DET NORSKE VERITAS
PROJECT REPORT
Emergency Response & Disaster
Management Plan for Cauvery Basin
Pipeline GAIL, Puducherry
Prepared for:
GAIL (India) Limited.
DNV Ref. No.: PP027998
Rev 1, 13th
April, 2012
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan for Cauvery Basin
Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page II
No distribution without permission from the client or responsible
organisational unit (however, free distribution for internal use within
DNV after 3 years) Indexing Terms
No distribution without permission from the client or responsible
organisational unit Key Words
ERDMP
Strictly confidential Service Area
SHE Risk Management
Unrestricted distribution Market Segment
Oil & Gas
Rev. No. / Date: Reason for Issue: Prepared by: Verified by Approved by:
Rev 0 /
2012-03-30
Draft report issued to GAIL for
comments AB SK SV
Rev 1 /
2012-04-13 Final Report issued to GAIL AB SK SV
All rights reserved. This publication or parts thereof may not be reproduced or transmitted in any form or by
any means, including photocopying or recording, without the prior written consent of Det Norske Veritas AS.
Emergency Response & Disaster Management Plan for cauvery
Pipeline GAIL, Puducherry
DET NORSKE VERITAS AS
DNV Maritime & Natural Gas
Flat. No. 202 & 203, Second Floor
Babu Khan Millenium Center,
RajBhavan Road, Somajuguda
500082 Hyderabad India
Tel: +91 40 23418186
Fax: +91 40 44745577 / 44745579
http://www.dnv.com
Org. No:PCGIN820
For:
GAIL (India) Limited
4th
Floor, Savitha Plaza,
Indira Gandhi Square,
Puducherry-605005
Account Ref.:
S.Arunachalam,
Sr. Manager (O&M),
GAIL (India) Limited,
Contact : 094878 44664
Email: [email protected]
Date of First Issue: 2012-04-13 Project No. PP027998
Report No.: 13WOASN-3 Organisation
Unit:
DNV Cleaner Energy & Natural Gas
Hyderabad
Revision No.: 1 Subject Group: SHE Risk Management
Summary:
This Emergency Response & Disaster Management Plan (ERDMP) to detail the action plan to be implemented
to minimise the losses through optimum utilisation of resources available in the organization as well as the
resources available with the external agencies in case of any disaster.
Prepared by: Name and Position
Avvari Anil Bhat, Consultant
Signature
Verified by Name and Position
Sandhya Kondaveety, Consultant
Signature
Approved by: Name and Position
Salian Varadharaja, Head of
Department
Signature
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan for Cauvery Basin
Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page III
Table of Contents
1 INTRODUCTION ................................................................................................................... 7
2 DEFINITION .......................................................................................................................... 7
3 OBJECTIVE ........................................................................................................................... 8
4 SCOPE ..................................................................................................................................... 8
5 GENERAL INFORMATION ABOUT PIPELINE ............................................................. 9
5.1 Description & Location ................................................................................................... 9
5.2 MAINTENANCE BASES ............................................................................................ 10
5.3 PIPELINE DESCRIPTION ........................................................................................... 10
5.4 DESPATCH TERMINAL ............................................................................................. 10
5.5 SECTIONALIZING VALVE STATIONS ................................................................... 10
6 TYPE OF EMERGENCIES: ............................................................................................... 13
7 CREDIBLE FAILURE SCENARIOS & HAZARD DISTANCES .................................. 14
8 SALIENT FEATURES ......................................................................................................... 35
8.1 Organizational Setup ..................................................................................................... 35
9 MAJOR CONTROLS AND INTER LOCKS .................................................................... 37
9.1 CONFIGURATION AND CONTROL FOR SV STATIONS ..................................... 37
9.2 CONFIGURATION AND CONTROL FOR RECEIVING TERMINALS ................. 37
9.3 SCADA SYSTEM AND FUNCTIONALITIES ........................................................... 37
10 SAFETY SYSTEMS WITHIN THE FACILITY .............................................................. 38
10.1 EMERGENCY VEHICLES .......................................................................................... 38
10.2 FIRE PROTECTION ARRANGEMENTS................................................................... 38
10.3 COMMUNICATION SYSTEMS ................................................................................. 38
10.4 REGIONAL GAS MANAGEMENT CENTRE ........................................................... 38
10.5 EMERGENCY CONTROL CENTRES (ECC) ............................................................ 38
10.6 Emergency Tools and Equipment ................................................................................. 39
11 ROLES AND RESPONSIBILITIES ................................................................................... 43
11.1 Organogram ................................................................................................................... 43
11.2 Action Plan for Coordinators and Key Personnel ......................................................... 46 11.2.1 Chief Incident Controller, DGM (O&M) / Officer In-charge: .......................... 46
11.2.2 Incident Controller, CM (O&M): ...................................................................... 47
11.2.3 Site Co-Ordinator, Base In charge: ................................................................... 47
11.2.4 Fire & Safety Co-Ordinator:.............................................................................. 47
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan for Cauvery Basin
Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page IV
11.2.5 Maintenance Co-Ordinator: ............................................................................... 47
11.2.6 Security Co-Ordinator: ...................................................................................... 48
11.2.7 Control Room Coordinator:............................................................................... 48
11.2.8 Material Co-Ordinator: ...................................................................................... 48
11.2.9 Finance Co-Ordinator: ....................................................................................... 48
11.2.10 Welfare, PR & Logistics Co-Ordinator: ........................................................ 48
11.2.11 Medical Co-Ordinator:................................................................................... 48
11.2.12 Communications Co-Ordinator: .................................................................... 49
12 SEQUENCE OF WORKS TO BE DONE DURING EMERGENCY ............................. 49
12.1 Approach Cautiously From Upwind: ............................................................................ 49
12.2 Secure The Scene: ......................................................................................................... 49
12.3 Identify The Hazards: .................................................................................................... 49
12.4 Assess The Situations: ................................................................................................... 49
12.5 General Precautions For Handling Emergencies........................................................... 50
12.6 Emergency Do's and Don’ts: ......................................................................................... 50
12.7 Action Plan to meet the Eventualities ........................................................................... 52
12.8 RESPONSIBILITIES ASSIGNED: .............................................................................. 53 12.8.1 Heavy Leakage: ................................................................................................. 53
12.8.2 Fire: ................................................................................................................... 54
12.8.3 Explosion: .......................................................................................................... 54
12.8.4 Failure of Critical Control System: ................................................................... 54
12.8.5 Design Deficiency: ............................................................................................ 54
12.8.6 Building/structure Collapse & other accidents: ................................................. 54
12.8.7 Riots/Civil Disorder/Mob attack ....................................................................... 55
12.8.8 Terrorism / Flood / Sabotage / Bomb Threat .................................................... 55
12.8.9 Outbreak of diseases / Food Poisoning / Water poisoning ................................ 55
13 PLAN OF COORDINATION .............................................................................................. 56
13.1 Communication Facilities.............................................................................................. 56 13.1.1 Telephones: ....................................................................................................... 56
13.2 Important Contact Numbers: ......................................................................................... 56
13.3 Telephone Directory at GAIL, Puducherry: .................................................................. 60
13.4 Mutual Aid Response Group ......................................................................................... 74
13.5 Co-ordination between the Local organisations/Mutual Aid Members: ....................... 74
13.6 Coordination with Outside Agencies: ........................................................................... 74
13.7 Role and Statutory Duties of Outside Agencies ............................................................ 75
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan for Cauvery Basin
Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page V
13.7.1 Role of police department ................................................................................. 75
13.7.2 Role of Tamil Nadu fire service ........................................................................ 75
13.7.3 Role of district authorities ................................................................................. 75
14 RESCUE AND RELIEF OPERATION PLAN .................................................................. 76
14.1 Assembly Points ............................................................................................................ 76
14.2 Emergency Evacuation .................................................................................................. 76
14.3 Rescue & Evacuation Procedure: .................................................................................. 76
15 MEDICAL FACILITIES ..................................................................................................... 77
15.1 First Aid Boxes:............................................................................................................. 77
15.2 Transportation Facilities: ............................................................................................... 78
16 RECOVERY PROCEDURES ............................................................................................. 78
17 REVISION & MOCK DRILLS ........................................................................................... 78
17.1 Revision: ........................................................................................................................ 78
17.2 Rehearsal / Mock Drill: ................................................................................................. 78
17.3 Training ......................................................................................................................... 79
17.4 Essential Employees ...................................................................................................... 79
17.5 Rehearsal / Mock Drill .................................................................................................. 79
17.6 Mock Drill Procedure .................................................................................................... 79
17.7 Updating the Plan .......................................................................................................... 82
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan for Cauvery Basin
Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page VI
List of Figures Figure 1 : Cauvery Basin Pipeline system ................................................................................ 12
Figure 2 : Individual Risk Contours for Narimanam Zone ....................................................... 19 Figure 3 : Individual Risk Contours for Kutthalam Zone ......................................................... 23 Figure 4 : Individual Risk Contours for Ramnad Zone ............................................................ 27 Figure 5 : Individual Risk Contours for Kovilkalappal Zone ................................................... 31 Figure 6 : Individual Risk Contours for Bhuvanagiri Zone ...................................................... 34
Figure 7 : Organisation Structure for Disaster Management Plan ............................................ 36 Figure 8: Lay-out of Narimanam zone ...................................................................................... 41
Figure 9: Lay-out of Kuthalam zone ......................................................................................... 41 Figure 10: Lay-out of Ramnad zone ......................................................................................... 42 Figure 11: Lay-out of Kovilkappal zone ................................................................................... 42 Figure 12: Lay-out of Bhuvanagiri zone ................................................................................... 43
Figure 13 : Emergency Line of command for Emergency Plan ............................................... 44 Figure 14 : Communication channel for Emergency Plan ........................................................ 45
List of Tables Table 1: Consequence Results for the Narimanam Zone’ Pipeline .......................................... 14 Table 2: Consequence Results for PRS at PPCL in the Narimanam Zone ............................... 16
Table 3: Consequence Results for AKM-NRM-Thirumarugal-Memathur Pipeline
and PRS at Memathur ............................................................................................................... 17
Table 4: Consequence Results for the Kutthalam Zone ............................................................ 20 Table 5: Consequence Results for the Ramnad Zone ............................................................... 24
Table 6: Consequence Results for the Kovilkalappal Zone ...................................................... 28 Table 7: Consequence Results for the Bhuvanagiri Zone ......................................................... 32 Table 8: Emergency Organisation Members ............................................................................ 46
Table 9: Do’s and Don’ts of Emergency .................................................................................. 50
Table 10: List of Important phone numbers of district authorities ........................................... 56 Table 11: Important Telephone Numbers of GAIL personnel .................................................. 60 Table 12: Mutual Aid Contact Details ...................................................................................... 61 Table 13: Police Station Contact Details .................................................................................. 65
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan for Cauvery Basin
Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 7
1 INTRODUCTION
With rapid industrialisation and the birth of large-scale plants using complex technologies, it
has become vital for industries to develop "Emergency Response & Disaster Management
Plans" to enable them to meet any undesired eventuality. Disaster management has assumed
added significance after the catastrophic happenings at Flixborough, Bhopal, Mexico, and
Chernobyl etc. Indeed some of the disasters in the recent past have brought out glaring
inadequacies in the management systems to respond to a disaster situation to effectively
control and minimise the loss of lives and property.
In view of the hazards associated with hydrocarbon processing industries, it is obligatory,
under the Factories Act, 1948(amended in 1987) and Manufacture, Storage and Import of
Hazardous Chemical (MSIHC) Rules, 1989 to develop our own ERDMP as per PNGRB
norms. Such a plan will ensure establishment of a system, which would make optimum use
of our available resources for speedy containment of the disaster protecting the health and
safety of people, nearby residences and workers as well as minimising damage to property
and environment. There are many agencies involved in the activities associated with disaster
situation e.g. Civil Administration, Fire services, Medical, Police, Army, Voluntary
organisations etc., which call for an organised multi-disciplinary approach to the problem.
DNV has been requested by GAIL to prepare and Emergency Response and Disaster
Management Plan (ERDMP) to satisfy both local regulatory and their internal HSE
requirements.
NAME AND ADDRESS OF THE PERSON FURNISHING THE INFORMATION
Name: Dinabandhu Soren,
Dy. Gen. Manager (O&M) & Officer In-charge,
Address:
Office: GAIL (India) Limited,
IV Floor, Savitha Plaza,
Puducherry - 605005.
Mobile: 9443242601
Landline: 0413 2200932, 2200933, 2201480
2 DEFINITION
Disaster is an incident or calamity caused by deficiencies in the system, accident, natural
causes, or deliberate intent and resulting in: serious damage or destruction to records and
facilities; a sudden threat to personal safety; or major disruption of operations. The aim of a
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan for Cauvery Basin
Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 8
disaster management plan is to detail the action plan to be implemented to minimise the
losses through optimum utilisation of resources available in the organization as well as the
resources available with the external agencies.
3 OBJECTIVE
The objective of the ERDMP is:
Identify potential hazards emergencies which has great threat to plant, property,
people & equipment
Initially contain and ultimately bring the incident under control
Minimize damage to property and environment
Effective rescue and treatment of casualties
Safeguard personnel in the premises
Provide authoritative information to news/media
Secure safe rehabilitation of affected areas
Preserve relevant records and equipment for subsequent inquiry into the cause and
circumstances of emergency
Make maximum use of the combined resources of the factory and the outside services
4 Scope
The scope of this ERDMP covers
Classifying the emergency
Pre emergency planning
Emergency mitigation measures
Emergency preparedness measures
Emergency response procedures and measures
Emergency organization and responsibilities
Infrastructure requirements
Declaration of Onsite and Offsite emergency
Resource for controlling emergencies
Demographic Information
Medical facilities
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan for Cauvery Basin
Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 9
Evacuation
Public relations and Information to Public
Reporting the incident
Emergency recovery Procedures
Integration of the ERDMP with National Disaster Management(NDMP)
Security threat plan
5 GENERAL INFORMATION ABOUT PIPELINE
5.1 Description & Location
Natural Gas pipeline network in Cauvery Basin has been designed to provide uninterrupted
service to both producers and consumers. The system has sufficient built-in redundancy to
meet breakdowns and planned withdrawal of units for routine maintenance. Normally,
pipeline is operated optimally to meet supply and demand forecast. The pipeline route has
been selected to avoid populated areas and has built in design factor commensurate with
degree of risk related to population index of that area.
