Page 1: PROJECT REPORT - ct-technologies.dk · • Stable cold room temperature +3 ºC, securing perfect potato quality. • Fully automatic operation calling for very little attendance

Engineering climate controlled facilities

offices: bosnia&herzegovina, denmark, ghana, india, indonesia, philippines, vietnam

Head Office: CT-Technologies ApS, Trørødvej 63B, 2950 Vedbæk, DenmarkP: +45 4565 1060 E: [email protected] WEB: ct-technologies.dk

PROJECT REPORTYears of Accomplishments

Page 2: PROJECT REPORT - ct-technologies.dk · • Stable cold room temperature +3 ºC, securing perfect potato quality. • Fully automatic operation calling for very little attendance

2

Page 3: PROJECT REPORT - ct-technologies.dk · • Stable cold room temperature +3 ºC, securing perfect potato quality. • Fully automatic operation calling for very little attendance

3

SCOPE OF SERVICES

• Design of extension of existingammonia refrigeration plant for potatocold store to serve an extra cold room.

• Upgrade of controls for coolingof existing cold rooms.

• Delivery of key equipment:Compressors, separator withammonia pumps, electricalswitchboard, valves and controls.

• Installation and commissioning.• Supply of spares.

ACHIEVEMENTS

• Delivery and installation executedin time for potato season.

• Stable cold room temperature +3 ºC,securing perfect potato quality.

• Fully automatic operation callingfor very little attendance.

REFRIGERATION EQUIPMENT FOR POTATO COLD STORAGE

Cold Storage with four existing cold rooms, totally 18 000 m3

and one new room, 1 000 m3

and two ante rooms.

Location: BangladeshYear of completion: 2017Client: Rajanigandha

PROJECT FACTS

Ammonia refrigeration plant with three existing and twonew compressors.Total cooling capacity: 884 kW with room temperature +3 ºC

Page 4: PROJECT REPORT - ct-technologies.dk · • Stable cold room temperature +3 ºC, securing perfect potato quality. • Fully automatic operation calling for very little attendance

4

SCOPE OF SERVICES

• Cladding and roofing.• Smoke extraction system

comprising of extraction fans,insulated ventilators, double banklouvres and control panels.

• Fire rated doors and Cold room doors.• Fall arrest system.• Lightning protection.• Cat ladders for roof access.• Maintenance platforms

for Air Cooling Units.• Gutter and Siphon System.

ACHIEVEMENTS

• Highest AS/RS in Singaporebuilt in short time.

• Building components designed,delivered and installed inaccordance with strict SingaporeFire Protection regulations.

• State-of the art AS/RS designed andmaterials carefully selected in orderto enhance energy efficiency.

• Constructed on a very spaceconstrained site on a platform10 m high.

AS/RSWAREHOUSEFOR COCA COLA

AS/RS Warehouse, dual temperature. One of the highest AS/RS built in South East Asia

Location: SingaporeYear of completion: 2017Client: Pacific Refreshment /SSI Schaefer

PROJECT FACTS

Pallets: 13,5KHeight: 47.2 mArea: 2 300 m2

Page 5: PROJECT REPORT - ct-technologies.dk · • Stable cold room temperature +3 ºC, securing perfect potato quality. • Fully automatic operation calling for very little attendance

5

Page 6: PROJECT REPORT - ct-technologies.dk · • Stable cold room temperature +3 ºC, securing perfect potato quality. • Fully automatic operation calling for very little attendance

6

SCOPE OF SERVICES

• Design of expansion of theexisting Cold Storage Plant.

• Sandwich panels.• Manual, automatic and

high-speed doors.• Dock equipment: dock levellers,

shelters and sectional doors.• Installation accessories.• Pressure relief valves.

ACHIEVEMENTS

• Successful joining of two Cold Storages.• Supply of materials within

a short time period.• Design of Ante corridor with

special locking system.• Docking equipment with segregated

lips for accommodation ofvarious trucking vehicles.

MULTI-PURPOSE COLD STORAGE

Distribution Centre for Frozen Products consisting of 5 Cold Rooms, Ante Rooms and Dispatch Area

Location: PhilippinesYear of completion: 2017Client: Royale Cold Storage

PROJECT FACTS

Area: 2 400 m2

Duration: 4 months

Page 7: PROJECT REPORT - ct-technologies.dk · • Stable cold room temperature +3 ºC, securing perfect potato quality. • Fully automatic operation calling for very little attendance

7

SCOPE OF SERVICES

• Design, supply and installationof prefabricated panel building,doors and floors for cold store.

