project presentation
DESCRIPTION
Bal Harbour / Surfside forcemain project presentationTRANSCRIPT
CONSTRUCTION ON COLLINS AVE
T
C
B L TB LandmarkConstruction, Inc.
11220 New Berlin RdJacksonville, FL 32226
Project Team
Bal Harbour Village
Alfred Treppeda – Village Manager
Peter Kunen – Village Engineer
Town of Surfside
Roger Carlton – Town Manager
Bill Evans – Public Works Director
TB Landmark
Tim Ward – Project Manager
Ken Coffield – Project Superintendent
Craig A. Smith and Associates (CAS)
Peter Kunen – Engineer of Record
Greg Jeffries – Project Manager
Al Caruso – Project Manager
Project Overview
Provide a new line for redundancy for a 60 year old line which has never been shut down for any type of maintenance
This is a risky condition
Once new line is built the existing line will be repaired as a back-up
Failure to do this could create a catastrophic event
Project Cost: $4.2 Million
TB Landmark will be installing a 16” HDPE Forcemain down the center of the Northbound side of Collins Ave (A1A)
Construction started at 96th Street and continue to 72nd Street
Construction will be accomplished by Horizontal Drilling (HDD) in nine sections of approximately 1,200 feet
Open trenching of approximately 50 feet will be required to join each of the nine sections
There will be dual lane closures during the process, primarily the center lane and the East lane. Two lanes will remain open for local traffic
Access to condominiums and businesses will be maintained at all times
Fusion Area
The pipe will be fused in 250’ sections at the staging area
Approximately 4 to 6 sections will be fused in the center of Collins Avenue at night
The fused sections will then be pulled through the previously drilled tunnel
The next slides show what the fusion machine and pipe will look like
Fusion Machine
Finished Welded Pipe Joint
When the previously drilled tunnel is ready we pull the pipe into place
Areas Completed Surfside and Bal Harbour 8/9/11 thru 8/28/11
Drilled and Pulled Pipe from 96 Street to 89 Street
New Work Zone 8/29/11 thru 9/4/11
Lift Station near 96 Street in Bal Harbour
MIAMI BEACH WORK 9/5/11 - 9/11/11
Drilling first from 87th St. to 89th St. & from 87th St. to 83rd St.
MIAMI BEACH WORK 9/12/11 thru 9/18/11
Drilling first from 80th St. to 83rd St. & from 80th St. to 76th St.
MIAMI BEACH WORK 9/19/11 – 9/25/11
Final location - 72nd St. in the parking lot area drilling back to 76th St.
The exit pit Maintenance of Traffic (MOT) will be contained to a small area (about 4,000 square feet) until the pipe is ready to be pulled, which will be installed during the evening hours
Lane closure signs will be set up and MOT will be in place
Barrels will then be placed along the pipe as traffic guidance
When the pipe is installed, the barrels will be removed
Example of Pipe Pull for 96th At Lift Station
Vacant lot at 92 Street Includes material storage, equipment, and a
recycling machine for material used to bore tunnels
The lot will be used for approximately four months
Includes material storage and pipe fusing process
Staging Areas
Project Public Information Officer Monica Diaz
24/7 Hotline: 786-531-3798
Email: [email protected]
Project Website www.balharboursurfsideconstruction.com
Download project updates, meeting presentation and submit questions
Weekly Email Updates
Community Meetings
Public Information
FDOT Roadway Resurfacing Project
THANK YOU