proposed development at 319 & 321 ordsall lane · ordsall lane salford. vision • creation of a...
TRANSCRIPT
-
w
Ordsall LaneSalford
VISION
• Creation of a new, high-quality housing development for Salford, the scheme is being designed in line with Salford City Councils policy re-quirements.
• 500 new homes on the site, scheme will have a mixture of properties to buy, affordable & private rented sector.
• Facilitate giving an underused site a new identity within a wider aspira-tion for the Ordsall Riverside.
• Create a new neighbourhood which fits with the existing and emerging townscape.
• Create high-quality green spaces.
• Ensure the masterplan is viable, sustainable and deliverable.
• Adopt sustainable building design techniques and promote green travel patterns, therefore reducing carbon emissions.
Site Area: 1.15 Ha
Proposed Dwellings: 500 units
Car Parking: 162 spaces
Promote a new residential sustainable community with:
• High quality architecture with integrated landscape. • Facilitate and benefit the future aspirations for the Obelisk Way
application and Ordsall Riverside Masterplan.• Design in keeping with the emerging typology of Ordsall Lane
emerging in the form of new developments • Provide amenity spaces for residents, including concierge
reception, gym, and lounges.• Provide communal external amenity space.
PROJECT FACTS
PROJECT TEAM
EUTOPIA HOMES LTD have over 1000 new homes in the pipeline across the Midlands and South West.
DARLING ASSOCIATES is a multi-award winning architectural practice to lead on the design of the new proposals for the site. Darling Associates will also be preparing the planning application with the support of a wider consultant team.
Existing Site - View Looking West Exmouth Junction, Exeter Camp Hill, Birmingham
PROPOSED DEVELOPMENT AT 319 & 321 ORDSALL LANE
-
w
Ordsall LaneSalford
SUMMARY OF PREVIOUS CONSULTATION EVENT
Eutopia Homes consulted the local community on the redevelopment proposals for 319 Ordsall Lane on the 29th October at St Clements Community Centre. Since this time, Eutopia Homes have purchase 321 Ordsall Lane and wish to consult with the local community on their proposals to develop both 319 and 321 Ordsall Lane.
• Site: 319 Ordsall Lane• Site Area: 0.56 Ha• Proposed Dwellings: 250 units• Car Parking: 90 spaces
• Site: 319 & 321 Ordsall Lane• Site Area: 1.15 Ha• Proposed Dwellings: 500 units• Car Parking: 162 spaces
PREVIOUS PROPOSAL NEW PROPOSAL
PREVIOUS SITE BOUNDARY NEW SITE BOUNDARY
319 Ordsall Lane
319 Ordsall Lane
321 Ordsall Lane
319 Ordsall Lane
321 Ordsall Lane
319 Ordsall Lane
321 Ordsall Lane
PREVIOUS ELEVATION - Ordsall Lane
NEW ELEVATION - Ordsall Lane
New Site Boundary
Prev. Site Boundary
ORDS
ALL
LANE
ORDS
ALL
LANE
RIVE
R IR
WEL
L
RIVE
R IR
WEL
L
-
w
Ordsall LaneSalford
The Site
Currently the site consists of two warehouses. The undeveloped parts of the site is mostly hard-standing used for car parking.
The property occupies an excellent waterside location, fronting onto the River Irwell with views towards Manchester City Centre.
There is strong demand for new housing in Salford & Greater Manchester (both for sale and rental). This development will be another significant contributor to meet Salford’s housing needs.
Salford & the Ordsall Riverside has a rich industrial heritage, the design of 319 & 321 Ordsall Lane draws influence from the industrial building typology of Salford & Greater Manchester. The form of building, choice of materials and colour palette have all been drawn from the historical analysis of the area.
The site is not located within a conservation area and does not contain any listed buildings.