• 200 mm insulation panelswith PIR foam, which is morefire retardant than PUR.

• Design, supply and installationof ammonia refrigeration plant.

• Training of operation andmaintenance staff.

ACHIEVEMENTS

• Panel building well adapted tolocally constructed building with oddshape due to space limitations.

• Stable cold room temperature -20 ºC.• Due to panels’ high insulating

effect, fish temperature is hardlyaffected by power breaks.

• Fully automatic operation.

COLD STORAGE FOR FROZEN FISH

1 200 t cold store for frozen fish, -20 ºC storage temperature

Location: GhanaYear of completion: 2017Client: Freedom Fisheries

PROJECT FACTS

Temperature: -20 ºC Low energy consumption

Page 8: PROJECT REPORT - ct-technologies.dk · • Stable cold room temperature +3 ºC, securing perfect potato quality. • Fully automatic operation calling for very little attendance

8

SCOPE OF SERVICES

• Design of processing rooms/cold stores/service rooms.

• Sandwich panels - walls and ceiling.• Floor insulation, vapor barrier.• Installation accessories.• Pressure relief valves.• Dock equipment Hoermann:

telescopic dock.• Installation eveller, inflatable shelter

and automatic sectional door.

ACHIEVEMENTS

• Supply of material by agreed schedule.• Installing 7 500 m2 panels by

the technological requirementsof the production process.

• Large production area, 3 chill roomstemp. 0 ºC, 2 flake ice rooms temp.-5 ºC, packing area, three coldrooms total of 6800 m2, storagetemperature -18 ºC, ante room.

• Docking equipment with inflatableshelter for accommodation ofvarious trucking vehicles.

• Successfully and timely completed theinstallation and handover of works.

COLD STORAGE FOR SHRIMPS

Shrimp Processing Plant,a total area of 3 600 m2

Location: IndiaYear of completion: 2017Client: Zeal Aqua

PROJECT FACTS

Panels: 7 500 m2

Area: 3 600 m2

Page 9: PROJECT REPORT - ct-technologies.dk · • Stable cold room temperature +3 ºC, securing perfect potato quality. • Fully automatic operation calling for very little attendance

9

Page 10: PROJECT REPORT - ct-technologies.dk · • Stable cold room temperature +3 ºC, securing perfect potato quality. • Fully automatic operation calling for very little attendance

10

TESTIMONIAL FROM OUR CLIENT

“...CT-TECHNOLOGIES have successfully completed the installation of panels throughout the factory right from the

raw material receiving to the Cold Storages. The service of the whole team has been Exemplary. Hoping to maintain

good Rapport with the company.”

Guruprasad B.General Manager

Zeal Aqua

Page 11: PROJECT REPORT - ct-technologies.dk · • Stable cold room temperature +3 ºC, securing perfect potato quality. • Fully automatic operation calling for very little attendance

11

SCOPE OF SERVICES

• Design of New Cold Storefor milk and cheese and IceCream Production Facility.

• Wall and ceiling sandwich panels.• Manual sliding and hinged doors.• Windows for Viewing

Gallery and Ice Cream.• Heating matts.• Light fixtures.• Installation.

ACHIEVEMENTS

• Project finalized in time.• Design, supply of materials and

installation in conformity withinternational hygienic standards.

• State of the Art Viewing Gallery.

DAIRY COLD STORAGE AND PRODUCTION

Cold Store, Chill/Freezer Room, Dry Goods Store, Corridor, Ice Cream Production Room and Viewing Gallery

Location: IndonesiaYear of completion: 2016Client: So Good Food

PROJECT FACTS

Duration: 9 monthsLow energy consumptionState-of-art work

Page 12: PROJECT REPORT - ct-technologies.dk · • Stable cold room temperature +3 ºC, securing perfect potato quality. • Fully automatic operation calling for very little attendance

12

SCOPE OF SERVICES

• Sandwich Panel (PIR)and its accessories.

• Insulated Doors, including slidingdoors, swing doors, hinged doors.

• Docking system, includingsectional door.

• Dock leveller, dock shelter.• Floor Insulation.• Vapour Barrier.• Light Fixtures.• Heating Mats.• Installation.

ACHIEVEMENTS

• Project finalised in time.• Compliance with internal

hygienic standards.• Reduced power consumption.• Pleasant working environment.

