QA Network developed through the whole processes, but also all members
involved will have to discuss how all Production Assurance Items are tied into each other, so it
actually fosters a good communication among all members and it allows them to check for any
overlook that exists, in terms of Production Assurance Items.
*A key-point in QA Network is how one can select Production Assurance Items, and how well one
can grasp how Production Assurance Items are all tied into each other. Therefore, it is important
that all departments work closely, and those who participate have a strong expertise in this area.
*Rank evaluation standards should cover (apply) to all types of work, in order to eliminate
qualitative judgment by the members implementing this program.
*To be able to evaluate the assurance level of target process and to implement Kaizen through the
QA Network, we have to have a good balance between “hardware” (equipment Kaizen) and
“soft”/intangible (operator training). In short, if Kaizen were to take substantial amount of cost or
take a lot of time due to technical aspect, set the target completion date first and provide operator
training, prepare Standardized Work Sheet, so we could attain high quality level.
*Occasionally, since defects do escape to the following processes due to poor trouble shooting
(unordinary work), though the process itself is satisfying the assurance level, it is necessary to
examine the methods/procedure for trouble-shooting beforehand, and the same can be said for
unordinary work.
*When any changes have been made to the processes, make sure to go back to the QA Network
and confirm the assurance level.
2-8 Cautionary Points at Implementation
QA Network Manual
QA N k M l
8/17/2019 QANet Manual
http://slidepdf.com/reader/full/qanet-manual 13/24
Prepare to implement.
Process names, description of representative part number.
Evaluation standards, target ranks, and establishment of overall judgment chart.
Organize the processes and document what was done
3-1 Procedures for ImplementationImplementation steps of QA Network vary depending on the situation in which it is used, and the type ofmanifest that is utilized. The following flowchart (Fig 3-1) illustrates the typical procedure that is used in our
company. Key points are explained according to each step in the procedure.
PreparationProcedure 1
Procedure 2
Procedure 3
Evaluation
of Process
Assurance
Level
Procedure 4
Procedure 5
Procedure 6
Procedure 7
Procedure 8
Procedure 9
Procedure 10
Procedure 11
Procedure 12
Procedure 13
Any overlook in the study?
Re-evaluation
by examining
the overall
flow
Production assurance items, functions(characteristics), select critical control designation anddocument.
Make a list of past defects and document them.
Find where defects occur (problematic process) and fill out circle ( ).
Select process for escape prevention and fill out .
Fill out current prevention method and determine the ranks from the aspect of escape prevention,then document.
Determine the target assurance ranks and document them.
Determine the current assurance ranks and document them.
Study the type of impact to the following processes, and document them.
Re-examine the QA Network.
3 Implementing QA Network
QA Network Manual
QA N t k M l
8/17/2019 QANet Manual
http://slidepdf.com/reader/full/qanet-manual 14/24
3-2 Key-point for Implementation & How to Fill Out (example)
[Procedure 1] Preparation Before Implementation
There are few items that need to be prepared beforehand, in order to develop QA Network and evaluate process
assurance level. Unless this preparation is done thoroughly, not only will it take a lot of time, but the goal will not be
achieved sufficiently.
(1) Understanding of Parts
First, the following contents need to be thoroughly understood through product design FMEA, and drawings.
1) How are parts connected with each other which make up SUB-ASSY parts?
2) In order for the parts to function per the spec., to what extent should SUB-ASSY parts be expected to perform?
3) What level of expectations do we have for the parts, in terms of reliability?
(2) Grasp the Target Lines (Processes)
At a complex line, there are a numerous factors that can be overlooked, even though you might think that you know
everything about the process. Thus, it is necessary to develop an organization chart and Process FMEA, so that you
can very well understand the functions that are expected for that particular process, as well as what kind of process is
used to build parts. In addition, do some investigation on past incidents regarding the delivery troubles that occurred
at similar processes.
(3) Grasp the upstream processes (suppliers) and following processes(customers)
As parts become more complex, it becomes more difficult to know who supplies each of those parts. To know the
suppliers for all of these parts is not an easy task. To establish the Net (for quality assurance) on all concerned
suppliers, it might be helpful to prepare a chart as shown below. Also, if you are developing the QA Network for
products’ Final Line, you should know how the parts are handled once customer receives them, and what sort of
inspections are going to be performed for finished vehicles (inspection items).
