85 Vote 9 - Public Transport, Roads and Works • 2009/10 - Budget Statement 3 VOTE 9 PUBLIC TRANSPORT, ROADS AND WORKS Infrastructure to be appropriated by Vote R6 707 476 000 Responsible MEC MEC for Public Transport, Roads and Works Administering department Department of Public Transport, Roads and Works Accounting officer Head of Department 1. STRATEGIC OVERVIEW OF INFRASTRUCTURE PROGRAMME FOR 2009 MTEF Strategic objectives The infrastructure programme of the Department is guided by the following departmental strategic objectives: Providing accessible, affordable, reliable, safe, integrated and environmentally sustainable public transport system Supporting economic growth and investment through the provision of appropriate transport systems and socio-economic infrastructure Integrating transport and socio-economic infrastructure systems within the Gauteng Growth and Development Strategy and the development plans of other spheres of government Implementing the Expanded Public Works Programmes (EPWP) in a manner that optimizes employment and addresses the economic and social needs of the poor The programme is further shaped by the following three provincial key thrusts: Building Gauteng as a globally competitive city region Implementing the Gauteng social development strategy Building the capacity and organisation of the state In line with the objective of transforming the province into a competitive global city region, the department has commissioned the Gauteng Infrastructure Renewal and Investment Plan (GIRIP). Through GIRIP, the department aims to build and improve infrastructure leading to economic growth that will help to halve poverty and unemployment by 2015. Improving access to the road network for the people of previously disadvantaged areas through spatial reprioritisation of capital and maintenance of roads will assist with economic development and ensure that citizens in these disadvantaged areas can access economic opportunities. GIRIP aims to fast-track the elimination of infrastructure backlogs, renew existing infrastructure to reduce disparities and harmonise development across the province, integrate principles of sustainable development in planning for future infrastructure needs and encourage private and public participation in infrastructure development. The department is responsible for developing certain planning guidelines such as the Provincial Land Transport Framework, for a socio-economic infrastructure investment framework and for site development plans for provincial facilities in Gauteng. It plays an inter-governmental role in the establishment and maintenance of urban transport information management systems (intelligent transport systems). The provision of transport infrastructure entails planning, construction, maintenance and protection of the provincial road network. The department maintains approximately 4200 kilometers of the provincial road network (surfaced and gravel roads). The department is responsible for the delivery of integrated public infrastructure in the form of capital and maintenance works and expects one hundred per cent statutory compliance for all new works as well as adherence to planned time, cost and quality indicators. This ensures that government’s property assets are well managed •VOTE 9 TRANSPORT(NEW).indd 85 2009/02/17 7:58 AM

Upload: others

Post on 01-Feb-2022

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Public TRanSPORT, ROadS and WORkS

85

Vote 9 - Public Transport, Roads and Works • 2009/10 - Budget Statement 3

VOTE 9

Public TRanSPORT, ROadS and WORkSInfrastructure to be appropriated by Vote R6 707 476 000 Responsible MEC MEC for Public Transport, Roads and WorksAdministering department Department of Public Transport, Roads and WorksAccounting officer Head of Department

1. STRATEGIC OVERVIEW OF INFRASTRUCTURE PROGRAMME FOR 2009 MTEF

Strategic objectivesThe infrastructure programme of the Department is guided by the following departmental strategic objectives: • Providing accessible, affordable, reliable, safe, integrated and environmentally sustainable public transport

system • Supporting economic growth and investment through the provision of appropriate transport systems and

socio-economic infrastructure • Integrating transport and socio-economic infrastructure systems within the Gauteng Growth and Development

Strategy and the development plans of other spheres of government • Implementing the Expanded Public Works Programmes (EPWP) in a manner that optimizes employment and

addresses the economic and social needs of the poor

The programme is further shaped by the following three provincial key thrusts: • Building Gauteng as a globally competitive city region • Implementing the Gauteng social development strategy • Building the capacity and organisation of the state

In line with the objective of transforming the province into a competitive global city region, the department has commissioned the Gauteng Infrastructure Renewal and Investment Plan (GIRIP). Through GIRIP, the department aims to build and improve infrastructure leading to economic growth that will help to halve poverty and unemployment by 2015. Improving access to the road network for the people of previously disadvantaged areas through spatial reprioritisation of capital and maintenance of roads will assist with economic development and ensure that citizens in these disadvantaged areas can access economic opportunities.

GIRIP aims to fast-track the elimination of infrastructure backlogs, renew existing infrastructure to reduce disparities and harmonise development across the province, integrate principles of sustainable development in planning for future infrastructure needs and encourage private and public participation in infrastructure development.

The department is responsible for developing certain planning guidelines such as the Provincial Land Transport Framework, for a socio-economic infrastructure investment framework and for site development plans for provincial facilities in Gauteng. It plays an inter-governmental role in the establishment and maintenance of urban transport information management systems (intelligent transport systems).

The provision of transport infrastructure entails planning, construction, maintenance and protection of the provincial road network. The department maintains approximately 4200 kilometers of the provincial road network (surfaced and gravel roads).

The department is responsible for the delivery of integrated public infrastructure in the form of capital and maintenance works and expects one hundred per cent statutory compliance for all new works as well as adherence to planned time, cost and quality indicators. This ensures that government’s property assets are well managed

•VOTE 9 TRANSPORT(NEW).indd 85 2009/02/17 7:58 AM

Page 2: Public TRanSPORT, ROadS and WORkS

86

Budget Statement 3 - 2009/10 • Vote 9 - Public Transport, Roads and Works

and utilised to maximise provincial revenue.

Government’s short to medium term Expanded Public Works Programme (EPWP) is aimed at providing additional work opportunities coupled with training, and involves creating temporary opportunities for the unemployed through public sector expenditure. The Department adopts EPWP principles by increasing the labour intensity of government funded infrastructure projects, incorporating labour-intensive methods of upgrading rural and municipal roads, municipal pipelines and storm-water drains. The Department’s role is to plan, co-ordinate and inform the implementation of EPWP by all provincial departments and establish a centralised and coordinated management structure to ensure speedy and high-quality service delivery.

Legislative mandateAll implemented projects comply with the following legislation: • Skills Development Act, 1998 • Occupational Health and Safety Act, 1993 • Standards Act, 1982 and in particular the associated National Building Regulations • Architectural Profession Act, 2000 • Built Environment Professions Act, 2000 • Construction Industry Development Board, 2000 • Engineering Profession Act, 2000 • Landscape Architectural Profession Act, 2000 • Project and Construction Management Professions Act, 2000 • Property Valuers Profession Act, 2000 • Quantity Surveyors Profession Act, 2000

2. REVIEW OF THE 2008/09 FINANCIAL YEAR

ROADS INFRASTRUCTUREDuring the 2008-09 financial year, the Department aimed to construct 21 km of new roads and to develop 15 km. The Department carried out the following projects during the year: • Construction of the Voortrekker Road (K71/R55) dual carriageway (Phase 1) between the Monavoni Circle

and Wierda Road (M10, Sunderlandridge) • Completion of surfacing of the access road (Phase 1) to the Eye of Africa Development. Phase 2 of the

project has started. • Construction of the Malibongwe Drive (K29) dual carriageway between Cosmo City and N14 Krugersdorp

Highway • Construction of the Main Road (K54/M71) dual carriageway between Zinnia Road (Kyalami A.H.) and

Woodmead Drive (P66-1/R55) • Completion of the Cullinan Road (P2 – P5) from Pretoria to Cullinan • Completion of the R550 (P174) between Devon and Nigel • Surfacing of all previously unsurfaced roads in Atteridgeville • Surfacing of 109.9 kilometers of previously unsurfaced roads in 20 prioritised townships • Completion of a demonstration project for the use of ultra-thin reinforced concrete pavement (UTRCP) in

Soshanguve and the road was opened to normal traffic.

The construction of 3 kilometres of Malibongwe Drive (K29) dual carriageway from Cosmo City to N14 Krugersdorp Highway, noted above, is in preparation for the 2010 Soccer World Cup. The project will cost R119 million. The tender for the K29 – N14 to Lanseria Airport has been awarded and designs have been completed for the Pinehaven Interchange. Upgrading and rehabilitation of Albertina Sisulu Highway (R21) has been handed to SANRAL as part of the Gauteng Freeway Improvement Programme.

PUbLIC WORkS

Capital WorksDuring 2008/09, the focus of the Public Works Programme has been on rendering a client-centred and efficient building and infrastructure development and maintenance service to the GPG. The Public Works Programme also rehabilitates, upgrades and maintains existing provincial social infrastructure.Most of the work undertaken by the Department supports the delivery of infrastructure on behalf of client departments: Health; Social Development; Agriculture, Conservation and Environment; Sport, Arts, Culture, and Recreation; Education; and Community Safety.

•VOTE 9 TRANSPORT(NEW).indd 86 2009/02/17 7:58 AM

Page 3: Public TRanSPORT, ROadS and WORkS

87

Vote 9 - Public Transport, Roads and Works • 2009/10 - Budget Statement 3

Types of facilities built and upgraded on behalf of client departments include:

• Health facilities (central, provincial and district hospitals; community health centres; laboratories; clinics; mortuaries; nursing training colleges; nurses residences; emergency medical centres; housing; and radio communications)

• Social Development facilities including places of safety; old age homes; day care and home base care facilities; substance abuse and early childhood development centres and staff housing (Mohlakeng, Sebokeng, Daveyton and Tsakane); old age homes; and the Jabulani new secure care centre in Soshanguve

• Facilities in nature reserves, including radio communications, at Roodeplaat, Suikerbosrand and Alice Glochner Nature Reserves

• Community Safety facilities including rehabilitation centres, traffic offices, victim empowerment centres and radio communications

• Sports facilities including 2010 legacy stadia: Rand Stadium, HM Pitje Stadium and Sinaba Stadium • Education facilities, including primary and secondary schools and colleges. Soweto and Sebokeng colleges

are being renovated for use as Further Education and Training (FET) colleges and 300 schools are being renovated including the Pretoria Inner City Secondary School where an unused clinic is being converted into a school.

Further rehabilitation and upgrading work was undertaken at the department’s own facilities. The following works were completed during the financial year: • Upgrading of existing departmental building on Loveday Street • Upgrading of radio communications centres by replacing existing consoles, repeaters, etc. Involvement in

a new communication system for Emergency Medical Services (EMS) and Community Safety in conjunction with the South African Police Services

• Replacing the boiler at Charlotte Maxeke Johannesburg Academic Hospital

MaintenanceThe following type of maintenance is done at departmental institutions: statutory, preventative, routine (day-to-day), planned, condition-based, and maintenance of radio communication equipment.

During 2008/09, the Department was also responsible for ongoing maintenance of the provincial radio communication network and equipment, which consists of 1600 mobile and portable radios and 80 repeater stations at 27 high sites.