FOODPROCESSINGPLANT

Distribution Centre and Test Kitchen for food and beverage

Location: IndonesiaYear of completion: 2016Client: Masuya Graha Trikencana

PROJECT FACTS

Duration: 4 monthsArea: 3 600 m2

Page 13: PROJECT REPORT - ct-technologies.dk · • Stable cold room temperature +3 ºC, securing perfect potato quality. • Fully automatic operation calling for very little attendance

13

Page 14: PROJECT REPORT - ct-technologies.dk · • Stable cold room temperature +3 ºC, securing perfect potato quality. • Fully automatic operation calling for very little attendance

14

SCOPE OF SERVICES

• Design of insulated partof Processing plant.

• Sandwich panel for wall and ceiling.• Doors and windows.• Polyurethane floor insulation

and vapour barrier.• Heating matts.• Light fixtures.• Installation.

ACHIEVEMENTS

• Short construction time.• Compliance with internal

hygiene standards.• Reduced power consumption.

EXPANSION OF POULTRY PROCESSINGPLANT

Poultry Processing plant consisting of: 4x Blast Freezers, Packing Room, Cooling Room, Meat Preparation Room, Seasoning Room, Smoking Room and Chill Room

Location: IndonesiaYear of completion: 2016Client: Wonokoyo

PROJECT FACTS

Short durationLow energy consumption

Page 15: PROJECT REPORT - ct-technologies.dk · • Stable cold room temperature +3 ºC, securing perfect potato quality. • Fully automatic operation calling for very little attendance

15

SCOPE OF SERVICES

• Design of insulated part of the Plant.• Windows.• Emergency doors.• Installation.

ACHIEVEMENTS

• Working parallel withmultiple Contractor.

• Clean working environment.

TOBACCO PROCESSINGPLANT

Building area that is used for further processing tobacco and other ingredients

Location: IndonesiaYear of completion: 2016Client: Gudang Garam

PROJECT FACTS

Short construction timeCost effective constructionLow energy consumptionWall installed between steel columns

Page 16: PROJECT REPORT - ct-technologies.dk · • Stable cold room temperature +3 ºC, securing perfect potato quality. • Fully automatic operation calling for very little attendance

16

SCOPE OF SERVICES

• Design of insulated part of the Plant.• Windows.• Louvres.• Emergency doors.• Installation.

ACHIEVEMENTS

• Short construction time.• Working parallel with

multiple Contractor.• Low energy consumption.• Clean working environment.

TOBACCO PROCESSINGPLANT

A building area that is used for processing special kind of dark tobacco

Location: IndonesiaYear of completion: 2016Client: Gudang Garam

PROJECT FACTS

Short durationLow energy consumptionCost effective construction

Page 17: PROJECT REPORT - ct-technologies.dk · • Stable cold room temperature +3 ºC, securing perfect potato quality. • Fully automatic operation calling for very little attendance

17

Page 18: PROJECT REPORT - ct-technologies.dk · • Stable cold room temperature +3 ºC, securing perfect potato quality. • Fully automatic operation calling for very little attendance

18

SCOPE OF SERVICES

• Design and supply of Sandwich Panelsfor facades, internal walls and ceiling.

• Installation of Sandwich Panels forWall, 60 mm thick, 1 598 m2 (New SKM).

• Installation of Sandwich Panelsfor Wall, 6 025 m2 (Annex).

• Design and supply of external andinternal doors and windows.

• Installation of Windows,Steel and Doors.

ACHIEVEMENTS

• Short construction time.• Sandwich panels used

as building envelope.• Reduced power consumption.• Very tight vapour barriers.

TOBACCO PROCESSINGPLANT

Temperature and Humidity Controlled storage

Location: IndonesiaYear of completion: 2016Client: Gudang Garam

PROJECT FACTS

Short durationLow energy consumptionControlled indoor environment

Page 19: PROJECT REPORT - ct-technologies.dk · • Stable cold room temperature +3 ºC, securing perfect potato quality. • Fully automatic operation calling for very little attendance

19

SCOPE OF SERVICES

• Design of insulated part of the Plant.• Sandwich Panels for Wall & Gutter.• Sandwich Panels for Ceiling.• Sandwich Panels for Canopy.• Emergency doors.• Installation.

ACHIEVEMENTS

• Short construction time.• Working parallel with

multiple Contractor.• Very low energy consumption.• Special roof design minimizing

energy losses and risk of leaks.