Site Location
SALFORD CRESCENT
SALFORD CENTRAL
MANCHESTER VICTORIA
MANCHESTER PICCADILLY
ARDWICK
DEANSGATE
MANCHESTER UNITED FOOTBALL GROUND
MANCHESTER OXFORD
MANCHESTER CITY CENTRESALFORD
TRAFFORD
CHEETHAM
HILL
BRADFORD
SITE CONTEXT
10MIN
Site Plan - Existing
View 2
View 1
SITE
Trafford
Stadium
University of
Manchester
University
of Salford
Ordsall Riverside Masterplan Boundary
V1V2
-
w
Ordsall LaneSalford
SITE CONTEXT - EMERGING DEVELOPMENTS
1
5
6
3
2
4
Ordsall Lane - up to 11 storeys
2.23 ha site (split over two sites)
924 units
Planning Approved (9th May 2018)
Bridgewater Point - up to 7 storeys
0.54 ha site
207 units
Under Construction
The Dye Works, Worrall Street - up to 11 storeys
approx. 0.41 ha site (split over two sites)
252 units
Planning Approved (7th June 2017)
No. 1 Derwent Street - up to 28 storeys
0.58 ha site
183 units
Under Construction
Ordsall Lane / Worrall Street Development - up to 9 storeys
approx. 0.46 ha site
196 units
Planning Approved (1st February 2018)
Downtown - up to 13 storeys
0.68ha site
368 units
Under Construction
1
4
2
5
3
6
SITE
-
w
Ordsall LaneSalford
DESIGN STRATEGY
Ground Floor - Enhance the pedestrian experience
New development offers the opportunity to improve the
condition of the riverside walkway, our proposals will seek
to enhance the sites relationship with this pedestrian route,
making it an active area not just a means of travel.
Roof Level - Step the roof of the proposed building
We have reduced the appearance of mass by introducing
breaks in the facade. Taller elements are placed
strategically to prevent the feel of a monolithic block.
Fall across site allows extra floor to be gained at lower ground, infill with amenity.
R i v e r I r w e l l
O r d s a l l L a n e
R i v
e r
I r
w e
l l
6
6 6
6
6
6
7
7
8
7
87
8
8
10
10
Streetscape
The proposed development has been set back from the
red line boundary. Defensible space around the perimeter
makes for a more generous pedestrian experience. The
design intends to reflect the pedestrian scale with design
traits that give the lower levels a feel of housing typology.
This can be achieved through using distinctive architectural
features that are typical of the local housing.
Layout Strategy
• Unlock the site potential, existing building does not add a positive contribution to the area.
• Existing building has no street frontages, instead it has a severe boundary treatment. Site footprint is underutilised with the majority of the site being used as car parking.
• Align spine of building to eastern boundary and facilitate the neighbouring developments aspirations to create a new street Our proposals will address the frontage with residential units.
• Arrangement creates large courtyard area to be enjoyed by residents.
• Divide courtyard into zones, pockets of green space are more likely to be used as residents won’t feel so on display.
• Establish vertical hierarchy across site, stepping the height down towards residential area and up towards river to take advantage of the views.
Ground Floor Strategy
• The building has been considered as a whole but also in distinct areas that affect the community at a human scale.
• In particular the ground and first floor has additional detailing around windows and doors to create architectural interest.
• The building is setback from the boundaries to allow the 319 development to create a high quality green buffer zone in between boundaries of neighbouring developments.
Ords
all L
ane
Entra
nce
Entra
nce
28m
Vehi
cle
Entra
nce
Obelisk W
ayTerrace
TerraceTerrace
Terrace
Central green thoroughfare
Green buffer zone to distance
development from
the Foundry
Courtyards - Visual Connectivity Between Green Spaces
Residential spaces have access to terraces with greenery, as well as private balconies that look out onto the ground floor
communal terraces. These communal terraces in turn share a visual connection not only with the communal terrace opposite
but with the green central thoroughfare on the lower ground floor that leads to the riverside.
Section through proposed development
Residential Residential
Residential Residential
Residential Residential
Residential Residential
Residential Residential
Residential Residential
Car Park Car Park
Communal Courtyard Communal Courtyard
Communal TerraceCommunal Terrace
Central Green Avenue
Green Buffer between site
& the Foundry
Obelisk Way towards river
Podium Line - Street Level
Riverside Walk
Neighbouring Development
22m distance
-
w
Ordsall LaneSalford
The
Foun
dry
MASTERPLAN
MASTERPLAN & LANDSCAPING -
VIEW ALONG GREEN AVENUE
SECTION THROUGH GREEN AVENUE
Cores
Amenity (Ground & Lower Ground Floor)
Vehicle Access to Car Park
Landscape & Amenity Strategy
• The principle design aspiration is to create a community within the development and within the local area. The landscape strategy will be inviting and attractive for all, encouraging members of local area to engage with our development.
• In particular our scheme will engage with the new proposals by the neighbouring development for Obelisk Way to ensure it is a community street not just a thoroughfare.