Departmental facilities maintained during the financial year include: • Official residences • Roads laboratories • Licensing offices • Office accommodation, including Kopanong GPG Precinct buildings • Gauteng provincially owned buildings • Road camps • Special and historical buildings, including the State Theatre and Emoyeni • Training colleges

SPECIAL PROjECTS

Gautrain Rapid Rail LinkThe project commenced with civil works and the design and procurement of the electrical and mechanical equipment for the project including rolling stock, overhead traction equipment and signalling and communication systems. In 2007/08, activities were mainly focussed on the construction of the project, environmental aspects, procurement of land and integration with other role players. By the end of December 2008, significant progress had been made: • Tunnelling has reached 11 132 meters of a total of 14 974 meters (74% completed) • Tunnelling for Phase 1, which includes sections between Oliver Tambo International Airport and Sandton,

and between Sandton and Midrand, is complete • For Phase 1, 77 out of 89 viaduct piers have been completed, meaning that in total 123 out of 196 viaduct

piers for the whole project have been completed • For Phase 1, 71 out of 95 viaduct segment spans have been completed (75% achievement rate)

•VOTE 9 TRANSPORT(NEW).indd 87 2009/02/17 7:58 AM

Page 4: Public TRanSPORT, ROadS and WORkS

88

Budget Statement 3 - 2009/10 • Vote 9 - Public Transport, Roads and Works

• 42 out of 66 underpass boxes at the N3 have been completed (64%) • At the precast yard, 2 121 viaduct sections have been completed (66%), 14 171 meters of M-beams

completed (53%), 2 844 M-beam side panels cast (76%), and 1 233 tunnel walkway units cast (18%).

Construction of the depot facilities is well advanced, with both bus and train depot administration buildings already complete. The train depot will be used to maintain, service and secure Gautrain’s 24 train sets while the bus depot will perform a similar function for Gautrain’s fleet of 125 luxury buses.

The delivery and installation of the Operations Control Centre equipment is in progress in the train depot administration building. This centre will be Gautrain’s heartbeat, from where signalling, telecommunications, automatic fare collection, traction power and overhead distribution CCTV cameras and maintenance will be managed, using world-class high-technology systems.

Track laying and all associated railway installations, including the overhead catenaries and the signalling system, are complete. Track laying and catenary installation are ongoing on the mainline sections adjacent to the depot.

During November and December 2008, four completed rail cars constructed and assembled in Derby, United Kingdom, arrived in Durban and the testing of these rail cars has begun at the Gautrain depot. Other Gautrain rail cars are being assembled by local technicians at the Union Carriage and Wagon Partnership in Nigel after a successful skills transfer programme.

Some of the challenges experienced by the project include delays with design development, obtaining consent from third parties, procurement, manufacturing, and construction, in the last case in part due to problems in procuring land. Recent delays by the South African National Roads Agency Limited (SANRAL) at the N3 crossing and the late delivery of land have held back the first phase by three months and the second phase by five and a half months. The forecast date for the completion of Phase 1 is now 29 September 2010, and Phase 2 will be completed by 19 September 2011.

20 Prioritised Township Projects (20PTP)The Department is responsible for addressing backlogs in the surfacing and upgrading of roads, installation of storm water drainage and erecting of sidewalks in the 20 identified townships. In total, 109.9 kilometres of road have been completed to date: 12 kilometres in Westrand, 15.4 kilometres in Sedibeng, 16.4 kilometres in Tshwane, 30.1 kilometres in Ekurhuleni, 19.6 kilometres in Johannesburg and 16.4 kilometres in Metsweding.

3. OUTLOOK FOR THE 2009/10 FINANCIAL YEAR

The department has been allocated R6.707 billion for infrastructure in 2009/10. The infrastructure allocation will decrease by R2.590 billion (39 per cent) in 2010/11 and by R352.651 million (9%) in 2011/12. This is due to the decreasing allocation from R5.213 billion in 2009/10 to R2.188 billion in 2011/12 for Gautrain as construction is completeds.

•VOTE 9 TRANSPORT(NEW).indd 88 2009/02/17 7:58 AM

Page 5: Public TRanSPORT, ROadS and WORkS

89

Vote 9 - Public Transport, Roads and Works • 2009/10 - Budget Statement 3

VOTE 9: dEPaRTMEnT OF Public TRanSPORT, ROadS &WORkS

Programme 2005/06 2006/07 2007/08 2008/09 2009/10 2010/11 2011/12

audited

Main appropriation

adjusted appropriation

Revised estimate

Medium-term estimates

Payments for infrastructure by category

Newinfrastructure assets 74,121 74,200 4,613,990 5,140,057 5,141,057 5,076,772 5,335,458 2,465,771 2,188,230 Gautrain 4,765,993 4,766,993 4,766,993 5,212,691 2,430,660 2,188,230 Other new 374,064 374,064 309,779 122,767 35,111 - Existing infrastructure assets 269,010 247,925 611,903 1,083,681 1,083,681 1,220,024 1,372,018 1,652,199 1,577,089 Maintenance and repair 130,955 112,700 178,425 151,216 151,216 148,623 327,450 358,586 367,566 Upgrading and additions 138,055 135,225 433,478 896,665 896,665 1,009,682 1,044,569 1,293,613 1,209,523 Rehabilitation and refurbishment - - - 35,800 35,800 61,719 - - - Infrastructure transfers - - - - - - Current - - - - - - Capital - - - - - - Current infrastructure 130,955 112,700 178,425 151,216 151,216 151,216 411,950 449,667 458,647 Capital infrastructure 212,176 209,425 5,047,468 6,072,522 6,073,522 6,073,522 5,946,576 3,563,275 3,336,253 Total dPTRW infrastructure 343,131 322,125 5,225,893 6,223,738 6,224,738 6,296,796 6,707,476 4,117,970 3,765,319

An amount of R122.8 million has been allocated in 2009/10 for new infrastructure assets which include the construction of five intermodal facilities (taxi ranks) in the City of Johannesburg (K29 taxi rank, William Nicol, Beyers Naudé, Boipatong and Kyalami) at a cost of R65 million. The remaining R57.8 million is for new radio equipment in the City of Johannesburg and construction of multi-purpose centres and enterprise development centres.

An amount of R1.372 billion has been allocated in 2009/10 for the maintenance, repair and rehabilitation of existing infrastructure assets. The allocation increases by R280.181 million (20 per cent) to R1.652 billion in 2010/11 and then decreases by R75.110 million (5 per cent) in 2011/12. An amount of R327.450 million has been allocated for maintenance and repair of infrastructure in 2009/10, which includes R312.498 million for maintenance to roads and R14.952 million for maintenance of the Department’s buildings.

The allocation for maintenance and repair increases at an annual average rate of 6 per cent over the MTEF period while the allocation for upgrading and additions increases by an average of 7.6 per cent per annum. The allocation of R1.045 billion for upgrades in 2009/10 includes R846.256 million for roads rehabilitation and R198.3 million for rehabilitation of the Department’s buildings and community enterprise development centres.

ROADS INFRASTRUCTUREDue to the economic growth of the last few years, the growing middle class resulting from government policies of wealth distribution, and growing urbanisation, the province has experienced a tremendous increase in the number of vehicles using our roads. With the limited funds available, the construction and upgrading of roads will not significantly ease congestion or improve the overall condition of the road network. Nevertheless, during the next MTEF period the Department will increase expenditure on the upgrading, rehabilitation and reconstruction of roads.

The following road projects will be executed during the 2009/10 financial year: • Completion of the Voortrekker road (K71/R55) dual carriageway (Phase 1) between the Monavoni Circle

and Wierda Road (M10, Sunderlandridge) • Construction of the Voortrekker road (K71/R55) dual carriageway (Phase 2) between Wierda road (M10,

Sunderlandridge) and Main Road in Laudium • Completion of surfacing of Cayman Road (Phase 2) to the Eye of Africa • Completion of the Adcock Street (K15/R558) dual carriageway between Leratong Hospital and Dobsonville

(Phase 1)

•VOTE 9 TRANSPORT(NEW).indd 89 2009/02/17 7:58 AM

Page 6: Public TRanSPORT, ROadS and WORkS

90

Budget Statement 3 - 2009/10 • Vote 9 - Public Transport, Roads and Works

• Construction of the Adcock Street (K15/R558) dual carriageway between Dobsonville and Protea Glen (Phase 2)

• Completion of the Malibongwe Drive (K29/R512) dual carriageway between Cosmo City and N14 Krugersdorp highway (Phase 2)

• Construction of the Malibongwe Drive (K29/R512) dual carriageway between N14 and Ashanti road to Lanseria Airport (Phase 3)

• Construction of the William Nicol drive (K46/R511) dual carriageway from Witkoppen to PWV (Phase 1) • Construction of the Beyers Naudé (D374) dual carriageway from Honeydew Police Station to Peter Road

(Zandsuit)

In preparation for the 2010 Soccer World Cup, the Department will construct 5.7 kilometres of double carriageway along Malibongwe Drive (K29) from N14 Krugersdorp highway to Ashanti road, Lanseria Airport, at an estimated cost of R400 million.

PUbLIC WORkS INFRASTRUCTURE

Capital WorksDuring 2009/10, the Public Works branch will further enhance its client-focussed infrastructure delivery strategy. This will promote the Department as a preferred service provider to client departments.

The work to be undertaken by the department will continue to support the delivery of infrastructure on behalf of client departments. The budget available for new capital works in 2009/10 is R57.8 million. These funds will be used to purchase new radio equipment and for the construction of enterprise development centres, multipurpose centres, home based care centres and a market.

Total per Metro/Municipality

Metro/district Municipality Project cost (R’000)

City of Johannesburg New radio equipment 1 500

Metsweding New enterprise development centre 3 802

City of Johannesburg New enterprise development centre, home based care centre, multipurpose centre 27 609

Ekurhuleni Metro New home based care centre 2 154

Sedibeng New multipurpose centre 5 702

Tshwane Metro Construction of market 17 000

Total 57 767

MaintenanceThe maintenance budget for 2009/10 is R14,9 million, with incremental increases proposed for subsequent years. In 2009/10, statutory, routine and condition-based maintenance work will be done on an ongoing basis at departmental institutions (regional offices, licensing centres, traffic offices and other buildings). Funds have also been allocated for the licenses and maintenance of the provincial radio communication network and equipment.

SPECIAL PROjECTS

Gautrain Rapid Rail LinkGautrain has been allocated an amount of R5.213 billion for the 2009/10 financial year. This is comprised of a conditional grant allocation of R2.833 billion from national government; R2 billion from the provincial government and borrowings of R380 million

All bulk physical work required for operating Phase 1 (Sandton Station to OR Tambo International Airport (ORTIA)) will be completed in 2009/10. This includes the remaining civil construction works and the procurement and installation of all mechanical and electrical works. Testing, commissioning and trail-running work will be completed in 2010/11. Phase 1 civil construction work to be completed includes: • Marlboro rail over rail cross-over (by April 2009) • Tunnel boring machine dismantled and removed from project • N3 crossing cut and cover construction work • All bridges on the Airport line

•VOTE 9 TRANSPORT(NEW).indd 90 2009/02/17 7:58 AM

Page 7: Public TRanSPORT, ROadS and WORkS

91

Vote 9 - Public Transport, Roads and Works • 2009/10 - Budget Statement 3

• All viaducts • Sandton station multi-storey parking structure • Sandton station building to be made ready for electrical and mechanical installations • All tunnels, and civil, electrical and mechanical works • Civil works for Malboro, Rhodesfield and ORTIA stations.