TOBACCO WAREHOUSE WITH AUTOMATIC STORAGE

Warehouse with Automatic Storage and Retrieval System, comprising of a Receiving Area, Storage area that utilizies seven automatic Robots, and Transfer area with an automatic robot that connects to Processing Area

Location: IndonesiaYear of completion: 2016Client: Gudang Garam

PROJECT FACTS

Short durationLow energy consumptionVentilated roof, reducing energy consumption

Page 20: PROJECT REPORT - ct-technologies.dk · • Stable cold room temperature +3 ºC, securing perfect potato quality. • Fully automatic operation calling for very little attendance

20

SCOPE OF SERVICES

• Supply of sandwichpanels 50 mm thick.

• Installation of Sandwichpanels and accessories.

ACHIEVEMENTS

• Project finalised in time.

BENTOELTOWER

Bentoel Tower Malang (Cigarette Factory, Production House), Commenced on September 2016 and completed on November 2016

Location: IndonesiaYear of completion: 2016Client: Bentoel Balang

PROJECT FACTS

Short duration: 3 monthsCost effective constructionNice architecture features

Page 21: PROJECT REPORT - ct-technologies.dk · • Stable cold room temperature +3 ºC, securing perfect potato quality. • Fully automatic operation calling for very little attendance

21

Page 22: PROJECT REPORT - ct-technologies.dk · • Stable cold room temperature +3 ºC, securing perfect potato quality. • Fully automatic operation calling for very little attendance

22

SCOPE OF SERVICES

• Wall and ceiling panel insualtion.• Floor insulation.• Sliding doors and hinged

doors and hatches.• Relief valves.• Heating matts.• Light fixtures.• PVC curtains.• Evaporators for cold rooms,

chill rooms, flake ice storeand processing rooms.

• Refrigeration system valves.• Taking care of cold storage installation.

ACHIVEMENTS

• We kept the negative temperaturethat is required for the IQF products.

• Cold storages:• CR 1: 20x26.25m internal

+ 4m H for all, -25 ºC• CR 2 : 11.38x26.25m, +5 ºC to -25 ºC• CR 3: 17.7 x26.25m, -25 ºC• Chilled room 1: 6.0x10.05m

internal + 3m H for all, +5 ºC• Chilled room 2: 13.10x4.63m, +5 ºC• Flake ice room: 6.06x5.0m, -7 ºC

COLD STORAGE FOR FRUIT-VEGETABLE

Cold Stores and handling Area for Fruit and Vegetables consisting of 3 Cold Storages with partitions equipped withfull accessories and dock leveller,2 Chill Rooms and 1 flake Ice Store

Location: VietnamYear of completion: 2015Client: Antesco

PROJECT FACTS

Short duration: 1.5 monthsTemperature: -25 ºC

Page 23: PROJECT REPORT - ct-technologies.dk · • Stable cold room temperature +3 ºC, securing perfect potato quality. • Fully automatic operation calling for very little attendance

23

TESTIMONIAL FROM OUR CLIENT

“CT-TECHNOLOGIES has perfectly performed the installation of Cold Storages, Chill rooms, Flake Ice Room, Light fixtures and all Evaporators for the cooling system.

The whole scope of supply and installation under CT-TECHNOLOGIES

supervision led to trouble free operation and excellent quality work”

Quach Thanh BinhGeneral Director

Antesco

Page 24: PROJECT REPORT - ct-technologies.dk · • Stable cold room temperature +3 ºC, securing perfect potato quality. • Fully automatic operation calling for very little attendance

24

SCOPE OF SERVICES

• Design of all elements: Steel building,panel works and refrigeration system.

• Galvanised steel structures.• Prefabricated wall and ceiling

panels insulated with PIR foamwith enhanced fire resistance.

• Extruded floor insulationand vapour barriers.

• Door with air curtain.• Light fixtures.• Complete ammonia

refrigeration system.• Central refrigeration system

prepared for future connection ofexisting rooms, presently workingwith freon split systems.

• Installation and start-up andTraining of plant operators.

ACHIEVEMENTS

• Short, uncomplicated construction time• Stable storage temperature• Low electricity consumption

COLD STORE FOR FROZEN FISH

Expansion of Cold Store capacity for repeat client

Location: GhanaYear of completion: 2014Client: We2 Sea Foods

PROJECT FACTS

Capacity: 2 000 tShort durationLow energy consumptionInternal wall protection installed

Page 25: PROJECT REPORT - ct-technologies.dk · • Stable cold room temperature +3 ºC, securing perfect potato quality. • Fully automatic operation calling for very little attendance

25

SCOPE OF SERVICES

• Design and supply of sandwich panels.• Installation accessories.• Wall protection.• Pressure relief valves.• Doors.• Floor insulation.• Floor vapour barriers and floor heating.

