DRA,i REPoRI itN()K f)PPIDIAA v SE (A I N D i a ANDHRA PRADESH IRRIGATION PROJECT - Itl SRI RAMA SAGAR PROJECT PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT DEPARTMENI GOVERNMENT OF ANDHRA PRADESH HYDERABAD Agricultural finance Corporation Limited (Wholly Owned by the Commercial Banks) HYDERABAD NOVEMBER 1995 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Upload: others

Post on 14-Mar-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

DRA,i REPoRIitN()K f)PPIDIAA v SE (A

I N D i aANDHRA PRADESH IRRIGATION PROJECT - Itl

SRI RAMA SAGAR PROJECT

PROJECT AFFECTED PERSONSECONOMIC REHABILITATION PROGRAMME

(PAPERP)

Prepared for

IRRIGATION AND COMMAND AREA DEVELOPMENT DEPARTMENIGOVERNMENT OF ANDHRA PRADESH

HYDERABAD

Agricultural finance Corporation Limited(Wholly Owned by the Commercial Banks)

HYDERABADNOVEMBER 1995

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Page 2: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

IJKAI I KPEI-RI(FOR OFFICIAL, tLSE ONI Y

I N D I AANDHRA PRADESH IRRIGATION PROJECT - III

SRI RAMA SAGAR PROJECT

PROJECT AFFECTED PERSONSECONOMIC REHABILITATION PROGRAMME

(PAPERP)

VOLUME - 11

ACTION PLAN

Prepared for

IRRIGATION AND COMMAND AREA DEVELOPMENT DEPARTMENTGQVERNMENT OF ANDHRA PRADESH

HYDERABAD

I w

Agricultural Finance Corporation Limited(Wholly Owned by the Commercial Banks)

HYDERABADNOVEMBER 1995

Page 3: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

INDIAANDHRA PRADESH IRRIGATION PROJECT - III

SOCIO-ECONOMIC STUDY OF PROJECT AFFECTED HOUSEHOLDSUNDER SRI RAMA SAGAR PROJECT

ACKNOWLEDGEMENTS

Our acknowledgements are due to

Sl.no Name Designation i

A. SECRETARIAT .

1 _ Shri K. Koshal Ram, IAS PrincipalSecret_ ary.(I...CADD

1. Shri K. Koshal Ram, S AS Principal Secretary (I & CADD)2. Shri S. Ray, lAS Principal Secretary (i & CAU5) 1!3. Shri P.K. Agarwal, IAS Principal Secretary, Projects (I & CAD)

4. Shri M.G. Gopal, IAS Joint Secretary (I & CADD)

5. Dr. W.R. Reddy, IAS Joint Secretary, Irrigation

6. Shri B. Narsaiah, [AS Special Collector, SRSP & SLBC

B., SRI RAMASAGAR PROJECT

1. Shri M. Dharma Rao Chief Engineer

2. Shri B. Anantha Ramulu Superintending Engineer, Karimnagar

3. Shri Muralidhara Rao Executive Engineer, Warangal

4. Shri M. Lakshminarayana Executive Engineer, Hanamkonda

5. Shri R. Laxma Reddy Executive Engineer, Huzurabad i6. Shri M. Sudhakar Executive Engineer

7. Shri K. Ravinder Reddy I Executive Engineer, Hanumakonda

8. Shri L. Banda Reddy Executive Engineer, Huzurabad !9. Shri G. Somi Reddy Executive Engineer, Hanumakonda

10. Shri V. Shankaraiah Executive Engineer, Hanumakonda

11. Shri C. Muralidhar Executive Engineer, Hanumakonda

12. iShri B. Shankaaii Executive Engineer, Hanurnakonda

13. | Shri M.V. Ramanarsaiah Executive Engineer

14. Shri Chukkayya Pay &-Accounts Officer

Page 4: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

I.

Si-no Name Designation

C. PROJECT PREPARATION AND MONITORING CELL

1. Shri C. Seshadri Special Officer

2. Shri Quasim Sherif Superintending Engineer

3. Shri S. Madhusudan Rao Executive Engineer

4. Shri M. Sathiah Deputy Executive Engineer

D. DISTRICT LEVEL OFFICERS

1. Shri Ajay Mishra, iAS District Collector

2. Shri Rajaiah Special Deputy Collector (LA), Warangai

3. Shri M.V. Krishna Rao Special Deputy Collector (LA), Karimnagar

Page 5: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

ii

ANDHRA PRADESH IRRIGATION PROJECT - IIISRI RAMA SAGAR PROJECT

ACTION PLAN

THE TEAM

Dr. D.V.Ramana Project DirectorEr. G. Krishnaji AdvisorV. Ram Mohan Economist0. Maheswar Reddy Field Organiser

SYSTEMS SUPPO,RT

0. Vijaya Sai Systems AnalystMs. K. Padma Computer ProgrammerMs. K. Rama Lakshmi Computer Operator

Page 6: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

liii

ANDHRA PRADESH IRRIGATION PROJECT - IIISRI RAMA SAGAR PROJECT

PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME

VOkUME -11

PART-I: ACTION PLAN

CONTENTS

* Acknowledgementsl * The Team iii*xF Cnntents iii-vi* List of Annexures vii* List of Charts viii

Chapter Title Page No(s)

INTRODUCTION 1 -2

Agricultural Situation 1

Second AP Irrigation Project 2

_______________ Necessity of Third AP Irrigation Project 2

THE PROJECT 3 - 5

Sri Rama Sagar Project 3

Sri Rama Sagar Project Coverage 4

Resettlement and Rehabilitation . 5

_________________ Project Benefits 5

II ll PROJECT AFFECTED AREA 6-7

IntroduLction -6

Land Use Pattern 7

Irrigation 7

Cropping Pattern 7

Crop Production 7

Production Loss 7

Infrastructure- 7

IV PROJECT AFFECTED COMMUNITY 8-14

Head of the Household 8

Religion t8

Caste 9

Type of Family 9

Population 9

Page 7: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

iv

Chapter Title Page No(s)

Sex Ratio 9

Age Distribution 10

Literacy 10

Work Force 10

Dependency 10

Skill Position 11

Income 11

Impact of Land Acquisition 11

Land Holding 11

Production Loss 12

Impact on Livestock 12

Satisfaction 12

Land Bifurcation 13

Benefits 13

Impoverishment 13

Impact on Women 13

V. LAND ACQUISITION 15-20

Introduction 15

Procedure 15

Requisition 15

Draft Notification (DN) Stage 16

Draft Declaration Stage 16

Award Stage 16

Grievance Redressel 18

Consent Award v 18

Acquisition 19

Utilisation of Compensation 19

VI E.ESETTLEMENT AND REHABILITATION THE POLICrY 21-26

Introduction 21

Objectives 22

Definitions 22

.___________ aStrategy for Economic. Rehabilitation 23

Page 8: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

V

Chapter T Trde Page No(s)

Entitlements 24

Land Acquisition 24

Resettlement & Rehabilitation 24

Involvement of Non-Governmental Organisations (NGOs) 26

______________ Participatory Planning and Implementation 26

VIli PARTICIPATION AND CONSULATATION 27-30

Stages 27

Stage I: Awareness 26

Stage Il: Compensation 27

Stage IlIl: Resettlement 27

Stage IV: Rehabilitation 27

Stage V: Participation in Construction 27

Stage VI: Water Management 27

Grievance Redressal/Appeal Mechanism 27

Vill. ACTION PLAN 31-34

Objective 31

Plan Component 32

Acquisition 32

Strategy for Fixing Compensation 32

Rehabilitation 33

Linkages with other development programmes 34

The Schemes 3 4

IX. ORGANISATION AND MANAGEMENT 35-39

Institutional Set up and Functions for SRS Project 35

At the Government level 35

At the Departmental level 35

At Project Ievel 37

At District level 37

District Level Rehabilitation Committee 38

Functions 38

State Level Rehabilitation Committee(SLRC) 39

Functions 39

Page 9: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

vi

Chapter Titie Page No(s)