• Amenity will be provided to residents, both private (balconies) & communal (courtyards & roof terraces). The massing creates enclosed communal courtyards, these courtyards are provided at first floor level to ensure security and use by residents.
Scheme Overview
• The design we are currently consulting on has been the result of a collaborative approach through pre-application discussions with Salford Council’s planning and design officers.
• The height and massing has taken the topography of the site into consideration as well as the proximity of existing emerging and existing developments.
• The residential offering will be a mix of private for sale, private rented & affordable homes. Residential units will be provided with amenity areas and courtyards.
• There is a building typology emerging in the developments along Ordsall Lane, the perimeter block/courtyard arrangement. The proposed site masterplan is in keeping with the emerging townscape of Ordsall Riverside. The development activates the primarily public edge conditions & creates sheltered communal areas on the internal face.
• Designing a great place for people to live in is at the heart of the proposal.
Hard landscaping
Hard landscaping to
create public space at
riverside entrance
Courtyard
(Ground Floor)
Courtyard
(Ground Floor)
Courtyard
(Ground Floor)
Courtyard
(Ground Floor)
Private Gardens
(Ground Floor)
Enhanced green
avenue
Enhanced green avenue
Roof Terrace
Roof Terrace
Child Play SpaceCommunal Seating Areas
Ords
all L
ane
Rive
r Walk
way
Rive
r Irw
ell
319
Ord
sall L
ane
Vehi
cle
Entra
nce
321 O
rdsa
ll Lan
e
Rive
r Walk
way
Entra
nce
Entra
nce
Entrance
Roof Terrace
Roof Terrace
-
w
Ordsall LaneSalford
257 Ordsall Lane Site 1 & 2
The Albert Mill
STREET ELEVATION - ORDSALL LANE
ELEVATION DESIGN PRINCIPLES
DESIGN PROPOSAL - APPEARANCE
The Albert Mill North Elevation
ELEVATION DESIGN PRINCIPLES
Vertically grouped windows
Recessed / projecting planes
Level changes
Framing and detailing around
windows
Development Site
Street Zone
Pomona Docks
River Irwell Residential Units Residential TowerMassing stepped to
define the blocks Ordsall LaneRiverside Walkway
Vertical bays and defining the top and bottom. Grouping the fenestration and varying the treatment to those on ground level.
Recessing planes and articulating heights of the building.
STREET ELEVATION DIAGRAM - OBELISK WAY
Proposed Scheme
-
w
Ordsall LaneSalford
DESIGN PROPOSAL - STREET DESIGN
Street Design
The scheme is designed to enhance key frontages with a primary focus on the pedestrian experience. By activating the street frontages our scheme will encourage pedestrians to occupy the riverside area.
Design assessments have been made to consider pedestrian interactions and experiences. Increased green space and planting are provided on the new improved Obelisk Way.
Width of footpaths increased by setting the building back from the boundaries on Ordsall Lane, Obelisk Way & the Riverside Walkway.
Activated frontages along Obelisk way will provide security through natural surveillance
3
1 2
Street furnitureTrees break up
planters at intervals
Residential
terraces
Stepped Planters
with wild flowers
SITE BOUNDARY
R I V E R S I D E
W A L K W A Y
Residential
balconies
2
Riverside Walkway
Green Buffer
21m
Site Boundary
Fo
otp
ath
Fo
otp
ath
Pri
vate
Am
enit
y
O R D S A L L L A N E
SITE BOUNDARY
Street furniture
Residential
terraces
Stepped planters with
wild flowers
Residential
balconies
1
Ordsall Lane
19.5m
Site Boundary
Footpath Footpath
Pri
vate
Am
enit
y
R I V E R S I D E
SITE BOUNDARY
Planters along elevation enrich the
pedestrian experience and can act
as SUDS in case of flooding.
Two- storey
amenity
space
White framing around
fenestration at
lower levels to show
different treatment at
pedestrian level.