The following Phase 2 civil construction works for the Gautrain project will be completed: • All bridges • Pretoria station • Midrand station • Rosebank station and parking structures • All tunnel, civil, electrical and mechanical works.

20 Prioritised Township Projects (20 PTP)The Department will be constructing and upgrading roads, which includes the construction of associated stormwater drains, in the 20 identified townships. This involves upgrading gravel to surfaced roads, construction of bulk stormwater facilities, and construction of walkways and paved sidewalks. The Department has allocated R369.9 million to implement the three year programme for upgrading 149.4 kilometers of road within the 20 prioritised townships. The following projects will be implemented in 2009/10 with completion by March 2011: • Surfacing and rehabilitating Bolani Road in Soweto • Upgrading of gravel to surfaced roads, installing storm water drainage and construction of 10.25 kilometers

of walkways in Mohlakeng, Mogale City • Surfacing Sacramento Street and construction of walkways in Kagiso, Mogale City • Upgrading of Kwathema Riverside Road, Letera Road, Morapedi Street and Motlabi Street in Kwathema,

Ekurhuleni • Upgrading of L section roads in Soshanguve, Tshwane • Surfacing of Roads 6 and 7 in Sharpeville, Sedibeng • Constructing and developing 20 kilometres of the existing road network: R55 (K71) phase 1 (6 kilometres),

Adcock Road (K15) near Leratong Hospital (6 kilometres), Malibongwe Drive (K29) from Cosmo City to N14 Krugersdorp Highway (4 kilometres) and Cayman Road (4 kilometres).

•VOTE 9 TRANSPORT(NEW).indd 91 2009/02/17 7:58 AM

Page 8: Public TRanSPORT, ROadS and WORkS

92

Budget Statement 3 - 2009/10 • Vote 9 - Public Transport, Roads and Works

Det

ails

of

paym

ents

for

infr

ast

ruct

ure

by

cate

gory

: W

ORK

S

no.

Proj

ect n

ame

Mun

icipa

lity

Proj

ect d

escr

iptio

n/

type

of s

truc

ture

Proj

ect s

taut

sPr

ojec

t dur

atio

nim

plem

entin

g ag

ent

Tota

l Pro

ject

cost

Expe

nditu

re

to d

ate

from

pr

evio

us y

ears

budg

et 2

009/

10M

TEF F

orw

ard

Estim

ates

date

: Sta

rtda

te: F

inish

Prof

essio

nal

Fees

cons

truc

tion

Tota

l ava

ilabl

eM

TEF

2001

0/11

MTE

F 20

11/1

21

new

cons

truc

tion

1.1Ra

dio Co

mmun

icatio

n -

Equip

ment

City o

f Joh

anne

sburg

New

Equip

ment

Reten

tion

Apr-0

7Ma

r-10

Publi

c Work

s 13

,060

11,56

01,5

001,5

000

0Su

b To

tal c

ity o

f Joh

anne

sbur

g13

,060

11,5

600

1,5

00

1,50

00

02

upgr

adin

g/ R

ehab

ilita

tion

2.1Pro

fessio

nal S

ervice

s in

Supp

ort of

Proje

ct Im

pleme

ntatio

n

City o

f Joh

anne

sburg

Profes

siona

l Serv

ices t

o Su

pport

Imple

menta

tion o

f Pro

jects,

Partic

ularly

Clien

t De

partm

ents

Cons

tructi

on

Jun-06

Mar-1

2Pu

blic W

orks

128,3

0420

,304

25,00

025

,000

20,00

030

,000

2.2Joh

anne

sburg

Hos

pital

Boile

rCit

y of

Johan

nesb

urgBo

iler R

eplac

emen

tRe

tentio

nAp

r-07

Apr-0

9Pu

blic W

orks

16,62

116

,215

406

406

00

2.3Up

grade

of Pu

blic

Works

Prop

erties

City o

f Joh

anne

sburg

Upgra

deDe

sign

Apr-1

0Ma

r-13

Publi

c Work

s11

6,500

03,7

5021

,250

25,00

018

,000

35,00

02.4

Plann

ingCit

y of

Johan

nesb

urgBo

ilers

Desig

nAp

r-08

Mar-1

2Pu

blic W

orks

7,200

01,0

001,0

002,0

002,0

00Su

b To

tal c

ity o

f Joh

anne

sbur

g26

8,62

536

,519

29,7

50 2

1,65

6 51

,406

40,0

0067

,000

2.5Ko

edoe

spoo

rt Re

gion

City O

f Tsh

wane

Reno

vatio

ns &

Upg

rading

of

the Re

giona

l Offic

eDe

sign

Apr-0

8Ma

r-12

Publi

c Work

s27

,200

01,0

001,0

00

1,000

12

,000

2.6Ko

edoe

spoo

rt La

borat

ories

City O

f Tsh

wane

Reno

vatio

ns &

Upg

rading

of

the Re

giona

l Offic

eRe

tentio

nAp

r-08

Mar-1

1Pu

blic W

orks

11,00

05,9

494,0

514,0

51

1,000

0

Sub

Tota

l city

of T

shw

ane

38,2

005,

949

5,05

10

5,05

12,

000

12,0

002.7

Amak

hosi

Moga

le Cit

y Up

gradin

g De

sign

Apr-0

8Ma

r-11

Publi

c Work

s60

,259

0 1,

644

18,91

220

,556

39,70

30

2.8Kru

gersd

orpMo

gale

City

Exten

tions

and R

enov

ation

sDe

sign

Apr-1

1Ma

r-14

Publi

c Work

s10

,500

0 -

0 0

5,000

Su

b To

tal M

ogal

e ci

ty70

,759

01,

644

18,

912

20,5

5639

,703

5,00

02.9

Veree

niging

Sedib

eng

Exten

tions

and R

enov

ation

sDe

sign

Apr-1

1Ma

r-14

Publi

c Work

s10

,500

0 -

0 0

5,000

Su

b To

tal S

edib

eng

10,5

000

0 -

00

5,00

0To

tal f

or u

pgra

ding

/ R

ehab

ilita

tion

388,

084

42,4

6836

,445

40,5

6877

,013

81,7

0389

,000

3ad

ditio

ns4

Mai

nten

ance

4.1Ra

dio Co

mmun

icatio

n - L

icens

esCit

y of

Johan

nesb

urgLic

enses

Cons

tructi

on

Apr-0

7Ma

r-10

Publi

c Work

s13

,110

11,56

025

0 25

0 25

0 50

04.2

Radio

Comm

unica

tion -

Ma

inten

ance

City o

f Joh

anne

sburg

Maint

enan

ceCo

nstru

ction

Ap

r-07

Mar-1

0Pu

blic W

orks

15,26

011

,560

800

800

800

1000

Sub

Tota

l city

of J

ohan

nesb

urg

28,3

7023

,120

01,

050

1,05

01,

050

1,50

0

•VOTE 9 TRANSPORT(NEW).indd 92 2009/02/17 7:58 AM

Page 9: Public TRanSPORT, ROadS and WORkS

93

Vote 9 - Public Transport, Roads and Works • 2009/10 - Budget Statement 3

no.