X. MONiTORING AND EVALUATION 40-43

Monitoring Indicators 41

Inputs 41

Impact 41

External Conditions 41

Availability 41

Relevance 41

Accessibility 42

Utilisation 42

Coverage 42

Quality 42

Effort 42

Efficiency 42

Inputs 42

Monitoring and Evaluation 43

XI. IMPLEMENTATION SCHEDULE 44

Xli. PAPERP: THE BUDGET 45-46

ANNEXURES 47-126

CHARTS 127-136

PART-IICHOUTAPALLI: A VILLAGE ACTION PLAN

1. Village Action Plan Report J 137-14

|_____________ Appendices

I i Choutapalii Village: Cropping Pattern 142

II .Choutapalli Village: Popular Crop Varieties 143

Iil Proposed household Schemes and Unit Costs 144

IV, Choutapatli Village: Action Plan 145-164

Figures| I. Soils 165

II. Proposed Command Area 166

Ill. Location of Wells 167

IV & V Cropping Pattern - Kharif and Rabi 168-169 J

Page 10: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

vii

ANDHRA PRADESH IRRIGATION PRO3ECT - IIISRI RAMA SAGAR PROJECT

VOLUME- IfACTION PLAIN

LIST OF ANNEXURES lAnnexure No Title Page No(s)

Annexure - I Reachwise Project Affected Villages 47-54

Annexure - II Field Work Teams 55-57

Annexure - Ill Field Visits of the Study Team Schedule of Socio- 58Economic Survey

Annexure - IV Village wise Number of Awardees and those covered 59-64under the Study

Annexure - V Caste and Sex wise Distribution of PAPs and Land 65-73Acquired in Different Areas

Annexure - VI Details of Court Cases under Land Acquisition 74-80

Annexure - Vil Mobility Matrix of PAPs from Pre Acquisition Period 81to Post Acquisition Period

Annexure - VIII Projected Affected Persons details of eligible family 82-90members for Productive Asset Grant and otherEconomic Assistance

| Annexure - IX Projected Affected Persons under Economic 91Rehabilitation Programme details of DisplacedFamilies

Annexure - X PAPs: Details of Land Acquisition and Compensation 92-100Paid Reachwise and Villagewise

Annexure - X.l DiWtribution and Villagewise Land Acquired for Canal 101-108Infrastructure Development under SRSP in Warangal

______________________ DistrictAnnexure - Xi Unit Costs Proposed Asset Based Household 109-113

l_____________ _ Schemes -

Annexure - XII Project Affected Persons Economic Rehabilitation 114-123.______________ lProgramme (PAPERP) Reachwise Action Plan .

Annexure - Xil Project !,Affected Economic Rehabilitation 124l_______________ Programme: The Budget .

Annexure - XIV Project Affected Economic Rehabilitation Programme: 125Reachwise Action Plan

Annexure - XV Project Affected Persons Economic Rehabilitation 126.Programme - Indicative Budget . .

Page 11: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

viii

ANDHRA PRADESH IRRIGATION PROJECT - IIISRI RAMA SAGAR PROJECT

VOLUME - If

ACTION PLAN

__________ LIST OF CHARTS

Chart No Title Page No(s)

Chart - I Implementation Schedule of Land Acquisition for 127Main Canal km 234-km 284

Chart - II Implementation Schedule of Land Acquisition for 128DBM-31

Chart - III Implementation Schedule of Land Acquisition for 129DBM-37

Chart - IV Implementation Schedule of Land Acquisition for 130_______ DBM-38

Chart - V Implementation Schedule of Land Acquisition for 131DBM-40

Chart - VI Implementation Schedule of Land Acquisition for 132DBM-48

Chart -VII implementation Schedule: Training, Skill, 133Development and Self Employment

1 Chart - Vill Implementation Schedule: Productive Asset Supprot 134Programme

Chart - IX Implementation Schedule: Group Economic Activity 135for Women

;hart -X Implementation Schedule: Payment of Cattle 136Allowance and Maintenance Allowance

':.?~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~.

Page 12: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

ANDHRA PRADESH IRRIGATION PROJECT - IIISRI RANA SAGAR PROJECT

PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME

VOLUME- 11

PART-I

ACTION PLAN

Page 13: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

t wKADAM DAMSR-IRAMA SAGAR DAMr SRIRAMASAGAR PROJECT. I3rl9< ~~~COM MAND A RE A

LAXMI CANAL E z E < E \o ARMUR ETPLL

> LLI<AAPALNT HA"SL

KARIN A

LOWER MANAIR DAM m.16 t -i

._. r > ~~~ANDHRA PRADESH K. 3l 3 /

. - STUDY AREA {

Page 14: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

ANDHRA PRADESH IRRIGATION PROQCT - IIISRI RANA SAGAR PROJECT

PROJECT AFFECrED PERSONS ECONOMIC REHABILTATION PROGRAMME

ACTION PLAN

CHAPTER I

INTRODUCTION

Page 15: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

l

INTRODUCTION

1.01 General: Andhra Pradesh is the fifth largest state inAGRICULTURAL the country with an area of 27.5 million ha and a populationSITUATION. of 66.5 million of which about 73 percent is rural. About 70

percent of the work force is engaged in agriculture(cultivation and agricultural labour) which is the main stay of

the state's economy; about 34 percent of the State's Net Domestic Product isconstituted by agriculture.

1.02 Irrigation Development: Over the last five years (1989-90 to 1993-94),the net irrigated area has fluctuated between 3.89 million ha (1993-94) and 4.35million ha (1991-92). The net irrigated area through canals accounts for more than 80per cent of the net irrigated area in the state. While the net irrigated area constitutedabout 38 per cent of net sown area, the percentage oa gross irrigated area to grossarea sown in 1993-94 was about 40 percent.

1.03 Development of irrigation has been given high priority by the state in tunewith the national priorities. Till the year 1991, potential upto 6.4 million ha i.e. about51 per cent of the ultimate potential has been created. With a view to improve theutilisation of created potential, the state has initiated several steps such as launchingof Command Area Development authorities (CADA) for Nagarjuna Sagar Project INSP),Sri Rama Sagar Project (SRSP) and Tungabhadra Project.

Page 16: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

2 Introduction

1.04 The Second A.P Irrigation Project was taken upSECOND AP with the financial assistance of World Bank to the tuneIRPIGAT1ON PROJECT of SDR 127.5 M (US $140 M as on 1986) as credit

and US $ 131 M as loan. The project was planned tobe completed in a duration of seven and half years i.e.

from June 1986 to December 31, 1993 with the credit/loan closing date as June 30,1994. The main objective of the project was to increase agricultural production andfarmers income in the command area of the projects; In respect of Sriramasagar Project(SRSP) modernisation of 1,65,000 ha and development of 1,63,000 ha under KakatiyaCanal was contemplated.