Residential
balconies
3
River Irwell
Site Boundary
River Views
Footpath SUDS
SECTIONS KEY
Section Principles - Ordsall Lane Residential Units
Section Principles - Obelisk Way
Section Principles - Riverside Walkway
New 'street' - enhanced link to riverside
Activated Residential Frontage
Activ
ated
Fro
ntag
e
Residents Courtyard
Residents Courtyard
Residents Courtyard
Residents Courtyard
Activated Residential Frontage
Activated Residential Frontage
Key node along riverside
Activ
ated
Fro
ntag
e
Activated Residential Frontage
Framing Details Around Windows Defined Base - Entry
Defined Base - Active Frontage
Pedestrian Focus - Shared Surfaces
Defined Base - Active Frontage
Pedestrian Focus - Communal Terraces
DESIGN REFERENCES &
Key:
Public Route
Key Public Junctions
Private Route
Key Private Junctions
Private Courtyard
Sheltered Zone
Public / Private Axis
-
w
Ordsall LaneSalford
BIODIVERSITY, ECOLOGY AND SUSTAINABILITY• We are committed to enhancing green spaces through an Integrated landscaping solution
which promote pedestrian movement across the site. In line with Policy DES3 and DES4,
the layout has been designed to ensure that the public open space has a clear purpose and
connects to established pedestrian routes and other public spaces.
• As part of the landscaping strategy we aim to enhance the level of existing trees and foliage
across the site. In line with Policy DES 9 Landscaping, high quality hard and soft landscaping
will be provided on site to enhance the design of the development.
• In addition, there will be areas of new green spaces and native planting which will replace
the concrete hard standing. These spaces will comprise of a mix of public open space and
private open space for the use of residents.
HIGHWAYS• Seeking to reduce the dominance of cars with significantly reduced on-site parking provision,
compared to the Council’s policy.
• Secure car parking (including disabled provision) will be provided within the site along with
dedicated cycle parking. Parking provision strikes a balance between serving residents and
meeting the Council’s aspirations for lower car usage in the City.
• All apartments will have dedicated cycle storage which is in line with Policy A2 which ensures
the adequate provision for cyclists.
• Within suggested acceptable walking distances (equivalent to approximately 20 minutes
walk) a variety of retail, leisure and employment opportunities are available in Old Trafford,
Salford Quays and areas in Manchester city centre. Footways are provided along Ordsall
Lane with crossing infrastructure provided at key locations to facilitate access around the
network.
• Within suggested acceptable cycling distances (approximately 20 minutes), the majority
of Manchester and Salford city centres can be accessed as well as other retail and leisure
opportunities in the surrounding towns and suburbs.
• Ordsall Lane is used by cyclists with on-carriageway markings to identify the presence of
cyclists and infrastructure is provided at key junctions (i.e. advanced cycle stop lines). The
existing residential network to the west of the site forms part of the advisory cycle network
with 20mph speed limits providing options to access Salford Quays. In addition, the river
path is designated as a traffic-free route with a good surface in TfGM’s maps and provides
links to Manchester city centre and the National Cycle Network
• Bus stops are located within 150 metres walking distance from the site. Additional bus stops
and services are available on Trafford Road approximately 700 metres walking distance from
the site.
• The Metrolink network can be accessed within 600 metres walking distance of the site,
equivalent to 7-8 minutes walking time. Regular services are provided between Salford
Quays, Eccles and Manchester city centre.
• The planning application will be accompanied by a comprehensive Transport Assessment
and Travel Plan with a focus on the promotion of sustainable travel modes.
DRAINAGE• Surface water runoff generated from the development shall be discharged at a controlled
rate into the Manchester Ship Canal. This is in accordance with current best practice and
avoids adding additional flows to the public sewer system. The controlled flow rate shall
provide a betterment in the existing runoff rate generated on the current site.
• Where appropriate, SuDS systems shall be incorporated into the design of the development.
• The Environment Agency records on flood levels in this area have been reviewed and
considered in the proposed finished floor levels of the development. This ensures the proposed
development levels reference appropriate Salford City Council Planning Policy.
• The planning application will be accompanied by a Flood Risk Assessment and Initial Drainage
Strategy.
-
w
Ordsall LaneSalford
WHAT HAPPENS NEXT ?
PROPOSED TIMELINE
• Proposals for 319 Ordsall Lane - October 2019
• Second consultation event to present scheme for 319 & 321 Ordsall Lane - November 2019
• Submit Planning Aplication - November 2019
• Start on site - Early 2021
• First homes delivered - 18 months after start on site
• Proposed completion - End of 2022
NEXT STEPS
Thank you for attending the consultation event today.
We hope that you will be able to leave your final comments withus on a feedback form.
We expect to submit a planning application in December 2019. Once the application is submitted, Salford City Council will undertake its own con-sultation exercise, enabling local residents and businesses to comment on the final planning application.
KEEPING YOU INFORMED
Eutopia Homes are committed to community consultation.
Our project website: www.eutopiasalford.co.uk – will be updated as plans progress.
North Elevation