Proj

ect n

ame

Mun

icipa

lity

Proj

ect d

escr

iptio

n/

type

of s

truc

ture

Proj

ect s

taut

sPr

ojec

t dur

atio

nim

plem

entin

g ag

ent

Tota

l Pro

ject

cost

Expe

nditu

re

to d

ate

from

pr

evio

us y

ears

budg

et 2

009/

10M

TEF F

orw

ard

Estim

ates

date

: Sta

rtda

te: F

inish

Prof

essio

nal

Fees

cons

truc

tion

Tota

l ava

ilabl

eM

TEF

2001

0/11

MTE

F 20

11/1

24.3

Westh

oven

Regio

nal

Offic

eCit

y of

Johan

nesb

urgMa

inten

ance

Cons

tructi

onAp

r-08

Mar-1

3Pu

blic W

orks

15,92

011

,560

939

939

1,033

1,137

4.4Tul

isa Pa

rk Re

giona

l Of

fice

City o

f Joh

anne

sburg

Maint

enan

ceCo

nstru

ction

Apr-0

8Ma

r-13

Publi

c Work

s18

,539

11,56

01,5

041,5

041,6

541,8

194.5

Batho

Pele

Hous

eCit

y of

Johan

nesb

urgMa

inten

ance

Cons

tructi

onAp

r-08

Mar-1

3Pu

blic W

orks

15,70

011

,560

892

892

981

1,079

4.6 Ec

clesto

n Dr B

ryans

tonCit

y of

Johan

nesb

urgMa

inten

ance

Cons

tructi

onAp

r-08

Mar-1

3Pu

blic W

orks

15,26

611

,560

799

799

878

966

4.7Bo

nales

edi Tr

affic O

ffice

City o

f Joh

anne

sburg

Maint

enan

ceCo

nstru

ction

Apr-0

8Ma

r-13

Publi

c Work

s11

,820

11,56

056

5662

684.8

Regio

nal O

ffice S

oweto

City o

f Joh

anne

sburg

Maint

enan

ceCo

nstru

ction

Apr-0

8Ma

r-13

Publi

c Work

s14

,393

11,56

061

161

167

273

9Su

b To

tal c

ity o

f Joh

anne

sbur

g91

,639

69,3

600

4,80

04,

800

5,28

05,

808

4.9Kru

gersd

orp Ro

ads

Offic

eMo

gale

City

Maint

enan

ceCo

nstru

ction

Apr-0

8Ma

r-13

Publi

c Work

s43

494

9410

311

3Su

b To

tal M

ogal

e ci

ty43

40

094

9410

311

34.1

Vaald

amSe

diben

g Metr

oMa

inten

ance

Cons

tructi

onAp

r-08

Mar-1

3Pu

blic W

orks

11,78

011

,560

4747

5257

4.11

Veree

niging

Traffi

c Se

rvice

Sedib

eng M

etro

Maint

enan

ceCo

nstru

ction

Apr-0

8Ma

r-13

Publi

c Work

s11

,780

11,56

047

4752

574.1

2He

idelbe

rg Ro

ads O

ffice

Sedib

eng M

etro

Maint

enan

ceCo

nstru

ction

Apr-0

8Ma

r-13

Publi

c Work

s13

,919

11,56

050

850

855

961

54.1

3He

idelbe

rg Tra

ffic

Servi

cesSe

diben

g Metr

oMa

inten

ance

Cons

tructi

onAp

r-08

Mar-1

3Pu

blic W

orks

12,21

311

,560

141

141

155

170

4.14

Meye

rton W

eighb

ridge

Sedib

eng M

etro

Maint

enan

ceCo

nstru

ction

Apr-0

8Ma

r-13

Publi

c Work

s12

,213

11,56

014

114

115

517

04.1

5Ve

reenig

ing Ro

ads

Offic

eSe

diben

g Metr

oMa

inten

ance

Cons

tructi

onAp

r-08

Mar-1

3Pu

blic W

orks

11,86

611

,560

6666

7380

Sub

Tota

l Sed

iben

g73

,771

69,3

600

950

950

1,04

51,

150

4.16

GPG

Build

ing an

d Old

Poyn

tons

City O

f Tsh

wane

Maint

enan

ceCo

nstru

ction

Apr-0

8Ma

r-13

Publi

c Work

s21

,586

11,56

02,1

602,1

602,3

762,6

144.1

7Ko

edoe

spoo

rt Ro

ads

Offic

eCit

y Of T

shwa

neMa

inten

ance

Cons

tructi

onAp

r-08

Mar-1

3Pu

blic W

orks

14,39

311

,560

611

611

672

739

4.18

Derde

poort

Road

s Of

fice

City O

f Tsh

wane

Maint

enan

ceCo

nstru

ction

Apr-0

8Ma

r-13

Publi

c Work

s11

,994

11,56

094

9410

311

34.1

9Ha

mman

skraa

l Roa

ds

Camp

City O

f Tsh

wane

Maint

enan

ceCo

nstru

ction

Apr-0

8Ma

r-13

Publi

c Work

s11

,994

11,56

094

9410

311

34.2

Pretor

ia: St

ate Th

eatre

City O

f Tsh

wane

Maint

enan

ceCo

nstru

ction

Apr-0

8Ma

r-13

Publi

c Work

s12

,867

11,56

028

228

231

034

14.2

1Pre

toria

Regio

nal O

ffice

/Pret

oria R

igo Co

urt

and A

BET

City O

f Tsh

wane

Maint

enan

ceCo

nstru

ction

Apr-0

8Ma

r-13

Publi

c Work

s

17,01

211

,560

1,175

1,175

1,292

1,422

•VOTE 9 TRANSPORT(NEW).indd 93 2009/02/17 7:58 AM

Page 10: Public TRanSPORT, ROadS and WORkS

94

Budget Statement 3 - 2009/10 • Vote 9 - Public Transport, Roads and Works

no.

Proj

ect n

ame

Mun

icipa

lity

Proj

ect d

escr

iptio

n/

type

of s

truc

ture

Proj

ect s

taut

sPr

ojec

t dur

atio

nim

plem

entin

g ag

ent

Tota

l Pro

ject

cost

Expe

nditu

re

to d

ate

from

pr

evio

us y

ears

budg

et 2

009/

10M

TEF F

orw

ard

Estim

ates

date

: Sta

rtda

te: F

inish

Prof

essio

nal

Fees

cons

truc

tion

Tota

l ava

ilabl

eM

TEF

2001

0/11

MTE

F 20

11/1

24.2

2Sw

artKo

p Roa

ds O

ffice

City O

f Tsh

wane

Maint

enan

ceCo

nstru

ction

Apr-0

8Ma

r-13

Publi

c Work

s11

,994

11,56

094

9410

311

34.2

3Ro

odep

laat D

amCit

y Of T

shwa

neMa

inten

ance

Cons

tructi

onAp

r-08

Mar-1

3Pu

blic W

orks

12,65

211

,560

235

235

259

285

4.24

Boek

enho

utkloo

f Traf

fic

Colle

geCit

y Of T

shwa

neMa

inten

ance

Cons

tructi

onAp

r-08

Mar-1

3Pu

blic W

orks

12,65

211

,560

235

235

259

285

4.25

D F M

alan B

uildin

gCit

y Of T

shwa

neMa

inten

ance

Cons

tructi

onAp

r-08

Mar-1

3Pu

blic W

orks

11,78

011

,560

4747

5257

4.26

Karel

Scho

eman

Bu

ilding

City O

f Tsh

wane

Maint

enan

ceCo

nstru

ction

Apr-0

8Ma

r-13

Publi

c Work

s14

,174

11,56

056

356

362

068

14.2

7Ba

psfon

tein

Weigh

bridg

eCit

y Of T

shwa

neMa

inten

ance

Cons

tructi

onAp

r-08

Mar-1

3Pu

blic W

orks

11,72

811

,560

3636

4044

4.28

Grand

Centr

al Wo

rksCit

y Of T

shwa

neMa

inten

ance

Cons

tructi

onAp

r-08

Mar-1

3Pu

blic W

orks

11,73

411

,560

3737

4145

Sub

Tota

l city

of T

shw

ane

176,

561

00

5,66

35,

663

6,22

96,

852

4.29

Ekga

ngala

Traffi

c Offic

eKu

ngwi

niMa

inten

ance

Cons

tructi

onAp

r-08

Mar-1

3Pu

blic W

orks

12,91

311

,560

292

292

321

353

4.3Bro

nkho

rstsp

ruit R

oads

Of

fice

Kung

wini

Maint

enan

ceCo

nstru

ction

Apr-0

8Ma

r-13

Publi

c Work

s12

,127

11,56

012

212

213

414

8Su

b To

tal k

ungw

ini

25,0

400

- 41

441

445

550

04.3

1Ga

ranku

wa O

ffice

Garan

kuwa

Maint

enan

ceCo

nstru

ction

Apr-0

8Ma

r-13

Publi

c Work

s4,7

991,0

341,0

341,1

371,2

514.3

2Ga

ranku

wa H

ouses

Garan

kuwa

Maint

enan

ceCo

nstru

ction

Apr-0

8Ma

r-13

Publi

c Work

s2,3

9951

751

756

962

6Su

b To

tal G

aran

kuw

a7,1

980

01,

551

1,55

11,

706

1,87

74.3

3Re

giona

l Offic

e Spri

ngs

Ekurh

uleni

Metro

Maint

enan

ceCo

nstru

ction

Apr-0

8Ma

r-13

Publi

c Work

s12

,520

11,56

020

720

722

725

04.3

4Be

noni

Traffic

Offic

eEk

urhule

ni Me

troMa

inten

ance

Cons

tructi

onAp

r-08

Mar-1

3Pu

blic W

orks

12,08

111

,560

112

112

123

136

4.35

Beno

ni Ro

ads O

ffice

Ekurh

uleni

Metro

Maint

enan

ceCo

nstru

ction

Apr-0

8Ma

r-13

Publi

c Work

s12

,081

11,56

011

211

212

313

6Su

b To

tal E

kurh

ulen

i Met

ro36

,681

34,6

800

431

431

474

522

Tota

l for

Mai

nten

ance

439,

693

196,

520

014

,952

14,9

5216

,343

18,3

23GR

and

TOTa

l - W

ORkS

840,

837

250,

548

36,4

4557

,020

93,4

6598

,046

107,

323

•VOTE 9 TRANSPORT(NEW).indd 94 2009/02/17 7:58 AM

Page 11: Public TRanSPORT, ROadS and WORkS

95

Vote 9 - Public Transport, Roads and Works • 2009/10 - Budget Statement 3

no.

Proj

ect n

ame

dist

rict /

Re

gion

Mun

icipa

lity

Proj

ect

desc

riptio

n/ ty

pe

of st

ruct

ure

Proj

ect d

urat

ion

Prog

ram

me

Tota

l Pro

ject

cost

Expe

nditu

re

to 2

007/

08

finan

cial

year

Estim

ated

ex

pend

iture

20

08/0

9 fin

ancia

l ye

ar

budg

et 2

009/

10M

TEF F

orw

ard

Estim

ates

date

: Sta

rtda

te: F

inish

Prof

essio

nal

Fees

cons

truc

tion

Tota

l av

aila

ble

MTE

F 20

10/1

1M

TEF

2011

/12

aup

grad

ing/

Reha

bilit

atio

n

1Ca

yman

road

(D25

29)

Phas

e 2Ve

reenin

gCit

y of J

o’Burg

Tarrin

g of C

ayma

n Rd

as an

acces

s roa

d to t

he Ey

e of

Africa

Deve

lopme

nt (p

hase

2)

Mar-2

009

Feb-2

010

3

34,90

01,3

003,6

0030

,000

33,60

00

0

2R5

5 (K7

1) Ph

ase 1

Pretor

iaTsh

wane

The r

ehab

of

Voort

rekke

r road

(R

55) b

etwee

n the

N14

and

Wierd

a Rd (

M10,

Sund

erlan

dridg

e) -

P66/

1

Oct-2

007

Oct-2

009

3

230,1

7726

,500

112,0

089,8

2281

,847

91,66

90

0

3R5

5 (K7

1) Ph

ase 2

Pretor

iaTsh

wane

The r

ehab

of

Voort

rekke

r road

(R

55) b

etwee

n Wi

erda R

d (M1

0, Su

nderl

andri

dge)

an

d Main

Rd (M

26,

Laud

ium) -

P66/

1

Feb-2

010

Nov-2

011

3

241,1

2018

01,5

001,6

8014

3,920

95,52

0

4Ad

cock

road

(K15

) Ph

ase 2

Kruge

rsdorp

City o

f Jo’B

urgPh

ase 2

- Dou

bling

of

Adco

ck St

(R55

8)

from

Lerat

ong (

R41)

to

Dobs

onvill

e K10

2

Oct-2

007

Aug-2

009

3

273,8

9438

,000

138,7

9010

,404

86,70

097

,104

00

5Ad

cock

(K15

) Pha

se 3

Kruge

rsdorp

City o

f Jo’B

urgPh

ase 3

- Dou

bling

of

Adco

ck St

(R55

8)

from

Dobs

onvill

e to

Protea

Glen

Mar-2

010

Sep-2

011

3

243,8

0015

01,5

001,6

5016

1,400

80,75

0

6Ma

libon

gwe d

rive

(K29

) Pha

se 2

Kruge

rsdorp

City o

f Jo’B

urgDo

ublin

g of

Malib

ongw

e Driv

e (R

512)

from

Cosm

o Cit

y to t

he N

14

Apr-2

008

Oct-2

009

3

119,1

5958

,119

6,540

54,50

061

,040

00

Det

ails

of

infr

ast

ruct

ure

exp

enditu

re b

y ca

teg

ory

: RO

AD

S

•VOTE 9 TRANSPORT(NEW).indd 95 2009/02/17 7:58 AM

Page 12: Public TRanSPORT, ROadS and WORkS

96

Budget Statement 3 - 2009/10 • Vote 9 - Public Transport, Roads and Works

no.