VCT
229800-0261, 229810-0060
, 229815-0010
229826-0010
229816-0060
NOK
Primary Suppliers
VCT
229800-0261229810-0060
229815-0010
229826-0010
229816-0060NOK
Cutting
SakakibaraPrecision
Secondary Suppliers
Molding, heat processing
Tokai Spring
TogoManufacturing
Shipping InspectionWinding, Heat Process, Grinding
Aiba Spring Industry
O-ring
HericalAssy Part Name
Assy Part#
Shaft, spline
Disc, spring
Spring, retard
Ring, seal, housing
QA Network Manual
QA Network Manual
8/17/2019 QANet Manual
http://slidepdf.com/reader/full/qanet-manual 15/24
(4) Developing the QA Network Sheet
Figure 3-3 illustrates the basic manifest that is used for QA Network.
F u n c t i o n s ( C h a r a c t e r i s t i c s )
C r i t i c a l C o n t r o l
D e s i g n a t i o n
P r o d u c t i o n
A s s u r a n c e I t e m s
P a s t D e f e c t s
Supplier PreviousProcesses
CorrespondingProcess
FollowingProcesses
T a r g e t A s s u r a n c e R a n k s
C u r r e n t A s s u r a n c e R a n k s Kaizen Items Control
Manifest
I m p a c t t o t h e f o l l o w i n g
p r o c e s s e s
Fig 3-3 Basic Manifest for QA Network
[Procedure 2] Process Names, Part Number Description
Develop the QA Network and select the line to be targeted. Then, document the line (Process) name, as well as
the main part number, which is produced at this particular line. Furthermore, the QA Network should be
basically developed for each “Kanketsu” (Complete Process) line; however, when there are many parts on the
same line that require preparation by part number, then study should be done for each part number and develop
QA Network should be developed
[Procedure 3] Evaluation Standards, Target Ranks, Establishing Overall Judging ChartWhen developing the Rank Evaluation Standards for Defect Prevention, be sure to have a thorough discussion
with Production Engineering Department, Production, Quality Assurance and Inspection Group.
The Ranking Evaluation Standards for defect prevention and escape prevention allow you to make a judgment
objectively. Since judgment can vary, depending on who makes them, it would be ideal to come up with
judgment based on Work Element (See table 3-1, 3-2), that is the basic concept (Stamping, welding, caulking,
etc.).
When judgment is difficult to make, it might be helpful if you go back to “The Basic Concept” under Ranking.
Table 3-1 Example: Evaluation Standards for Defect Prevention Rank
Basic Concept
Ranks (1) (2) (3) (4)
*Equipment alone can prevent
defects and is also capable of
detecting them.
*Quality still has to be assured(partially) by members.4M is standardized and mostdefects are prevented in theordinary work condition.
*Relying on human labor greatly;however does not have to rely on theelement of intution or method ofindividualIt is not sufficient for prevention ofoccurrence with equipment;However process capability exists
*Difficult to adhere to thestandards*Process capability notsufficient from equip. aspect*Team members rely on knuck
S e c u r i n g
W r o n g p a r t
M i s s i n g P a r t
m b l y
*Assure torque lower limit+
prevention for secure overlook
(Impact wrench with torque
gauge+interlock, QL
wrench+interlock)
*Assure torque lower limit (Impact
wrench w/o torquegauge+interlock, QL wrench)
*No assurance for torque. T/Mrelies on his “gut feeling”.
But, there is process capability.(Impact wrench w/o torquegauge)
*No assurance for torque.T/M relies on his “gut feeling”.Process capability is notsufficient.
*T/M checks if he picks up the
correct part (Detection device
for part picking+interlock)
*There is a automatic
mechanism by which a T/M
can just pick a part by
following instruction (lamp
and voice instruction)
*T/M uses his memory and selects
two types of parts
*There is a clear labeling that one
can definitely tell what he is picking
(Engine part# is placed in the rack)
*Based on what T/M
remembers, he selects more
than 3 types of parts
QA Network Manual
QA Network Manual
8/17/2019 QANet Manual
http://slidepdf.com/reader/full/qanet-manual 16/24
Table 3-2 Example: Evaluation Standard for Escape Prevention Ranking
Rank
B a s i c
C o n c e p t
A s s y
P r o c e s s i n g
(1) (2) (3) (4)
*Defect prevention is equipment
wise. Also, capable of knowing
equipment breakdown
*Assurance is partially provided bymembers. During normaloperation, 4M is standardized andescape prevention is sufficientlydone
*Largely relying on members.Standardization and adherence ofstandard is questionable.Equipment wise, escape preventionis not perfect
*Lack of standards, or not adheredas they are supposed to.*It is likely to have defects escape,equipment wise
*All defects are caught and a larm
will go off
*Possible to detect defects 100%
*Check-Kanbans are used for double
check and doing “marking-check”.