ACHIEVEMENTS

• Successful installation andhandover on time.

• 1st this kind of processingplant for Hoka Bento.

• Delivery materials aheadof time schedule.

VEGETABLE/MEAT COLD STORAGE AND 2 ABF

New factory for processing products vegetables, meat etc. 2 ABF was built for fast freezing of products

Location: IndonesiaYear of completion: 2014Client: Hoka Bento

PROJECT FACTS

Short durationMultiple temperature facilityVery high hygienic requirements

Page 26: PROJECT REPORT - ct-technologies.dk · • Stable cold room temperature +3 ºC, securing perfect potato quality. • Fully automatic operation calling for very little attendance

26

SCOPE OF SERVICES

• Design of insulated partof Processing plant.

• Sandwich Panels for walls and ceiling.• Doors, including sliding and

hinged doors for positive andnegative temperature Windows.

• Polyurethane floor insulationand vapour barriers.

• Installation accessories.• Installation.

ACHIEVEMENTS

• Short construction time of 3 months.• Compliance with internal

hygienic standards.• Reduced power consumption.• Pleasant working environment.

POULTRYCOLD STORES

Cold Stores and Dispatch Area door for Poultry Processing Plant. The project was divided into 2 phases,1st phase (cold storage 1&2) was finished by 2014, and the 2nd phase (cold storage 3&4) was finished in 2015

Location: IndonesiaYear of completion: 2014Client: Wonokoyo

PROJECT FACTS

Loading Docks: 7Height: 12 mArea: 3 024 m2

Page 27: PROJECT REPORT - ct-technologies.dk · • Stable cold room temperature +3 ºC, securing perfect potato quality. • Fully automatic operation calling for very little attendance

27

Page 28: PROJECT REPORT - ct-technologies.dk · • Stable cold room temperature +3 ºC, securing perfect potato quality. • Fully automatic operation calling for very little attendance

28

TESTIMONIAL FROM OUR CLIENT

“CT-TECHNOLOGIES have been working for us on several projects and completed the

work in a good condition. All the rooms are still working well until now and have been

giving trouble free service ever since. It has been a pleasure working with PT.Teknologi Insulati Asia and we look forward working

with them on many future projects.”

Andi Tando SutantoProject Manager

PT. Wonokoyo Jaya Corporindo

Page 29: PROJECT REPORT - ct-technologies.dk · • Stable cold room temperature +3 ºC, securing perfect potato quality. • Fully automatic operation calling for very little attendance

29

SCOPE OF SERVICES

• Design of insulated part of the Plant.• Sandwich Panels.• Insulated doors.• Docks consisting of dock shelters,

dock levellers and sectional doors.• Installation.

ACHIEVEMENTS

• Short construction time.• New concept as regards

Docking Stations.• Very low energy consumption.• Hygienic and easy to clean.

FRUIT AND VEGETABLEPLANT

Integrated Fruit and Vegetable Processing Plant comprising Receiving Area, Precooling Rooms, Processing Area, Packaging Area, Chill and Cold Rooms and Dispatch Area. Processing Equipment including dedicated lines for processing of leafy vegetables

Location: IndiaYear of completion: 2012Client: B.Y. Agro

PROJECT FACTS

Short durationLow energy consumption

Page 30: PROJECT REPORT - ct-technologies.dk · • Stable cold room temperature +3 ºC, securing perfect potato quality. • Fully automatic operation calling for very little attendance

30

SCOPE OF SERVICES

• Design, supply and installationof prefabricated panel building.

• Including conveyor system for loading/unloading cold rooms on first floor.

• Design, supply and installationof ammonia refrigeration plant.

• Training of operation andmaintenance staff.

• Supply of spare parts.

ACHIEVEMENTS

• Efficient product handling.• Room temperature -25 ºC maintained

with use of one or two out oftotally three compressor units –i.e. generous stand-by capacity.

• Low energy consumption.• Fully automatic operation.

COLD STORAGE FOR FROZEN FISH

4 000 t cold store for frozen fish, -25 ºC in locally constructedtwo-storey building

Location: NigeriaYear of completion: 2012Client: Haano

PROJECT FACTS

Room temperature: -25 ºCLow energy consumption

Page 31: PROJECT REPORT - ct-technologies.dk · • Stable cold room temperature +3 ºC, securing perfect potato quality. • Fully automatic operation calling for very little attendance

31

Page 32: PROJECT REPORT - ct-technologies.dk · • Stable cold room temperature +3 ºC, securing perfect potato quality. • Fully automatic operation calling for very little attendance

32

SCOPE OF SERVICES

• Design of New Cold Storefor milk and cheese and IceCream Production Facility

• Wall and ceiling sandwich panelsfor Cold Store, Chill/Freezer Room.