Proj

ect n

ame

dist

rict /

Re

gion

Mun

icipa

lity

Proj

ect

desc

riptio

n/ ty

pe

of st

ruct

ure

Proj

ect d

urat

ion

Prog

ram

me

Tota

l Pro

ject

cost

Expe

nditu

re

to 2

007/

08

finan

cial

year

Estim

ated

ex

pend

iture

20

08/0

9 fin

ancia

l ye

ar

budg

et 2

009/

10M

TEF F

orw

ard

Estim

ates

date

: Sta

rtda

te: F

inish

Prof

essio

nal

Fees

cons

truc

tion

Tota

l av

aila

ble

MTE

F 20

10/1

1M

TEF

2011

/12

7Ma

libon

gwe (

K29)

ph

ase 3

Kruge

rsdorp

Moga

le Cit

yDo

ublin

g of

Malib

ongw

e Driv

e (R

512)

from

N14

to La

nseri

a Airp

ort

(Ash

anti R

d - D2

339)

Feb-2

009

Mar-2

011

3

378,5

0018

,500

5,200

143,5

0014

8,700

202,8

008,5

00

8K1

02 Ph

ase 3

Kruge

rsdorp

City o

f Jo’B

urgCo

nstru

ction

of

Hope

well R

d from

Ma

iman

e Dr to

56th

Stree

t

Apr-2

011

Mar-2

012

3

61,00

00

061

,000

9K1

02 Ph

ase 4

Kruge

rsdorp

City o

f Jo’B

urgNe

w Co

nstru

ction

from

56th

St to

Rood

epoo

rt Rd

(M77

)

Jun-20

12Jan

-2014

3

120,0

000

0

10Wi

lliam

Nicol

(K46

) Ph

ase 2

Kruge

rsdorp

City o

f Jo’B

urgDo

ublin

g of W

illiam

Nicol

(R51

1) fro

m Wi

tkopp

en Rd

(R56

4)

to PW

V5

May-2

009

May-2

011

3

145,1

6036

03,0

003,3

6013

9,600

2,200

11Wi

lliam

Nicol

(K46

) Ph

ase 3

Kruge

rsdorp

City o

f Jo’B

urgDo

ublin

g of W

illiam

Nicol

(R51

1) fro

m PW

V5 to

Diep

sloot

(N14

)

Jun-20

11Ma

r-201

33

280,0

000

065

,000

12D7

81 Ph

ase 1

Beno

niEk

urhule

niStr

uctur

es for

up

gradin

g of th

e gra

vel ro

ad to

a s

urfac

ed ro

ad

at Ela

ndsfo

ntein

Small

holdi

ngs

Apr-2

011

Mar-2

012

3

25,00

00

25,00

0

13D7

81 Ph

ase 2

Beno

niEk

urhule

niUp

gradin

g of th

e gra

vel ro

ad to

a s

urfac

ed ro

ad

at Ela

ndsfo

ntein

Small

holdi

ngs

Apr-2

012

Mar-2

013

3

34,00

00

•VOTE 9 TRANSPORT(NEW).indd 96 2009/02/17 7:58 AM

Page 13: Public TRanSPORT, ROadS and WORkS

97

Vote 9 - Public Transport, Roads and Works • 2009/10 - Budget Statement 3

no.

Proj

ect n

ame

dist

rict /

Re

gion

Mun

icipa

lity

Proj

ect

desc

riptio

n/ ty

pe

of st

ruct

ure

Proj

ect d

urat

ion

Prog

ram

me

Tota

l Pro

ject

cost

Expe

nditu

re

to 2

007/

08

finan

cial

year

Estim

ated

ex

pend

iture

20

08/0

9 fin

ancia

l ye

ar

budg

et 2

009/

10M

TEF F

orw

ard

Estim

ates

date

: Sta

rtda

te: F

inish

Prof

essio

nal

Fees

cons

truc

tion

Tota

l av

aila

ble

MTE

F 20

10/1

1M

TEF

2011

/12

14Be

yers

Naud

e (D3

74)

Kruge

rsdorp

Johan

nesb

urgUp

gradin

g of B

eyers

Na

ude (

D374

) into

a d

ual c

arriag

eway

fro

m Ho

neyd

ew to

Za

ndsp

ruit

Mar-2

009

Oct-2

010

3

116,2

807,0

8059

,000

66,08

050

,200

15P1

26/1

Phas

e 1Kru

gersd

orpWe

st Ra

ndCo

nstru

ction

of

struc

tures

for

Interc

hang

e with

the

N14 a

t Pine

have

n

Feb-2

010

Mar-2

011

3

30,15

015

01,5

001,6

5028

,500

16P1

26/1

Phas

e 2Kru

gersd

orpWe

st Ra

ndNe

w roa

d con

struc

tion

of the

inter

chan

ge

with

the N

14 at

Pin

ehav

en

Feb-2

012

Nov-2

013

3

290,0

000

95,00

0

17Ne

derve

en ro

ad (P

4-1)

Beno

niSe

diben

gCa

pacit

y imp

rovem

ent

on N

ederv

een r

oad

(R10

3) be

twee

n Le

onda

leFors

dick R

d (R

554)

and B

arry

Maria

s Rd (

R21)

Jan-20

11No

v-201

23

195,0

000

016

0,000

18Le

nasia

Rail C

rossin

gKru

gersd

orpJoh

anne

sburg

Cons

tructi

on of

K142

on

new

align

ment

acros

s rail

way l

ine

to im

prove

acces

s to

Lena

sia

Apr-2

009

Mar-2

013

3

120,0

002,0

002,0

0020

,000

60,00

0

19R8

2 (P1

/1) O

ld Ve

reenig

ing ro

adVe

reenig

ingSe

diben

gDo

ublin

g of O

ld Ve

renigi

ng Ro

ad

betw

een E

ikenh

of (ro

ad D7

66) a

nd

Walke

rville

(roa

d D1

073)

Feb-2

010

Mar-2

012

3

157,3

6018

01,5

001,6

800

67,68

0

Tota

l:upg

radi

ng/r

ehab

ilita

tion

3,09

5,50

064

,500

328,

717

45,6

6646

4,54

751

0,21

374

6,42

072

0,65

0

•VOTE 9 TRANSPORT(NEW).indd 97 2009/02/17 7:58 AM

Page 14: Public TRanSPORT, ROadS and WORkS

98

Budget Statement 3 - 2009/10 • Vote 9 - Public Transport, Roads and Works

no.

Proj

ect n

ame

dist

rict /

Re

gion

Mun

icipa

lity

Proj

ect

desc

riptio

n/ ty

pe

of st

ruct

ure

Proj

ect d

urat

ion

Prog

ram

me

Tota

l Pro

ject

cost

Expe

nditu

re

to 2

007/

08

finan

cial

year

Estim

ated

ex

pend

iture

20

08/0

9 fin

ancia

l ye

ar

budg

et 2

009/

10M

TEF F

orw

ard

Estim

ates

date

: Sta

rtda

te: F

inish

Prof

essio

nal

Fees

cons

truc

tion

Tota

l av

aila

ble

MTE

F 20

10/1

1M

TEF

2011

/12

Tab

le B

.5(a

): D

etails

of

infr

ast

ruct

ure

exp

end

iture

by

cate

gory

- r

oad

sBo

lani R

oad

Johan

nesb

urgJoh

anne

sburg

Surfa

cing a

nd

upgra

ding o

f Bola

ni Ro

ad in

Sowe

to

Mar-2

009

Mar-2

010

3

64,35

09,3

5055

,000

64,35

0

The u

pgrad

ing of

Road

A,

Road

B an

d Roa

d C a

nd st

orm w

ater

draina

ge

Moga

le Cit

yMo

hlake

ngTh

e upg

rading

of

grave

l road

s to

surfa

ced ra

ods a

nd

storm

wate

r drai

nage

Mar-2

009

Mar-2

010

3

24,21

93,5

1920

,700

24,21

9

1Co

nstru

ction

of 10

.25

km W

alkwa

ysMo

gale

City

Mohla

keng

Cons

tructi

on of

10.25

km

Walk

ways

Mar-2

009

Mar-2

010

39,8

9425

51,5

001,7

558,1

39

2Sa

crame

nto st

, Gile

bert

Tsitsa

and c

onstr

uctio

n of

walkw

ays

Moga

le Cit

yKa

giso

Epgra

ding o

f sa

crame

nto st

, Gile

bert

Tsitsa

to su

rfaced

roa

ds an

d con

struc

tion

of wa

lkway

s

Mar-2

009

Mar-2

010

3

6,084

884

5,200

6,084

3Le

khuru

stree

tRe

filwe

Refilw

eSu

rfacin

g of L

ekhu

ru str

eet

Mar-2

009

Mar-2

010

35,4

2978

94,6

405,4

29

4Po

nyan

e stre

etRe

filwe

Refilw

ePo

nyan

e stre

etMa

r-200

9Ma

r-201

03

5,288

768

4,520

5,288

5Kw

a Tem

a (Riv

er sid

e roa

ds up

gradin

g &

storm

water

)

Ekurh

uleni

Kwath

ema

Upgra

ding o

f va

rious

road

s in

Kwath

ema (

River

Side)

, Mon

amets

e, Mo

raped

i, More

, Mo

hlala,

Mote

ane,

morak

e, mo

lotu,

Moko

u, Mo

kate,

Mo

tlabi

stree

ts etc

.

Mar-2

009

Mar-2

010

3

39,78

05,7

8034

,000

39,78

0

6M

Exten

sions

road

sTsh

wane

Sosh

angu

veUp

gradin

g of M

Ex

tensio

ns ro

ads

Mar-2

009

Mar-2

010

325

,531

3,710

21,82

125

,531

7L s

ection

road

sTsh

wane

Sosh

angu

veUp

gradin

g of L

secti

on

roads

Mar-2

009

Mar-2

010

362

,778

3,682

21,65

625

,338

37,44

0

•VOTE 9 TRANSPORT(NEW).indd 98 2009/02/17 7:58 AM

Page 15: Public TRanSPORT, ROadS and WORkS

99

Vote 9 - Public Transport, Roads and Works • 2009/10 - Budget Statement 3

no.