To prevent damage due to corrosion, three layer PE coated pipes have been used for most of
the lines. Besides, a permanent CP system has been installed for additional protection, the
health of which is routinely monitored.
GAIL, Cauvery Basin consists of a network of around 267 Kms of pipeline of various sizes
and lengths supplying NATURAL GAS to 52 consumers in the region distributed
geographically in different districts. There are 9 gas collecting stations of ONGCL
(Narimanam, Kamalapuram, Nannilam, Tiruvarur EPS, Adiyakkamangalam, Bhuvanagiri,
Kovilkalappal, Ramnad, Kuthalam) divided into Five zones being utilized for supplying gas
to the consumers.
The Five zones are:
Narimanam zone catering to 38 consumers.
Kovilkalappal (Thirumakkotai) zone catering to 2 consumers.
Bhuvanagiri zone catering to 1 consumer.
Kuthalam Zone catering to 6 consumers
Ramnad Zone catering to 5 consumers
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan for Cauvery Basin
Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 10
5.2 MAINTENANCE BASES
The pipeline network has been divided into the following five Zones of operation with the
Base stations as given below
i) PPCL (Narimanam Zone)
ii) Tirumakottai TNEB (Kovilkalappal Zone)
iii) Kuthalam TNEB (Kuthalam & Bhuvanagiri Zones)
iv) Ramnad TNEB (Ramnad Zone)
Each of the above base station is headed by a Base-In-charge who is responsible for safe
operation and maintenance as well as management of any emergency involving the pipeline
arising in the area.
5.3 PIPELINE DESCRIPTION
The following facilities have been provided (as well as proposed) along the Pipeline network:
1. Despatch Terminal
2. Receiving Terminals
3. Sectionalizing valve stations
4. Tap-ins / tap-offs
Natural gas in the pipeline network of Cauvery Basin is supplied through the production
installations of ONGC. The Natural gas from the pipeline grid is supplied to the downstream
consumers.
5.4 DESPATCH TERMINAL
The pipeline network has six Dispatch terminals in total covering all the Zones. The gas is
received from ONGCL and is transported to the downstream consumers through the Pipeline
network at an average operating pressure of 10-15 Kg / cm2.
5.5 SECTIONALIZING VALVE STATIONS
The SV stations are installed on the main trunk line, for the purpose of isolating the sections
of pipeline system in case of any maintenance or emergency or accident.
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan for Cauvery Basin
Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 11
These stations apart from main line isolation valve do have the provision for safe venting off
the gas from the pipeline to the atmosphere. Most of the SVs along the entire pipeline
network are guarded round the clock by security guards, who work in shifts. The security
guards have been provided with Emergency Telephone numbers and have been directed to
provide information as and when necessary.
Each SV station is located inside chain-link fencing and its gate is kept locked.
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 12
Figure 1 : Cauvery Basin Pipeline system
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan for Cauvery Basin
Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 13
6 TYPE OF EMERGENCIES:
The emergencies are mainly classified into three levels
Level 1 : This is an emergency or an incident which
can be effectively and safely managed, and contained within the site, location or
installation by the available resources
has no impact outside the site, location or installation
is unlikely to be danger to life, the environment or to company assets or reputation
All the lelvel1 emergencies will be handled by the GAIL Personnel
Level 2 : This is an emergency or an incident which
cannot be effectively and safely managed or contained at the site, location or
installation by available resource and additional support is required
is having, or has the potential to have an effect beyond the site, location or installation
and where external support of mutual aid partner may be involved
is likely to be danger to life, to the environment, to company assets or reputation
level 2 emergencies will be handled by the GAIL personnel and members under
Mutual Aid Scheme
Level 3 : This is an emergency or an incident which
is catastrophic and is likely to affect the population, property and environment inside
and outside the installation, and management & control is done by District
Administration. Although the level 3 emergency falls under the purview of District
Authority but till this will be taken care till the District administration comes into
force.
Level 1 & Level 2 shall normally be grouped as onsite emergency and Level 3 as off-site
emergency.
DET NORSKE VERITAS
MANAGING RISK Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 14
7 CREDIBLE FAILURE SCENARIOS & HAZARD DISTANCES
The credible failure scenarios are given in below table
Table 1: Consequence Results for the Narimanam Zone’ Pipeline
No. Node Description Scenario Release Rate &
Duration Event Impact criteria
Consequence
Distance(m)
D
11m/s
B
2m/s
F
2m/s
1
Pipeline from CPCL to
PPCL
(High Flow Rate Line)
Pipeline
Medium 3.98E+00 kg/s & 711.77s
Flash Fire LFL (41766 ppm) 60.7 73.26 32.33
Jet Fire
37.5Kw/m2 11.34 8.77 8.77
12.5Kw/m2 13.17 11.83 11.83
4Kw/m2 19.41 20.86 20.86
Explosion
0.3bar 36.6 41.6 21.6
0.1bar 56.17 61.17 41.17
0.03bar 111.33 116.33 96.33
Large 1.594E+01kg/s & 177.94s
Flash Fire LFL (41766 ppm) 118.94 57.51 131.24
Jet Fire
37.5Kw/m2 21.98 16.34 16.34
12.5Kw/m2 26.43 24.84 24.84
4Kw/m2 44.21 44.77 44.77
Explosion
0.3bar 61.6 71.6 31.6
0.1bar 81.17 91.17 51.17
0.03bar 136.33 146.33 106.33
Rupture NA
Flash Fire LFL (41766 ppm) 51.76 48.32 21.04
Jet Fire
37.5Kw/m2 8.65 8.65 13.71
12.5Kw/m2 12.14 12.14 14.73
4Kw/m2 21.56 21.56 16.41
Explosion
0.3bar 0 26.6 0
0.1bar 0 46.17 0
0.03bar 0 101.33 0
2 Pipeline from ISRM Pipeline Medium 2.18E+00 kg/s & 66.9s Flash Fire LFL (39302.1 ppm) 47.66 64.46 57.09
DET NORSKE VERITAS
MANAGING RISK Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 15
No. Node Description Scenario Release Rate &
Duration Event Impact criteria
Consequence
Distance(m)
D
11m/s
B
2m/s
F
2m/s
consumers to Jayadevi
(Low Flow Rate) Jet Fire
37.5Kw/m2 5.68 6.72 6.72
12.5Kw/m2 5.83 8.6 8.6
4Kw/m2 12.72 14.32 14.32
Explosion
0.3bar NH 36.62 31.62
0.1bar NH 56.24 51.24
0.03bar NH 111.56 106.56
Large 8.73E+00kg/s & 16.72s
Flash Fire LFL (39302.1 ppm) 93.62 120.19 51.23
Jet Fire
37.5Kw/m2 16.49 12.46 12.46
12.5Kw/m2 19.54 17.89 17.89
4Kw/m2 31.48 32.5 32.5
Explosion
0.3bar 51.62 103.11 31.62
0.1bar 71.24 122.74 51.24
0.03bar 126.56 178.05 106.56
Rupture NA
Flash Fire LFL (39302.1 ppm) 50.91 57.1 27.1
Jet Fire
37.5Kw/m2 11.33 8.06 8.06
12.5Kw/m2 12.54 10.67 17.87
4Kw/m2 15.65 10.67 17.87
Explosion
0.3bar 31.62 NH NH
0.1bar 51.24 NH NH
0.03bar 106.55 NH NH
DET NORSKE VERITAS
MANAGING RISK Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 16
Based the dynamic inventory, PRS at PPCL has considered as the representative for all the PRS station in Narimanam Zone. Table 2 below
summarises representative failure cases with the consequence results.
Table 2: Consequence Results for PRS at PPCL in the Narimanam Zone
No. Node Description Scenario Release Rate &
Duration Event Impact criteria
Consequence
Distance(m)
D
11m/s
B
2m/s
F
2m/s
1 PRS AT CPCL
(High Flow Rate) PRS
Small 1.17E-02kg/s & 900s
Flash Fire LFL (41766 ppm) 0.745 0.913 0.931
Jet Fire
37.5Kw/m2 NR NR NR
12.5Kw/m2 NR NR NR
4Kw/m2 1.74 1.74 1.74
Medium 2.94E-01kg/s & 900s
Flash Fire LFL (41766 ppm) 3.45 4.41 4.59
Jet Fire
37.5Kw/m2 NR NR NR
12.5Kw/m2 NR 6.19 6.19
4Kw/m2 7.6 8.47 8.47
Large 4.69E+00kg/s & 585.29s
Flash Fire LFL (41766 ppm) 14.89 20.2 19.16
Jet Fire
37.5Kw/m2 29.14 24.06 24.06
12.5Kw/m2 33.39 30.03 30.03
4Kw/m2 38.35 37.83 37.83
Rupture NA
Flash Fire LFL (41766 ppm) 4.39 5.77 6.13
Jet Fire
37.5Kw/m2 8.59 8.59 8.59
12.5Kw/m2 9.5 9.5 9.5
4Kw/m2 11.66 11.66 11.11
DET NORSKE VERITAS
MANAGING RISK Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 17
below summarises the failure cases with the consequence results of AKM-NRM-Thirumarugal-Memathur Pipeline and PRS at Memathur
Table 3: Consequence Results for AKM-NRM-Thirumarugal-Memathur Pipeline and PRS at Memathur
No Node Description Accident
Scenario
Release Rate &
Duration Event Impact criteria
Consequence
Distance(m)
D
11m/s
B
2m/s
F
2m/s
1
Pipeline from AKM-NRM-
THIRUMARUGAL-
MEMATHUR
Pipeline
Medium 4.11E+00 kg/s & 900s
Flash Fire LFL (39302.1 ppm) 63.83 87.16 77.44
Jet Fire
37.5Kw/m2 11.39 8.84 8.84
12.5Kw/m2 13.26 11.94 11.94
4Kw/m2 19.72 21.16 21.16
Explosion
0.3bar 36.62 46.62 41.62
0.1bar 56.24 66.24 61.24
0.03bar 111.56 121.56 116.56
Large 1.64E+01kg/s & 432.76s
Flash Fire LFL (39302.1 ppm) 125.66 162.91 67.63
Jet Fire
37.5Kw/m2 22.12 16.48 16.48
12.5Kw/m2 26.64 25.2 25.2
4Kw/m2 44.85 45.38 45.38
Explosion
0.3bar 66.62 86.62 36.62
0.1bar 86.24 106.24 56.24
0.03bar 141.56 161.56 111.56
Rupture NA
Flash Fire LFL (39302.1 ppm) 198.12 77.19 87.19
Fireball
37.5Kw/m2 136.63 136.63 136.63
12.5Kw/m2 385.73 385.73 385.73
4Kw/m2 717.6 717.6 717.6
Explosion
0.3bar 106.99 9.69 17.7
0.1bar 126.62 29.31 37.32
0.03bar 181.93 84.63 92.64
2 PRS at SV3 Memathur Pipeline Small 1.21E-02kg/s & 900s Flash Fire LFL (39302.1 ppm) 0.754 0.919 0.937
DET NORSKE VERITAS
MANAGING RISK Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 18
No Node Description Accident
Scenario
Release Rate &
Duration Event Impact criteria
Consequence
Distance(m)
D
11m/s
B
2m/s
F
2m/s
Medium 3.03E-1kg/s & 900s
Flash Fire LFL (39302.1 ppm) 3.48 4.46 4.63
Jet Fire
37.5Kw/m2 NR NR NR
12.5Kw/m2 NR 6.36 6.36
4Kw/m2 7.69 8.57 8.57
Large 4.84E+00kg/s & 774.79s
Flash Fire LFL (39302.1 ppm) 15.16 19.32 20.33
Jet Fire
37.5Kw/m2 29.34 24.32 24.32
12.5Kw/m2 33.65 30.35 30.35
4Kw/m2 38.69 38.23 38.23
Rupture NA
Flash Fire LFL (39302.1 ppm) 183.16 55.52 61.04
Fireball
37.5Kw/m2 NR NR NR
12.5Kw/m2 196.13 196.13 196.13
4Kw/m2 396.28 396.28 396.28
Explosion
0.3bar NR NR NR
0.1bar 183.39 17.77 30.04
0.03bar 216.39 50.76 63.03
DET NORSKE VERITAS
MANAGING RISK Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 19
Individual Risk
Figure 2 : Individual Risk Contours for Narimanam Zone
DET NORSKE VERITAS
MANAGING RISK Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 20
Table 4: Consequence Results for the Kutthalam Zone
S.No Description Accident
Scenario
Release Rate, Release
Duration Event
Impact criteria
Consequence Distance(m)
Day Night
B 2m/s D 11m/s F 2m/s
1
Receiving and Distribution
Terminal Kutthalam (KUT
DT)
Small 0.01kg/s, 900s
Flash Fire LFL (39302.1) 0.91 0.75 0.9
Jet Fire
37.5kW/m2 1.76 1.76 1.76
12.5kW/m2 1.76 1.76 1.76
4 kW/m2 1.76 1.76 1.76
Medium 0.3kg/s, 900s
Flash Fire LFL (39302.1) 4.39 3.48 4..41
Jet Fire
37.5kW/m2 6.24 6.24 6.24
12.5kW/m2 7.24 7.24 7.24
4 kW/m2 8.5 7.69 8.5
Large 4.84kg/s, 900s