*Check is done using instrument
*Double check or marking check *Assembly member visually checks theitems that are easy to detect.*Maybe possible to detect beforeleaving the plant (abnormal noise check)
*Assembly members visuallychecks that are easy tooverlook
*All parts are checked by equip. Ifdefect is found, the line will stop.Also, checking detection capability.*Gauge is used to check all defectsusing the sampling frequency thatcontains defects before leaving the process
*Gauge is used to check all defectsusing the sampling frequency thatwill contain defects before leavingthe plant.*Responsible person checks (bysenses) all items.
*Inspection is performed usinggauge (other than what’s describedin the left column)
*Inspection by senses (touch,feel, see etc.) Except forwhat’s listed on the left.
When establishing the target assurance rank and overall judgment of assurance rank, Table 3-3 and 3-4 are used as a rule.
Table 3-3 Target Assurance Rank Chart Table 3-4 Overall Judgment Chart for Assurance Rank
B
C
A
Defect Prevention Rank
2
3
4
A
E s c a p e p r e v e
n t i o n R a n k
[Procedure 4] Organization of Processes and Description
By referring to Process Organization chart, classify the line by process as an independent unit (Unit used in theProcess Control Detail Chart)and document, in the order of previous processes (including suppliers), targeted
processes, and the following processes (customers). (Fig 3-4)
For suppliers, be sure to document the name of suppliers and the part description. For following processes(customers), document all inspection items that are related to each part from the categories of Conveyance,Storage or Final Inspection Process.
As for parts built by suppliers and previous processes (Sub-Assy), develop the QA Network independently andevaluate the Process Assurance Level.
1 2 3 4
B A B
A B C D
A C D D
B D D D
QA Network Manual
QA Network Manual
8/17/2019 QANet Manual
http://slidepdf.com/reader/full/qanet-manual 17/24
[Procedure 5] Selection and Description of Production Assurance Items (or defect items), Function
(quality), and Critical Control Designation
Refer to the Process FMEA defect mode, drawings (Request form to designating certain area as Quality Control
Point), design FMEA, and previous defects, then further discuss with all departments involved to come up with a list
of production related defects that would affect product quality. When done with this process, document them in the
column under Production Assurance Items (or defect items).
Also, document which function of product that the Production Assurance Items may affect, as well as how the
Critical Control Designation items are set for those items. When documenting above, please take into account not
only the drawing, but the impact caused by Process FMEA defects.
Part Number 028200-686*
Process Name R2.0 Starter Armature Line
Supplier PreviousProcess
Armature Process
F u n c t i o n s
( C h a r a c t e r i s t i c s )
C
r i t i c a l C o n t r o l D e s i g n a t i o n
Production’s Assurance Items
P r e v i o u s D e f e c t s
L e a d w i r e
( D a i i c h i D e n k o )
S h a f t 1 W
S h a f t c u t t i n g ( # 1 )
S h a f t c u t t i n g ( # 2 )
K n u r l i n g
f o r m r o l l i n g
Fig 3-5 Description of Process Assurance Items
Make sure slotting
measurement is correct
Make sure the measurement
for spot facing is correct
Performance
Drop
Performance
Drop
[Procedure 6] Selection and Description of Previous Defects
In order to prevent reccurrence, make sure of document dates on all defects if they had past history (occurrence).
Also, investigate all similar defects, or if defects occurred at a similar process, then document them.
Part Number 028200-686*
Process Name R2.0 Starter Armature Line
Supplier PreviousProcess
Armature Process
F u n c t i o n s
( C h a r a c t e r i s t i c s )
C
r i t i c a l C o n t r o l D e s i g n a t i o n
Production’s Assurance Items
P r e v i o u s D e f e c t s
L e a d w i r e
( D a i i c h i D e n k o )
S h a f t 1 W
S h a f t c u t t i n g ( # 1 )
S h a f t c u t t i n g ( # 2 )
K n u r l i n g
f o r m r o l l i n g
Fig 3-6 Description of Past Defects
Make sure slotting
measurement is correct
Make sure the measurement
for spot facing is correct
Performance
Drop
Performance
Drop
[Procedure 7] Extraction of Problematic Processes and Use of Legend “O”
QA Network Manual
QA Network Manual
8/17/2019 QANet Manual
http://slidepdf.com/reader/full/qanet-manual 18/24
When problematic processes are found in multiple locations, put “O” to all such processes.