• Goods Store, Corridor, Ice CreamProduction Room and Viewing Gallery.

• Manual sliding and hinged doors.• Windows for Viewing Gallery and

Ice Cream Production Room.• Heating matts.• Light fixtures.• Installation.

ACHIEVEMENTS

• Project finalised in time.• Completion of partly finished building.• Combination of storage and

processing facilities.

COLD STORE, DIARY PLANT & PRODUCTION FACILITY

Cold Store, Chill/Freezer Room, Dry Goods Store, Corridor, Ice Cream Production Room and Viewing Gallery

Location: IndonesiaYear of completion: 2012Client: Diamond Halmahera

PROJECT FACTS

Duration: 4 monthsInternational hygienic standards

Page 33: PROJECT REPORT - ct-technologies.dk · • Stable cold room temperature +3 ºC, securing perfect potato quality. • Fully automatic operation calling for very little attendance

33

SCOPE OF SERVICES

• Design of insulated part of theplant and refrigeration plant.

• Sandwich panels for coldstorage, processing & roof.

• Processing and cold store doors.• Windows.• Dock houses consisting of

dock shelters, dock levellersand sectional doors.

• NH3 Refrigeration plant.• Drive-in Racking System.• Installation.

ACHIEVEMENTS

• Compact design resultingin short transport distances.

• Battery charging room, storages,racking system, tunnels, etc.integrated in building.

• Design, materials and installationin conformity with internationalhygienic standards.

MEAT PROCESSING AND STORAGE PLANT

Meat Processing & Cold Stores, Loading Bays, Refrigeration Plant

Location: MacedoniaYear of completion: 2004Client: Mega

PROJECT FACTS

Area: 8 000 m2

International hygienic standards

Page 34: PROJECT REPORT - ct-technologies.dk · • Stable cold room temperature +3 ºC, securing perfect potato quality. • Fully automatic operation calling for very little attendance

34

SCOPE OF SERVICES

• Design of insulated part of the Plant.• Sandwich Panels.• Doors including automatic doors

and quick opening doors.• Extruded floor insulation

and vapour Barriers.• Iso-Docks consisting of dock shelters,

dock levellers and sectional doors.• Mobile Racking System.• Light fixtures.• Installation.

ACHIEVEMENTS

• Short construction time of 2 monthsfrom date of order to finished project.

• Compact design incorporatingProcessing, Storage and Dispatch.

RASPBERRY PROCESSING & COLD STORE FACILITY

Cold Storage and Raspberry Processing Plant with freezing tunnels inside

Location: SerbiaYear of completion: 2004Client: Miralex

PROJECT FACTS

Capacity: 8 000 tDuration: 2 months

Page 35: PROJECT REPORT - ct-technologies.dk · • Stable cold room temperature +3 ºC, securing perfect potato quality. • Fully automatic operation calling for very little attendance

35

SCOPE OF SERVICES

• Design of insulated part of the plant.• Sandwich, cold store & roof panels.• Doors.• Installation.

ACHIEVEMENTS

• Compact design resultingin short travelling distances.

• Design, materials and installationin conformity with internationalhygienic standards.

SLAUGHTERHOUSE, MEAT PROCESSING AND STORAGE

Slaughterhouse consisiting of Storage, Processing line and Slaughter line

Location: SerbiaYear of completion: 2003Client: Yuhor

PROJECT FACTS

Comprises processing and storage areasInternational hygienic standards

Page 36: PROJECT REPORT - ct-technologies.dk · • Stable cold room temperature +3 ºC, securing perfect potato quality. • Fully automatic operation calling for very little attendance

36

SCOPE OF SERVICES

• The supply, installation, testingand commissioning of purefoods

• Hot dog insulated wall & ceilingpanel and floor insulation

• And supply of sliding doors and dockequipment for small and reefer trucks

ACHIEVEMENTS

• Biggest Cold room storage andprocessing facility in the Philippines

• Installation of high tech doorsand dock equipment

• 20 Cold Rooms -20C• 4 big Dry Storages +20C

PUREFOODS HOT DOG PLANT – JUMBO PROJECT

Location: PhilippinesYear of completion: 2018Client: The Purefoods Hormel Company, San Miguel Corporation