Proj

ect n

ame

dist

rict /

Re

gion

Mun

icipa

lity

Proj

ect

desc

riptio

n/ ty

pe

of st

ruct

ure

Proj

ect d

urat

ion

Prog

ram

me

Tota

l Pro

ject

cost

Expe

nditu

re

to 2

007/

08

finan

cial

year

Estim

ated

ex

pend

iture

20

08/0

9 fin

ancia

l ye

ar

budg

et 2

009/

10M

TEF F

orw

ard

Estim

ates

date

: Sta

rtda

te: F

inish

Prof

essio

nal

Fees

cons

truc

tion

Tota

l av

aila

ble

MTE

F 20

10/1

1M

TEF

2011

/12

8Tw

enty

stree

t, Ma

ngen

a, Wa

za,

Phan

yane

, Phe

tla,

Mado

nsela

stree

ts

Tshwa

neMa

melod

iUp

gradin

g of

Mame

lodi W

est ro

ads

to su

rface

Mar-2

009

Mar-2

010

3

44,46

62,7

9816

,458

19,25

625

,210

9Sa

fatsa

Stree

tSe

diben

gSh

arpvill

eSu

rfacin

g of S

afatsa

Str

eet

Mar-2

009

Mar-2

010

34,6

8068

04,0

004,6

80

10Su

rfacin

g of R

oad 2

Ext

Sedib

eng

Sharp

ville

Surfa

cing o

f Roa

d 2 E

xtMa

r-200

9Ma

r-201

03

7,605

1,105

6,500

7,605

11Su

rfacin

g of S

akala

and

Road

DSe

diben

gSh

arpvill

eSu

rfacin

g of S

akala

an

d Roa

d DMa

r-200

9Ma

r-201

03

5,236

761

4,475

5,236

12Su

rfacin

g of R

oad A

, Ro

ad B,

Road

CSe

diben

gSh

arpvill

eSu

rfacin

g of R

oad A

, Ro

ad B,

Road

a CMa

r-200

9Ma

r-201

03

2,457

357

2,100

2,457

13Su

rfacin

g of R

oad E

, Ro

ad F,

Road

G, Ro

ad

H, Ro

ad J,

Road

k

Sedib

eng

Sharp

ville

Surfa

cing o

f Roa

d E,

Road

F, Ro

ad G,

Road

H,

Road

J, Ro

ad k

Mar-2

009

Mar-2

010

3

7,166

1,041

6,125

7,166

14Su

rfacin

g of R

oad 3

, roa

d 4, ro

ad 5

Sedib

eng

Sharp

ville

Surfa

cing o

f Roa

d 3,

road 4

, road

5Ma

r-200

9Ma

r-201

03

5,265

765

4,500

5,265

15Su

rfacin

g of ro

ad 6

and

road 7

Sedib

eng

Sharp

ville

Surfa

cing o

f road

6 an

d roa

d 7Ma

r-200

9Ma

r-201

03

8,249

1,199

7,050

8,249

16Su

rfacin

g of ro

ad 9

Sedib

eng

Sharp

ville

Surfa

cing o

f road

9Ma

r-200

9Ma

r-201

03

5,558

808

4,750

5,558

17Su

rfacin

g of ro

ad 10

&

11Se

diben

gSh

arpvill

eSu

rfacin

g of ro

ad 10

&

11Ma

r-200

9Ma

r-201

03

7,824

287

1,687

1,974

5,850

18Su

rfacin

g of ro

ad 12

&

13Se

diben

gSh

arpvill

eSu

rfacin

g of ro

ad 12

&

13Ma

r-200

9Ma

r-201

03

7,605

255

1,500

1,755

5,850

19Ro

ad 1,

2,3,4,

5Tsh

wane

Tshwa

neTh

e upg

rading

of

grave

l road

s to

surfa

ced ra

ods a

nd

storm

wate

r drai

nage

Mar-2

010

Mar-2

011

3

299,0

0090

,000

99,00

0

20Ro

ad 1,

2,3,4,

5Se

diben

gSe

diben

gTh

e upg

rading

of

grave

l road

s to

surfa

ced ra

ods a

nd

storm

wate

r drai

nage

Mar-2

010

Mar-2

011

3

263,0

0080

,000

88,00

0

•VOTE 9 TRANSPORT(NEW).indd 99 2009/02/17 7:58 AM

Page 16: Public TRanSPORT, ROadS and WORkS

100

Budget Statement 3 - 2009/10 • Vote 9 - Public Transport, Roads and Works

no.

Proj

ect n

ame

dist

rict /

Re

gion

Mun

icipa

lity

Proj

ect

desc

riptio

n/ ty

pe

of st

ruct

ure

Proj

ect d

urat

ion

Prog

ram

me

Tota

l Pro

ject

cost

Expe

nditu

re

to 2

007/

08

finan

cial

year

Estim

ated

ex

pend

iture

20

08/0

9 fin

ancia

l ye

ar

budg

et 2

009/

10M

TEF F

orw

ard

Estim

ates

date

: Sta

rtda

te: F

inish

Prof

essio

nal

Fees

cons

truc

tion

Tota

l av

aila

ble

MTE

F 20

10/1

1M

TEF

2011

/12

21Ro

ad 1,

2,3,4,

5Ek

urhule

niEk

urhule

niTh

e upg

rading

of

grave

l road

s to

surfa

ced ra

ods a

nd

storm

wate

r drai

nage

Mar-2

010

Mar-2

011

3

101,0

0030

,000

33,00

0

22Ro

ad 1,

2,3,4,

5me

tswed

ingme

tswed

ingTh

e upg

rading

of

grave

l road

s to

surfa

ced ra

ods a

nd

storm

wate

r drai

nage

Mar-2

010

Mar-2

011

3

67,00

020

,000

22,00

0

23Ro

ad 1,

2,3,4,

5We

stran

dWe

stran

dTh

e upg

rading

of

grave

l road

s to

surfa

ced ra

ods a

nd

storm

wate

r drai

nage

Mar-2

010

Mar-2

011

3

165,0

0050

,000

55,00

0

24Ro

ad 1,

2,3,4,

5Joh

anne

sburg

Johan

nesb

urgTh

e upg

rading

of

grave

l road

s to

surfa

ced ra

ods a

nd

storm

wate

r drai

nage

Mar-2

010

Mar-2

011

3

103,0

0030

,000

33,00

0

Tota

l:upg

radi

ng (E

PWP

up S

calin

g)1,

347,

462

38,7

9122

8,18

226

6,97

338

2,48

933

0,00

0

25TO

Tal

4,44

2,96

264

,500

328,

717

84,4

5769

2,72

977

7,186

1,12

8,90

91,

050,

650

•VOTE 9 TRANSPORT(NEW).indd 100 2009/02/17 7:58 AM

Page 17: Public TRanSPORT, ROadS and WORkS

101

Vote 9 - Public Transport, Roads and Works • 2009/10 - Budget Statement 3

no.

Proj

ect

nam

eM

unici

palit

yPr

ojec

t des

crip

tion/

ty

pe o

f str

uctu

rePr

ojec

t st

atus

Proj

ect d

urat

ion

Prog

ram

me

Fund

ing

sour

ceim

plem

entin

g ag

ent

Tota

l Pr

ojec

t co

st

Expe

nditu

re

to 2

007/

08

finan

cial

year

Estim

ated

Ex

pend

iture

20

08/0

9

budg

et 2

009/

10M

TEF F

orw

ard

Estim

ates

date

: Sta

rtda

te:

Finish

Prof

essio

nal

Fees

cons

truc

tion

Tota

l av

aila

ble

MTE

F 20

010/

11M

TEF

2011

/12

4.1

Mai

nten

ance

: Res

eals

4.1.1

P40/

1EK

URHU

LENI

Resea

l and

Reha

bilita

tion

of 6.

04 km

Cons

tructi

onNo

v-08

Nov-0

93

PROV

INCE

GPTR

W 47

,000

21,00

03,0

0023

,000

26,00

04.1

.2P6

7/1

EKUR

HULE

NIRe

seal a

nd Re

habil

itatio

n of

17.0k

mCo

nstru

ction

Jan-09

Jan-10

3PR

OVINC

EGP

TRW

49,00

010

,000

4,000

35,00

039

,000

4.1.3

P68/

1EK

URHU

LENI

Resea

l and

Reha

bilita

tion

of 11

.92 km

Cons

tructi

onNo

v-08

Jan-10

3PR

OVINC

EGP

TRW

85,00

033

,000

7,000

45,00

052

,000

Tota

l :RE

SEal

S18

1,00

064

,000

14,0

0010

3,00

011

7,00

04.

2M

aint

enan

ce: R

outin

e (c

ontr

actu

al)

4.2.1

605 K

m RO

ADS

EKUR

HULE

NIRo

utine

Road

Main

tenan

ce of

Provin

cial R

oads

in

50Km

Work

Pack

ages

Cons

tructi

onNo

v-08

Mar-1

23

PROV

INCE

GPTR

W

262,0

0830

,996

9,76

1 5,

495

15,25

5 48

,762

48,76

2 4.2

.251

0 Km

ROAD

SME

TSWE

DING

Routi

ne Ro

ad M

ainten

ance

of Pro

vincia

l Roa

ds in

50

Km W

ork Pa

ckag

es

Cons

tructi

onNo

v-08

Mar-1

23

PROV

INCE

GPTR

W

274,0

0532

,985

10,49

617

,989

28,48

5 50

,760

50,76

04.2

.385

7 Km

ROAD

SWE

ST RA

NDRo

utine

Road

Main

tenan

ce of

Provin

cial R

oads

in

50Km

Work

Pack

ages

Cons

tructi

onNo

v-08

Mar-1

23

PROV

INCE

GPTR

W

354,0

2433

,984

11,98

89,7

56 21

,744

66,25

866

,258

4.2.3

772 K

m RO

ADS

TSHW

ANE

Routi

ne Ro

ad M

ainten

ance

of Pro

vincia

l Roa

ds in

50

Km W

ork Pa

ckag

es

Cons

tructi

onNo

v-08

Mar-1

23

PROV

INCE

GPTR

W

313,9

73

44,01

9 12

,757

23,26

9 36

,026

55,46

2 55

,462

4.2.5

553 K

m RO

ADS

SEDIB

ENG

Routi

ne Ro

ad M

ainten

ance

of Pro

vincia

l Roa

ds in

50

Km W

ork Pa

ckag

es

Cons

tructi

onNo

v-08

Mar-1

23

PROV

INCE

GPTR

W

281,9

95

34,00

6 11

,246

18,74

3 29

,988

52,00

1 52

,001

Tota

l : R

OuTi

nE M

ainT

Enan

cE c

OnTR

acTu

al 1

,486

,005

1

75,9

90

56,

247

75,

251

131

,498

2

73,2

43

273

,243

4.

3M

aint

enan

ce: R

outin

e (d

epar

tmen

tal)

4.3.1

589 K

m RO

ADS

EKUR

HULE

NIRo

utine

main

tenan

ce of

provin

cial ro

ads

Apr-0

9Ma

r-12

396

,500

31,50

014

,000

14,00

015

,000

17,00

04.3

.232

5 Km

ROAD

SME

TSWE

DING

Routi

ne m

ainten

ance

of pro

vincia

l road

s Ap

r-09

Mar-1

23

54,70

019

,700

8,000

8,000

8,000

9,000

4.3.3

296 K

m RO

ADS

WEST

RAND

Routi

ne m

ainten

ance

of pro

vincia

l road

s Ap

r-09

Mar-1

23

105,4

0036

,400

15,00

015

,000

16,00

018

,000

Det

ails

of

infr

ast

ruct

ure

exp

enditu

re b

y ca

teg

ory

: RO

AD

S M

AIN

TEN

AN

CE

•VOTE 9 TRANSPORT(NEW).indd 101 2009/02/17 7:58 AM

Page 18: Public TRanSPORT, ROadS and WORkS

102

Budget Statement 3 - 2009/10 • Vote 9 - Public Transport, Roads and Works

no.