If, however, problematic processes are found in upstream/previous processes (including suppliers), write down thecurrent assurance rank, which corresponds to Production Assurance Items from the QA Network that is for the
upstream processes.
Part Number 028200-686*
Process Name R2.0 Starter Armature Line
Supplier PreviousProcess
Armature Process
F u n c t i o n s
( C
h a r a c t e r i s t i c s )
C r i t i c a l C o n t r o l
D e s i g n a t i o n Production’s Assurance Items
P r e v
i o u s D e f e c t s
L e a d
w i r e
( D a i i c h i D e n k o )
S h a f t 1 W
S h a f t c u t t i n g ( # 1 )
S h a f t c u t t i n g ( # 2 )
K n u r l i n g
f o r m
r o l l i n g
Fig 3-7 Documenting the Process Where Defect Occurred
Make sure slotting
measurement is correct
Make sure the measurement
for spot facing is correct
Performance
Drop
Performance
Drop
Performance
Drop
C
C Make sure the measurement
(outer diameter)for spot facing
is correctB
[Procedure 8] Selection of Process for Escape (defect) Prevention and Use of Legend “ ”
For each Production Assurance Item, use Process FMEA as a reference, and figure out where the “Escape Prevention
Process” should be set up, and put “ ”.
Part Number 028200-686*
Process Name R2.0 Starter Armature Line
Supplier PreviousProcess
Armature Process
F u n c t i o n s
( C h a r a c t e r i s t i c s )
C r i t i c a l C o n t r o l
D e s i g n a t i o n Production’s Assurance Items
P r e v i o u s D e f e c t s
L e a d w i r e
( D a i i c h i D e n k o )
S h a f t 1 W
S h a f t c u t t i n g ( # 1 )
S h a f t c u t t i n g ( # 2 )
K n u r l i n g
f o r m r o l l i n g
Fig 3-8 Description of “Escape (defect) Prevention Process”
Make sure slotting
measurement is correct
Performance
Drop
Performance
Drop
C
C Make sure the measurement
(outer diameter)for spot facing
is correctB
QA Network Manual
QA Network Manual
8/17/2019 QANet Manual
http://slidepdf.com/reader/full/qanet-manual 19/24
[Procedure 9] Examine and Document the Rank for the Current Defect Prevention & “Escape Prevention”
Examine the status of the current defect prevention, as well as escape prevention effort, and put down the rankingvalue inside of the legend and after cross-checking with the Evaluation Standard that was developed in
Procedure 3.
Part Number 028200-686*
Process Name R2.0 Starter Armature Line
Supplier PreviousProcess
Armature Process
F u n c t i o n s
( C h a r a c t e r i s t i c s )
C r i t i c a
l C o n t r o l
D e s i g n
a t i o n Production’s Assurance Items
P r e v i o u s D e f e c t s
L e a d w
i r e
( D a i i c h i D e n k o )
S h a f t 1
W
S h a f t c
u t t i n g ( # 1 )
S h a f t c
u t t i n g ( # 2 )
K n u r l i n g
f o r m r o l l i n g
Fig 3-9 Description of “Escape (defect) Prevention Process”
Make sure slotting
measurement is correct
Performance
Drop
Performance
Drop
C
C Make sure the measurement
(outer diameter)for spot facing
is correctB
C = Critical
…
1 11
1
1
[Procedure 10] Examine and Document the Target Assurance Rank
Based on the Target Assurance Rank Table, which was established in the Procedure 3, write down the rank of target
assurance. During the study, refer to Critical Control Designation, or Function (characteristics).
Part Number 028200-686*
Process Name R2.0 Starter Armature Line
Supplier PreviousProcess
Armature Process
F u n c t i o n s
( C h a r a c t e r i s t i c s )
C r i t i c a l C o n t r o l
D e s i g n a t i o n Production’s Assurance Items
P r e v i o u s D e f e c t s
L e a d w i r e
( D a i i c h i D e n k o )
S h a f t 1 W
S h a f t c u t t i n g ( # 1 )
S h a f t c u t t i n g ( # 2 )
K n u r l i n g
f o r m r o l l i n g
Fig 3-10 Description of Target Assurance Rank
Make sure slotting
measurement is correct
Performance
Drop
Performance
Drop
C
C Make sure the measurement
(outer diameter)for spot facing
is correctB
C = Critical
…1
1
1
1
T a r g e t A s s u r a n c e R a n k
B
B
1
Q
QA Network Manual
8/17/2019 QANet Manual
http://slidepdf.com/reader/full/qanet-manual 20/24
Furthermore, when there are previous processes (including suppliers’ processes), make a comparison between the
current assurance rank of the targeted process and the assurance rank of the previous processes. Basically, whichever one (rank) that is more problematic should be documented.
