project manager [pmp] reference projects

12
MAGED HABASHY, PMP, B.Sc. Arch. M: 647-675-5500 | Email: [email protected] Project Management Portfolio 02 References PROJECTS

Upload: maged-habashy

Post on 20-Mar-2017

21 views

Category:

Leadership & Management


0 download

TRANSCRIPT

MAGED HABASHY, PMP, B.Sc. Arch. M: 647-675-5500 | Email: [email protected]

P r o j e c t M a n a g e m e n t P o r t f o l i o

02 References PROJECTS

MAGED HABASHY, B.Sc. Arch, PMP REFERENCE PROJECTS

R e f e r e n c e P r o j e c t s P a g e | 1

ARCHITECTURAL & ENGINEERING CONSULTANTS [AEC]

2007 : 2016 A Variety of Master Planning, High Rise Towers, Educational Facilities, Aviation, Office Buildings, Hotels, Luxurious Villas, Interior Design and Fit-Out; including but not limited to the following:

Khalifa City Phase-I Master Planning Developer: H.H. Khalifa B. Zayid Foundation Cost: 145,000,000 $

Al Raha Beach Gateway Complex Developer: Al-Dar Properties Cost: 623,200,000 $

First Gulf Bank Main Office Building Client: First Gulf Bank Cost: 80,000,00 $

35+ Fl. Commercial Tower Developer: Link Investment Cost: 87,500,000 $

First Gulf Bank Office Building Client: First Gulf Bank Cost: 11,500,000 $

UAE Embassy, Dar Es-Salam, Tanzania Client: Crown Prince Court Cost: 40,000,000 $

Aloft Hotel, Sport City Client: BAM Int., Developer: Aafaq Cost: 46,000,000 $

Kuwait Embassy, Abu Dhabi, UAE Owner: Ministry of Foreign Affairs Cost: 27,400,000 $

Planet Group Hotel Client: Planet Group Cost: 110,000,000 $

A Variety of 20+ Mixed Use Towers Client: Individual Investors Avg. Cost: 75,000,000 $

Brighton School, Bloom Gardens Developer: Bloom Properties Cost: 44,000,000 $

Al Gurm 3 Prestigious Villas Developer: Al-Dar Properties Cost: 40,300,000 $

Abu Dhabi Grammar School Client: Private Establishment Capacity: 1,100 Students

AD Police Aircraft Hanger Developer: Abu Dhabi Airports Company ADAC

Al Slama Language School Client: Private Establishment Capacity: 1,100 Students

VIP Private Airport Terminal Developer: Dubai World Central

DWC

Redevelopment of St. Andrew’s Center Client: St. Andrew’s Churches Comp.

GASCO Pipelines Division Management Owner: GASCO

DOT HQ Interior Design/Fit-Out Client: Department of Transport

Interior Design of Tadweer Offices Client: Center of Waste Management

Zakher Palace Luxurious Villas ID/Fit-Out Client: H.H. Sh. Saif Office

KM Supermarket, Al Waha Mall Client: KM Trading

MAGED HABASHY, B.Sc. Arch, PMP REFERENCE PROJECTS

R e f e r e n c e P r o j e c t s P a g e | 2

ORASCOM CONSTRUCTION INDUSTRIES

1998 : 2007

Project Manager 2005 : 2007

Architecture Section Manager 1998 : 2005

El Bahrain Military Base, Manamah US Corps of Engineers

PV V Logistics Depot US Corps of Engineers

F-16 Surface Treatment Facility US Corps of Engineers

US Embassy Basement Renovation USA Embassy

Peace Vector IV Airbase US Corps of Engineers

Immigration Building, Uzbekistan US Corps of Engineers

Kandahar Hospital US Corps of Engineers

Entry Control Facilities, Bagram US Corps of Engineers

Spare Parts Main Depot-63 US Corps of Engineers

Almaza Airfield Systems, Cairo US Corps of Engineers

ANA Brigade Facilities US Corps of Engineers

PV VI Airbase Upgrade US Corps of Engineers

CSIF/JOC Balad Air Base US Corps of Engineers

Grand Celebration Hall Egyptian Air Force

Orascom HQ, Nile City Orascom Construction Industries

Egypt Liquid Natural Gas (LNG) KJT for SEAGAS,

Network Operation Center (NOC) US Aid

Al-Abbassia Railway Workshops Railway Authority

Call Center & El-Masreya IT H.Q. Smart Villages Company

4 Lots Radar Approach Terminals Egyptian Civil Aviation Authority

Mobinil Warehouse Mobinil

Glaxo New Administration Building GlaxoSmithKline

Dry Mix Factory SCIB Chemicals

Hurghada Hospital Ministry of Health

Hamma Desalination Plant Stanley Consultants Inc.

OCI Katameya Workshop Orascom Construction Industries

Forward Operating Base, Kandahar US Corps of Engineers

Hurghada Hospital Ministry of Health

New Barrage Services Area, MEE & MWRI, Nagaa Hamadi

US Embassy New Regional Print Shop USA Embassy

Reference PROJECTSMaster Planning

Cost: 145,000,000 $

Khalifa City Phase-I

Reference PROJECTSOffice Buildings

Cost: 80,000,000 $

First Gulf Bank Office Building

Kuwait Embassy - Abu Dhabi, UAE

Cost: 27,400,000 $

Reference PROJECTSHigh Rise Towers

Cost: 87,500,000 $

Link Properties Tower

Reference PROJECTSHigh Rise Towers

Cost: 75,000,000 $

Al Montazah Tower

Cost: 75,000,000 $

Al Mounira Tower

Reference PROJECTSHospitality

Cost: 46,000,000 $

Aloft Hotel

Reference PROJECTSVillas & Luxurious Houses

Cost: 25,000,000 $

Colonial Style Villa

Reference PROJECTSInterior Design & Furniture

Center of Waste Management Furniture

Cost: 15,000 $

Reference PROJECTSInterior Design & Furniture

Department of Transport HQ Interior Design & Furniture

Cost: 32,000 $

Reference PROJECTSOffice Buildings | Interior Design

ORASCOM HQ Relocation