Page 1: Project Presentation

CONSTRUCTION ON COLLINS AVE

T

C

B L TB LandmarkConstruction, Inc.

11220 New Berlin RdJacksonville, FL 32226

Page 2: Project Presentation

Project Team

Bal Harbour Village

Alfred Treppeda – Village Manager

Peter Kunen – Village Engineer

Town of Surfside

Roger Carlton – Town Manager

Bill Evans – Public Works Director

TB Landmark

Tim Ward – Project Manager

Ken Coffield – Project Superintendent

Craig A. Smith and Associates (CAS)

Peter Kunen – Engineer of Record

Greg Jeffries – Project Manager

Al Caruso – Project Manager

Page 3: Project Presentation

Project Overview

Provide a new line for redundancy for a 60 year old line which has never been shut down for any type of maintenance

This is a risky condition

Once new line is built the existing line will be repaired as a back-up

Failure to do this could create a catastrophic event

Project Cost: $4.2 Million

Page 4: Project Presentation

TB Landmark will be installing a 16” HDPE Forcemain down the center of the Northbound side of Collins Ave (A1A)

Construction started at 96th Street and continue to 72nd Street

Construction will be accomplished by Horizontal Drilling (HDD) in nine sections of approximately 1,200 feet

Open trenching of approximately 50 feet will be required to join each of the nine sections

There will be dual lane closures during the process, primarily the center lane and the East lane. Two lanes will remain open for local traffic

Access to condominiums and businesses will be maintained at all times

Page 5: Project Presentation
Page 6: Project Presentation

Fusion Area

The pipe will be fused in 250’ sections at the staging area

Approximately 4 to 6 sections will be fused in the center of Collins Avenue at night

The fused sections will then be pulled through the previously drilled tunnel

The next slides show what the fusion machine and pipe will look like

Page 7: Project Presentation

Fusion Machine

Page 8: Project Presentation

Finished Welded Pipe Joint

Page 9: Project Presentation

When the previously drilled tunnel is ready we pull the pipe into place

Page 10: Project Presentation

Areas Completed Surfside and Bal Harbour 8/9/11 thru 8/28/11

Drilled and Pulled Pipe from 96 Street to 89 Street

Page 11: Project Presentation

New Work Zone 8/29/11 thru 9/4/11

Lift Station near 96 Street in Bal Harbour

Page 12: Project Presentation

MIAMI BEACH WORK 9/5/11 - 9/11/11

Drilling first from 87th St. to 89th St. & from 87th St. to 83rd St.

Page 13: Project Presentation

MIAMI BEACH WORK 9/12/11 thru 9/18/11

Drilling first from 80th St. to 83rd St. & from 80th St. to 76th St.

Page 14: Project Presentation

MIAMI BEACH WORK 9/19/11 – 9/25/11

Final location - 72nd St. in the parking lot area drilling back to 76th St.

Page 15: Project Presentation

The exit pit Maintenance of Traffic (MOT) will be contained to a small area (about 4,000 square feet) until the pipe is ready to be pulled, which will be installed during the evening hours

Lane closure signs will be set up and MOT will be in place

Barrels will then be placed along the pipe as traffic guidance

When the pipe is installed, the barrels will be removed

Page 16: Project Presentation

Example of Pipe Pull for 96th At Lift Station

Page 17: Project Presentation

Vacant lot at 92 Street Includes material storage, equipment, and a

recycling machine for material used to bore tunnels

The lot will be used for approximately four months

Includes material storage and pipe fusing process

Staging Areas

Page 18: Project Presentation

Project Public Information Officer Monica Diaz

24/7 Hotline: 786-531-3798

Email: [email protected]

Project Website www.balharboursurfsideconstruction.com

Download project updates, meeting presentation and submit questions

Weekly Email Updates

Community Meetings

Public Information

Page 19: Project Presentation

FDOT Roadway Resurfacing Project

Page 20: Project Presentation

THANK YOU