1 Project Management Dr. Richard Jerz © 2010 rjerz.com 1 Describe or Explain: Learning Objectives What are “projects” The role of the project manager Work breakdown structure Project management tools (Gantt, PERT, & CPM) The use of software tools: MS Project © 2010 rjerz.com 2 What are Projects? Unique, onetime operations designed to accomplish a specific set of objectives in limited time frame. Often expensive and resource intensive. © 2010 rjerz.com 5 Build A A Done Build B B Done Build C C Done Build D Ship JAN FEB MAR APR MAY JUN On time!

Upload: ngohanh

Post on 27-Mar-2018

223 views

Category:

Documents


3 download

TRANSCRIPT

1

Project Management

Dr. Richard Jerz

© 2010 rjerz.com1

Describe or Explain:

Learning Objectives

• What are “projects”• The role of the project manager• Work breakdown structure• Project management tools (Gantt, PERT, & CPM)

• The use of software tools: MS Project

© 2010 rjerz.com2

What are Projects?

• Unique, one‐time operations designed to accomplish a specific set of objectives in limited time frame.

• Often expensive and resource intensive.

© 2010 rjerz.com5

Build A

A Done

Build B

B Done

Build C

C Done

Build D

Ship

JAN FEB MAR APR MAY JUN

On time!

2

Management Key Decisions

• Deciding which projects to implement• Selecting a project manager• Selecting a project team• Planning and designing the project• Managing and controlling project resources• Deciding if and when a project should be terminated

© 2010 rjerz.com6

Management of Projects

Planning ‐ goal setting, defining the project, team organization

Scheduling ‐ relates people, money, and supplies to specific activities and activities to each other

Controlling ‐monitors resources, costs, quality, and budgets; revises plans and shifts resources to meet time and cost demands

© 2010 rjerz.com7

Project Goals

• On time• On budget• Accomplish tasks with expected quality

© 2010 rjerz.com8

3

Project Organization

• Often temporary structure• Uses specialists from entire company• Headed by project manager• Coordinates activities • Monitors schedule and costs• Project structure is called “matrix organization”

© 2010 rjerz.com10

TestEngineer

MechanicalEngineer

Project 1 ProjectManager

Technician

Technician

Project 2 ProjectManager

ElectricalEngineer

Computer Engineer

Marketing FinanceHumanResources Design Quality

Mgt Production

President

A Sample Project Organization

11 © 2010 rjerz.com

Steps of Project Planning

• Develop statement of work• Define work breakdown structure• List resources needed• Estimate time required• Estimate the cost

12 © 2010 rjerz.com

4

Project Risks

• Risk: occurrence of events that have undesirable consequences• Delays• Increased costs• Inability to meet specifications• Unexpected project termination

© 2010 rjerz.com13

Risk Management

• Identify potential risks• Analyze and assess risks• Work to minimize occurrence of risk• Establish contingency plans

© 2010 rjerz.com14

Other Issues

• Temptation to understate costs• Withhold information• Misleading status reports• Falsifying records• Comprising workers’ safety• Approving substandard work

15 © 2010 rjerz.com

5

Project Scheduling

• Identify activities and resources needed• Identifying precedence relationships • Sequencing activities• Determining activity times & costs• Estimating material and worker requirements• Determining critical activities

© 2010 rjerz.com16

Work Breakdown Structure

Project X

Level 1

Level 2

Level 3

Level 4

18 © 2010 rjerz.com

Project Management Tools

• Project task listing• Gantt charts• Critical Path Method (CPM)• Program Evaluation and Review Technique (PERT)

19 © 2010 rjerz.com

6

MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

Locate new facilities

Interview staff

Hire and train staff

Select and order furniture

Remodel and install phones

Move in/startup

Gantt Chart

21 © 2010 rjerz.com

Gantt Charts

• Advantages• Visual presentation• Simplicity

• Disadvantages• Updating• Doesn’t reflect costs• Doesn’t show relationships between tasks

22 © 2010 rjerz.com

PERT and CPM

• PERT:  Program Evaluation and Review Technique (1958)

• CPM:  Critical Path Method (1957)

• Graphically displays project activities• Estimates how long the project will take• Indicates most critical activities• Show where delays will not affect project• Can calculate slack times• Helps resource allocation

24 © 2010 rjerz.com

7

Precedence Diagram

1

2

3

5

6

Locatefacilities

Orderfurniture

Furnituresetup

Interview

RemodelMove in

4

Hire andtrain

7S

25 © 2010 rjerz.com

Example with Times (& AOL)

1

2

3

4

5 6

8 weeks

6 weeks

3 weeks

4 weeks9 weeks

11 weeks

1 week

Move in

26 © 2010 rjerz.com

PERT/CPM Information

• Expected completion time• Critical activities (path)• Each network activities

• Earliest (ES) & latest (LS) start• Earliest (EF) & latest (LF) finish• Slack (S): Allowable delay, = LS‐ES, or LF‐EF

• What if?

27 © 2010 rjerz.com

8

Critical Path Analysis

• Identifies critical path• Longest path in network• Shortest time project can be completed• Any delay on critical path activities delays project• Critical path activities have 0 slack

28 © 2010 rjerz.com

Probabilistic Estimates

Activitystart

Optimistictime

Most likelytime (mode)

Pessimistictime

o pm te

29 © 2010 rjerz.com

Advantages of PERT

• Forces managers to organize• Provides graphic display of activities• Identifies

• Critical activities• Slack activities

1

2

3

4

5 6

31 © 2010 rjerz.com

9

Limitations of PERT

• Important activities may be omitted• Precedence relationships may not be correct• Estimates may include a fudge factor

• Not exact science• Iterative process

1

2

3

4

5 6

142 weeks

32 © 2010 rjerz.com

It is not uncommon to face the following situations:

Shortening the duration of the project is called project crashing

Project Crashing

• The project is behind schedule• The completion time has been moved forward

33 © 2010 rjerz.com

Project Management Software

• Computer aided design (CAD)• Groupware (Lotus Notes)• CA Super Project• Harvard Total Manager• MS Project• Sure Track Project Manager• Time Line

© 2010 rjerz.com34

10

Software Demo: MS Project

35 © 2010 rjerz.com

Advantages of PM Software

• Imposes a methodology• Provides a logical planning structure• Enhances team communication• Flag constraint violations• Automatic report formats• Multiple levels of reports• Enables what‐if scenarios• Generates various chart types

© 2010 rjerz.com36

© 2010 rjerz.com37

11

Using Microsoft Project

38 © 2010 rjerz.com

Using Microsoft Project

39 © 2010 rjerz.com

Using Microsoft Project

40 © 2010 rjerz.com

12

Using Microsoft Project

41 © 2010 rjerz.com

Using Microsoft Project

42 © 2010 rjerz.com