Flash Fire LFL 18.9 15.16 19.2
Jet Fire
37.5kW/m2 24.86 29.33 24.86
12.5kW/m2 30.75 33.65 30.75
4 kW/m2 38.32 38.69 38.32
Rupture 37.07kg/s, 834s
Flash Fire LFL (39302.1) 72.26 81.44 77.97
Jet Fire
37.5kW/m2 61.02 76.22 61.02
12.5kW/m2 78.31 86.07 78.21
4 kW/m2 102.31 101.59 102.31
Explosion
0.3bar - - -
0.1bar 48.25 53.25 48.25
0.03bar 81.24 86.24 81.24
2 KUT DT to SV Memathur Medium 4.11kg/s, 900s
Flash Fire LFL (39302.1) 87.33 63.83 76.38
Jet Fire
37.5kW/m2 9.07 11.39 9.07
12.5kW/m2 12.09 13.24 12.09
4 kW/m2 21.07 19.72 21.07
Explosion
0.3bar 46.62 36.62 41.62
0.1bar 66.24 56.24 61.24
0.03bar 121/559 111.55 61.24
DET NORSKE VERITAS
MANAGING RISK Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 21
S.No Description Accident
Scenario
Release Rate, Release
Duration Event
Impact criteria
Consequence Distance(m)
Day Night
B 2m/s D 11m/s F 2m/s
Large 16.4kg/s, 900s
Flash Fire LFL (39302.1) 167.21 125.65 149.34
Jet Fire
37.5kW/m2 16.94 22.12 16.94
12.5kW/m2 25.17 26.64 25.17
4 kW/m2 45.36 44.84 45.36
Explosion
0.3bar 86.6 66.5 76.62
0.1bar 106.24 86.24 96.24
0.03bar 161.55 141.55 151.55
Rupture 28.1kg/s, 900s
Flash Fire LFL (39302.1) 9.83 0 14.01
Jet Fire
37.5kW/m2 24.99 38.03 24.99
12.5kW/m2 38.24 43.12 38.24
4 kW/m2 68.97 65.82 68.97
Explosion
0.3bar 36.6 76.6 31.6
0.1bar 56.24 96.24 51.24
0.03bar 111.55 151.55 106.55
3 KUT TNEB to Kaveri Gas
Medium 4.1kg/s, 900s
Flash Fire LFL (39302.1) 88.17 63.97 77.57
Jet Fire
37.5kW/m2 9.07 11.4 9.07
12.5kW/m2 12.104 13.27 12.104
4 kW/m2 21.1 19.75 21.1
Explosion
0.3bar 46.62 36.62 41.62
0.1bar 66.24 56.24 61.24
0.03bar 121.55 111.55 116.55
Large 16.48kg/s, 781s
Flash Fire LFL (39302.1) 169.7 126.04 150.68
Jet Fire
37.5kW/m2 16.95 22.14 16.95
12.5kW/m2 25.19 26.66 25.19
4 kW/m2 45.4 44.89 45.4
Explosion
0.3bar 86.62 66.62 81.62
0.1bar 106.24 86.24 101.24
0.03bar 161.55 141.55 156.55
DET NORSKE VERITAS
MANAGING RISK Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 22
S.No Description Accident
Scenario
Release Rate, Release
Duration Event
Impact criteria
Consequence Distance(m)
Day Night
B 2m/s D 11m/s F 2m/s
Rupture 16.62kg/s, 775.3s
Flash Fire LFL (39302.1) 166.18 125.94 149.44
Jet Fire
37.5kW/m2 17.02 22.22 17.02
12.5kW/m2 25.36 26.77 25.36
4 kW/m2 45.6 45.09 45.6
Explosion
0.3bar 86.62 66.62 76.62
0.1bar 106.24 86.24 96.24
0.03bar 161.55 141.55 151.55
DET NORSKE VERITAS
MANAGING RISK Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 23
Individual Risk
Figure 3 : Individual Risk Contours for Kutthalam Zone
DET NORSKE VERITAS
MANAGING RISK Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 24
Table 5: Consequence Results for the Ramnad Zone
S.No Description Accident
Scenario
Release Rate,
Release Duration Event Impact criteria
Consequence Distance(m)
Day Night
B 2m/s D 11m/s F 2m/s
1
Receiving and
Distribution terminal
Ramnad (RMD GCS)
Small 0.01kg/s, 900s Flash Fire LFL (39302.1) 0.91 0.75 0.9
Medium 0.29kg/s, 900s
Flash Fire LFL (39302.1) 4.37 3.46 4.39
Jet Fire
37.5kW/m2 6.02 6.02 6.02
12.5kW/m2 7.4 7.4 7.4
4 kW/m2 8.39 7.57 8.39
Large 4.67kg/s, 900s
Flash Fire LFL (39302.1) 18.98 15.04 19.9
Jet Fire
37.5kW/m2 24.58 29.07 24.58
12.5kW/m2 30.38 33.32 30.38
4 kW/m2 37.87 38.27 37.87
Rupture 35.67kg/s, 900s
Flash Fire LFL (39302.1) 71.09 74.9 78.68
Jet Fire
37.5kW/m2 60.35 75.24 60.35
12.5kW/m2 77.33 84.97 77.33
4 kW/m2 100.85 100.32 100.85
Explosion
0.3bar - - -
0.1bar 48.22 48.22 48.22
0.03bar 81.13 81.13 81.13
2 RMD GCS to TNEB Medium 3.96kg/s, 900s
Flash Fire LFL (39302.1) 74.2 59.71 61.75
Jet Fire
37.5kW/m2 8.98 11.31 8.98
12.5kW/m2 11.95 13.13 11.95
4 kW/m2 20.76 19.39 20.76
Explosion
0.3bar 41.6 0 36.6
0.1bar 61.17 0 56.17
0.03bar 116.35 0 111.35
Large 15.8kg/s, 900s Flash Fire LFL (39302.1) 135.33 118.25 56.69
DET NORSKE VERITAS
MANAGING RISK Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 25
S.No Description Accident
Scenario
Release Rate,
Release Duration Event Impact criteria
Consequence Distance(m)
Day Night
B 2m/s D 11m/s F 2m/s
Jet Fire
37.5kW/m2 16.78 21.95 16.78
12.5kW/m2 24.81 26.38 24.81
4 kW/m2 44.75 44.21 44.75
Explosion
0.3bar 71.63 61.63 31.63
0.1bar 91.17 91.17 51.17
0.03bar 146.35 136.35 106.35
Rupture 24.5kg/s, 900s
Flash Fire LFL 139.36 141.91 58.97
Jet Fire
37.5kW/m2 20.76 28.57 20.76
12.5kW/m2 32.31 34.08 32.31
4 kW/m2 58.06 57.57 58.06
Explosion
0.3bar 71.63 76.63 31.63
0.1bar 91.17 96.17 51.17
0.03bar 146.35 151.35 106.35
3 RMD TNEB to
Coromandel
Medium 4.0kg/s, 900s
Flash Fire LFL (39302.1) 76.97 61.32 64.85
Jet Fire
37.5kW/m2 9.03 11.37 9.03
12.5kW/m2 12.02 13.21 12.02
4 kW/m2 20.9 19.54 20.9
Explosion
0.3bar 41.6 36.6 36.6
0.1bar 61.17 56.17 56.17
0.03bar 116.35 111.35 111.35
Large 16.01kg/s, 900s
Flash Fire LFL 141.43 120.45 58.61
Jet Fire
37.5kW/m2 16.86 22.06 16.86
12.5kW/m2 24.96 26.52 24.96
4 kW/m2 45.01 44.48 45.01
Explosion 0.3bar 76.6 66.6 31.6
DET NORSKE VERITAS
MANAGING RISK Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 26
S.No Description Accident
Scenario
Release Rate,
Release Duration Event Impact criteria
Consequence Distance(m)
Day Night
B 2m/s D 11m/s F 2m/s
0.1bar 96.17 86.17 51.17
0.03bar 151.35 141.35 106.35
Rupture 10.11kg/s, 900s
Flash Fire LFL (39302.1) 118.16 96.82 96.46
Jet Fire
37.5kW/m2 13.79 17.87 13.79
12.5kW/m2 19.49 21.24 19.49
4 kW/m2 35.38 34.51 35.38
Explosion
0.3bar 61.6 51.6 51.6
0.1bar 81.17 71.11 71.11
0.03bar 136.35 126.35 126.35
DET NORSKE VERITAS
MANAGING RISK Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 27
Individual Risk
Figure 4 : Individual Risk Contours for Ramnad Zone
DET NORSKE VERITAS
MANAGING RISK Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 28
Table 6: Consequence Results for the Kovilkalappal Zone
S.No Description Accident
Scenario
Release Rate, Release
Duration Event Impact criteria
Consequence Distance(m)
Day Night
B 2m/s D 11m/s F 2m/s
1 Receiving and Distribution
Terminal (Nallur DT)
Small 0.01kg/s, 900s Flash Fire LFL (39302.1) 0.91 0.75 0.9
Medium 0.3kg/s, 900s
Flash Fire LFL (39302.1) 4.39 3.48 4.41
Jet Fire
37.5kW/m2 6.24 6.24 6.24
12.5kW/m2 7.8 7.8 7.8
4 kW/m2 8.54 7.69 8.5
Large 4.84kg/s, 900s
Flash Fire LFL (39302.1) 18.99 15.16 19.92
Jet Fire
37.5kW/m2 24.86 29.33 24.86
12.5kW/m2 30.85 33.65 30.75
4 kW/m2 38.32 38.69 38.32
Rupture 37kg/s, 521s
Flash Fire LFL (39302.1) 72.26 81.44 77.97
Jet Fire
37.5kW/m2 61.02 76.22 61.02
12.5kW/m2 78.31 86.07 78.31
4 kW/m2 102.31 101.59 102.31
Explosion
0.3bar 0 0 0
0.1bar 48.25 53.25 48.25
0.03bar 81.14 86.24 81.24
2 Nallur DT to TNEB TMK
Medium 4.11kg/s, 900s
Flash Fire LFL (39302.1) 87.33 63.83 76.38
Jet Fire
37.5kW/m2 9.07 11.39 9.07
12.5kW/m2 12.09 13.25 12.09
4 kW/m2 21.07 19.72 21.07
Explosion
0.3bar 46.62 36.62 41.62
0.1bar 66.24 56.24 61.24
0.03bar 121.55 111.55 116.55
Large 16.4kg/s, 900s
Flash Fire LFL (39302.1) 167.21 125.65 149.34
Jet Fire 37.5kW/m2 16.94 22.12 16.94
12.5kW/m2 25.17 26.64 25.17
DET NORSKE VERITAS
MANAGING RISK Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 29
S.No Description Accident
Scenario
Release Rate, Release
Duration Event Impact criteria
Consequence Distance(m)
Day Night
B 2m/s D 11m/s F 2m/s
4 kW/m2 45.36 44.84 45.36
Explosion
0.3bar 86.62 66.62 76.62
0.1bar 106.24 86.26 96.24
0.03bar 161.55 141.55 151.55
Rupture 13.11kg/s, 900s
Flash Fire LFL (39302.1) 97.88 104.26 40.21
Jet Fire
37.5kW/m2 17.59 26.83 17.59
12.5kW/m2 25.86 29.85 25.86
4 kW/m2 46.86 41.48 46.86
Explosion
0.3bar 51.62 56.62 26.62
0.1bar 71.24 76.24 46.24
0.03bar 126.55 131.55 101.55
3 Nallur DT to Premi
Chemco
Medium 2.82kg/s, 129s
Flash Fire LFL (39302.1) 72.56 53.14 64.77
Jet Fire
37.5kW/m2 7.66 9.48 7.66
12.5kW/m2 9.96 10.85 9.96
4 kW/m2 16.75 15.31 16.75
Explosion
0.3bar 41.62 0 36.62
0.1bar 61.24 0 56.25
0.03bar 116.55 0 111.55
Large 11.3kg/s, 32.2s
Flash Fire LFL (39302.1) 140.62 105.05 125.4
Jet Fire
37.5kW/m2 14.38 18.64 14.38
12.5kW/m2 20.59 22.24 20.59
4 kW/m2 37.32 36.52 37.32
Explosion
0.3bar 76.62 56.62 87.87
0.1bar 96.24 76.24 107.49
0.03bar 151.55 131.55 162.81
Rupture 3.5kg/s, 104s Flash Fire LFL (39302.1) 73.34 55.18 62.78
Jet Fire 37.5kW/m2 8.88 11.56 8.88
DET NORSKE VERITAS
MANAGING RISK Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 30
S.No Description Accident
Scenario
Release Rate, Release
Duration Event Impact criteria
Consequence Distance(m)
Day Night
B 2m/s D 11m/s F 2m/s
12.5kW/m2 11.72 13.23 11.72
4 kW/m2 19.89 18.34 19.89
Explosion
0.3bar 41.62 0 36.62
0.1bar 61.24 0 56.25
0.03bar 116.55 0 111.55
DET NORSKE VERITAS
MANAGING RISK Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 31
Individual Risk
Figure 5 : Individual Risk Contours for Kovilkalappal Zone
DET NORSKE VERITAS
MANAGING RISK Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 32
Table 7: Consequence Results for the Bhuvanagiri Zone
S.No Description Accident Scenario Release Rate,
Release Duration Event Impact criteria
Consequence Distance(m)
Day/Night
B 2m/s D 11m/s F 2m/s
1 Neycer (India) Ltd
Small 0.11kg/s, 900s Flash Fire LFL (39302.1) 0.91 0.75 0.9
Medium 0.3kg/s, 900s
Flash Fire LFL (39302.1) 4.39 3.48 4.41
Jet Fire
37.5kW/m2 6.24 6.24 6.24
12.5kW/m2 7.6 7.6 7.6
4 kW/m2 8.5 7.69 8.5
Large 4.84kg/s, 239s
Flash Fire LFL (39302.1) 18.99 15.16 19.92
Jet Fire
37.5kW/m2 24.86 29.33 24.86
12.5kW/m2 30.75 33.65 30.75
4 kW/m2 38.32 38.69 38.32
Rupture 2.68kg/s, 431s
Flash Fire LFL (39302.1) 14.85 10.25 15.47
Jet Fire
37.5kW/m2 19.27 25.44 19.27
12.5kW/m2 24.36 27.78 24.36
4 kW/m2 30.53 31.01 30.53
2 Bhuvanagiri to Neycer (India) Ltd
Medium 3.45kg/s, 900s
Flash Fire LFL (39302.1) 78.88 58.01 67.41
Jet Fire
37.5kW/m2 8.36 10.43 8.36
12.5kW/m2 11.05 12.08 11.05
4 kW/m2 18.97 17.56 18.97
Explosion
0.3bar 41.62 0 36.62
0.1bar 61.24 0 56.24
0.03bar 116.55 0 111.55
Large 13.8kg/s, 316s
Flash Fire LFL (39302.1) 150.44 113.377 133.63
Jet Fire 37.5kW/m2 15.72 20.46 15.72
12.5kW/m2 22.96 24.53 22.96
DET NORSKE VERITAS
MANAGING RISK Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 33
S.No Description Accident Scenario Release Rate,
Release Duration Event Impact criteria
Consequence Distance(m)
Day/Night
B 2m/s D 11m/s F 2m/s
4 kW/m2 41.47 40.82 41.47
Explosion
0.3bar 81.62 61.62 71.62
0.1bar 101.24 81.24 91.24
0.03bar 156.55 136.55 149.55
Rupture 0.48kg/s, 900s
Flash Fire LFL (39302.1) 24.9 23.11 18.02
Jet Fire
37.5kW/m2 7.16 8.25 7.16
12.5kW/m2 7.16 8.25 7.16
4 kW/m2 7.17 8.25 7.17
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 34
Individual Risk
Figure 6 : Individual Risk Contours for Bhuvanagiri Zone
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan for Cauvery Basin
Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 35
In these scenarios most of them can be treated as onsite emergencies and come under level 1
and level 2 emergencies. The level 3 emergencies mostly consist of
Riots/Civil Disorder/Mob attack
Terrorism
Sabotage
Bomb threat
War / hit by missiles
Abduction
Food poisoning / water poisoning.