Part Number 028200-686*
Process Name R2.0 Starter Armature Line
Supplier PreviousProcess
Armature Process
F u n c t i o n s
( C h a r a c t e r i s t i c s )
C
r i t i c a l C o n t r o l
D
e s i g n a t i o n Production’s Assurance Items
P r e v i o u s D e f e c t s
L e a d w i r e
( D a i i c h i D e n k o )
S h a f t 1 W
S h a f t c u t t i n g ( # 1 )
S h a f t c u t t i n g ( # 2 )
K
n u r l i n g
f o
r m r o l l i n g
Fig 3-11 Description of the Current Assurance Rank
Make sure slotting
measurement is correct
Performance
Drop
Performance
Drop
C
C Make sure the measurement
(outer diameter)for spot facing
is correctB
C = Critical
…1
1
1
1
T a r g e t A s s u r a n c e R a n k
B
C u r r e n t A s s u r a n c e R a n k
B
B
In order to see the whole flow from upstream processes to the downstream processes, it is necessary to define the
relation from every step of manufacturing process, such as upstream processes, your own process, and downstream
process (cause and effect relation).
For this reason, which of the production assurance item of the QA Network is related to which production assurance
item, is described in “Impact to the Following Processes”.When conducting study, make sure to have a detailed discussion with members from the following processes and
make it clear before you start documenting the cause and effect relation.
[Procedure 12] Examine and Document the Target Assurance Rank
A
Part Number 028200-686*
Process Name R2.0 Starter Armature Line
F u n c t i o n s
( C h a r a c t e r i s t i c s )
C r i t i c a l C o n t r o l
D e s i g n a t i o n
Production’s
Assurance Items
P r e v i o u s D e f e c t s
Make sure slotting
measurement is
correct
C
Make sure thePerformance C
PreviousProcess
Armature Process Kaizen ItemsControlManifest
S h a f t 1
W
S h a f t c u t t i n g ( # 1 )
S h a f t c u t t i n g ( # 2 )
K n u r l i n g
f o r m
r o l l i n g
T a r g e t A
s s u r a n c e R a n k
C u r r e n t
A s s u r a n c e R a n k
C o n t e n t s
D u e P
o s t K a
i z e n R a n k
I m p a c t t o t h e f o l l o w i n g p r o c e s s e s
Torque
Performance
Drop
I n s p e c t i o n s h e e t f o r c h e c k i n s t r u m e n t
S t a n d a r d i z e d W
o r k S h e e t
1
1 B
BB
1
1
1B
1
QA Network Manual
8/17/2019 QANet Manual
http://slidepdf.com/reader/full/qanet-manual 21/24
When additions or errors are found, make a correction accordingly.
Part Number 028200-686*
Process Name R2.0 Starter Armature Line
F u n c t i o n s
( C h a r a c t e r i s t i c s )
C r i t i c a l C o n t r o l
D e s i g n a t i o n
Production’s
Assurance Items
P r e v i o u s D e f e c t s
Make sure groove’s
measurement is
correct
C
Make sure themeasurement(outer diameter)forspot facing iscorrect
Performance
Drop
C
PreviousProcess
Armature Process Kaizen ItemsControlManifest
S h a f t 1 W
S h a f t c u t t i n g ( # 1 )
S h a f t c u t t i n g ( # 2 )
K n u r l i n g f o r m
r o l l i n g
T a r g e t A s s u r a n c e R a n k
C u r r e n t A s s u r a n c e R a n k
C o n t e n t s
D u e P
o s t K a i z e n R a n k
I m p a c t t o t h e
f o l l o w i n g
p r o c e s s e s
Torque
Defect
Performance
Drop
I n s p e c t i o n
s h e e t f o r c h e c k i n s t r u m e n t
S t a n d a r d i z e d W o r k S h e e t
How does this relate to
previous processes?
How does this relate to
following processes?