SRS Sub-Project

The main components of the project were:

1. Upgrading and completion of conveyance works of Kakatiya Canal Commandbetween km 0 - 146.

2. Completion and new conveyance works of the Kakatiya Canal Commandbetween Km 146-267.

3. Excavation of the tail section of the Kakatiya Canal to serve as an escape (Km267-284).

1.05 Though the project implementation improved very much in the last two and halfyears i.e. 1992-93 onwards, the project could not be completed in full by June 30,1994 because of earlier slippages in the project implementation. Though the SRSPphysical progress to end of June 1994 was only 21 per cent, since the achievementunder certain connected activities was nearly full the project would have been able toirrigate in 1996-97 i.e. with an extension of three years.

1.06 Since the objectives of the Second A.PNECESSITY OF THIRD Irrigation Project could not be achived due to non-AP IRRIGATION PROJECy completion of the project it is felt desirable not to

leave or delay the project in the present half-finishedand inoperable state but to find additional

5 investnrentSneeded to complete the works early and realise the potential created bypast investments for increased agricultural production to improve the economy of thebackward regions of Andhra Pradesh. 4

1.07 The Third A.P irrigation Project thus contemplates to complete the spill overworks of the Second A.P Irrigation Project at the earliest to generate the benefitscontemplated.

Page 17: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

ANDHRA PRADESH IRRIGATION PROJECT - IIISRI RANA SAGAf PROJECr

PROJECr AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME

ACrION PLAN

CHAPTER If

THE PROJECT

Page 18: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

THE PROJECT

2.01 The Project The Kakatiya Main canal, theSRI RAMA SAGAR major canal under SRSP takes off from Sri Rama SagarPROJECT dam built across river Godavari at Pochampad. The

canal after traversing about 146 km outfalls into theLower Manair Reservoir (LMD) built across rivefManair. The LMD acts as a balancing reservoir in the

canal system.

2.02 For construction of the dam near Pochampad and part development of thecommand, World Bank assistance was sought under Pochampad Irrigation Project (Cr.268-IN). Subsequently for the construction of the Kakatiya Main canal of SRSP and alsofor construction of Sri Sailam Right Branch Canal (SRBC) and development of theircommands, project called Andhra Pradesh Irrigation Project II (APIP-I1) was formulatedfor support from World Bank. The main components included in the World Bankassisted APIP-II in respect of SRSP were:

a. upgrading and completion of conveyance works of KakatiyaMain canal command between 0-146 km;

b. completion and new conveyance works of Kakatiya canalcommand between km 146-267 km and Distributory networkfrom DBh; 1 to DBM 48.

Page 19: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

4 *11Ic Piject

C. excavation of the tail section of the Kakatiya canal from km267-km 284.

d. Modernisation of 1,65,000 ha of the existing system anddevelopment of new ayacut of 1,63,000 ha.

e. equipment support f6r implemientation including provisionoftelecommunication facilitiec.

f. .feeder roads network in the command for facilitating transportof agricultural produce;

g. Providing training to project implementation staff and farmerbeneficiaries including provision of training facilities;

h. rehabilitation of oustees of Lower Manair Dam and other projectworks including provision of amenities; and

i. monitoring and evaluation, technical services including planningand conducting of studies;

j. provision of drinking water to Karimnagar, Jagitial and Warangaltowns.

2.03 The APIP-II initiated in June 1986 was planned to be completed by end ofcalender year 1993. Due to slippages in implementation, ihe APIP-II could not beimpelemented within the stipulated period. The Third AP irrigation Project was thenproposed to be launched to complete the spill over works of SRSP under APIP - il sothat the works left incormplete and in an inoperable state be completed throughadditional investments and the contemplated irrigation potential created in full andutilised through better water management practices for augmentation of agriculturalproduction. The Third AP irrigation project (APIP-lli) is also being posed for World bankfor financing.

2.04 While the Kakatiya Main canal in its reach

SRI RAMASGAR upto 146 km has been designed to provideirrigation to an area of 1,65,000 ha in the districtsPROJECTw COVER A GE of Nizamabad an1 Karimnagar, the command area

below LMD is 1,63,000 ha most of which falls in66 mandals of Nizamabad, Karimnagar and

Warangal districts. The Lower Manair Dam (LMD) is a balancing reservoir. The worksin SRSP under the APIP-III consist mainly of:

a. Completing balance works of upgrading and completion ofconveyance works of Kakatiya Main canal and its distributoriesabov '..D i.e. from 0-146 km

b. completing the balance works in conveyance system below LMDkm 146-234 including the distribution network.

c. provision of feeder roads network in the irrigation command inWarangal and Karimnagar districts.

Page 20: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

5 Thc Project

2.05 Reseftlement and Rehabilitation (R & R)

RIESETTLEIENT programme for the Oustees of Lower Manair Dam (LMD)of Sri Rama Sagar Project, AP Irrigation Project -11 isAND already under implementation. Necessary basic

REHABILITATION infrastructural facilities like education, health, electricity,

approach roads, etc. have been created in theresettlements of those oustees and necessary

rehabilitation support is extended through IRDP, DWCRA and TRYSEM programmes bythe District Rural Development Agency (DRDA), Karimnagar. Similar to the R & R ActionProgramme under APIP-II, GOAP is committed to provide all required support andassistance for the affected households who lost their assets like land, house etc underacquisition for SRSP APIP-III project irrigation infrastructure .

2.06 As in any other major irrigation work, the State Government has continuouslyacquired land and other associated properties for construction of canal, distributories,feeder roads and other project works such as buildings and camps to keep pace withthe construction schedule of the various components of the SRS project. The landshave been acquired from number of households spread over the command area as alsooutside the command area. The persons who have lost their lands and associatedproperties are most liekly to lose their normal income earning potential which is boundto upset their socio-economic conditions and disturb cultural life. Hence there is needfor resettlement and rehabilitation so as to provide the affected persons means toimprove their production levels, earning capacity and living standards or at least takethem as close as possible to their former levels, through payment of adequatecompensation for the loss of their assets and provision of assistance through variousgovernment sponsored income generating schemes.

2.07 The project provides both direct and indirect

PROJECI BENEFITS benefits contributing in overall area development in itscommand.

The direct benefits are:

1. Increase in area under assured irrigation.2. Higher cropping intensity.S. Improved crop productivity and higher crop production.4. Stabilisation of agriculture from vagaries of monsoon.

The Indirect benefits are:

1. Increase in ground water levels and enhanced ground water reacharge.2. Provision of adequate drinking water facility to the settlements through

dug/bore wells.3. Generation of employment opportunities in construction, service,

basiness and industrial sectors.4. Enhanced crop benefits and higher income levels to the households.5. Environmental improvement through health green cover on the depleting

soil wealth.6. Provision of additional habitat for aquatic/wild life especially migrating

birds and resident species besides aquatic wild life.7. Improved living standards and change in life styles.

Page 21: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

ANDHRA PRADESH IRRIGATON PROJECT - fitSRI RAMA SAGAR PROJECT

PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMMEACTION PLAN

CHAPTER III

PROJECT AFFECTED AREA

Page 22: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

III

PROJECT AFFECTED AREA

3.01 The project affected villages are defined as suchINTRODUCIwION villages where the land acquisition has taken place for

construction of irrigation iiifrastructure and ayacut roadsand a part of the cultivable land was lost; some of thehouseholds living in such villages were affected by loss

of land and other assets. There are 174 affected villages spread over 22 mandals outof the total 50 mandals in Warangal district under the scope of the study. An area of98,000 acres is likely to be brought under irrigation once the irrigation waters arereleased through the canal network in the area.