Flood
Earth quake
Cyclone
Outbreak of disease
Excessive rains
Tsunami
All the scenarios will be acted by the combined resources of the GAIL and the outside
services based on their level.
8 SALIENT FEATURES
8.1 Organizational Setup
The organization chart is given in Figure 7
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 36
Figure 7 : Organisation Structure for Disaster Management Plan
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan for Cauvery Basin
Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 37
9 MAJOR CONTROLS AND INTER LOCKS
In view of the hazards (fire / leakage) associated with the highly flammable natural gas and
the fact that the cross country pipe lines passing through a number of populated areas, GAIL
has recognized the paramount importance in ensuring safety during transportation through
the pipe line. A number of SV stations have been provided at different locations along the
pipe line to make it safe.
9.1 CONFIGURATION AND CONTROL FOR SV STATIONS
SV stations are provided along the pipe line at every 20 to 25 Kms approximately. These SV
stations consist of main isolating ball valves QOEC System for evacuating gas. In case of
emergency in any particular section the up / down stream of SV stations can be isolated and
the gas can be vent out in order to facilitate repair jobs in that particular section.
All SV stations are guarded round the clock by security guards. Communication facility is
available for communicating with the RGMC, Pondicherry.
9.2 CONFIGURATION AND CONTROL FOR RECEIVING
TERMINALS
The Receiving terminals are provided with filtration system which consists of slug catcher,
scrubber and filter separators, pressure reduction system and metering system. The pressure
reduction system consists of pressure controllers and shutdown valves. Normally all the
major receiving terminals have two loops of pressure reduction system and one loop will be
online and the second loop will be in hot standby. If the online loop fails immediately the
stand by loop will come into line and by this way it is ensured that required pressure is
always maintained to the consumer. The receiving terminals also have safety valves in order
to take care of any excessive pressure to ensure safety of the terminal.
9.3 SCADA SYSTEM AND FUNCTIONALITIES
Monitoring
The pipe line parameters of various stations like Pressure, Temperature, and Gas flow can be
monitored from RGMC, Pondicherry by SCADA.
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan for Cauvery Basin
Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 38
10 SAFETY SYSTEMS WITHIN THE FACILITY
In view of possible emergencies involving natural gas along the pipeline GAIL has provided
the following resources for controlling emergencies and necessary mitigate actions. These are
described in this section.
10.1 EMERGENCY VEHICLES
Each base station has been equipped with a round-the-clock vehicle. This vehicle would be
available with the pipeline O&M department in the respective Base Station and would be
used for reaching the scene of any accident along the pipeline and controlling the
emergencies.
10.2 FIRE PROTECTION ARRANGEMENTS
All major terminals are provided with fire water hydrant systems and portable fire
extinguishers and all other terminals and pipeline installations are provided with portable fire
extinguishers. Minimum 2 numbers of 10 kg Dry Chemical Powder type fire extinguishers
are kept at small installation & additional 25 kg Dry Chemical Powder type fire extinguisher
is kept at major installation
10.3 COMMUNICATION SYSTEMS
The main mode of communication between the base stations and RGMC Pondicherry is
Landline Phones/Mobile phones.
10.4 REGIONAL GAS MANAGEMENT CENTRE
Regional Gas Management Centre established at Pondicherry Office WILL ACT AS
REGIONAL CONTROL CENTRE. In RGMC all the data regarding operational requirement
can be collected through GSM Modem based SCADA communication.
10.5 EMERGENCY CONTROL CENTRES (ECC)
The control room shall be designated as the Emergency Control Centre for controlling any
emergency arising in their respective regions. The Chief Incident Controller shall be present
at the Emergency Control Centers along with the Engineers & Technicians, as required.
Depending upon the situation and decision of the Chief Incident Controller(s) the Emergency
Control Centre may also be temporarily shifted to the location of leak along the Natural Gas
pipeline.
The following facilities shall be available at each of the Emergency Control Centers (ECC):
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan for Cauvery Basin
Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 39
a) Master plan of the whole pipeline network including associated facilities and surrounding
areas.
b) Layout plan of the relevant installations.
c) Maps indicating location of pipeline and associated facilities vis-à-vis populated areas in
the neighborhood
d) Communication arrangements ( Mobile phones, phones, etc.)
e) A copy of the Disaster Management Plan
f) List of telephone numbers of all key personnel of GAIL
g) List of telephone numbers of external agencies (District authorities, police, hospitals,
contractors, neighbouring industries, consumers, etc.)
h) Telephone directory both local as well as other districts in the region
i) Transport facility (in addition to the emergency vehicle)
j) General stationery like paper, pencils, pens etc.
The control room staff shall never leave the control room (ECC) in any case, except in the
following situations:
a) Fire inside the control room
b) Natural Gas ingress inside the control room
10.6 Emergency Tools and Equipment
1. LEL detector.
2. PPEs – (Minimum 3 sets)
- Safety helmets
- Ear muff
- Cotton hand gloves
3. First aid box.
4. Safety torch.
5. Valve sealant gun and sufficient cartridges.
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan for Cauvery Basin
Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 40
6. Measuring tape.
7. S.W. Gaskets- 2”, 4”, 6”, 8”, 10”, 12”, 14”, 18”.
8. Grease.
9. Rustoline.
10. Marking cloth.
11. Teflon tape.
12. Insulation tape.
13. DCP fire extinguisher.
14. SS fittings.
15. O-Ring kit.
16. Tool box containing following Non-Sparking Tools
- Set of ring spanners 6-32 mm
- Set of open end spanner 6-32mm
- Pipe wrench
- Adjustable wrench
- Set of screw drivers
- Allen key set
- Location Maps for the Terminals
The location maps for the terminals are given below so that they can be used during
emergency situations.
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan for Cauvery Basin
Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 41
Figure 8: Lay-out of Narimanam zone
Figure 9: Lay-out of Kuthalam zone
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan for Cauvery Basin
Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 42
Figure 10: Lay-out of Ramnad zone
Figure 11: Lay-out of Kovilkappal zone
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan for Cauvery Basin
Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 43
Figure 12: Lay-out of Bhuvanagiri zone
11 ROLES AND RESPONSIBILITIES
11.1 Organogram
The details (designation) and duties of the staff are given below in the “organisation structure
for emergency plan” is given in Figure 13
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 44
Figure 13 : Emergency Line of command for Emergency Plan
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 45
Figure 14 : Communication channel for Emergency Plan
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan
for Cauvery Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 46
The role of key personnel is clearly defined to avoid confusion and to meet the emergency
effectively. The Chief Incident Controller are the personnel for effective control of an
emergency at site.
Chief Incident Controller - DGM/OFFICER IN-CHARGE
Incident Controller -MR (O&M)
Site Coordinator -Base Incharge
The various coordinators shall act upon depending on the situation for running/shutdown of
the plant in consultation with the site main controller. They shall take in to account the safety
of personnel, plant property. Safe operating procedures which are already in practice shall be
followed:
Table 8: Emergency Organisation Members
CO-ORDINATOR DESIGNATION
1 Chief Incident Controller DGM / OFFICER IN-CHARGE
2 Incident Controller MR (O&M)
3 Site Coordinator Base In charge
4 Fire & Safety Coordinator HOD (F&S)
5 Maintenance Coordinator HOD (Maintenance)
6 Security Coordinator HOD (Security)
7 Control Room Coordinator RGM-In-charge
8 Material Coordinator HOD (C&P)
9 Communication Coordinator HOD (GAIL TEL)
10 Welfare and Medical Coordinator HOD (HR)
11 Finance Coordinator HOD (F&A)
11.2 Action Plan for Coordinators and Key Personnel
Action Plan for Coordinators and Key Personnel in Case of Fire / Explosion / Flammable
Gas/Liquid Leakage / Toxic Gas/ Liquid Leakage Emergencies
11.2.1 Chief Incident Controller, DGM (O&M) / Officer In-charge:
He shall,
Rush to RGMC control room (emergency control center)
Take overall charge of situation
Inform the higher authorities at corporate office and outside agencies, if required
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan
for Cauvery Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 47
Keep in touch with all coordinators & give necessary instructions to control the
emergency
Accord final approval for all action plans and overall co-ordination.
11.2.2 Incident Controller, CM (O&M):
He shall,
Rush to site with the emergency response team from Puducherry
Keep in touch with chief incident controller & all coordinators
Take overall charge of site operations from base in charge
Take suitable action in consultation with chief incident controller to control the
emergency
11.2.3 Site Co-Ordinator, Base In charge:
Rush to site with his team from base
Take charge of situation till arrival of incident controller
Co-ordinate with incident controller & RGMC control room for requirement of
resources
Assist incident controller in formulating remedial measures to control the emergency
11.2.4 Fire & Safety Co-Ordinator:
Rush to site along with emergency response team from Puducherry
Take charge of firefighting & rescue operations at site
Assist incident controller in mitigating the emergency & liaison with other fire
services
11.2.5 Maintenance Co-Ordinator:
Rush to site along with emergency response team from Puducherry
Take charge of maintenance operations at site
Assist incident controller in mitigating the emergency
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan
for Cauvery Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 48
11.2.6 Security Co-Ordinator:
Rush to site along with emergency response team from Puducherry
Take charge of security operations at site
Assist incident controller in rescue operations & liaison with police authorities
11.2.7 Control Room Coordinator:
Rush to RGMC control room
Assist chief incident controller with managing flow of gas through the pipeline
network
11.2.8 Material Co-Ordinator:
Rush to RGMC control room
Assist chief incident controller
Manage stores functions, issue/ procurement of materials required in emergency
11.2.9 Finance Co-Ordinator:
Rush to RGMC control room
Assist chief incident controller
Arrange funds for emergency purposes
11.2.10 Welfare, PR & Logistics Co-Ordinator:
Rush to RGMC control room
With due approval of CIC control information flow to external parties
Action for arranging welfare/ transportation of men & material
11.2.11 Medical Co-Ordinator:
Rush to RGMC control room
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan
for Cauvery Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 49
Assist chief incident controller by liaising with concerned authorities to provide
medical & other related facilities at site
11.2.12 Communications Co-Ordinator:
Rush to RGMC control room
Assist chief incident controller by establishing communication link with site &
keeping him posted with updated information.
12 SEQUENCE OF WORKS TO BE DONE DURING EMERGENCY
The following sequence of works is to be done for different emergency situations.
12.1 Approach Cautiously From Upwind:
Resist the urge to rush in; others cannot be helped until the situation has been fully assessed.
12.2 Secure The Scene:
Without entering the immediate hazard area, isolate the area and assure the safety of people
and the environment, keep people away from the scene and outside the safety perimeter.
Allow enough room to move your own equipment.
12.3 Identify The Hazards:
Placards, container labels, shipping documents and / or expert persons on the scene are
valuable information sources. Evaluate all available information and consult the
recommended MSDS to reduce immediate risks.
12.4 Assess The Situations:
Consider the following:
Is there a fire, a spill or a leak?
What are the weather conditions?
What is the terrain like?
Who/what is at risk: people, property or the environment?
What actions should be taken: Is an evacuation necessary?
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan
for Cauvery Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 50
What resources (human and equipment) are required and are readily available?
What can be done immediately?
12.5 General Precautions For Handling Emergencies
Decide On Site Entry:
Any efforts made to rescue persons, protect property or the environment must be weighed
against the possibility that you could become part of the problem. Enter the area only when
wearing appropriate protective gear (see the MSDS on protective clothing and equipment).
Respond:
Respond in an appropriate manner. Establish a command post and lines of communication.
Rescue casualties where possible & evacuate if necessary. Maintain control of the site.
Continually re-assess the situation & modify the response accordingly. The first duty is to
consider the safety of the people in the immediate area, including your own.
Above All:
Don’t walk into or touch spilled materials. Avoid inhalation of fumes, smoke & vapours,
even if no dangerous chemicals are known to the involved. Don’t assume that the gases or
vapours are harmless because of lack of smell – odourless gases or vapours may be harmful.
12.6 Emergency Do's and Don’ts:
Table 9: Do’s and Don’ts of Emergency
DO'S DON'TS
ANY ONE NOTICING AN EMERGENCY:
Will inform control room and / or fire station and
provide assistance for the crew where ever possible.
Then report to the assembly point and await further
instructions.
DO NOT take unnecessary risk.
DO NOT run in panic.
DO NOT argue or discuss in the scene of fire.
DO NOT try to operate the firefighting
equipment if you do not know the operation.
DO NOT over crowd the scene of fire
unnecessarily.
DO NOT get too excited, because fire is faster
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan
for Cauvery Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 51
DO'S DON'TS
than you.
DO NOT linger with firefighting equipment,
when there is fire, every moment counts.
DO NOT order or signal unless required to
do.
CONTRACTOR PERSONNEL
Stop work on hearing alarm. Assemble at the
ASSEMBLY POINT and be ready to evacuate.
DO NOT enters the site, till it is cleared for the
normal work by Chief Incident Controller.
SECURITY :
Keep the gate manned
Keep the road clear for movement of fire tenders.
Control traffic.
DO NOT allow unauthorized visitors free to
enter.
VISITORS :
Leave the place and assemble at assembly point.
DO NOT enter the site if emergency alarm is
heard.
ALL OTHER EMPLOYEES ON SITE :
On hearing FIRE alarm, go to assembly point and
wait for further instruction.
DO NOT panic
DO NOT go to the site of emergency unless
specifically instructed by site main/incident
controller.
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan
for Cauvery Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 52
12.7 Action Plan to meet the Eventualities
Procedure for Handling Fire
Case-1 Fire at Terminal area
Locate the fire affected area
Evaluate the Magnitude of fire
Isolate the affected section from the remaining area
Extinguish the fire by suitable fire extinguisher if required seek the assistance of
customer tender and fire men
Inform the Base In-charges / GAIL officers and the customer control room & Fire
station
Inform the MCR/OIC GAIL, Puducherry according to the nature of fire
Case-2 Fire at Pipeline area
As the message comes confirm about the identity of P/L location particulars and
quantum of fire
Immediately inform BIC / GAIL officers and customer control room
BIC shall rush to the site with necessary fire extinguishers, retaining one
coordinator at the terminal and extinguish the fire.