PROJECT FACTS

85 000 m2 panels55 door and dock equipment

Page 37: PROJECT REPORT - ct-technologies.dk · • Stable cold room temperature +3 ºC, securing perfect potato quality. • Fully automatic operation calling for very little attendance

37

SCOPE OF SERVICES

• The supply and installation of wall &ceiling panel and floor insulation

• Supply of sliding doors and dockequipment for small and reefer trucks

ACHIEVEMENTS

• Central Warehouse in Metro Manila• Installation of high tech doors

and dock equipment• 32 Cold Rooms -25C

MAGSAYSAY – ONE STOP WAREHOUSING SOLUTION

Location: PhilippinesYear of completion: 2018Client: Magsaysay Logistics

PROJECT FACTS

20 000 m2 panels22 door and dock equipment

Page 38: PROJECT REPORT - ct-technologies.dk · • Stable cold room temperature +3 ºC, securing perfect potato quality. • Fully automatic operation calling for very little attendance

38

SCOPE OF SERVICES

• Delivery of design and materialfor erection of functionaland efficient facility

• Professional supervision of works• Panel thickness 150mm,

100mm and 80mm• Floor insulation c/w vapour barrier• Loading docks consisting of

sectional doors, hydrauliclevelers and dock shelters

• Industrial lighting fixtures, PRVs,sliding door and hinge doors

ACHIEVEMENTS

• Delivery of design and materialdone within agreed timeframe

• Supervisors timely providedquality technical support andinterventions to Client’s workforce

• Erected facility provides one coldstore, one ante room and threeloading rooms, followed by onebattery room, which all give out620m2 are for storage and operation

COLD STORE FOR FISH

1300MT Cold Store for Frozen Fish-25degC storage temperature

Location: VietnamYear of completion: 2017Client: CASEAMEX

PROJECT FACTS

2200m2 of panels3 fully equipped loading docks

Page 39: PROJECT REPORT - ct-technologies.dk · • Stable cold room temperature +3 ºC, securing perfect potato quality. • Fully automatic operation calling for very little attendance

39

SCOPE OF SERVICES

• Engineering, supply, installation,testing and commissioning ofsendwich panels facade docks, firesliding doors, and sectional doors

ACHIEVEMENTS

• Participating and sucessiful completionof the state of art factory project withhigh quality demands in the Philippines

• Installation of high tech doorsand dock equipment

• High architectural asetheticsdemands achieved by using sendwichpanels as external cladding

JTI CIGARETTE FACTORY – PROJECT FLEX

Location: PhilippinesYear of completion: 2017Client: STA. CLARA INTERNATIONAL CORPORATION

PROJECT FACTS

13 000 m2 panels including steel substructure7 Docks14 Fire sliding doors15 Sectional doors

Page 40: PROJECT REPORT - ct-technologies.dk · • Stable cold room temperature +3 ºC, securing perfect potato quality. • Fully automatic operation calling for very little attendance

40

OUR REFERENCES

Page 41: PROJECT REPORT - ct-technologies.dk · • Stable cold room temperature +3 ºC, securing perfect potato quality. • Fully automatic operation calling for very little attendance

41

Page 42: PROJECT REPORT - ct-technologies.dk · • Stable cold room temperature +3 ºC, securing perfect potato quality. • Fully automatic operation calling for very little attendance

42

SELECTED CT-TECHNOLOGIES CLIENTS

AFRICA

Ghana

Ecko DioFreedom FisheriesMankoadzeMORE PNissi ResourcesOcean FareWe 2

Nigeria

AbimbolaAssudamalFan MilkGlobal Cold Chain AllianceHaano

Kenya

Brookside DairyEnergyPAK

ASIA

Armenia

World Bank

Bangladesh

Rajanigandha

China

Hogu Coffee

India

AllanaAquaticaB.Y. Agro & Infrs Pvt. Ltd.CCL ProductsDevi FisheriesDSL Distribution Centre

Falcon GroupForstar Frozen FoodsGrowellHelodImpartial AgrotechKings Marine EximKNC AgroMKCNila SeafoodsNSR DocksTakenaka IndiaTolar OceanWeiss Technik IndiaWest Coast Frozen FoodsZeal Aqua

Indonesia

BentoelBluescopeBMIBosco LSCampinaChareon PokphandDiamond Halmahera and IrianHoka BentoIndojoyITUJapfa SantoriKaryadibya MahardhikaKraft FoodsGudang GaramMega Marine PrideMulti SariRPISKMSo Good FoodVictory Retailindo Masuya BekasiUltra JayaUnileverWonokoyo