3.02 The Project Affected Villages (PAVs) with a total geographical area of 17284 sqkm comprising 174 settlements spread over 22 mandals in Warangal district form thestudy area (Ref: Annexure-l). The study area of these PAVs has a population of 499083as per 1991 census, of which 254756 are males and 244327 females. The sex ratiois 944 females per 1000 males. The scheduled castes (SCs) constitute 17.75 per centand Scheduled Tribes (STs) 15.57 per cent of the total population. The literacy rate is

* 26.77 per cent with a literacy of 37.66 per cent among males and 15.41 per centamong females.

3.03 The workforce constitutes 49.01 per cent of the total population. The workforceamong males is 55.67 per cent while among females it is 42.06 per cent. The marginalworkers having less than 180 days of employment in a year constitute 3.23 per centof total population of the PAVs/Study Area. Out of the total workforce, 36.82 per centare cultivators, 45.99 per cent agricultural labour and persons depending on forestry,fishing and livestock are 1.14 per cent which together constitute 83.95 per cent of theworkforce all of whom depend on primary sector namely agriculture alone. The workersin secondary and tertiary sectors are 16.05 per cent.

3.04 The soils in the area are predominantly black soils (48%) and red soils (40%)which together constitute 88 per cent of the total geographical area.

Page 23: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

7 Project Affected Ara

3.05 Land Use Pattem:The total geographical area of the project affected villagesis 364900.59 acres of which the forest area constitutes about 1.13 per cent coveringan area of 4134 acres, mostly located in project affected villages under DBM-48. Thenet sown area is 222927.94 acres which constitutes 61.09 per cent of the totalgeographical area. The current fallows, permanent fallows and culturable waste puttogether constitute about 23 per cent of the total geographical area. The permanentpastures are about 2.87 per cent while the barren and uncultivable land and area putto non-agricultural use together constitute about 12 per cent. The distributory wise landuse pattern among the Project Affected Villages shows highest percentage of net sownarea of 70.37 per cent of the total geographical area in the PAVs under DBM-40 andthe lowest of 53.01 per cent in PAVs under DBM-37. Besides the predominance of theblack and black cotton soils which are suitable for cultivation of paddy and othercommercial crops the area is blessed with favourable climate and rainfall. Thepercentage of net sown area of the total geographical area in the study area is veryhigh compared to the state average of 37 per cent.

3.06 Irrigation:The total irrigated area under different sources was about 92,000acres. During kharif the net area irrigated was 91837 acres and during rabi it was54822 acres. Thus the gross irrigated area was 146657 acres during 1993-94. Theirrigated area was 41.2 per cent of the net sown area. Wells are the predominantsource of irrigation which provide irrigation to 72 per cent of the total irrigated area inkharif and to 96 per cent of the total irrigated area during rabi. Tanks rank second inproviding irrigation to the extent of 25 per cent during kharif and about 3 per centduring rabi. The irrigation under canals during kharif was only 2.9 per cent.

3.07 Maximum irrigated area lies under DBM 31 with 86.29 per cent during kharif,while lowest irrigated area lies under DBM-40 with 55.38 per cent. In almost all thereaches the irrigation percentage during rabi is varying around 70-90.

3.08 The cropping intensity in the study area is about 130 per cent of the net sownarea. The cropping intensity varies in different reaches.

3.09 Cropping Pattem:Out of the total cropped area in kharif 24.37 per cent ofthe area is under cotton with an area of 50366 acres. Paddy is the next predominantcrop during kharif covering an area of 40294 acres, which constitutes 19.50 per cent.Chillies,are grown in an area of 22227 acres in kharif constituting 10.46 per cent. Theother predominant commercial crop in the area is turmeric grown in an area of 10925acres which forms 5.28 per cent of the net area cultivated during kharif. Amongoilseeds groundnut and sunflower are the predominant crops &Jring rabi whilegroundnut is also grown during kharif. The other crops are jowar and maize which aregrown both in kharif and rabi.

3.10 Crop Production:The area produces 233247 tonnes of various crops. Paddyalone accounts for 75333 tonnes followed by groundnut 39886 tonnes, cotton 38681tonnes, chillies 15426 tonnes and turmeric 12411 tonnes.

3.11 Production Loss:The total production loss of various crops has been assessedas 4125 tonnes due to the land acquisition effected in the area.

3.12 Infrastructure:The area is endowed with adequate infrastructure related toeducation, health, communication, transport, electricity, credit, banking and agriculturalsupport services, etc.

Page 24: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

ANDHRA PRADESH IRRIGATION PROJECT - IIISRI RAMA SAGAR PROJECT

PROJECT AFFECrED PERSONS ECOINOMIC REHABIUTATION PROGRAMME

ACrION PLAN

CHAPTER IV

PROJECT AFFECTED COMMUNITY

Page 25: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

8

Iv

PROJECT AFFECTED COMMUNITY

4.01 The Socio-Economic Survey was carriedout for 8208 households affected byland acquisition for providing irrigation infrastructure of which 1579 (19.2 per cent) arePAPs. Two of these PAPs have lost houses. PAPs are those who lost more than 25 percent of land under the project and are left with less than 5 acres and those who are leftwith marginally more than 5 acres but coming under the category Below Poverty Line(BPL). All these households who come under the definition of Project Affected Persons(PAPs)are eligible for assistance under Economic Rehabilitation Programme ,(PAPERP).All other households surveyed (6629) which are not eligible for any assistance underPAPERP are categorised as Other Aff, ted persons (OAPs). With regard to affectedhouseholds under ayacut roads only32ldentified PAP households were administeredsocidt-economic survey schedule out of 516 total affected households. For the purposeof PAPERP; PAP households are treated as project affected community in this report.The details of the Field Teams and the schedule of visits of the Field Teams arepresented in Annexures II and Ill. Annexure IV provides the details of villagewise totalnumber of awardees, awardees covered under the study and identfied PAPs.

4.02 Head of the Household: The head of the household is male in 96.5 per centof the surveyed households and in case of PAPs, the male headed households are 96.1per cent and female headed households 3.9 per cent. In case of Ayacut roads all the29 PAP households are headed by male.

4.03 Religion: Hindus are the predominant community with 98.42 per cent of thesurveyed households. Muslims with 1.67 per cent are the next predominentcommunity. Christians (0.19%) and others (0.12%) put together are 0.31 per cent. Incase of ayacut roads all the PAP households (29) are Hindus.

Page 26: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

9 Project Affected CommunityA Demographic Profile

4.04 Out of 1579 PAP households BCs constitute 51.3 per cent

CASTE followed by STs 25.46 per cent. OCs 11.91 per cent and the leastbeing SCs with 11.34 per cent. The STs are predominent in DBM-48 and DBM-40 and in case of BCs they are predominent in DBM-48, DBM-31 and DBM-38. Under ayacut roads out of 29 PAP

households surveyed BCs are 16 (55.17%), SCs 5((17.24%), OCs 5 (17.24%) and STs3 (10.34%). As in canal infrastructure, under ayacut roads also BCs are in majority(Ref: Annexure - V).

i 4.05 About four fifths (81.13%) of the total PAP

TYPE OF FAMILY households are nuclear families, 16.15 per cent jointfamilies and 2.72 per cent single mostly comprisingwidowed, divorced and aged. Among PAPs under ayacutroads joint families are 11 (37.93%) nuclear families

11(37.93%), and single families 7(24.14%) showing joint and nuclear families in sameproportions. Joint family system is observed among BCs (5 nos), OCs (4 nos), and SCs(2 nos). It is observed that 86 per cent of the ST households are nuclear and 12.2 percent are joint. The extent of joint family households is highest among OCs. STs by theirtraditional culture are mostly nuclear.