Proj

ect

nam

eM

unici

palit

yPr

ojec

t des

crip

tion/

ty

pe o

f str

uctu

rePr

ojec

t st

atus

Proj

ect d

urat

ion

Prog

ram

me

Fund

ing

sour

ceim

plem

entin

g ag

ent

Tota

l Pr

ojec

t co

st

Expe

nditu

re

to 2

007/

08

finan

cial

year

Estim

ated

Ex

pend

iture

20

08/0

9

budg

et 2

009/

10M

TEF F

orw

ard

Estim

ates

date

: Sta

rtda

te:

Finish

Prof

essio

nal

Fees

cons

truc

tion

Tota

l av

aila

ble

MTE

F 20

010/

11M

TEF

2011

/12

4.3.4

264 K

m RO

ADS

TSHW

ANE

Routi

ne m

ainten

ance

of pro

vincia

l road

s Ap

r-09

Mar-1

23

105,8

0039

,800

14,00

014

,000

16,00

017

,000

4.3.5

458 K

m RO

ADS

SEDIB

ENG

Routi

ne m

ainten

ance

of pro

vincia

l road

s Ap

r-09

Mar-1

23

82,50

023

,500

13,00

013

,000

14,00

015

,000

Tota

l : R

OuTi

nE M

ainT

Enan

cE d

EPaR

TMEn

Tal

444,

900

64,0

0064

,000

69,0

0076

,000

TOTa

l : M

ainT

Enan

cE

2,11

1,90

50

239,

990

70,2

47.0

024

2,25

131

2,49

834

2,24

334

9,24

3

no.

Proj

ect

nam

eM

unici

palit

yPr

ojec

t des

crip

tion/

type

of

stru

ctur

ePr

ojec

t st

atus

Proj

ect d

urat

ion

Prog

ram

me

Fund

ing

sour

ceim

plem

entin

g ag

ent

Tota

l Pro

ject

cost

Expe

nditu

re

to d

ate

from

pr

evio

us

year

s

budg

et 2

009/

10M

TEF F

orw

ard

Estim

ates

date

: Sta

rtda

te: F

inish

Prof

essio

nal

Fees

cons

truc

tion

Tota

l av

aila

ble

MTE

F 20

10/1

1M

TEF

2011

/12

1ne

w c

onst

ruct

ion

1.1K2

9 Tax

i rank

Thab

o Mbe

ki Vil

lage

Cons

tructi

on of

an in

termo

dal

facilit

y / Ta

xi Ra

nkDe

sign

Jun-20

09Jan

-2010

4Dis

cretio

nary

DPTR

&W16

,000

0 1,9

2014

,080

16,00

01.2

Willia

m Nic

ol /

K46 T

axi

Rank

City o

f Jo’B

urgCo

nstru

ction

of an

inter

moda

l fac

ility /

Taxi

Rank

Feas

ibility

Feb-2

010

Oct-2

010

4Dis

cretio

nary

DPTR

&W

18,00

00

1,000

01,0

0017

,000

1.3Be

yers

Naud

e Cit

y of J

o’Burg

Cons

tructi

on of

an in

termo

dal

facilit

y / Ta

xi Ra

nkDe

sign

Jul-20

09Jan

-2010

4Dis

cretio

nary

DPTR

&W18

,000

0 2,1

6015

,840

18,00

01.4

Boipa

tong

Taxi R

ank

City o

f Jo’B

urgCo

nstru

ction

of an

inter

moda

l fac

ility /

Taxi

Rank

Desig

n Au

g-200

9Ma

r-201

04

Discre

tiona

ryDP

TR&W

12,00

00

1,440

10,56

012

,000

1.5R5

5 Kya

lami

Taxi R

ank

City o

f Jo’B

urgco

nstru

ction

of th

e Kya

lami ta

xi Ra

nkDe

sign

Sep-2

009

Mar-2

010

4Dis

cretio

nary

DPTR

&W18

,000

0 1,6

8016

,320

18,00

0To

tal n

ew c

onst

ruct

ion

82,0

000

8,20

056

,800

65,0

0017

,000

0

2up

grad

e - i

ntem

odal

Facil

ities

2.1

Nasre

c int

ermod

al fac

ilities

City o

f Jo’B

urgNa

srec S

tation

De

sign

Jun-09

Mar-1

04

DPTR

&W

1,300

010

01,2

001,3

000

02.2

SPTN

facili

ties

Moga

le Cit

yBu

s She

lters,

taxi

curbs

and N

MT

facilit

iesFe

asibi

lityJun

-09Ma

r-10

4DP

TR&W

3,600

040

03,2

003,6

000

0

Det

ails

of

paym

ents

for

infr

ast

ruct

ure

by

cate

gory

: IN

TEG

RA

TED

PU

BLIC

TRA

NSP

ORT

SYST

EMS

AN

D S

PEC

IAL

PRO

JEC

TS

•VOTE 9 TRANSPORT(NEW).indd 102 2009/02/17 7:58 AM

Page 19: Public TRanSPORT, ROadS and WORkS

103

Vote 9 - Public Transport, Roads and Works • 2009/10 - Budget Statement 3

no.

Proj

ect

nam

eM

unici

palit

yPr

ojec

t des

crip

tion/

type

of

stru

ctur

ePr

ojec

t st

atus

Proj

ect d

urat

ion

Prog

ram

me

Fund

ing

sour

ceim

plem

entin

g ag

ent

Tota

l Pro

ject

cost

Expe

nditu

re

to d

ate

from

pr

evio

us

year

s

budg

et 2

009/

10M

TEF F

orw

ard

Estim

ates

date

: Sta

rtda

te: F

inish

Prof

essio

nal

Fees

cons

truc

tion

Tota

l av

aila

ble

MTE

F 20

10/1

1M

TEF

2011

/12

2.3Or

lando

Sta

tion p

ublic

trans

port

facilit

ies

impro

veme

nt

City o

f Jo’B

urgOr

lando

Stati

on

Desig

nJul

-09Ma

r-10

4DP

TR&W

1,300

010

01,2

001,3

000

02.4

Loftu

s im

prove

ment

of int

ermod

al fac

ilities

City o

f Tsh

wane

Loftu

s Stat

ion

Desig

nAu

g-09

Mar-1

04

DPTR

&W

1,300

010

01,2

001,3

000

02.5

Stretf

ord

impro

veme

nt of

interm

odal

facilit

ies

Stretf

ord st

ation

De

sign

Sep-0

9Ma

r-10

4DP

TR&W

1,300

010

01,2

001,3

000

02.7

Ikhwe

zi Sta

tion

impro

veme

nt of

interm

odal

facilit

ies

City o

f Jo’B

urgIkw

ezi S

tation

Desig

nNo

v-09

Mar-1

04

DPTR

&W

1,300

010

01,2

001,3

000

02.8

SPTN

facili

ties

City o

f Tsh

wane

Bus S

helte

rs, ta

xi cu

rbs an

d NMT

fac

ilities

Feas

ibility

Dec-0

9Ma

r-10

4DP

TR&W

13,50

00

1,500

12,00

013

,500

2.9Ne

w Ca

nada

Sta

tion

impro

veme

nt of

interm

odal

facilit

ies

City o

f Jo’B

urgNe

w Ca

nada

Stati

onDe

sign

May-0

9Ma

r-10

4DP

TR&W

2,200

020

02,0

002,2

002.1

0’SP

TN fa

cilitie

sCit

y of J

oburg

Bus S

helte

rs, ta

xi cu

rbs an

d NMT

fac

ilities

Feas

ibility

May-0

9Ma

r-10

4DP

TR&W

6,800

080

06,0

006,8

002.1

1Tem

bisa

impro

veme

nt of

interm

odal

facilit

ies

Ekurh

uleni

Tembis

a stat

ionDe

sign

May-0

9Ma

r-10

4DP

TR&W

2,200

020

02,0

002,2

002.1

2Tsh

wane

Sta

tion

impro

veme

nt of

interm

odal

facilit

ies

City o

ftshw

ane

Pretor

ia/ Ts

hwan

e stat

ion m

ajor

upgra

des

Desig

nMa

y-09

Mar-1

04

DPTR

&W

7,300

080

06,5

007,3

00

•VOTE 9 TRANSPORT(NEW).indd 103 2009/02/17 7:58 AM

Page 20: Public TRanSPORT, ROadS and WORkS

104

Budget Statement 3 - 2009/10 • Vote 9 - Public Transport, Roads and Works

no.

Proj

ect

nam

eM

unici

palit

yPr

ojec

t des

crip

tion/

type

of

stru

ctur

ePr

ojec

t st

atus

Proj

ect d

urat

ion

Prog

ram

me

Fund

ing

sour

ceim

plem

entin

g ag

ent

Tota

l Pro

ject

cost

Expe

nditu

re

to d

ate

from

pr

evio

us

year

s

budg

et 2

009/

10M

TEF F

orw

ard

Estim

ates

date

: Sta

rtda

te: F

inish

Prof

essio

nal

Fees

cons

truc

tion

Tota

l av

aila

ble

MTE

F 20

10/1

1M

TEF

2011

/12

2.15

Mame

lodi

impro

veme

nt of

interm

odal

facilit

ies

City o

f Tsh

wane

Mame

lodi s

taion

De

sign

May-0

9Ma

r-10

4DP

TR&W

2,300

030

02,0

002,3

002.1

6Rh

odesfi

eld

Statio

n NMT

fac

ilities

Im

prove

ment

City o

f Tsh

wane

Rhod

esfield

Stati

on N

MT fa

cilitie

sDe

sign

May-0

9Ma

r-10

4DP

TR&W

2,300

030

02,0

002,3

002.1

7La

nseri

a Hub

im

prove

ment

of Pu

blic

Trans

port

facilit

ies

City o

f Jo’B

urgPu

blic t

ransp

ort fa

cilitie

sDe

sign

May-0

9Ma

r-10

4DP

TR&W

5,800

069

05,1

105,8

002.1

8SP

TN fa

cilitie

sEk

urhule

niPu

blic t

ransp

ort a

nd N

MT fa

cilitie

sFe

asibi

lityJul

-09Oc

t-201

04

DPTR

&W12

,600

065

04,8

505,5

007,1

002.2

0’SP

TN fa

cilitie

sEm

fulen

iPu

blic t

ransp

ort a

nd N

MT fa

cilitie

sFe

asibi

lityJul

-09De

c-201

04

DPTR

&W7,3

000

350

2,570

2,920

4,380

2.21

Integ

rated

tic

ket s

uppo

rt inf

rastru

cture

City o

f Job

urgInf

ormati

on an

d ven

ding k

iosk

Feas

ibility

Sep-0

9De

c-201

04

DPTR

&W

16,00

00

960

7,040

8,000

8,000

Tota

l upg

rade

88,4

000

7,65

061

,270

68,9

2019

,480

0

3ad

ditio

ns N

MT fa

cilitie

s3.1

NMT F

acilit

ies

in Sw

arkop

Pri

mary

Scho

ol (1

00)

West

Rand

Dis

trict

Bicycl

e Park

ing ra

cks a

nd sh

elters

De

sign

Jun-09

Oct-0

94

DPTR

&W

500

644

503.2

NMT F

acilit

ies

in Die

poort

Pri

mary

schoo

l (10

0)

West

Rand

Dis

trict

Bicycl

e Park

ing ra

cks a

nd sh

elters

De

sign

Jun-09

Nov-0

94

DPTR

&W

500

644

503.3

NMT F

acilit

ies

at Le

sego

Prima

ry Sc

hool

(100

)

West

Rand

Dis

trict

Bicycl

e Park

ing ra

cks a

nd sh

elters

De

sign

Jun-09

Nov-0

94

DPTR

&W

500

644

50To

tal a

dditi

ons

150

018

132

150

00

GRan

d TO

Tal T

RanS

PORT

inFR

aSTR

ucTu

RE17

0,55

00

15,8

6811

8,20

213

4,07

036

,480

0

•VOTE 9 TRANSPORT(NEW).indd 104 2009/02/17 7:58 AM

Page 21: Public TRanSPORT, ROadS and WORkS

105

Vote 9 - Public Transport, Roads and Works • 2009/10 - Budget Statement 3

no.