Fig 3-13 Reconsidering QA Network
[Procedure 14] Examining & Documenting Kaizen Items (proposal)
For items whose current assurance rank are not meeting the target assurance rank, conduct Kaizen study and come
up with the details and due dates.
Make sure to include in Kaizen proposal (during the study stage) whether the countermeasure is for defect
prevention or escape prevention, and also how their ranks varies.
When it requires some time to implement Kaizen from cost and technical aspect, first establish the target completion
date for Kaizen and start the following, in order to meet quality target: operator training, preparation of standardized
work sheet, implementation of countermeasure through software.
If the countermeasure is done by means of software, make sure to put “+” in the current assurance rank, so that you
will be able measure the effect of the countermeasure.(Example: B+ means that the current assurance level is B rank when considering all tangible aspects, but it is only
given when the process is deemed A-rank equivalent, which is achieved through some Kaizen and training for team
members.)
B
Part Number 028200-686*
Process Name R2.0 Starter Armature Line
F u n c t i o n s
( C h a r a c t e r i s t i c s )
C r i t i c a l C o n t r o l
D e s i g n a t i o n
Production’s
Assurance Items
P r e v i o u s D e f e c t s
Make sure groove’s
measurement is
correct
C
PreviousProcess
Armature Process Kaizen Items
S h a f t 1 W
S h a f t c u t t i n g ( # 1 )
S h a f t c u t t i n g ( # 2 )
K n u r l i n g f o r m
r o l l i n g
T a r g e t A s s u r a n c e
R a n k
C u r r e n t A s s u r a n c e R a n k
C o n t e n t s
D u e P
o s t K a i z e n R a n k
Performance
Drop
1
1
1
1
1B A
B B
1
1 1A
B
QA Network Manual
8/17/2019 QANet Manual
http://slidepdf.com/reader/full/qanet-manual 22/24
[Procedure 15] Writing Down the Assurance Rank After Kaizen
B
1B
Part Number 028200-686*
Process Name R2.0 Starter Armature Line
F u n c t i o n s
( C h a r a c t e r i s t i c s )
C r i t i c a l C o n t r o l
D e s i g n a t i o n
Production’s
Assurance Items
P r e v i o u s D e f e c t s
Make sure groove’s
measurement is
correct
C
Make sure themeasurement(outer diameter)forspot facing iscorrect
Performance
Drop
C
PreviousProcess
Armature Process Kaizen Items
S h a f t 1 W
S h a f t c u t t i n g ( # 1 )
S h a f t c u t t i n g ( # 2 )
K n u r l i n g f o r m
r o l l i n g
T a r g e t A s s u r a n c e R a n k
C u r r e n t A s s u r a n c e R a n k
C o n t e n t s
D u e P
o s t K a i z e n R a n k
Performance
Drop
Fig 3-15 Document Rank After Kaizen
[Procedure 16] Documenting on Control Manifest and Checking
In order to keep up with the process assurance rank, which was achieved after the QA network evaluation
and Kaizen effort, it is essential that the contents are also documented properly for the control purpose. In
the case where the production assurance items are controlled from the aspects of defect and escape
prevention, then document if a check sheet (for check instrument) that allows you to perform periodic
inspection has been prepared. However, if the equipment alone cannot contain defects, or prevent defects
from escaping to the following processes, check to see if they are controlled through the Work Instruction
sheet and write down this Work Instruction Control Number.
B
B B
1
Part Number 028200-686*
Process Name R2.0 Starter Armature Line
F u n c t i o n s
( C h a r a c t e r i s t i c s )
C r i t i c a l C o n t r o l
D e s i g n a t i o n
Production’s
Assurance Items
P r e v i o u s D e f e c t s
Make sure groove’s
measurement is
correct
C
Make sure themeasurement(outer diameter)forspot facing iscorrect
Performance
Drop
C
PreviousProcess
Armature Process Kaizen ItemsControlManifest
S h a f t 1 W
S
h a f t c u t t i n g ( # 1 )
S
h a f t c u t t i n g ( # 2 )
K
n u r l i n g f o r m
r o l l i n g
T a r g e t A s s u r a n c e R a n k
C u r r e n t A s s u r a n c e R a n k
C
o n t e n t s
D u e P
o s t K a i z e n R a n k
I m p a c t t o t h e
f o l l o w i n g p r o c e s s e s
Torque
Defect
Performance
Drop
I n s p e c t i o n s h e e t f o r c h e c k i n s t r u m e n t
S t a n d a r d i z e d W o r k S h e e t
1
11
1
B
A
B
B
1
1
1
1