Ensure that P/L section is isolated if required
BIC shall asses the nature of fire and accordingly inform the MCR/OIC GAIL
Puducherry & Tamil Nadu State Govt. authorities.
Once the fire is extinguished a detailed report on the incident shall be submitted to
OIC, GAIL, Puducherry.
Procedure for handling Accidents
Incase of any accident occurred in the installation provide the first aid to the
injured person immediately.
If the accident is of major in nature provide first aid to the person and then refer
him I the customer dispensary or to the hospital.
All minor/Major accidents shall be reported to the safety officer and BIC.
Procedure for Handling Flange Leakage
In case of Flange leakage
Evaluate the magnitude of the leak
Inform the BIC/ GAIL officials
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan
for Cauvery Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 53
Plan for the Material , Manpower and Tools & Tackles
Necessary work permit may be obtained from the authorities before carrying out
the job.
Place fire extinguisher, arrange necessary non sparking tools
Minor Leak
Before carrying out the job wear personnel protective equipment like safety
helmet, gloves and safety goggles.
Try to control the leak by further tightening of bolts.
Use standard Engineering practice while tightening the nuts & bolts, check for
any leakage
If leak does not stop arrange for shut down of the equipment, if necessary.
Major Leak
Inform the BIC and the customer
Prepare for the shutdown of the equipment if necessary
Close the upstream and downstream valve of the leaking flange. Allow the gas
flow to the customer through by pass line if possible.
Vent the Entrapped gas to depressurize the equipment/line
Remove the nuts & bolts by standard practice if necessary use flange-separators.
Replace the old gasket with the new one after cleaning the flange surface
Tighten the nuts & bolts by standard practice and arrest leakage if any before
resuming gas supply to the customer.
Open the upstream valve slowly and then open the downstream valve when the
customer is ready to draw.
12.8 RESPONSIBILITIES ASSIGNED:
Responsibilities have been assigned to key persons for handling of emergencies at site.
General actions required to be taken by key persons are given below. They shall take
appropriate action to control emergencies. If required, help from mutual aid response group
shall be taken to control the on-site emergencies.
12.8.1 Heavy Leakage:
For containment of Heavy Leakages, HOD (Ops) & HOD (Mech) shall take action in
coordination with HOD (F&S) and other HOD’s. HOD (F&S) shall ensure that all hot jobs
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan
for Cauvery Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 54
are stopped and if required and take action to blanket flammable liquid with foam. For heavy
gas leakage take help of mutual aid members for leak arresting and containment.
12.8.2 Fire:
HOD (F&S)/Designated safety officer shall take action for the control/extinguishment of
particular type of fire. However, HOD (Ops) shall guide him about the process parameters of
the equipments / vessels involved in fire. For large fire take help of mutual aid member.
12.8.3 Explosion:
HOD (F&S)/Designated safety officer shall take action in case of the explosion of particular
type of equipment / vessel, however, HOD (Ops) shall guide him about the process
parameters of the equipments / vessels involving in the explosion. Take help from mutual aid
members for a large scale search and rescue operation.
12.8.4 Failure of Critical Control System:
HOD (Ops) and HOD (Mech) shall work in coordination for the situation such as failure of
critical control system. In such situations HOD (F&S) shall guide the working personnel
about the safe handling of the situation. Evacuation and barricading of area shall be done as
per requirement by HOD (F&S) in consultation with Site Main Controller and with the help
of Security Coordinator. For large scale damage take help of mutual aid members for getting
the situation into control.
12.8.5 Design Deficiency:
HOD (Ops) and HOD (Mech) shall work in coordination for doing the HAZOP for different
units, identify the design deficiency as and when required and address the same in
coordination with HOD (F&S), HOD (Civil) etc.
12.8.6 Building/structure Collapse & other accidents:
Building/structure collapse may be due to earthquack, other causes/hazards & secondary
effects of above emergencies. Accidents such as electrocution, cold/hot burn, suffocation etc.
may happened during plant operation. HOD (F&S)/Designated safety officer shall take action
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan
for Cauvery Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 55
for search and rescue. HOD (Operation) will take action for clearing of collapsed
building/structure. HOD (Mech) will assist HOD (Operation). HOD (HR) will arrange for
medical help as per requirement. Take help from mutual aid members for a large scale search
and rescue operation.
12.8.7 Riots/Civil Disorder/Mob attack
The most effective way to deal with riots, Civil disorders, Mob attacks is to identify and
report potentially dangerous situations prior to an incident. All employees are therefore
expected to exercise good judgment and to immediately inform Human Resources if any
such behaviour or situations are found. Based on the intensity of the situation the HOD (HR)
will take action by calling police or by declaring suspension of works. After calm up of the
situation the employees shall be informed by the HOD (HR) and HOD (F&S) to attend their
normal duties.
12.8.8 Terrorism / Flood / Sabotage / Bomb Threat
Any prior information of the terrorism or flood or sabotage or bomb threat is known to the
HOD (F&S) will coordinate with the NDMA authorities, assess the situation and based on
the emergency they will coordinate with the Mutual Aid group and the district authorities.
Will shut down the operations in coordination with the other HOD’s and if any emergency
situation occurs the Emergency Medical Technician team will start rescue operations.
12.8.9 Outbreak of diseases / Food Poisoning / Water poisoning
If there is an outbreak of diseases in the district the site coordinator will be informed by the
health department about this. Then the Site coordinator, HOD (HR) should coordinate with
the local government hospitals and get the possible medication for all the employees and
educate them about that pandemic disseises to make them aware of the situation.
In case of food poisoning / water poisoning the concerned employees are to be taken to the
nearby hospital by the Site coordinator, HOD (HR) or the HOD (F&S). After proper
treatment, the cause for this to be evaluated by them and proof to be preserved for further
investigation. The food or water should be discarded so that no one else will consume the
same.
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan
for Cauvery Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 56
13 PLAN OF COORDINATION
The plan of co-ordination includes the procedures for the following:
13.1 Communication Facilities
communication at GAIL Puducherry.
13.1.1 Telephones:
DOT Telephone (Landline & WLL)
Inter com Telephone
Satellite Phone
Telephones are provided at strategic location in plant and in various departments for internal
as well as external communication (selected locations). Telephone facility is also provided at
the residence of key person, coordinators.
13.2 Important Contact Numbers:
List of District and State Authorities:
Table 10: List of Important phone numbers of district authorities
NAGAPATTINAM DISTRICT CIVIL AUTHORITIES
1 DISTRICT COLLECTOR
04365 – 247000/253083 (O) 04365 – 247800
(R)
2 DIVISIONAL FIRE OFFICER 04365 – 249409
3 HOSPITAL COORDINATOR 04365 – 242459
4 DY. DIRECTOR HEALTH SERVICES 04365 – 248734
5 REGIONAL TRANSPORT OFFICER 04365 – 249477
6 SUPENTENDENT OF POLICE 04365 – 242888 (O) 04365 – 248777 (R)
7 SR. REG. MANAGER, CIVIL SUPPLY 04365 – 251843 / 251393
8 EXECUTIVE ENGINEER (PWD) 04365 – 220082
9 INSPECTOR OF FACTORIES 04366 - 242327
10
DISTRICT TELEPHONE AUTHORITY
(DE) 04365 – 225600
11
RAILWAY STATION
NAGAPATTINAM 04365 – 242131
THIRUVARUR DISTRICT CIVIL AUTHORITIES
1 DISTRICT COLLECTOR 04366 – 221001 / 02 / 03 / 04 04366 – 223344
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan
for Cauvery Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 57
(DIRECT) 04366 – 243242
2 SENIOR FIRE OFFICER 04366 – 222101
3 HOSPITAL COORDINATOR 04366 – 242354
4 DY. DIRECTOR HEALTH SERVICES 04366 – 250879
5 REGIONAL TRANSPORT OFFICER 04366 – 240357 / 221261
6 SUPENTENDENT OF POLICE 04366 – 222377 (O) 04366 – 222029 (R)
7 DISTRICT OFFICER CIVIL SUPPLY 04366 – 220510
8 EXECUTIVE ENGINEER (PWD) 04366 – 241347
9 INSPECTOR OF FACTORIES 04366 – 242327
10
DISTRICT TELEPHONE AUTHORITY
(DE) 04366 – 224800
11 RAILWAY STATION THIRVARUR 04366 – 222551
KARAIKAL DISTRICT CIVIL AUTHORITIES
1 DISTRICT COLLECTOR 04368 – 222444 / 221760
2 DIVISIONAL FIRE OFFICER 04368 – 230112
3 HOSPITAL COORDINATOR 04368 – 222593 / 223917
4 RES. MEDICAL OFFICER 04368 – 222450
5 REGIONAL TRANSPORT OFFICER 04368 – 222729
6 SUPENTENDENT OF POLICE 04368 – 228007
7 SR. SUPENTENDENT OF POLICE 04368 – 223238
8 DY. DIRECTOR CIVIL SUPPLY 04368 – 227718
9 EXECUTIVE ENGINEER (PWD) 04368 – 222592
10 INSPECTOR OF FACTORIES 04368 – 221740 / 222562
11
DISTRICT TELEPHONE AUTHORITY
(DE) 04368 – 222500
RAMNAD DISTRICT CIVIL AUTHORITIES
1 DISTRICT COLLECTOR 04567 – 231220 / 230060 04567 – 222079 (R)
2 REHABITATION OFFICER 04567 – 231410
3 DIVISIONAL FIRE OFFICER 04567 – 232118 / 230094
4 HOSPITAL COORDINATOR 04567 – 220102 / 340 / 341
5 DY. DIRECTOR HEALTH SERVICES 04567 – 222454
6 REGIONAL TRANSPORT OFFICER 04567 – 220622 / 722 04567 – 232120 / 231373
7 SUPENTENDENT OF POLICE
04567 – 232243 / 232114 04567 – 231350 /
230770
8 DISTRICT OFFICER CIVIL SUPPLY 04567 – 230056 / 57 / 58
9 EXECUTIVE ENGINEER (PWD) 04567 – 220239 / 230728
10 INSPECTOR OF FACTORIES 04575 – 224326 0452 – 2530729 (MADURAI)
11
DISTRICT TELEPHONE AUTHORITY
(DE) 04567 – 222400 / 222222
12 RAILWAY STATION RAMNAD 04567 – 220810
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan
for Cauvery Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 58
TANJORE DISTRICT CIVIL AUTHORITIES
1 DISTRICT COLLECTOR 04362 – 230121 04362 – 230201 (R)
2 DIVISIONAL FIRE OFFICER 04362 – 238932
3 HOSPITAL COORDINATOR 04362 – 231221,231023
4 DY. DIRECTOR HEALTH SERVICES 04362 – 273503
5 REGIONAL TRANSPORT OFFICER 04362 – 227358
6 SUPENTENDENT OF POLICE 04362 – 277220
7 DISTRICT OFFICER CIVIL SUPPLY 04362 – 231336
8 EXECUTIVE ENGINEER (PWD) 04362 – 271250
9 INSPECTOR OF FACTORIES 04362 – 235469
10
DISTRICT TELEPHONE AUTHORITY,
GM -KUMHBAKONAM 0435 – 2430000
11
RAILWAY STATION
KUMBHAKONAM 0435 – 2433131
CUDDALORE DISTRICT CIVIL AUTHORITIES
1 DISTRICT COLLECTOR 04142 – 230668 (O) 04142 – 230777 (R)
2 DIVISIONAL FIRE OFFICER 04142 – 295101 / 293301
3 HOSPITAL COORDINATOR 04142 – 231590
4 DY. DIRECTOR HEALTH SERVICES 04142 – 295134
5 REGIONAL TRANSPORT OFFICER 04142 – 290035
6 SUPENTENDENT OF POLICE 04142 – 214477 (O) 04142 – 251161 (R)
7 DISTRICT OFFICER CIVIL SUPPLY 04142 – 230223
8 EXECUTIVE ENGINEER (PWD) 04142 – 230274
9 INSPECTOR OF FACTORIES 04142 – 231864
10
DISTRICT TELEPHONE AUTHORITY
( SDE ) 04142 – 285050 / 217000
11 RAILWAY STATION CUDDALORE 04142 – 237642
OTHER IMPORTANT TELEPHONE NUMBERS
1 FIRE STATION CHIDAMBARAM 04144 – 238099 / 244366
2 GOVT. HOSPITAL MAILADUTHURAI 04364 – 222459
3 GOVT. HOSPITAL BHUVANAGIRI 04144 – 241001
4 POLICE STATION NAGORE 04365 – 250100
5 POLICE STATION KEELVELUR 04365 – 275450
6 POLICE STATION THITTACHERRY 04365 – 234100
7 POLICE STATION NERAVI 04368 – 238376
8 POLICE STATION THIRUNALLAR 04368 – 236465
9 POLICE STATION KORADACHERRY 04366 – 232450
10 POLICE STATION MANNARGUDI 04367 – 222244
11
POLICE STATION THIRUVARUR
TOWN 04366 – 222203
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan
for Cauvery Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 59
12 TAHASILDAR RAMNAD 04567 – 220352
13 TAHASILDAR NAGAPATTINAM 04365 – 242456
14 TAHASILDAR KEELVELUR 04365 – 275493
15 TAHASILDAR KARAIKAL 04368 – 222637
16 TAHASILDAR NANNILAM 04367 – 230456
17 TAHASILDAR KODAVASAL 04365 – 262056
18 TAHASILDAR MANNARGUDI 04367 – 222291
19
EXECUTIVE ENGINEER
MAILADUTHURAI PWD 04364 – 225904
20
RAILWAY STATION
MAILADUTHURAI 04364 - 222131
21
RAILWAY STATION
CHIDAMBARAM 04144 – 238298,238759
22 RAILWAY STATION VADALURE 04142 - 260090
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan
for Cauvery Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 60
13.3 Telephone Directory at GAIL, Puducherry:
Table 11: Important Telephone Numbers of GAIL personnel
Contact Person Extensio
n Landline Mobile Residence
Gail-Puducherry
D.Soren, DGM (O&M) 500 0413-2200982 9443242601 2240588
L.Arumugam, CM (O&M) 300 0413-2200981 9443242605 2203228
D Baskaran, CM (HR) 340 0413-2200927 9845626696
Scaria Mathew, SM (O&M) 450 0413-2200729 9486852610 2276628
R. Rajagopalan, SM (F&A) 360 0413-2205285 9435525257
T.S.Viswanathan, SM (O&M) 460 0413-2200930 9445182895 24983711
S.Arunachalam, SM (O&M) 470 0413-2200977 9487844664
Mukalesh Biswas, SM (Mech.) 471 0413-2200935 9047027022 2200720
S.Krishnan, SM (C&P) 380 0413-2200980 9443347934 2242293
M.Monsingh, DM (F&S) 440 0413-2200932 9442244187
RGMC – Puducherry 330/ 331 0413-2200729
Gail-Narimanam zone 04365-320999
P.Nandagopal, Sr. Mgr(O&M) 04368-234460/61 9442527780
D Selva Kumar Mgr.(O&M) 04368-234460/ 61
Surya Prasad, DM (Mech.) 04368-234460/61
Narimanam GAIL-GCS 04365-235101/326777
Adaiyakkamangalam GAIL-GCS 04366-204885
Kamalapuram GAIL-GCS 04366-204453
Gail- Kuthalam zone
P.Lakshmi, Sr Mgr. (NG P/L,O&M) 04364-237058 9442292274
Kathiresan, Mgr.(O&M) 04364-237258 9442237081
PPN Gas Receiving Terminal 04364-204570
Disp.term.,Kshethrapalapuram 04364-234058
Gail-Tirumakottai zone
M.I.A.Jabbar, SM (Elect.) 04367-292392/272033 9442104704
Nallur Gas Dispatch Terminal 04367-277204
P Maruthu Pandian SE (O&M) 04367-272033 9442276512
GAIL-Ramnad zone
Sivabalan, Sr Mgr.(NG P/L,O&M) 04567-255007/291386 9442257055
D Jegannathan
04567-255007/
291386
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan
for Cauvery Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 61
Contact Person Extensio
n Landline Mobile Residence
D.Sakthivel,DM(Inst.)
