Project structure Project definition X WBS- Work Break struc X Networks Network Header Activities Network Items Planning Dates Resource ( Man/machines) materials cost Revenues Execution Date confirmation man hours materials ( Consumptioj) actual cost actual revenue Period end closing overhead calculation settlement Billing Billing to end customer Revenue

Upload: santoshvemuri

Post on 03-Dec-2015

214 views

Category:

Documents


0 download

DESCRIPTION

PS excel

TRANSCRIPT

Page 1: PS_TSOL

Project structure Project definition X WBS- Work Break structure X

Networks Network HeaderActivities Network Items

Planning Dates Resource ( Man/machines) materials cost RevenuesExecution Date confirmation man hours materials ( Consumptioj) actual cost actual revenuePeriod end closing overhead calculation settlementBilling Billing to end customer Revenue

Page 2: PS_TSOL

Design Designlist down all Raw materials Procurement -MMprocured externally -vendors production - PPproductions Assembly - PP/PS/MM/SDassembly Testingtest runFinal testingInventory

Page 3: PS_TSOL

Organization structure

Company FICOcompany code FICOsales org SDdistributon channel SDdivision SDplant MMSDstorage loc SDmmshipping point SDPurchase organization MMwarehouse number WMPlanning Plant PM

Integration 1 organization structure>>>>>>Organization structure of SD/MM/FICO

CJ20n- Project Builder

Number Ranges

Coding Mask

Either Internal Number or External NO

project IDmask>>>>special characters (!@#$%^&*()_+/<>)

PL :2 represents project IDSL

cj20n -End user transaction to create Project

Project stock

No stock: there is no consumption to project Material 1

valuted: 2 qty

>>>> X or 0 ( x- represents alpha numerical value and 0 represents alphabets)

Page 4: PS_TSOL

non valuated 2 qty

Status management

System status user status

networks network header ( order type PS01)

1. Schedule the project2. Connect the Activities ( network items) to WBS

work center 10 employees Maintenance8 hours10*8 = 80 hours roll out

100 $ implementation8000$

cost center

system will automatically set the status based on the transaction

user has to manually do

Page 5: PS_TSOL

a-00909 pda-0909 sl

200

Page 6: PS_TSOL

X

Activities1. Control the flow2. Capture the hours3. Capture the cost4. Capture the duration

75

80

100$

Network item ( control key PS01/PS02/PS03)

Page 7: PS_TSOL

Master Data

Customer masterMaterial masterWork centerActivity typesG/LCost elementsCost centersvendor

2 .Master data>>>>> master data which is owned by other modules is used in PS

Operative Indicators

Planning indicator: Planning of cost

Account assignment: consumption of actual cost

Page 8: PS_TSOL

Billing indicator: revenue posting {integration to SD and PS}

WBS:-

0

Engineering acitivty -PS01

Work center = work1hoursactivity type -

scheduling - RequiredDetermine capacity requrementGeneral costcost

Page 9: PS_TSOL

SDMM/SDPP/COCOFICOFICOficoMM

Configurations

Coding mask ,special charactersPerson responsibleApplilcation noproject profile

Deletion flag 7/1/2015

deletion indicator 8/1/2015

archiving 8/5/2015

Page 10: PS_TSOL

External activity -PS02

Vendor ( service provider)hoursPrice /Outline agreement/ Source list

Page 11: PS_TSOL

project definition

design procurement production assembly

billing/header

caad

manual

Page 12: PS_TSOL

4000$10$

4400

assembly

Page 13: PS_TSOL

Reservation

KP26

Work center and activity type

resource material

activities performed by either man or

machines

internal ( PS01)

external (PS02)

Work center

and activity

type

Vendor/ Hrs

cost cent

er

Ativity type

cost

PRSUBON

cost

L - interna ( Inventory/ Prodution)l

Plant Production

Page 14: PS_TSOL

material

N- external (Procurement through

vendor)

PR/PO

Page 15: PS_TSOL

Internal activity

Material ( internal production)

reservation createdMB23

G/L accounts:

Cost elements

Primary cost elements

Secondary cost elements

Account determination

OBYC-->Valuation Modifier

OMWD

L-->MOVEMENT TYPE

Page 16: PS_TSOL

L Reservation

WBS ?Network ?