Page 43: PROJECT REPORT - ct-technologies.dk · • Stable cold room temperature +3 ºC, securing perfect potato quality. • Fully automatic operation calling for very little attendance

43

Japan

Hasegawa

Philippines

AntarticaCentury AgricultureDole PhilippinesElite MarketingJentecJTI/Sta. Clara Cigarette FactoryKFCLBIMagsaysayPolar Cold StoragePurefoods Hormel CompanyRoyal CargoRoyale Cold Stores

Kuwait

Kazema

Malaysia

Petronas

Russia

Kraft FoodsOrimi

Singapore

Pacific RefreshmentSchaefer Systems International

Sri Lanka

Tuna WorksFinlay

Turkey

CarrefourPandaPenguin

Vietnam

AntescoCafatexCafé Outspan VietnamCeseamaxCochi Co.Dao Heuang GroupGEA Niro OlamHai Thanh Co.HatchandoViet Foods Co.

EUROPE

Bosnia and Herzegovina

BrajlovicNelt

Croatia

Ag DinasBig BullKonzumLinde

Germany

Kraft FoodsViva Coffee

Macedonia

PKBMega Dooel

Serbia

AgroživBig BullBranko Cold StoreCool and FrostLakiMiralexYuhur A.D

Page 44: PROJECT REPORT - ct-technologies.dk · • Stable cold room temperature +3 ºC, securing perfect potato quality. • Fully automatic operation calling for very little attendance

44

CT-TECHNOLOGIES ApS was established

in 1989 in Denmark. We are specialized

in design and supply of materials and

equipment for insulation of Cold Stores

and Food Processing Plants based on

specific demands from our clients.

Based on our 30 years of international

experience we possess a unique knowledge

and are able to execute almost any type

of temperature/hygienic controlled facility

within Food Storage, Fish Processing, Meat

Processing, Vegetable and Fruit Processing,

Dairy and Ice-Cream Industry, Ripening

Rooms, Control Atmosphere Rooms etc.

Whether your requirement is for sandwich

panels, doors, floor insulation, docking

systems, refrigeration system or the

complete facility CT-TECHNOLOGIES

can fulfil it conforming to all appropriate

standards and norms. To be able to create

the best for our clients we strive to ensure

satisfaction and professionalism in the

process of designing the insulated facility

and delivery of the materials and equipment.

We guarantee an individual treatment and

support and optimal choice of materials

for each project both in terms of price and

quality. Our experience and our references

is your guarantee that your project will

comply with all your requirements and

the industry’s international standards.

CT-TECHNOLOGIES know two projects

are not alike and each project is tailor

made to suit your specific demands.

CT-TECHNOLOGIES–the obvious

partner for your project.

Page 45: PROJECT REPORT - ct-technologies.dk · • Stable cold room temperature +3 ºC, securing perfect potato quality. • Fully automatic operation calling for very little attendance

45

OUR OFFICES

HEAD OFFICE

Denmark

CT-TECHNOLOGIES

Trorodvej 63B

2950 Vedbaek

www.ct-technologies.dk

ENGINEERING OFFICE

Bosnia and Herzegovina

CT-TECHNOLOGIES

Envera Šehovića 34

71000 Sarajevo

www.ct-technologies.dk

SUBSIDIARY

Phillippines

CT-TECHNOLOGIES

Unit 505, Alpap

Li Building

Madrigal Business

Park Ayala Alabang

Muntinlupa City 1780

www.ct-technologies.dk

SUBSIDIARY

Indonesia

TEKNOLOGI INSULASI ASIA

Jl. Tuna Raya 5

Muara Baru Ujung

Penjaringan

Jakarta Utara 14440

www.tiasia.co.id

REPRESENTATIVE OFFICE

Vietnam

CT-TECHNOLOGIES

Nhuyen Ding 80

Chieu Street, Disctrict 1

Ho Chi Minh City

www.ct-technologies.dk

www.ct-technologies.dk

Page 46: PROJECT REPORT - ct-technologies.dk · • Stable cold room temperature +3 ºC, securing perfect potato quality. • Fully automatic operation calling for very little attendance

46

MEMO

Page 47: PROJECT REPORT - ct-technologies.dk · • Stable cold room temperature +3 ºC, securing perfect potato quality. • Fully automatic operation calling for very little attendance

47

Page 48: PROJECT REPORT - ct-technologies.dk · • Stable cold room temperature +3 ºC, securing perfect potato quality. • Fully automatic operation calling for very little attendance