04567-
255007/291386 9442150003
Valantharavai Dispatch Terminal 04567-253808
Table 12: Mutual Aid Contact Details
S.
No Name Address Phone number
NARIMANAM ZONE
1
CHENNAI
PETROLEUM CORP
LTD
Panangudi, Nagapattinam-611 002.
04365 – 256412, 256416
Fax No. 0435 – 256415 /
414
2 EZHIL CHEMICALS
(P) LTD
No.123, Uttamacholapuram, Narimanam,
Nagapattinam-611 002. 04365 – 256478
3 KIRAN SILICATES
PVT LTD
No. 123, Uthamacholapuram,
Serunangai, Narimanam P.O.
Nagapattinam-611 002.
04365 – 256478
4 MADRAS
CHEMICALS
66/2-A, 123, Uthamacholapuram,
Boothangudi, Nannilam Taluk,
Nagapattinam-611 002.
04365 – 291118
5 MMS STEEL &
POWER PVT LTD
No.17/20, ONGC Road,
Naranamangalam, Narimanam, Nagore,
Nagapattinam-611 002.
04365 - 256343 & 344
Fax No. 04365 - 221202
6 NANNILAM
SILICATES (P) LTD.,
No.151/C, Uttamacholapuram,
Serunangai, Narimanam P.O.
Nagapattinam-611 002.
04365 – 256478
7 PREM CHEMICAL
INDUSTRIES
No.123, Uttamacholapuram, Narimanam
P.O. Nannilam Taluk, Nagapattinam -
611 002.
04365 – 256590
8 REENA SILICATES
PVT LTD
No.123-C, Uthamacholapuram,
Narimanam Post, Nagapattinam District-
611 002.
04365 – 256217
9 SUNRISE
SILICATES PVT LTD
No.123, Uttamacholapuram, Serunangai,
Narimanam P.O. Nagapattinam-611 002. 04365 – 256478
10 ADITYA FERRO
ALLOYS PVT LTD
SF No.242/1, Sorakkudy Village,
Peralam Main Road, Thirunallar,
Karaikal-609 607.
04368 – 236721
Mobile: 9842468322
11 BOSS PROFILES
LTD
No.24, Sorakkudy Village, Thirunallar
Commune, Karaikal-609607.
04368 - 236401/402/404
Mobile: 9842468302
12 CHEMPLAST
SANMAR LTD.
Melavanjore, T. R. Pattinam. Karaikal -
611 002 04365 - 256475 / 476
Mobile: 9894091715
Fax No. 04365 – 256473
13 CHEMPLAST
SANMAR LTD.
Nitro Aromatics Unit, Melavanjore, T. R.
Pattinam, Karaikal. 611 002
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan
for Cauvery Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 62
S.
No Name Address Phone number
(PHASE-II)
14 GODREJ SARA LEE
LTD
Kurumbakulam, Nedungadu, Karaikal,
Pondicherry. 04368 - 262147 / 148
15 GODREJ SARA LEE
LTD- (T)
Sethur Village, Thirunallar Commune,
Karaikal -609601
04368 – 236697
Fax No. 04368 - 236697
16
H & R
JOHNSON(INDIA)
LTD
Thennangudi, Karaikal, Pondicherry.
609601
04368 - 236731 / 733 /
734 / 735 / 729
17 HENKEL INDIA LTD No.131, Peralam Main Road,
Thirunallar, Karaikal-609 607.
04368 - 236494-98
Mobile: 9443121271
18
KAMAKSHI
CHEMICALS
(Eshwerie-old)
57/3, Nainikattai Road, Polagam village,
T. R.Pattinam, Karaikal-609 606.
04368 – 233312
Mobile: 9443133317
19 KARAIKAL
CHLORATES
Melakarakudy Village, Nedungadu,
Karaikal -609603
04368 - 292976
Mobile: 9362920233
20 MURUDESWAR
CERAMICS LTD
No.143, Illayancudy road, Devamapuram
village,Karaikal-609 607.
04368 - 236899
Mobile: 9842446508
21 PONDICHERRY
POWER CORP LTD
Polagam, T. R. Pattinam, Melavanjore,
Karaikal.609606 04368 – 233988, 233193
22
KIRAN PONDY
CHEM LTD (Kiran
Pondichem Group)
No.37, Nagore Main Road, Melavanjore,
Karaikal-611 002 04365 – 256478
23 R J CHEMICALS No.17/3, Ambagarathur Road,
Thirunallar, Karaikal-609 607. 04368 – 236448
24 REGMA CERAMICS
LTD
Sellur Village, Agalaukannu Road,
Karaikal-609 607.
04368 - 268271 & 273 &
274 Fax No. 04368-
268272
25 SILICATE INDIA General Manager, No.37, Nagore Road,
Melavanjore,Karaikal -611 002. 04365 – 256210
26 SOUNDARAJA
MILLS LIMITED- (N) Nedungadu-609 603, Karaikal.
04368 – 261293 / 284
Fax No. 04398 - 261519
27
VAIGAI
INDUSTRIES PVT.
LIMITED
No.32/1&2, Melakarakudy village,
Nedungadu Commune, Karaikal-609
603.
04368 - 261375
28 VANJORE
SILICATES LTD
R.S.No.92/1, Keeliyur South, T. R.
Pattinam,Karaikal-609 606. 04368 – 234143/ 44
29
SOUTH INDIA
EDIBLE OIL PVT
LTD
Karuppur village, Semangalam,
Tiruvarur District.
04366 - 220911
Mobile: 9842433515
30 SOUTHERN
REFRACTORY
No.121/1-A, Pulivalam Road, Meppalam
village, Thiruvarur.
04366 - 204688
Mobile: 98422504066
31 SREE
RAGHAVENDRA
No.206/A, Pulivalam Road, Vellakudy
village, Peruntharakudi Taluk, Kulikarai Mobile: 9600095564
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan
for Cauvery Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 63
S.
No Name Address Phone number
ALKALIES P.O, Tiruvarur-610001
32 TAMILNADU CIVIL
SUPPLIES CORP.
Modern Rice Mill, Tiruvarur Main Road,
Tiruvarur-610 001. 04366 - 222575
33 JAYADEVI
INDUSTRIES
No.117/1B/1, Kuthalam Village,
Gopurajapuram Post-via Thittachery,
Kuttalam, Nagapattinam District.
04365 - 234326
Mobile: 9443134327
34 DIAMOND
SILICATES
3/207, K. K. Nagar, Vilamal,
Ammaiyappan, Tiruvarur. 610001 04366 - 205001
35 NARIMANAM
SILICATE
Plot No.91, K. T. R. Estate, Near Bye-
Pass Road, Tiruvarur-610 001. 04366 – 250009
36 NARIMANAM
SILICATE - II
R.S No.11 -7/C, Karuppur road,
Adiyakkamangalam village, Tiruvarur
Dist. - 611 101.
04366 – 356684
Mobile: 9443156646,
9366680471
KUTHALAM / BHUVANAGIRI ZONE
1 KAVERI GAS
POWER LTD.
Muruthur Village, Therizhandur-609808,
Mailaduthurai, Nagai District. mobile 9790996410
2 OPG ENERGY
PRIVATE LTD
Muruthur Village, Therizhandur-609808,
Mailaduthurai
04364 - 237099
Mobile: 9344303671
3 PPN POWER
GENERATING LTD
Pillai Perumal Nallur, Thirumeighanam
Post, Thirukkadaiyur Via Tharangambadi
Taluk, Nagai Dist. -609311.
04364 - 287050
Fax No. 04364 - 287039
4 SAHELI EXPORTS
PVT. LTD.
Kothangudi Road, Komal West,
Mayiladuthurai-609805 04364 - 237237 & 239
5
TAMILNADU
ELECTRICITY
BOARD
KGTPS, Muruthur Village,
Therizhandur, Mailaduthurai. 609808 04364 - 237084
6 ABAN POWER
COMPANY LIMITED
No.9, Karuppur, Thiruvidaimaruthur
Taluk, Tanjore District. - 609 807.
0435 - 2451199 & 232
Mobile: 9443251199,
9443321232 Fax No.
0435 - 2451288
7 NEYCER INDIA LTD Sanitaryware Division, Vadalur,
Cuddalore District -607 303. 04142 - 259181 & 253
RAMNAD ZONE
1
ARKAY ENERGY
LTD -II
(Rameswaram)
Near ONGC-GCS, Therukkukattoor,
Valantharavai Post, Ramnad
District.623536
04567 - 253516
2
COROMANDEL
ELECTRIC
COMPANY LTD
Near TNEB-VGTPP Power Station,
Valuthur,Valantharavai Post, Ramnad
District. 623536
04567 - 255248
Fax. No.: 04567 - 255241
3
PENNA
ELECTRICITY
LIMITED
Near ONGC-GCS, Therukkukattoor,
Valantharavai Post, Ramnad District
623536
04567 – 253792, 293561
4 04 SAI REGENCY
POWER LT
Kalugurani Village, Ramnad District
623536
04567 - 293228
Mr. Y. Paradesi:
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan
for Cauvery Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 64
S.
No Name Address Phone number
9443135794
5
TAMIL NADU
ELECTRICITY
BOARD
VGTPPS, Valuthur, Valantharavai
Branch Post,Ramnad. 623536
04567 - 255025 / 255030
& 255385
KOVILKALAPPAL ZONE
1 PREMI CHEMCO No.1/73, 74, Nallur, Adichapuram (via),
Mannargudi Taluk, Tiruvarur. 04367 - 277295
2
TAMILNADU
ELECTRICITY
BOAD - TMK
T (K) GTPS, Tirumakottai. Tiruvarur
District. -614017
04367 - 272766 & 034
Fax No. 04367- 272390
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 65
Table 13: Police Station Contact Details
PIPELINES JURISDICTION
SI NO
NAME OF THE INSTALLATION
LOCATION JURISDICTION MANDALAM POLICE STATION PHONE NO
A KARAIKAL AREA PIPELINES
1 NRM GCS TO SFCL KUTHALAM KUTHALAM ERAVANCHERI GOPURAJAPURAM THITTACHERI AGARAKONDAGAI KOTHAMANGALAM ALATHUR ARULMOZHITHEVAN KEEZHAMANAI PETTAI
NAGAI TK & DIST KARAIKAL TK PONDY STATE
THITTACHERI THIRUNALLAR
04366 234100 04368 236465
2 MARAIKANCHAVADI SV STATION TO KSCL
THITTACHERI THITTACHERI AGARAKONDAGAI PANANGUDI POLAGAM VANJORE
NAGAI TK & DIST KARAIKAL TK PONDY STATE
THITTACHERI T R PATTINAM
04366 234100 04368 233480
3 KSCL TAP OFF TO PONDY CHEM
VANJORE VANJORE KARAIKAL TK PONDY STATE
T R PATTINAM 04366 233480
4 KSCL TAP OFF TO MEENAKSHI SILICATE
POLAGAM POLAGAM KARAIKAL TK PONDY STATE
T R PATTINAM 04368 233480
5 HENKEL SPIC TO BOSS PROFILES
THIRUNALLAR THIRUNALLAR SORAKKODI
KARAIKAL TK PONDY STATE
THIRUNALLAR 04368 233480
6 HENKEL SPIC TO H&R JOHNSON
THIRUNALLAR PETTAI SELLUR
KARAIKAL TK PONDY STATE
THIRUNALLAR 04368 233480
7 HENKEL SPIC- RCL THIRUNALLAR PETTAI SELLUR THENNANGUDI
KARAIKAL TK PONDY STATE
THIRUNALLAR 04368 233480
8 HENKEL SPIC- SRCM
THIRUNALLAR PETTAI SELLUR
KARAIKAL TK PONDY STATE
THIRUNALLAR 04368 233480
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 66
THENNANGUDI DEVAMAPURAM SORAKUDY NEDUNGADU
9 PPCL TO VANJORE SILICATE
KELAIYUR SOUTH
KELAIYUR SOUTH KARAIKKAL TK KARAIKKAL DT
TR PATTINAM 04368 233274
10 CPCL TO PPCL TAP OFF TO CHEMPLAST
PANANGUDY & VAJORE
PANANGUDY VANJORE
KARAIKKAL TK KARAIKKAL DT
TR PATTINAM 04368 270357
11 SPIC TO EID PARRY TAP OFF TO RJ CHEMICALS
SELLUR SELLUR KARAIKKAL TK KARAIKKAL DT
THIRUNALLAR 04368 232465
12 SPIC TO JOHNSON TAP OFF TO MURUDEESWAR P LTD
DEVANAMPURAM
DEVAMAPURAM KARAIKKAL TK KARAIKKAL DT
THIRUNALLAR 04368 232465
13 SPIC TO SRCM THENNAMKUDY
THENNAMKUDY DEVAMAPURAM SORAKKUDY SELLUR NEDUNKADU
KARAIKKAL TK KARAIKKAL DT
THIRUNALLAR 04368 232465
14 SRCM TO GODREJ SARA LEE
NEDUNKADU NEDUNKADU KURUMBAKULAM
KARAIKKAL TK KARAIKKAL DT
NEDUNKADU 04368 232465
15 SPIC TO BOSS PROFILES TAP OFF TO ADITYA
SORAKKUDY SORAKKUDY KARAIKKAL TK KARAIKKAL DT
THIRUNALLAR 04368 232465
16 SPIC TO VAIGAI KK CHOLORIDE
SORAKKUDY SORAKKUDY SULERAPURAM MELAKARAKUDY
KARAIKKAL TK & PONDY STATE
THIRUNALLAR 04368 232465
17 H& R JOHNSON TILES TO GRSLS, SETHUR
SETHUR SETHUR THIRUNALLAR TK KARAIKKAL DT
THIRUNALLAR 04368 232465
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 67
B NARIMANAM AREA PIPELINES
1 NARIMANM-ISRM THITTACHERI 04366 234100
2 NARIMANAM-TNEB THITTACHERI 04366 234100
3 NRM GCT TO MM STEEL POWER
KUTHALAM KUTHALAM NARIMANAM
NAGAI TALUK & DIST
THITTACHERY 04365 234217
4 NRM GCS TO KIRAN SILICATE
KUTHALAM KUTHALAM NARIMANAM
NAGAI TALUK & DIST
THITTACHERY 04365 234100
5 NRM TO MRL TAP OFF TO JAYADEVI
KUTHALAM KUTHALAM NARIMANAM
NAGAI TALUK & DIST
THITTACHERY 04365 234100
6 MARAIKANCHAVADY TAP IN POINT TO ESHWARI INDUST.
AGARAKONDARGUR AGARAKONDARGUR THITTACHERI
POLAGRAM
NAGAI TK & DT.