4.06 Land hoking size: Of the total PAP households, 13.3 per cent are landless. Asthe PAPs have been defined as those possessing around 5 acres of land (having lost25 per cent of their land under the project and being BPL), some of them (less than 0.5per cent) are reportedly possessing medium size holdings (i.e., of size 5-10 acres).70.6 per cent of the PAPs hold marginal holdings (upto 1 ha).

4.07 The land holding distribution among the PAP households before and after periodsshows that there were only two landless households who lost houses under acquisitionand the number of landless households went up to 211 after acquisition showing thatland acquisition has caused drifting of some households into landless category. Amongthese who have become landless after acquisition, the actual number of householdsdrifted to landless category, exclusively due to land acquisition is only 57 of whom SCsare 2, STs-8, BCs-37 and OCs-10 and the remaining 152 households sold out theirremaining land due to economic compulsions and have become landless.

4.08 The total population of the PAP households is 7,478.POPULATION The percentage of male and female population in the PAP

households is almost equal, the male population being 50.6percent.

4.09 The sex ratio is 1002 females per thousand malesSEX RATIO among PAPs. The higher incidence of female population

among PAPs is attributed to similar situation prevailing in theBC and OC households.

4.10 Among the PAPs under ayacut roads the sex ratio is 870 females per 1000males, mostly because of large number of single size households (24.14 per cent).

Page 27: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

10 Project Affccted CommwuityA Demographic Profile

4.11 The average size of family among the PAP households works out to 4.7. Theaverage size of the household is highest among the ST households (5.1) while amongthe OC households it is 4.2.

4.12 As regards PAP households under ayacut roads average size is 5.0, and thehighest family size of 5.2 is in SCs and lowest of 2.0 in STs.

4.13 The STs and SCs constitute 27.7 per cent and 11.2 percent respectively of thetotal population of PAP households. As such there is a preponderence of the BCs whichconstitute 50.6 percent of the population.

4.14 In case of ayacut roads (PAP households) the population among different castesare SCs-26 (18.06%), STs-6(4.11%), BCs 88(61.11%) and OCs-24 (16.67%).

4.15 Among the total households the working age

AGE DISTRIBUTION group between 15-60 years constitute 64.3 per centof the total family members of 7478. The dependentsconstiture 35.7 per cent.

4.16 The number of those with ability to read and write are 2557LITERACY constituting 34.2 per cent of the total population of the PAP

households which is slightly more than the literacy rate of 32.6 percent of Warangal district (1991 census). The literacy rate variesfrom 31.1 per cent in reach DBM-40 to 49.2 in the reach of DBM

31. The literacy rate is 34.2 (being 45.2 among the males and 23.2 among females).

4.17 The lower rates of literacy are among the female ST households while thehigher literacy rates are prevalent among the males of the OCs. Further, the literacyrate among the PAP households is consistently lower than that of overall surveyedhouseholds (37.0 per cent).

4.18 Ayacut Roads: In case of ayacut roads among the PAP households the literacyis 34.42 per cent, with 44.35 per cent literates among males and 23.88 per centliterates among females.

4.19 The able bodied persons between the age group of 15WORKFORCE to 60 years constiwute the work force who are 64.5 per cent of

the total population. Further while the male work forceconstitutes 63.7 per cent of the total male population thefemale work force accounts for 65.3 of the total female

population of the PAP households. The work force is highest among OCs while it isleast among the STs.

4.20 The unemployed students and children below 5 years

DEPENDANCY constitute the dependants. The percentage of dependants oftotal population among the households of PAP is 44.6 percent. This per centage varies from 39.1 per cent in the maincanal area to 46.5 per cent in the reach of DBM-31.

Page 28: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

P;roject Alfcciscd ComnruniyA Dcrrmg' phic IYrotH

4.21 The dependancy is least among the ST households, followed by SCs and BCs.Among the OCs the dependancy is hig!.est among the women folk who aregenerally notfound to take up any occupations especially outside their household.

4.22 , The occupational classification of the PAPSKILL POSITION households provides the traditional skills available

among the PAPs and promoting such sktiis heips theindividuals to reach enhanced income levels to regaintheir econo,-nlic status prior to acquisition and to

further improve upon the same. The occupational classification indicates that over 91per cent of the PAP households are depending on agriculture alone with the cultivatorsconstituting 87.02 per cent, agricultural labour 6.72 per cent and livestock rearing 0.26per cent. In otherwords predominent number of hoVseholds are in agriculture alone whoneed support in agriculture and allied activities. The service sector namely barbers,washer men, traders, etc. together constitute 7.03 per cent and persons empsoyed inother avocations are only 0.38 per cent. Any rehabilitation measures focussed on theupliftment of these affected households should be tuned to the existing avocations andskills traditionally acquired over generations to provide sustainable economic supportto the households.

4.23 The average annual gross income of the household is Rs.INCOME 25,687 of which agriculture constitutes over 85 per cent and the

net annual income is Rs. 16,953. In otherwords most of the PAPhouseholds are under poverty conditions either below BPL ormarginally above BPL and deserve to be assisted under the

Economic Rehabilitation Programme.

4.24 The land acquisition has had its adverse impactIMPACT* OF IAND on the PAP households in different dimensions.ACQUISITION

4.25 Of the 1579 identified PAP households 2 are land less '&hoLAND lost houses under acquisitioni and the balance 1577 farmers ofHOLDING whom about 93 per cent are small and marginal farmers. The

average size of the holding among the PAPs which was 1.87before acquisition is reduced to 1.19 acres after acquisition. Thetotal area acquired among PAP households was 1494.65 acres.

4.26 About 70 per cent of the PAP households lost lands varying between 0.25acres to 1.50 acres and on an average the land loss was 0.95 acres due to landacquisition. In case of ayacut roads tIhe overage land loss was 0.148 and in case ofPAPs it was 0.33 acres. The land acquisition has pushed 209 households to landlesscategory of whom 57 households have become landless only due to land acquisitionand the balance 152 households disposed off their remaining piece of land due toeconomic compulsions and have become land less. The 57 households who havebecome land less comprise 2 SCs, 8 STs, 37 BCs and 1C OCs. As per the prevailingnorms the households who have become land less among STs should be compensated

Page 29: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

1 2 Pttojct Afkcu _ 'unif.an4yG\ Demograrnir P'r,Jihl

with land from the project funds. In case of ayacut roads the land acquisition does nothave much of negative impact except n one case where the household became landless after acquisition. In brief the land acquisition had its adverse impact by pushingsignificant number of households to land less category causing undue econotmchardship (Ref: Annexure VIl).

4.27 The iverage production loss due to land loss of 0.95PRODUCTION acre per PAP household is estimated at 6.36 quintals. InLOSS monetary terms after deducting the cost of cultivation, the net

loss is Rs. 3522. This loss can however be compensated tosome extent by the imputed minimum annual interest rate of10 per cent on the average compensation amount of Rs.

31817 per acre in which case the net loss would be around Rs 500 per household.However, since many of the PAP households would not normally invest the entirecornpensation amount for productive assets especially when large proportion ofhouseholds (over 90 per cent) belong to small and marginal farmets majority of themeither under BPL or marginally above BPL), rehabilitating these vulnerable groupsi>$through viable and sustainable economic support is an imminent need to regain their [f'1prior economic status.

