pt1.pdf

Upload: iljuha9

Post on 10-Feb-2018

226 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/22/2019 PT1.pdf

    1/2

    1. what should be involed in Test suite pre- Contructing2. Attribute determine the impact- Severity3. NOT white box test- Fuctional behavior4. Test run call as- An attempt5. Tested by integration testing in the small?- Between modules or subsystem6. Activity is validation?- Code review7. What type is testing to observe the external behaviors?- Interface test8. NOT software quality characteristic?- Environment9. Collection of entities and related information that alows a test to be executed?- Test case10. How many major part and chapters are- 4 and 2211. NOT a part of Test plan?- Defect report12. Purpose of software testing?- Ensure that the software system would ..13. Include in quality planing?- Setting qualit goals and forming a QA strategy14. Item can apply the inspection directly to detect and remove faults?- Software code,15. Focus of testing?- Defect Removal16. Some execution problems observed during testing may invole complicated scenarios

    and may possible sources of problems.- Problems diagnosis related

    17. NOT normally be an objective for a test?- Prove the low quality18. Relationship between testing and quality assurance?- Testing is a part of QA process19. Benefit of independent testing?- Independent testers have different view than developer and representative for users20. Correct order for the scope and content hierarchy?- Testing, qualiti assurance, software quality engineering

  • 7/22/2019 PT1.pdf

    2/2

    21. Defect found by customer is called as- Bug22. Responsible to identify the weakness in process and improment actions?- QA23. NOT reson why we test software- To violate development team24. What is defect logging?- Initial reporting and recoding of a discovered defect.25. Ways is the testing?- Defect measurement26. NOT a condition stop testing?- It is time to deliver the source code to customer27. NOT an activity of Quaility assessment and improvement?- Product release.28. What testing model is most applied in late sub-phase of testing?- UBST29. Expected result described in test case are- Used for input-ouput relation30. When will the oracle problem happen?- Regression testing31. Set of metrics can be used to monitor the test execution?- Number of test case run & not runl test cases passed & failed32. Error is a human33. Itemt can catche errors earlier?- Verification34. Purpose of a test coverage criterion?- To monitor and control testing progress35. Acceptance testing is the responsibility of- User36. Activity is verification?- Peer review37. Assess current product reliabiility and to determine if determine if the pre-set reliability

    goal has

    - Reliability analysis38. After extensive test activities have stopped. Which activity should be done?- Analyse and follow-up39. The following is true of the V-model?- It includes the verification and validation40. NOT a step of Quality improvement paradigm (QIP)?- Strategy forming