KARAIKAL TK & DT
THITTACHERI
TR PATTINAM
234217 233274
C ONGCL FEEDER LINES
1 NRM GCS TO CPCL PANANGUDI & RETURN LINE TO NRMGCS
KUTHALAM KUTHALAM NARIMANAM
NAGAI TK & DIST THITTACHERI 04366 234100
2 AKM GGS(ONGCL)-AMK GCS TWIN LINES
ALIVALAM ALIVALAM TVR TK & DIST
ALIVALAM 04366 247233
3 AKM GCS TO MRL ALIVALAM ALIVALAM KARUPPUR ADIYAKAMANGALAM SEMANGALAM KALLIKUDI KURUMANANGUDI ERAVANCHERI VADAKKUVELI AGARAKADAMBANUR
TVR TK & DIST KEEVALUR TK NAGAI DIST
ALIVALAM KEEVALUR
04366 247233 04366 275450
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 68
KOGUR VADAGARI UTHAMACHOLAPURAM NARIMANAM
NAGAI TK & DIST
NAGORE
250100
4 AKM GCS TO KPM EPS
ALIVALAM ALIVALAM VENKATESWARAPURAM PULIVALAM PERUNGUDI PERUNTHARAKUDI
TVR TK & DIST KODAVASAL TK TIRUVARUR DIST
ALIVALAM KODAVASAL
04366 247233 04366 262050
5 KMP EPS TO NLM EPS
PERUNTHARAKUDI PERUNTHARAKUDI KULIKARAI THIAGARAJAPURAM MELATHIRUMATHI- KUNNAM PARUTHIYUR KANKODUTHAVANITHAM ATHICHOLAMANGALAM KRISHNAKOTTAGAM
KODAVASAL TK TIRUVARUR DIST
KORADACHERI KORADACHERI
04366 232450 04366 232450
6 TVR EPS TO NRM GCS
OKKUR OKKUR VENGADANGAL NARIMANAM KUTHALAM
KEEVALUR TK NAGAI TK & DIST
KEEVALUR NAGORE
04366 275450 250100
7 KUTHALAM TO PPN
KUTHALAM KUTHALAM KSHETRA BALAPURAM THOLUTHA LANGUDY ANAI MELAGARAM SIKADU MARAIYUR KOVANKUDY AGARAKEERANKUDY KODANGUDY ANNAVASAL MEMATHUR
MAYILADUTHURAI TALUK NAGAI DT. THARANGAMPADI
KUTHALAM MAYILADUTHURAI
SEMBANARKOIL
04364 234100
1 Annexure – 6.
Page -1
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 69
KELMATHUR KILIYUR J. MANALMEDU THIRUKKADAIYUR PILLAI PERUMAL NALLUR
TALUK NAGAI DT.
THARANGAMBADI
8 AKM TO MEMATHUR (VIA) NARIMANAM GCS
ALIVALAM ALIVALAM KALAPPUR SEMANGALAM ADIYAKKAMANGALAM KALLIKUDY KURUMBANANGUDY AGARAKADAMABANUR VADAKANVELI IRAVANCHERRY ANNAIMANGALAM OKKUR VENGIDANGAL NARIMANAM KUTHALAM ERAVANCHERY THIRAIYUR SEGAL SEEYATHAMANGAI THIRUMARUGAL PONDARAVADAI THENPELAGAI SHESHAMOOLAI EDAYANTHENGUDY EAVADI THIRUKOTTARAM VELANGUDY MUGANDANUR
THIRUVARUR TK & DIST KELVELUR TK NAGAI DT. NAGAI TK & DT
THIRUVARUR KELVELUR NAGORE NAGAI
222595 04366 275450 04365 250100
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 70
NALLADAI KOTHANGUDY THIRUVILAYATHAM EACHANGUDY NARASINGANATTAM MEMATHUR
THARANGAMBADI TALUK NAGAI DIST.
THARANGAMBADI
D PPCL LINE
1 CPCL TO PPCL PANANGUDI PANANGUDI POLAGAM
NAGAI TK & DIST KARAIKAL TK PONDY STATE
NAGORE T R PATTINAM
250100 04368 233480
E OTHER CONSUMERS DEDICATED LINES
KAMALAPURAM AREA(NRM ZONE)
1 KAMALAPURAM-NRM SILICATE
PERUNTHARAKUDY PERUNTHARAKUDY KODAVASAL TK TIRUVARUR DIST
KODAVASAL 04366 262050
2 NRM SILICATE TAP OFF- RAGVENDRA
PERUNTHARAKUDY PERUNTHARAKUDY KODAVASAL TK TIRUVARUR DIST
KODAVASAL 04366 262050
3 KMP-TNCSE TIRUVARUR
TIRUVARUR PERANTHARAKKUDI THEVARKANDANALLUR PERUNGUDI THANDALAI VIJAYAPURAM
TIRUVARUR TK & DIST
KODAVASAL 04366 262050
4 KAMALAPURAM-DIAMOND SILICATE
PERUNTHARAKUDY PERUNTHARAKUDY KODAVASAL TK TIRUVARUR DIST
KODAVASAL 04366 262050
F BHUVANAGIRI ZONE
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 71
1 BHUVANAGIRI WELL NO 2 TO SUMANGALA STEEL LTD
ATHIVARAGANATHAM CHIDAMBARAM TK
CHIDAMBARAM TK CUDDALORE DIST
BHUVANAGIRI BHUVANAGIRI 04144 241244
2 BVG-NEYCER VADALUR ADIVARAGANATHAM VADAKARAYANPATTU ALAMBADI VADYIUR THALAIKULAM SOUTH THALAIKULAM NORTH KOLAKKUDI MARUVAI SERAKUPPAM
CHIDAMBARAM TK CUDALORE TK CUDALORE DIST
VADALUR BHUVANAGIRI
04142 259233
G KOVIL KALAPPAL ZONE
1 NALLUR-PREMI CHEMCO
NALLUR NALLUR MANNARGUDY TK TIRUVARUR DIST
KOTTUR 04367 279450
2 NALLUR EPS TO TNEB(TMK)
NALLUR NALLUR ORATHUR KALUVATHUR THENGARAI VALLUR RATHANARASIMMA- PURAM THIRUMAKKOTTAI
MANNARGUDI TK TIRUVARUR DIST
PARAVAKKOTTAI
04367 270437
H RAMNAD ZONE
1 RAMNAD-VALUTHUR(TNEB)
VALANTHARAVAI VALANTHARAVAI RAMANATHAPURAM TK & DIST
RAMANATHAPURAM 04567 230100 230770
2 VALANTHARAVAI TO PERUNGULAM TNEB
VALANTHARAVAI VALANTHARAVAI RAMNAD TALUK & DIST
RAMNAD 04567 230100 230770
2 Annexure – 6.
Page -8
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 72
3 VALANTHARAVAI TO TNEB TAP OFF TO RK ENERGY
VALANTHARAVAI VALANTHARAVAI RAMNAD TALUK & DIST
RAMNAD 04567 230100 230770
4 VALANTHARAVAI TO TNEB TAP OFF TO CORAMANDAL CO.
VALANTHARAVAI VALANTHARAVAI RAMNAD TALUK & DIST
RAMNAD 04567 230100 230770
5 RAMNAD GAIL DESPATCH TO SRPCPL
VALANTHARAVAI VALANTHARAVAI RAMNAD TALUK & DIST
RAMNAD 04567 230100 230770
I KUTHALAM ZONE
1 KUTHALAM-PPN(THIRUKKADAYIYUR)
KSHTERABALAPURAM KSHETRABALAPURAM KUTTALAM THOLUTHALAKKUDY ANNAI MELAGARAM ASIKKADU MARAIYUR KOVANGUDY AGARAKEERANKUDY ANNAVASAL MEMATHUR KEELAMATHUR KILLIYUR MANAMODU THIRUKKADAIYUR PILLAIPERUMALNALLUR
MAYILADUTHRAI TK & NAGAI DIST THARAGAMBDI TK & NAGAI DIST
KUTTALAM
MAYILADUTHRAI SEMBANARKOIL
04364 234100 04364 222450, 222010 04364 282100
2 KUTHALAM TO MARUTHUR TNEB
KSHETRABALAPURAM KSHETRABALAPURAM UMAYAMBALPURAM KUTHALAM SENNIYANALLUR MELAIYUR PERUMALKOIL MARUTHUR
MAYILADUTHURAI TALUK NAGAI DIST.
KUTHALAM 04364 234100
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 73
3 MARUTHUR TNEB TO OPG
MARUTHUR MARUTHUR PERUMAL KOIL
MAYILADUTHURAI TALUK NAGAI DIST.
KUTHALAM 04364 234100
4 KUTHALAM TO SAHELI MARUTHUR MARUTHUR PERUMALKOIL
MAYILADUTHURAI TALUK NAGAI DIST.
KUTHALAM 04364 234100
5 MARUTHUR TNEB TO KAVERI GAS POWER
MARUTHUR MARUTHUR PERUMALKOIL
MAYILADUTHURAI TALUK NAGAI DIST.
KUTHALAM 04364 234100
J GAS SOURCE INSTALLATIONS
1 NARIMANAM GCS KUTHALAM NAGAI TK
NAGAI TK & DIST THITTACHERI 04366 234100
2 MARAIKKAN CHAVADI S V STATION
THITTACHERI NAGAI TK & DIST THITTACHERI 04366 234100
3 ADIYAKAMANGALAM GCS
ALIVALAM TIRUVARUR TK & DIST TIRUVARUR 04365 222595
4 KAMALAPURAM EPS TERMINAL
PERUNTHARAKKUDI KODAVASAL TK TIRUVARUR DIST
TIRUVARUR 04365 222595
5 NANNILAM EPS TERMINAL
KRISHNAKOTTAGAM KODAVASAL TK TIRUVARUR DIST
KORADACHERI 04366 232450
6 TIRUVARUR EPS TERMINAL
OKKUR KEEVALUR TK NAGAI DIST
KEEVALUR 04366 275450
7 BISMI ALKALIES TO KIRAN SILICATE TERMINAL
NARIMANAM NAGAI TK & DIST NAGORE/ TITTACHERI
250100/ 04366 234100
8 NALLUR DISPATCH TERMINAL
NALLUR NALLUR MANNARGUDY TK TIRUVARUR DIST
KOTTUR 04367 279450
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan for Cauvery
Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 74
13.4 Mutual Aid Response Group
There is a formal arrangement towards Mutual Aid response in the area with all the
industries where ever the terminals are located; however following emergency
facilities are available with neighboring industries on understanding.
Ambulance Service.
Occupational Health Center.
Doctor and Para Medical Staff.
Technical Staff to assist in Emergency.
First-Aid equipment, Safety equipment, Self breathing apparatus.
Firefighting equipment.
13.5 Co-ordination between the Local organisations/Mutual Aid
Members:
Communications facilities have been provided in control rooms of all mutual aid response
group. Each member will coordinate with each other for mitigating damage to the extent
possible in case of emergencies.
13.6 Coordination with Outside Agencies:
Responsibility of information on necessary measures in the event of damage and warning to
the nearby population rests with the civic authorities and other government agencies.
Intimation/warning about the likely scenarios of disaster which may affect nearby population
is to be given to civic authorities (district collector) by OIC. The decision as to when the
population to be warned/evacuated in the event of possible damage lies with the civic
authorities.
Outside agencies support is required for the on-site emergency responses like:
Augmentation of the firefighting service and fire water.
Emergency medical help for the injured personnel of the plant.
Evacuation of the personnel.
Law enforcement and traffic control and crime protection.
Co-ordination with the other industrial establishment.
Special purpose equipment for rescue of the trapped persons in the plant.
Procuring firefighting consumable like foam compound, DCP, fire hoses etc.
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan for Cauvery
Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 75
13.7 Role and Statutory Duties of Outside Agencies
Traffic control, provision of alternate traffic, regulation of traffic within the area of
responsibility
Assisting the medical and evacuation team to work without any hindrance and further
help to the medical department in evacuation the casualties’ victim
Helping in evacuation of persons and domestic animals in the affected area
Preventing unauthorized entry of personnel in to the affected area.