Proj

ect n

ame

Mun

icipa

lity

Proj

ect d

escr

iptio

n/ ty

pe o

f st

ruct

ure

Proj

ect

stat

usPr

ojec

t dur

atio

nim

plem

entin

g ag

ent

Tota

l Pro

ject

cost

Expe

nditu

re

to d

ate

from

pr

evio

us

year

s

budg

et 2

009/

10M

TEF F

orw

ard

Estim

ates

date

: Sta

rtda

te: F

inish

Prof

essio

nal

Fees

cons

truc

tion

Tota

l ava

ilabl

eM

TEF

2001

0/11

MTE

F 201

1/12

1ne

w co

nstr

uctio

nPh

afana

ni En

terpri

se De

velop

ment

Metsw

eding

Dino

keng

tsa

daim

ane

Cons

tructi

on of

new

Enter

prise

Deve

lopme

nt Ce

ntre

Cons

tructi

on01

/11/

2005

06-20

09Pu

blic W

orks

7,500

3,698

760

3,042

3,802

0Su

b Tota

l Me

tswed

ing

Dinok

eng t

sa

dalm

ane

7,500

3,698

760

3,042

3,802

00

Doorn

kop

Enter

prise

Deve

lopme

nt Ce

ntre

City o

f Joh

anne

sburg

Cons

tructi

on of

new

Enter

prise

Deve

lopme

nt Ce

ntre

Desig

n01

/11/

2005

03-20

10Pu

blic W

orks

4,891

1,413

696

2,782

3,478

0Or

lando

Enter

prise

Deve

lopme

nt Ce

ntre

City o

f Joh

anne

sburg

Cons

tructi

on of

new

Enter

prise

Deve

lopme

nt Ce

ntre

Desig

n01

/11/

2005

30/0

4/20

10Pu

blic W

orks

5,325

1,030

859

3,436

4,295

Riverl

ea

Empo

werm

ent

Centr

e

City o

f Joh

anne

sburg

Cons

tructi

on of

a Ne

w Em

powe

rtmen

t Ce

ntre

Cons

tructi

on01

/04/

2007

30/0

1/20

09Pu

blic W

orks

15,00

015

,000

00

Kibler

-Park

Home

Ca

re Ce

ntre

City o

f Joh

anne

sburg

Cons

tructi

on of

new

Home

Based

Care

Centr

eDe

sign

01/1

1/20

0531

/03/

2010

Publi

c Work

s13

,986

2,000

1,320

5,280

6,600

5,386

Zola

Multi-

MPCC

City o

f Joh

anne

sburg

Cons

tructi

on of

Mult

i-Purp

ose C

entre

Desig

n01

/04/

2007

30/1

1/20

11Pu

blic W

orks

25,00

01,5

002,6

0010

,400

13,00

010

,500

Klips

pruit H

all

Saint

Ives

City o

f Joh

anne

sburg

Cons

tructi

on of

Hall

Cons

tructi

on01

/04/

2007

04-20

09Pu

blic W

orks

7,346

7,110

4718

923

60

Eldora

do Ta

xi Ra

nkCit

y of J

ohan

nesb

urgCo

nstru

ction

of Ta

xi Ra

nkTen

der

01/0

4/20

0530

/12/

2008

Publi

c Work

s2,3

582,3

58 -

- Su

b To

tal c

ity o

f Joh

anne

sbur

g73

,906

30,4

115,

522

22,0

8727

,609

15,8

860

T-Sha

d Pha

se 11

Ekurh

uleni

Metro

Cons

tructi

on of

Recyc

ling p

lant

Cons

tructi

on01

/11/

2005

30/1

2/20

08Pu

blic W

orks

4,636

4,636

00

Tembis

a Soc

iety

Upgra

ding

Ekurh

uleni

Metro

Cons

tructi

on of

Mult

i-Purp

ose C

entre

Cons

tructi

on01

/11/

2005

30/1

2/20

08Pu

blic W

orks

8,515

8,515

- -

Jameso

n Park

-Ho

me ba

sed Ca

re Ce

ntre

Ekurh

uleni

Metro

Cons

tructi

on of

new

Home

Based

Care

Centr

eCo

nstru

ction

01/1

1/20

0730

/06/

2009

Publi

c Work

s

6,305

4,151

431

1,723

2,154

0Su

b To

tal E

kurh

ulen

i Met

ro19

,456

17,30

243

11,7

232,1

540

0La

kesid

e MPC

CSe

diben

g Metr

oCo

nstru

ction

of M

ulti-P

urpos

e Cen

treTen

der

01/1

1/20

0530

/05/

2011

Publi

c Work

s8,6

161,1

404,5

625,7

022,2

25Su

b To

tal S

edib

eng

8,61

60

1,14

04,

562

5,70

22,

225

0

Det

ails

of

paym

ents

for

infr

ast

ruct

ure

by

cate

gory

: C

om

mu

nity

Base

d P

roje

cts

•VOTE 9 TRANSPORT(NEW).indd 105 2009/02/17 7:58 AM

Page 22: Public TRanSPORT, ROadS and WORkS

106

Budget Statement 3 - 2009/10 • Vote 9 - Public Transport, Roads and Works

no.

Proj

ect n

ame

Mun

icipa

lity

Proj

ect d

escr

iptio

n/ ty

pe o

f st

ruct

ure

Proj

ect

stat

usPr

ojec

t dur

atio

nim

plem

entin

g ag

ent

Tota

l Pro

ject

cost

Expe

nditu

re

to d

ate

from

pr

evio

us

year

s

budg

et 2

009/

10M

TEF F

orw

ard

Estim

ates

date

: Sta

rtda

te: F

inish

Prof

essio

nal

Fees

cons

truc

tion

Tota

l ava

ilabl

eM

TEF

2001

0/11

MTE

F 201

1/12

Koko

si MP

CCWe

st Ra

nd M

erafon

gCo

nstru

ction

of M

ulti-P

urpos

e Cen

treCo

nstru

ction

01/0

3/20

0530

/11/

2008

Publi

c Work

s5,5

005,5

000

Sub

Tota

l Wes

t Ran

d M

eraf

ong

5,500

5,500

00

00

0Lill

ian N

goyi

Africa

n Ma

rket

City o

f Tsh

wane

Cons

tructi

on of

a Ma

rket

Desig

n01

/04/

2008

30/0

4/20

08Pu

blic W

orks

19,00

03,4

0013

,600

17,00

0Su

b To

tal c

ity o

f Tsh

wan

e19

,000

03,4

0013

,600

17,00

00

0To

tal f

or n

ew c

onst

ruct

ion

133,9

7856

,911

11,25

345

,014

56,26

718

,111

0

2up

grad

ing/

Reh

abili

tatio

nSo

shan

guve

Blo

ck H

City o

f Tsh

wane

Storm

water

upgra

deCo

nstru

ction

01/1

1/20

0530

/08/

2008

Publi

c Work

s5,3

105,3

100

- Su

b To

tal c

ity o

f Tsh

wan

e5,

310

5,31

00

00

00

Sharp

ville H

allSe

diben

gRe

nova

tions

& U

pgrad

ing of

the H

allDe

sign

01/0

4/20

0730

/10/

2009

Publi

c Work

s10

,803

10,80

30

Sub

Tota

l Sed

iben

g10

,803

10,8

030

00

00

Sport

s field

- La

ngali

balel

e Pri

mary

Scho

ol

City o

f Joh

anne

sburg

Upgra

ding o

f spo

rts fie

ldTen

der

01/0

4/20

0730

/12/

2008

Publi

c Work

s

1,800

260

1,040

1,300

0Su

b To

tal c

ity o

f Joh

anne

sbur

g34

,026

32,2

2626

01,

040

1,30

00

0To

tal f

or u

pgra

ding

/ R

ehab

ilita

tion

50,13

948

,339

260

1,04

01,

300

00

3ad

ditio

nsEP

WP Pr

ovinc

ial

/ Pro

ject C

apac

ity

Supp

ort

City o

f Joh

anne

sburg

Capa

city s

uppo

rtco

nstru

ction

01/0

6/20

0730

/03/

2010

CBPW

32,76

310

,000

10,00

00

0Tra

ining

for E

PWP

projec

tsCit

y of J

ohan

nesb

urgTra

ining

budg

etTen

der

01/0

4/20

0731

/03/

2009

CBPW

8,646

20,00

020

,000

00

NYS C

onsu

ltant

fees

City o

f Joh

anne

sburg

Cons

ultan

tsco

nstru

ction

01/0

8/20

0731

/03/

2010

CBPW

4,000

4,000

00

0NY

S Stip

ends

City o

f Joh

anne

sburg

Stipe

nds

cons

tructi

on01

/04/

2008

31/0

3/20

09CB

PW31

,000

52,80

052

,800

57,60

063

,360

NYS C

itizen

ship

City o

f Joh

anne

sburg

Citize

nship

traini

ng Co

nsult

ant /

traini

ngco

nstru

ction

01/0

6/20

0831

/03/

2009

CBPW

16,41

62,2

002,2

000

Maha

tammo

ho

Co-op

erativ

eCit

y of J

ohan

nesb

urgTra

nsfer

to th

e co-o

pde

sign

01/0

4/20

0831

/03/

2009

CBPW

30,00

030

,000

30,00

00

0NY

S TRA

INING

City o

f Joh

anne

sburg

Traini

ng bu

dget

cons

tructi

on01

/04/

2008

31/0

3/20

09CB

PW11

,000

5,000

5,000

5,921

6,513

Sub

Tota

l city

of J

ohan

nesb

urg

133,

825

4,00

067

,200

52,8

0012

0,00

063

,521

69,8

73To

tal f

or a

dditi

ons

133,

825

4,00

067

,200

52,8

0012

0,00

063

,521

69,8

73GR

and

TOTa

l - W

ORkF

aRE

317,9

4210

9,25

078

,713

98,8

5417

7,56

781

,632

69,8

73

•VOTE 9 TRANSPORT(NEW).indd 106 2009/02/17 7:58 AM