4.28 During the survey it was observed that the land less labour working aspermanent servants on the PAP holdings do not exist since the average size of the PAPholding is itself quite marginal being less than 2 acres. However, the landlesspermanentservants do exist in the area who work mostly with medium and big farners.

4.29 Similarly pure tanant/share croppers wholly depending on the land of PAPs andwho are affected by acquisition of such land of PAPs do not exist in the study area.However, some cultivators who have their own land and also undertake tenant/ sharecropping do exist as tenant1share croppers. Such tenant/share croppers who have losttheir land under land acquisition are the project affected tenant/share croppinghouseholds and they may be PAPs as per the defined criteria. Due to acquisition, inrespect of 43.40 per cent households the land has become un-economical, 28 per centhave shifted to other avocations, 3 per cent have shifted to other land5.

4.30 About 67 per cent of the households expressed noIMPACT ON impact on livestock, 12 per cent expressed difficulty inLIVESTOCK maintenance of animals, 15 per cent did not respond and the'

balance 6 per cent expressed disease and other problems. 99per cent expressed that the project did not have any effect onfodder.

4.31 Only about 38 per cent of the PAP householdsSATISFACTION expressed their satisfaction with the compensation received

and 62 per cent are dis-satisfied. However,majority of the dis-satisfied (73%) either did not take any action or awaitinggroup response. Only about 4 per cent went to the court for

redressel and 0.31 per cent objected to canal construction and about 20 per cent didnot respond.

4.32 76% of the dissatisfied PAPs ere due to low amount of compensation received,18 percent due to delay in payment and the blance expressed multiple reasons.

Page 30: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

13 Pojt Affected CommunkyA Demographic Profile

4.33 The land acquisition has also created bifurcation of land

LAND into two or more parts. In 20 per cent of the cases the landBIFURCATION was intact, in 72 per cent cases it was bifurcated into two

and the balance 8 per cent it is more than 2 parts. 55 per centof the people expressed reduction in area, 43 per centexpressed difficulty in movement of carts due to disruption of

cart track and 2 per cent expressed difficulty in cultivation.

4.34 While the above is the adverse impact of the land',:BENEFITS acquisition the project is not without positive perceptions of the -

households. About 64 per cent of the PAP households expressed -'>boost in the crop production, appreciation of the land value and >

0.63 per cent expressed drinking water would be available. About { -

2 per cent expressed employment opportunities during and after construction.

4.35 The culminating effect of land acquisition is the

IMPOVERISHMENT impoverishment of the affected households. As perthe prevailing defined criteria the households havingannual income of less than Rs. 11,000 are treated asBelow Poverty Level. Based on the criteria of line of

poverty defined, the poverty among the PAPs which was 34.26 per cent prior toacquisition has risen to 40.98 per cent showing a percentage variation of 19.61 percent as the rate of impoverishment due to acquisition. The rate of impoverishmnnt ishighest among OCs with 36.86 per cent followed by STs 25.32 per cent, SCs 15.70per cent and the least being 14.90 per cent among BCs. In case of ayacut roads thehouseholds below poverty level are 65.52 per cent which did not undergo any change.

4.36 The project has created impoverishment among PAP households with an averagerate of percentage variation of 19.61 pr cent between before and after periodswarranting urgent rehabilitation to these impoverished households.

4.37 The overall responses of women indicate that the land

IMPACT ON acquisition has generally affected the social status of the familyWOMEN and created economic hardship to the family (74 per cent).

However, most of the women (92.9 per cent) expressed theirwillingness for land acquisition keeping in view the futurebenefits like appreciation of land value, higher crop production

and productivity and better living standards.

4.38 The land acquisition has also created shortage of fodder and firewood (0.55per cent) besides creating difficulties in fetching firewood. Some women (6.56 percent) have also felt that the cultivator before acquisition was turned into a landlesslabourer after acquisition. Many women (40 per cent) expressed their aspirations indoing business by sale of goods, flowers, vegetables or establishing a tea shop, pettybusiness and also tailoring. Some women (30 pr cent) expresed the need for skillimprovement. Many women (96 per cent) expressed that they were not getting anybenefits through Anganwadi centres either for them or for their children, which callsfor a critical look into the functioning of Anganwadi centres for their better performancein catering to the needs of women and children. Majority of women have also

Page 31: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

14 Project Affected CommunityA Demographic Profile

expressed (95 per cent) that they have equal status with men in the family and theyhave decision making powers (85 per cent) in children's education, marriages, purchaseand sale of property but most of the women (87 per cent) do not have any role orparticipation in village development activities. Formation of women groups under thriftand economic oriented programmes would activate the empowerment of these projectaffected rural women.

Page 32: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

IIe

i:i V

ZS's § y~~~~~~~~~~~~~~1

Page 33: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

v

LAND ACQUISITION

5.01 The Land Acquisition Act 1894 which was aINTRODUCTION Central Act was amended and made applicable to the AP.

This act was amended from time to time and the lastamendment took place in 1984. The govt of AndhraPradesh is empowered to acquire any land for a public

purpose under the provisions of the Act.

5.02 There are 4 distinct stages under the Act for processingPROCEDURE land acquisition.

1. Requisition from the requisitioning department DraftNotificai5on (DN) Stage:

2. Draft Notification (DN) Stage: Stage upto the submissionof Draft Notification(DN) under section 4t1) of the LAAct.

3. Draft Declaration (DD) Stage: Stage upto the submissionof the Draft Declaration (DD) under section 6 of the LAAct.

4. Award Stage: Stage upto passing of the award undersection 11 of the LA Act.

1. Requisition

5.03 The land required for construction of the Canal system is identified by theEngineering Wing of SRSP and land plans and schedules are prepared indicating thelocation of land with such details as the name of the village survey number and itsextent and the extent required to be acquired for the canal infrastructure. The

Page 34: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

16 Land Acquisition

requisition should specifically indicate that necessary provision has actually been madein the budget towards cost of acquisition. These land plans and schedules will be sentto the Special Deputy Collector (SDC), Land acquisition(LA) for processing theacquisition.

2. Draft Notification (DN) Stage

5.04 On receipt of the proper requisition, the SDC(LA) personal inspects on ground,the survey numbers and actual extent proposed, and will verify from records whetherthe land required is govt land or patta land and if patta land whether the pattadar isattracted by the Agricultural land ceiling Act. After verifying the above aspects, theSDC(LA) will prepare a draft notification under sec 4(1) of the LA Act. This notificationis only intended to declare the intention of government to acquire such land for publicpurpose. The publication of the notification will be caused through the following 3modes.

1. Publication in the official gazette.2. Publication in two local dailies of regional language.3. Issuing public notice in the village.

5.05 The last of the dates of the publication among the three modes will be treatedas the data of publication of DN under sec 4(1). Immediately after publication of DNunder sec 4(1), the SDC(LA) shall issue a notice requiring all persons interested in theland to file objections within 30 days from the date of publication of DN. On theappointed date, the SDA(LA) shall enquire into the objections, consider their validityand arrive at a conclusion and submit his 5.A enquiry report to the Special Collector(LA), SRSP, Hyderabad. with his specific remarks on each of the objections along withthe proposals for Draft declaration.

3. Draft Declaration Stage

5.06 The enquiry under sec 5-A can be dispensed with in case of urgency and theDN and DD proposals can be sent to the Special Collector(LA) simultaneously. TheSpecial Collector shall examine the records and submit the DD proposals together withthe objections, petetions, report of the SDC(LA), and remarks of the requisitioningauthority with his own remarks to the govt. The decision of the Government on the5A enqiiry report will be final. The draft declaration will be published after its approvalby the Government as in the case of DN.