The role of outside agencies as planned in advance is given below:
13.7.1 Role of police department
Police control room on receiving the emergency message shall communicate to district, civil
and police official on wireless network. On arriving at terminal they shall help in following
manner:
They shall help in traffic control, provisions of alternate traffic within the area of
responsibility
Helping in evacuation of person in the affected area
Preventing unauthorized entry of the personnel in the affected area
Controlling bystanders, identifying the dead and dealing with casualties and
informing to the relative of death or injury
13.7.2 Role of Tamil Nadu fire service
It is the responsibility of chief fire in-charge (work main controller) to call for external help
like fire brigade, police and help from “neighbouring industries” in case of a probability of a
major hazard. The chief fire in-charge will supervise the rescue and fire fighting operation,
till the arrival of the chief fire officer of the area. However, after the arrival of the CFO, the
CFO shall take command. Chief fire in-charge shall help him in the fire fighting work. Tamil
Nadu fire service on advice of GAIL chief fire in-charge shall also contact agencies to render
assistance for fighting fire, arranging for rescue, evacuation and medical aid.
Keeping the above in view, Tamil Nadu fire service shall familiarize themselves with the
location of onsite stores of flammable materials, water and other fire fighting equipment.
13.7.3 Role of district authorities
Following action shall be taken by the district authorities:
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan for Cauvery
Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 76
Evacuation of nearby population when required
Arranging for transportation of victims to hospitals and coordinating with hospitals
for admitting the victims
Arranging for education of the people nearby, regarding the possibilities
To nominate the persons to be contacted during disasters for coordinating of various
activities
14 RESCUE AND RELIEF OPERATION PLAN
14.1 Assembly Points
Assembly points marked in the consumer terminals will be the assembly point during any
emergency.
14.2 Emergency Evacuation
The incident is likely to affect people in the other plant area or environment outside the site.
The site main controller will intimate evacuation. Evacuation of the personnel to assempbly
point &/or away from site ensuring proper head count.
Accounting for site personnel, visitors and contractors, particularly those know to have been
in the affected area will be done.
All HOD’s will provide the exact head count details to HOD (F&S) during the emergency.
The evacuation is along the escape route leading to assembly point. People must be
evacuated at right angle to wind or opposite the wind direction.
14.3 Rescue & Evacuation Procedure:
Rescue operation will be carried out by the fire & safety personnel immediately attending to
the emergency. The above rescue operations generally refer to the rescue at incident site.
However a large scale rescue operations shall be carried by the fire & safety personnel if a
large scale emergency is perceived. The above operations will be lead by the second in
command of Fire & Safety dept. The list of casualties etc shall be reported to the HOD(F&S)
who in turn will be reporting to the site main controller at site. Casualties will be shifted to
hospital, if required by HR in consultation with Chief Incident Controller/OIC. Evacuation of
undesired personnel will be carried out in consultation with site main controller. Generally all
personnel required to be assembled at ASSEMBLY POINT and will be evacuated by
vehicles arranged by HOD(HR) / HR dept.
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan for Cauvery
Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 77
15 MEDICAL FACILITIES
Hospitals in the proximity of the site locations will be providing the medical facilities in case
of requirement. contact details of the hospitals are displayed prominently.
15.1 First Aid Boxes:
First Aid boxes are Provided at all the terminals
In first aid equipment are sustituted by other type medicines or are ommited from the
standard list, as decided by company doctor.
Content of First aid box (standard list):
Twenty four small sterilized dressings.
Twelve medium size sterilized dressings.
Twelve large size sterilized dressings.
Twelve large size sterilized burn dressings.
Twelve (15gm.) packets of sterilized cotton wool.
One (200 ml.) bottle of cetrimide solution (1 per cent ) or a suitable antiseptic
solution.
One (200 ml.) bottle of mercurochrome solution (2 percent ) in water.
One (120 ml) bottle containing sal-volatile having the doses and mode of
administration indicate on the label.
One pair of scissors.
One roll of adhesive plaster (6 cms. x 1 metre.)
Two rolls of adhesive plaster (2 cms x 1 metre.)
Twelve pieces of sterilized eye pads in separate sealed packets.
A bottle containing 100 tablets (each of 05grains ) of aspirin or any other analgesic.
One polythene wash bottle (500 cc.) for washing eyes.
Twelve roller bandages 10cms wide.
Twelve roller bandages 5 cms wide.
Six triangular bandages.
One tourniquet.
A supply of suitable splints.
Two packets of safety pins.
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan for Cauvery
Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 78
Kidney tray.
A snake-bite lancet.
One (30 ml.) bottle containing potassium permanganate crystals.
Ointment for burns.
15.2 Transportation Facilities:
Adequate transport vehicles are provided for medical treatment, evacuation and the
movement of key persons. If required help from outside transport agencies will be taken for
mass evacuation of persons.
16 RECOVERY PROCEDURES
After the emergency, the following activities will be carried out in detail.
Information to Statutory Authorities.
Incident Investigation.
Damage Assessment.
Salvage of products, de-contamination, clean-up and Restoration.
A detailed report shall be prepared based on the entire experience of the incident,
including restorations, limitations and Lessons learnt.
17 REVISION & MOCK DRILLS
17.1 Revision:
"The ERDMP" will be reviewed/modified on yearly basis or after occurrence of emergency
listed in this document or whenever any major changes in operations are carried out or if
deemed by issuing authority.
17.2 Rehearsal / Mock Drill:
In emergency management time is very important, the initial few minutes are critical and
timely action may contain the emergency. For persons to perform quickly their assigned
roles, it is essential that each individual should be made aware of emergency rehearsals
which will impart procedures and their individual roles through proper training. It is
necessary to test through necessary expertise to individuals to act quickly in case of a real
emergency situation. This will help in identifying the deficiencies in the procedures and the
likely difficulties, that may be encountered during implementation. Rehearsal of the plan will
be undertaken on quarterly basis.
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan for Cauvery
Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 79
17.3 Training
The employees will be informed about “On Site Emergency Plan” in details with the help of
training programmes. For the success of this plan not only training will be organized but for
mock drill will be organized periodically. Mock drill will help to understand the role to be
played by everyone during the emergency.
17.4 Essential Employees
In each shift there will be available some trained workers in fire fighting, use of gas masks,
first aid. It will be a task force to assist and execute the instructions of The Site Controller
and The Incident Controller.
Number of persons trained for firefighting : all
Number of persons trained for first aid firefighting : all
Number of persons trained for plant operations : all operators
17.5 Rehearsal / Mock Drill
In disaster, Management time is very important, the initial few minutes are critical and timely
action may control the emergency. For persons to perform quickly their assigned roles, it is
essential that each individual should be made aware of emergency rehearsals, which will
impart procedures and their individual roles through proper training. It is necessary to test
through necessary expertise to individuals to act quickly in case of a real emergency. This
will help in identifying the deficiencies in the procedures and the likely difficulties, that may
be encountered during implementation hence rehearsal of the plan will be undertaken at an
interval of three months of work or when any new substance is introduced in the process or
in the event of a serious accident taking place it will be reviewed and modified to the extent
necessary.
17.6 Mock Drill Procedure
Inform all the employees about mock drill.
Fix the date for mock drill.
Mock drill will be monitored by observer/s not involved in the exercise.
Emergency alarm will be raised.
After hearing the alarm Emergency Procedure will be followed.
All clear signs will be studied carefully.
Records of drill are maintained.
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan for Cauvery
Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 80
Emergency drills and integrated exercises have the following objectives:
These constitute another important component of emergency preparedness. They refer to the
re-enactment, under the assumption of a mock scenario, of the implementation of response
actions to be taken during an emergency.
a. To test the adequacy of the effectiveness, timing, and content of the DMP and
implementing procedures.
b. To ensure that the emergency organization personnel are familiar with their duties and
responsibilities by demonstration.
c. Provide hands-on experience with the procedures to be implemented during emergency.
d. Maintain emergency preparedness.
The frequency of the drills would vary depending on the severity of the hazard. However,
drills should be conducted once in a year. Scenarios may be developed in such a manner as to
accomplish more than one even objective. It may be ensured that the external agencies are
also made to participate in the mock drill at least once a year in order to familiarize them of
the emergency procedures/actions.
Drill and exercises shall be conducted as realistically as is reasonably practicable.
Planning for drills and exercises shall include:
a. The basic objectives
b. The dates, times and places
c. The participating organizations
d. The events to be simulated
e. An approximate schedule of events
f. Arrangements for qualified observers
g. An appropriate critique of drills/exercises with participants.
Evaluation of drills and exercises should be carried out which should include comments from
the participants and observers (internal as well as external). Discrepancies noted by the drill
observers during the drill shall be pointed out. The individual responsible for conducting the
drill or exercise should prepare a written evaluation of the drill or exercise. The evaluation
team should include assessments and recommendations on:
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan for Cauvery
Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 81
a. Areas that require immediate correction.
b. Areas where additional training is needed.
c. Suggested modifications to the DMP or procedure.
d. Deficiencies in equipment, training, and facilities.
The evaluation of a drill or exercise may be submitted to OIC Pondicherry for review and
acceptance who shall then determine the corrective actions to be taken and assign the
responsibility to appropriate personnel.
The Fire & Safety Coordinator may track all approved drill and exercise corrective actions as
a means of assuring that corrections are made in a reasonable amount of time, and shall
appraise OIC regarding status of implementation of corrective actions.
Records of drills, exercises, evaluations, and corrective actions should be scrupulously
maintained. The committee shall supervise the following activities:
a) Functioning of Emergency Control Centre very specifically availability of all facilities etc.
as mentioned in the plan and its functional healthiness.
b) To evaluate communication of the Disaster Management Plan (DMP) among all segments
of employees for familiarizing them on their likely responsibilities in case of any disaster
including evaluation of behavior of employees and others.
c) To ensure that all facilities as required under the plan from within or from nearby
industries/aid centers under mutual assistance scheme or otherwise are available.
d) To ensure that the necessities under material assistance scheme is properly documented
and the concerned employees are fully aware in this regard.
e) To ensure that employees are fully aware to fight any emergency like firefighting.
f) The mock drill operation should be timed and each timing should be reviewed with respect
to the previous one and long lead-time should be identified. The committee may invite any
other official/expert to assist its functioning.
Following activities shall be necessarily supervised to ensure effectiveness of the DMP.
a) All employees are trained about their responsibilities/duties. They all are aware about the
approach routes to various facilities from Pondicherry, direction of evaluation the
equipment’s to be used during evacuation or the method of evacuation.
DET NORSKE VERITAS
MANAGING RISK
Emergency Response & Disaster Management Plan for Cauvery
Basin Pipeline GAIL, Puducherry
PP027998/GAIL//2012-04-13 Page 82
b) All employees are fully trained to rescue their colleagues who are affected due to cause of
disaster in case they are unable to get out of the affected area. They should know to who they
are to inform about such persons.
c) All warning alarms are functional and public address system is in healthy condition.
d) All telephone lines/communication systems are provided in control rooms and there is no
removal of the facilities (as prescribed for the control rooms.
e) It is clear that who shall inform the District authorities, state authorities and corporate
office.
17.7 Updating the Plan
As and when required this “On Site Emergency Plan” will be updated and informed to all. If
necessary, after each drill the plan will be thoroughly reviewed to take account of
shortcomings.
As a commitment towards safe working environment, the Management has
formulated a safety policy and the same is displayed at prominent places.
ANNEXURE 1
MATERIAL SAFETY DATA SHEET
MSDS
________________________________________________________________________________________________________________Disclaimer: information contained in this material data sheet is believed to be reliable but not representation, guarantee or warranties of any
kind are made as to its accuracy, suitability for a particular application or results to be obtained for them. It is upto the user to ensure that the
information contained in the material safety data sheet is relevant to the product manufactured / handled or sold by him as the case may be.
We make no warranties expressed or implied in respect of the adequacy of this document for any particular purpose.
A. SAFETY DATA SHEET OF NATURAL GAS
MATERIAL SAFETY DATA SHEET (MSDS)
1. CHEMICAL IDENTITY
Trade Name : Natural Gas CAS No. : 8006-14-2
Synonyms : NG UN No. : 1972
Formula : Cn H2n+2, n=1,2
2. PHYSICAL PROPERTIES:
Boiling Point : -1610C Physical State : Gas
Melting/ Freezing Point : -1830 C Appearance : Colourless
Vapor Density : 0.6 Odour : Odourless
Can be Compressed to liquid at very low Temperature
3.FIRE/EXPLOSION HAZARD DATA
Explosive Limits : 5.3 to 14.8
% Vol. in air (LEL - HEL)
Auto ignition Temperature : 5370 C
HAZARDS PRECAUTIONS EXTINGUISHING AGENT
Fire: Highly inflammable.
(Flash Point: 187.80C)
Explosion: Gas forms an
explosive mixture with air.
No open fire, sparks, no
smoking.
Explosion proof electrical
equipment. Gag tests with
explosive meter suitable
for methane.
Shut off supply or let it burn
if there is no danger to
surroundings. Otherwise
extinguish with Carbon
dioxide, dry chemical powder
and water spray to cool it.
4. REACTIVITY DATA
Chemical Stability : Stable
Incompatibility with other Materials : Contact with strong oxidizing agents and
halogen
compound increase risk of the fire and explosion.
Reactivity : Stable
5. HEALTH HAZARD DATA
SYMPTOMS PRECAUTIONS FIRST AID
Inhalation: Dullness,
breathlessness, fatigue,
nausea, Vomiting, disturbs
muscle Co-ordination.
Ventilation, local air
extraction, air mask.
Remove the person to fresh
air and resort to artificial
respiration if necessary.
Report for medical
attention.
MSDS
________________________________________________________________________________________________________________Disclaimer: information contained in this material data sheet is believed to be reliable but not representation, guarantee or warranties of any
kind are made as to its accuracy, suitability for a particular application or results to be obtained for them. It is upto the user to ensure that the
information contained in the material safety data sheet is relevant to the product manufactured / handled or sold by him as the case may be.
We make no warranties expressed or implied in respect of the adequacy of this document for any particular purpose.
ADDITIONAL INFORMATION:
High concentrations in air cause Oxygen deficiency leading to unconsciousness.
Under atmospheric pressure and at low concentrations, hydrocarbon gases are not toxic for
humans. The presence of hydrocarbons (at a total concentration not exceeding 3 mg / m3)
has no long-term harmful effects on man. However, at high concentrations hydrocarbon
gases displace oxygen thus causing asphyxia.
The degree of fire and explosion hazards of Natural gas is high, mainly for the following
reasons:
a. Poor visibility of the ignitable mixture and high burning velocity that can injure
instantly anyone coming into contact with it, on account of high calorific value of
Natural Gas (~ 9500 K.Cal /m3).
b. Ability to ignite and burn.