Sr. No Contents Page No
1. Mechanical Aspects of the Project Report 3
2. Format and Sequence of the Project Report 4
3. Proposed Schedule for Project Report 5
4. Chapter Scheme 6
5. Illustrations: - Title page 7
6. Illustrations: - Certificates 8
2
-
7/31/2019 Project Report Monogram (1)
3/12
I. Mechanical Aspects of the Project Report
Length : Approximately 70 to 80 pages
Paper : A4 (7Kg) White Bond Paper
Typing : Standard letter size (12/14) Times New Roman font
Black Color
One side of the paper
1.5 line spacing
Margin : Left & Top 35 mm
Right & Bottom 20 mm
Cover : Hard Bound Black
Front Cover Engraved letters in block capital
6mm Size Title of the project
Full name of the candidate
Name of the course
Name of the institution
Year of submission
One white paper each, adjacent to front & back cover.
Page Numbers : All the pages in the initial part (from title list to the list of
graphs/charts) are in small roman centrally located at the
bottom of the pages. Each chapter should begin on a new
page. Chapter pages are in Arabic numerical. First page of the
chapter should not bear the page number, but it should be
counted & the page number should appear on the second page
of each chapter.
3
-
7/31/2019 Project Report Monogram (1)
4/12
Chapter Numbers : Chapters should be serially numbered in numerical. Sections
& sub-sections of each chapter should be in decimal notation.
E.g.: In Chapter 2, section would appear as 2.1, 2.2 etc. and the sub-section would
appear as 2.1.1, 2.2.2 etc.
4
-
7/31/2019 Project Report Monogram (1)
5/12
II. Format and Sequence of Project Report
1. Title Page
2. Certificate of the college
3. Certificate of the company
4. Declaration
5. Acknowledgement
6. Index
7. Executive Summary
8. Introduction
9. Objectives & Scope
10. Company Profile
11. Research Methodology
12. Data Analysis (SWOT)
13. Findings and Observations
14. Recommendations
15. Limitations
16. Conclusion
17. Bibliography
18. Annexure
5
-
7/31/2019 Project Report Monogram (1)
6/12
III. Proposed Schedule for Project Report
Starting of the Project : 14th May 2012
Selection of Topic/Discussion with Guide : 16th May 2012
Reading Background Literature/Questionnaire : 25th May 2012
Scope defined &approved : 28th May 2012
Collection of data/Review of Literature/
Field Survey/Visits : 30th June 2012
Data Analysis : 10th July 2012
Rough Draft
1) Rough draft submission to the faculty (Hard copy/Soft copy): 16th
July 12
2) Rough draft checking by the faculty: Minimum 10 days from the date
of submission
3) Second Draft: 25th July12
4) Second Draft Checking: Minimum 8 days from the date of submission
Final Copy before binding: 6th August12
6
-
7/31/2019 Project Report Monogram (1)
7/12
Final bound copy submission: 17th August12
Commencement of the College on 15th
July 2012
IV. Chapter Scheme to be followed
Main Body
1. Introductory Chapter: Theoretical background of the topic
2. Project profile:
i) Objective of the project
ii) Research Methodology
iii) Scope of the Project
iv) Limitations of the project
3. Organizational Profile: Profile of the organization where the project is
being conducted
4. Analysis of the data
5. Finding & Observations
6. Conclusions & Recommendations
7
-
7/31/2019 Project Report Monogram (1)
8/12
Closing Pages/ Back Matter
1. Bibliography
2. Appendices (documents, questionnaires etc.)
The entries in the bibliography should be made as follows:-
i. The name of the author
ii. Title underlined or in italics
iii. Place, Publisher & date of publication
iv. Specifying edition/volume
V. Illustrations: - Title page
APROJECT REPORT
On
(Title of the Project)
8
-
7/31/2019 Project Report Monogram (1)
9/12
-
7/31/2019 Project Report Monogram (1)
10/12
CERTIFICATE
This is to certify that Mr/Ms. KUNAL RATHOD
has successfully completed her summer project titled
Impact of Advertising on Sales of Consumer Durables.
in partial fulfillment of MBA Program.
(Principal) (Project Guide)
10
-
7/31/2019 Project Report Monogram (1)
11/12
SYMPHONY APPLIANCES LTD
Poornima Chambers A.B. Road, Pune 411038
TO WHOMSOEVER IT MAY CONCERN
This is to certify that Mr. KUNAL RATHOD has worked as a summer traineefrom 9/05/11 to 9/7/11in our Marketing Department.
During this period she completed the project on
Impact of Advertising on Sales of Consumer Durables.
She has been sincere, hardworking & punctual in her work.
I wish him all the best for all the future endeavors.
11
-
7/31/2019 Project Report Monogram (1)
12/12
Signature of the concerned manager
12