5.07 The Draft declaration under sec-6 shall be published within a period of one yearfrom the publication of the draft notification. The mode of publication of the DD shallbe same as for the DN publication.

4. Award Stage

5.08 After publication of the Draft declaration, the SDC(LA) shall issue notices undersec 9(3) and 10 of the LA Act to the concerned parties for award enquiry. TheSDC(LA) will fix up the market value of the land on the basis of sale transactions of thelands situated in the vicinity of the last 3 years preceding the notification under Sec4(1) of the lands and submit the preliminary valuation statements along with the DraftAward to the Special Collector(LA) for his approval. The Special Collector afterverification of the sale transactions approves the Draft award. The award has to bepassed within a period of two years from the date of draft notification.

Page 35: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

17 Land Acquisition

Table 1: COMPEMSATION PAYABLE FOR DIFFERENT TYPES OF ASSET ACQUISMON

Si. Nature of Cmpesaion Payable Reference to RemaksNo Land/Property the Act/GO

l 1 Private Lands I. Market value as on Market value will bethe date of 4(1) fixed depending onnotification sales statistics of 3

yrs preceding the 4(1)notification of similarly

I. 30% solatium on Sec 23(1) of situated lands in thethe market value to the L.A. Act. vicinity obtained fromcompensate the Registrationcompulsory nature of Departmentacquisition.

Ill. 12% of additional Sec 23(1) ofmarket value the L.A. Act.prevailing from thedate of 4(1)notification till thedate of takingpossession or date ofaward which ever isearlier

IV. Interest at the rateof 9% for the 1st yearand 15% thereafterfrom the date oftaking possession tillthe date of paymentof compensation.

2. Govt. lands and 1. Lumpsum ex-gratia G.O. Ms. 1307 1. The amount is to beSurplus ceiling payment equivalent to D123.12.93 treated as ex-gratialands resumed for market value Revenue 11. The assigneesthe project Department would not be entitled

Govt.of A.P. for making referenceSec 23(2) of under Sec. 18 and SecL.A. 281A of the L.A. act

to the courts.

11. Solatium equivalent A.P. Sec 23(2) 111. The Assignees willto 15% for the lands of L.A.Act not be entitled interestresumed prior to on the market value as30.4.82 and 30% for provided under thelands after that date.. L.A. Acton the market value

3. Structures As per the valuation The valuation is donedone by the taking intoEngineering wing consideration the type

of structure, time ofconstruction andquality of materialused and total amountcalculated on plintharea basis. Theamount is to betreated as ex-gratia.

Page 36: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

1 8 Land Acquisitio

SI. Nature of Compensation Payable Reference to RemarksNo LandlProperty the Act/GO

4. Trees As per the norms The valuation is fixedfixed by the based on the age ofAgricultural the trees andDepartment anticipated production

in future. The amountis to be treated as ex-gratia.

5. Crop As per the norms The Compensation isfixed by the fixed depending on theAgricultural stage of the CropDepartment growth and type of

Crop. The amount isto be treated as ex-gratia.

5.09 The compensation payable for the lands acquired both in respect of Patta landsand Govt lands is presented in the Table-1. For the purpose of land acquisition, theassigned lands have also been taken on similar lines of acquisition of private lands butfor the difference in procedure of acquisition. For the purpose of preparation ofpackage for the resettlement and rehabilitation of the affected households they havebeen treated at par and as if private lands have been acquired from them. After theaward is approved by the Special Collector (LA), the SDC(LA) pays the compensationto the awardees in the form of cheques. According to the amended law, before takingpossession under emergency provisions, 80% of the compensation as estimated by theCollector has to be paid in advance to the persons entitled there to.

5.10 The awardee is intimated the fact of passing of the award

GRIEVANCE showing the amounts awarded. In case the awardee is notREDRESSALs satisfied with the compensation amount awarded to him, he

receives the award under protest and files a petetion before theSDC(LA). Under the LA Act, the interests of the awardees areprotected by the stipulations incorporated in the Act which

require the Collector(LA) to refer all petetions filed by the awardees within Six weeksfrom the date of passing the award to Civil Court for adjudication and assist the courtto determine the amount of compensation.

5.11 To obviate the delay in finalisation of land acquisitionCONSENT proceedings provision of award on the basis of agreement is nowAWARD made under section 11(2) of the amended Act. No registration of

such agreement is necessary. Consent awards are passed and therates are agreed upon after detailed negotiations and deliberationswith the affected people.

5.12 According to the amended Act, consent awards have been passed in respectof lands in Warangal District coming under acquisition in DBM-40 and DBM-48 of SRSProject and the following consolidated amounts were paid towards compensation.

Rs. 30,000/- per acre for dry landsRs. 40,000/- per acre for B-C. Soil and Single WetRs. 45,000/- per acre for d/ouble Crop Wet

Page 37: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

19 Land Acquisition

5.13 These amounts are inclusive of market value of land and al the additionalbenefits including additional market value, solatium, interest etc.

5.14 Acquisition:: For development of irrigation infrastructure and also provision ofayacut roads in the area under AP Irrigation Project-lIl the GOAP has been acquiring therequired land in the area. The total land acquired for irrigation infrastructuredevelopment in these villages is 4689.44 of which 83.32 acres was irrigated and thebalance rainfed. The total affected households within the above acquired area are10216 in 174 project affected villages. Similarly the land acquisition for provision ofayacut roads mostly for widening of the existing road network is 76.18 acres for whichcompensation was paid (Ref: Annexure X).

5.15 The total compensation paid was Rs. 149.20 millions. The averagecompensation paid per acre was Rs. 31817. Maximum compensation per acre of Rs.43437 was paid in DMB-40 followed by Rs. 40587 under main canal and Rs. 36667under DBM-48 where the compensation was paid through consent awards and thefarmers received comparatively higher compensation over the other affected householdsunder DBM-31, DBM-37 and DBM-38 where the compensation was paid prior to1990-91 and was less. The total affected households were 10216. There is discontentprevailing among the affected households in DBM-31, DBM-37 and PBM-38 since mostof these households seem to have received less compensation compared to theircounterparts in DBM-40 and DMB-48. Some of these farmers have gone to the courtsand their cases are currently pending and awaiting disposal.

5.16 The disoussions with the Special Deputy Collector(SDC), Land Acquisition(L.A), Warangal revealed that about 100 Original Petitions(OPs) are pending with theDistrict Court from DBM-31 and DBM-38 and 45 cases involving about 200 acres areat the High Court level. One third payment was already made in both cases pendingdisposal (Ref: Annexure-VI).

5.17 The net sown area in the 174 affected villages (in which the compensation waspaid) was 2.10 per cent of the total net sown area. Even considering the pending caseswith different Courts, the total area at any cost may not be more than 5 per cent of thetotal net sown area in the study area.

5.18 The total acquired as per SDC (LA) Warangal was 4689.43 acres and thehousefiold survey was to be carried out for the reported area of 4689.43 acres covering10216 households as per the awardees lists furnished by SDC (LA), Warangal forwhich compensation was paid. But household survey could be carriedout for 8208households covering an area of 4213.81 acres which is 90 per cent of the total areareported by the SDC L.A Warangal.