Page 17: PS_TSOL

Work center Work1 KP26 (activity pricing)cost center/activiy type

Activity type 1999

No of hours 30

material material master Accounting tab

quantity cost element---> OBYC

item categoty L

Revenue elements

profit calculation: Material cost price is 100$ and selling price is 120$, Profit would be 20$ Primary cost element FI, CO

wages : Secondary cost elements: in which there is no FI impact ( no accounting document)

General Modifer Valuation class G/L

F- ACCOUNT ASSIGMENT CATWGORY MATERIAL MASTER

Page 18: PS_TSOL

10 for particular activity 90345 90 ( 90346)100 for particular WBS ( C/0001-ab2) QReservation fror WBSReservation for network

Page 19: PS_TSOL

External activity

cost element

activity type ( secondary cost element

Material External procurement

PR

Account determination

profit calculation: Material cost price is 100$ and selling price is 120$, Profit would be 20$ Primary cost element FI, CO

Page 20: PS_TSOL

PR/PO….Net price (ME53n/ME21n)vendorNumber of hours cost element: Primary cost elementinfo records cost element: determined from Project (Cj20N)outline agreement to the project, it will be determined by Network Profile (OPUU) Project price cost element is determined from OBYC

materialuantityItem category N ( non stock)VendorInfo recordsource list/Contract

Account assignment cateogy (PR as F)VBROMWD-- Valuation modifier (0001)valuation type = Material master

OBYC -- G/L this is Primary G/L

Page 21: PS_TSOL

to the project, it will be determined by Network Profile (OPUU)

Page 22: PS_TSOL

Pln Actul vari Revenue RA

100 120 20 50 7050 2010 10

Plantstock valuation

99 990

Page 23: PS_TSOL

G/L

Primary cost secondary cost

FI impact

CO impact CO

Projectstock valuation

1 10

Page 24: PS_TSOL

10 P-100 100$ 1186.6420 10$ 5 59.332

30 activity 200$40 40$

50 sales cost 500$60 50

Page 25: PS_TSOL

ProjectPlan value 10000$ actual values

10000$ 9000$ 120000$

concetre 100KG concetrete 110kg 20000$steel 100 kg steel 150 kg

20000$

Page 26: PS_TSOL

budget profile

Page 27: PS_TSOL

manufacturng : EquipmentRaw material

Direct cost Assemblyinstallation

indirect cost electric city costwater costStationery costcampaign costpromotion costinsurancetravellingaccommodation

AdministrativeCosting sheet

Material overhead

Production overhead

1. Base for overhead2. Percentage3. Cost element

Page 28: PS_TSOL

100$100$ 300$100$

5101020 15020404020

power, water, stationery, rent, lease

handling, storing, Renting

traveling, accmodation, campaign , promotion

2556.465 127.823

Page 29: PS_TSOL

Standard PDCJ91 Standard WBS

Standard Network

CN08 Assign material with Standard WBS and Standard Network

VA01 with the materialStrategy group =85from strategy group - Requirment type and requirement classSettlement profileNetwork typeResult analysis

Page 30: PS_TSOL

Project 17

cost Planned 1000$

Actual cost 250 $

Billed 170

Result analysis

WIP 80

Cos 170

actual cost 420

revene 290

WIP 130

COS 290

overhead 41

Result analysi 31

Allocation 43

settlement 21

Page 31: PS_TSOL

Project 27

cost planned 2000$

actual 170

120

result analysiswip 50

cos 120

planned 10

actual 7

Billed 4 7

RA key in the Project

KKA2

Page 32: PS_TSOL

Project XX

WBS1 300(0) WBS2 270(0)

Activity1 100$ Activity 2 150

material1 200$ material 2 120

300 - cost enter 1000 270 - cost center 2000

settlemen profile

wbs cost center300 0

0 300

1 Project creation CRTD2 plnning Activities/Material CRTD/REL3 actual postings REL4 BILLING TECO5 SETTLEMENT

Page 33: PS_TSOL

WBS 3 390 (0) 960 (0) cost center/PSG 1200

Activity 3 180 GL

material 3 210 Material

Fixed assets390 cost center 3000

REFX

SDI -PSG

Page 34: PS_TSOL

Validation Billing element

Customer Projects 1. Project profile

2. Project type

Failure/Successful Failure _pop-up with error message

successful : Project should be saved

m-16 EtO 12341234

Mto 1235

ATO 1236

CTO 1234