Public Information Session. Proposed Extension of the Acton Quarry May 5, 2009. Purpose of the Evening. Provide an overview of Dufferin’s extension application for the Acton Quarry Listen to your concerns to ensure Dufferin understands all the issues from your perspective - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Public Information Session

A division of Holcim (Canada) Inc.

Public Information Session

Proposed Extension of the Acton Quarry

May 5, 2009

Page 2: Public Information Session

2

A division of Holcim (Canada) Inc. TitleActon Quarry Extension – Public Information Session

Purpose of the Evening

• Provide an overview of Dufferin’s extension application for the Acton Quarry

• Listen to your concerns to ensure Dufferin understands all the issues from your perspective

• Begin to answer your questions related to the proposed extension

5 May 2009

Page 3: Public Information Session

3

A division of Holcim (Canada) Inc. TitleActon Quarry Extension – Public Information Session

Agenda

1. Dufferin’s Corporate Commitment

2. Overview of the Proposed Application and Key Technical Reports

3. Q&A

5 May 2009

Page 4: Public Information Session

4

A division of Holcim (Canada) Inc. TitleActon Quarry Extension – Public Information Session

Overview of the Proposed Application

• Dufferin’s land holdings in the area of the Acton Quarry total approximately 615 ha.

• 265 ha. is the existing Quarry and processing area.

• The extension’s proposed licence area is 124.4 ha, of which only 99 ha would be for extraction.

• The remaining 225 ha of land will remain in a natural state.

5 May 2009

Page 5: Public Information Session

5

A division of Holcim (Canada) Inc. TitleActon Quarry Extension – Public Information Session

Public Benefits of the Proposed Extension

• High-quality, locally-sourced and efficiently priced aggregate for public infrastructure

• Dedication of land to the public for long term recreation, conservation and water management needs

• An opportunity to enhance the regional greenlands system, Niagara Escarpment parks and open space system, and local conservation space

• Careful balance of economic, environmental and social considerations

5 May 2009

Page 6: Public Information Session

6

A division of Holcim (Canada) Inc. TitleActon Quarry Extension – Public Information Session5 May 2009

Dufferin’s Application Addresses…

1. Land-use Planning

2. Natural Environment

3. Geology and Water Resources

4. Traffic

5. Blasting

6. Noise

7. Air Quality

8. Adaptive Management

9. Cultural Heritage

Page 7: Public Information Session

7

A division of Holcim (Canada) Inc. TitleActon Quarry Extension – Public Information Session

Surface and Ground Water

Sensitive surface water and groundwater features will be protected, improved or restored

•A performance-based Adaptive Management Plan is proposed to monitor and mitigate potential impacts

•Final rehabilitated landform / lake levels will protect adjacent environmental features

•Opportunity to enter into long term water management agreement to improve surrounding features

5 May 2009

Page 8: Public Information Session

8

A division of Holcim (Canada) Inc. TitleActon Quarry Extension – Public Information Session

Natural Environment

Impacts to the Greenlands are to be minimized

• Minimal direct impact on significant natural features

• Ecological features with important functions have been protected and will not be extracted; real opportunity for meaningful enhancement

• A performance-based Adaptive Management Plan is proposed to monitor and mitigate potential impacts

5 May 2009

Page 9: Public Information Session

9

A division of Holcim (Canada) Inc. TitleActon Quarry Extension – Public Information Session

Traffic

• No increase in traffic above current approved tonnage limit

• Excellent to acceptable levels of service projected

• Road improvements and intersection improvements (some already planned by municipalities) will ensure that the traffic impact of the Quarry remains acceptable.

5 May 2009

Page 10: Public Information Session

10

A division of Holcim (Canada) Inc. TitleActon Quarry Extension – Public Information Session

Blasting, Noise and Air

• Proposed operation will comply with MOE’s guidelines for blasting and noise limit

• Dust will be within MOE guideline levels

• Continue to address nuisance concerns

5 May 2009

Page 11: Public Information Session

11

A division of Holcim (Canada) Inc. TitleActon Quarry Extension – Public Information Session

For More Information

www.dufferinactonquarry.com

Website includes:

• Citizen’s Guide

• Technical Reports

• Community Liaison Committee – members, meeting agendas, minutes and presentations

• JART Process

5 May 2009

Page 12: Public Information Session

12

A division of Holcim (Canada) Inc. TitleActon Quarry Extension – Public Information Session19 April 2023