5.19 Utilisation of Compensation:The Government of Andhra Pradesh has paidcompensation to the affected households for the assets acquired,for development ofcanal infrastructure and ayacut roads. Proper utilisation of compensation by themwould help in partly over-coming the adverse impact and regain quickly their earliereconomic positions without much hardship. PAPs were asked about how they madeuse of the compensation received by them. 32.17 percent of the households reportedthat part of the amount was spent on clearing old debts. 22.35 per cent of PAPhouseholds have made investments in agriculture. 7.40 per cent of the householdsspent on purchase of land and 4.8 percent on purchase/ construction of houses.Utilisation of compensation on Social ceremonies is also reported in 9.75 per cent ofrespondents and expenditure on marriages was incurred by 11.65 percent, 1.07

Page 38: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

20 Lad Acquisi9 or

percent spent on agricultural implements, 2.84 percent spent on digging wells andpurchase of pumpsets.

5.20 Analysis has also been carried out on the average amount of expenditureincurred for investment on agriculture and related activites and for consumptionpurposes. In case of investment expenditure among PAPs, highest average amount ofRs.3099 was spent for purchase of land (15.46 percent) Rs.2647 (13.21 percent) onland development as investment in agriculture and Rs.1434 (7.16 percent) on diggingwells and purchase of pumpsets. Some of the households have made investments onconstruction of houses and on an average investment on houses was Rs.1068 (5.33percent). Livestock forms 0.70 percent with an average investment of Rs.141. Loanrepayment by the households is one of the most common expenditures revealed by thePAPs which forms 27.48 per cent . Consumption expenditure like social ceremonies,marriages, medicines etc together constitute 29.71 percent of the compensation.

5.21 Average amount 42.29 per cent of the compensation was spent on productionassetslinvestments.The responses regarding compensation utilisation by the PAPsshows that 44.16 per cent of the PAPs spent on production assets like land, house,agriculture, irrigation, etc. This shows that considerable proportion of PAPs haveproperly utilised the compensation while over 55 per cent of the respondents spent onconsumption expenditure.

Page 39: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

ANDHRA PRA-ESH IRRIGATION PROJECT - IIISRI RAMA SAGAR PROJECr

PROJECr AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME

ACrION PLAN

CHAPTER VI

RESETTLEMENT AND REHABILITATION:THE POLICY

Page 40: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

VI

RESETTLEMENT AND REHABILITATIONTHE POLICY

6.01 The AP.11 Irrigation Project was taken up with the

INTRODUCTION financial assistance of World Bank to take upmodernisation of canal system in an extent of 1.65 lakhha. and development of new irrigation in 1.63 lakh ha.under the Sriramsagar Project (SRSP). Though the

Project has come to a close on June 30, 1994, the works taken up under the Projectcould not be fully completed. The AP IlIl Project aims to complete the balance worksof the AP II Project and realise fully the benefits of the investments already made. Thepresent Project , therefore, does not envisage any involuntary displacement apart fromwhat has already taken place under the AP.11.

6.02 For the persons displaced under the AP.11 Project, a detailed R & R Programnmewas prepared by the GOAP in accordance with the guidelines of the World Bank andthe same has been fully implemented within the Project period and to the satisfactionof the Bank. There are, therefore, no substantial residual R & R issues relating tothepeople involuntarily displaced under the AP.1I Project. However, there may bepeople who may not have been displaced, but may have been economically affectedby the acquisition of lands for layinig iae canal and road network. With a view to assistsuch affected persons under the AP.111 Irrigation Project, the GOAP adopts the followingpolicy framework:

Page 41: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

22 P-euJcincnLt and Rehabillitaio,n'Fil Policy

6.03 The basic objective of the R & R Programme is toOBJECTIVES avoid or to minimise wherever feasible, involuntary

displacement and/or loss of income by exploring viablealternatives of project design. If the displacement and/or lossof income becomes inevitable then the affected families have

to be resettled and rehabilitated in such a manner that their living standards areimproved by increasing their income earning capacity and production levels or atleastrestoring to the standdrds of their former living conditions. Relevant to the aboveobjective the following are the sub-objectives.

i. Identification of PAPs including land hoiders, tenants, share croppers, land less,etc, affected as a result of land acquisition for excavation of canal and thedistributory system and the laying/widening of the ayacut roads in thecommands;

ii. Extent of land and other assets acquired and to be acquired'and the strategy tocompensate adequate for the assets being acquired for the project;

iii. Provision of household oriented economic activities to the PAPs to regain theirincome levels prior to land acquisition;

iv. In case of STs adequate care to be t,ken,to protect their cultural identity andtraditional rights with regard to forests;

v. Planning of economic rehabilitation programme in accordance with theconstruction schedule of the project whe.rever the lands/assets are acquired andyet to be acquired; and

vi. Suggest suitable mechanism for monitoring and evaluation of the Action Plan;

vii. Involvement of PAPs in the preparation and implementation of the Action Plan.

6.04 The fc!lowing are the definitions relevant to theMI£FINITIONS present R & R Action Plan.

a) "Displaced Person means a person who since atleast oneyear prior to the date of publication of the Notification under

Sec. 4 of the L.A. Act 1894, or since atleast 5 years prior to the date of taking overfor the project, possession of any lInd under his/her occupation has been ordinarilyresiding in a project affected village and who has, on account of the acquisition ofhis/her land, including homestead, or of taking over of land from his/her possessionbeen physically displaced from such village.

b) "Project Affected Village" means a village where land or homestead iscompulsorily acquired or possession taken over for implementing the project.

c) "Minimum Loss of Holding" means loss ;1T a minimum of 25 per cent of theholding of a person for the Project as on the date of notification under the LAAct.

d} "Minimum Economic Holding" means a holding of 2 ha. of dry land or 1 ha. ofirrigated land or an equivalent land thereof taking project benefit into account.

Page 42: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

23 Resettcment and Rebabilitation'he Policy

e) "Project Affected Person' means a person other than a displaced person wholoses minimum of 25 per cent of his holding and is left with less than 'minimum (economic holding' after the acquisition or of taking over of lands from his/herpossession;

f) Family in relation to a displaced person/project affected person/ landlessaffected person means persons falling in the following categories as on the dateof publication of Sec. 4 notification or of taking over possession of his/herlands/homestead in the project affected village or of alienation from any landtaken over for the project.

i. The spouse of the displaced/ affected person minor children, minorbrothers/sisters, father and mother and other members of residing withhim and who are dependent on him/her for their livelihood; and

ii. major child of the displaced/affected person who is more than 18 yearsof age irrespective of his/her marital status.

g) "Non Governmental Organisation' means any organisation outside theGovernment machinery, duly registered under the Societies Registration Act anddevoted to perform socio-economic activities on a voluntary basis with a non-profit motive;

h) "Project" means the AP IlIl Irrigation Project;

i) "Landless affected person. means a person who is normally residing in a projectaffected village and who does not own land anywhere and who is solelydependent on manual labour for his/her livelihood and is living below povertyline and whose livelihood, subsistence or residence is substantially affectedthrough acquisition of taking over for the project of a land on which he/she usedto depend prior to his/her alienation from that land;

j) "Land" means any land legitimately in use in village or forest which ceases isnot available for use as a result of land acquisition or taking over for the project.

Strategy for Economic Rehabilitationi

6.05 The Policy is sought to be implemented by replacement of the lost assets andby providing to the affected persons economic assistance to maintain their formerlevels of income and to improve it after the acquisition. Since land happens to be animportant source of livelihood in the Project area, it shall be the endeavour of theGoverrnment to assign to the displaced and affected families available government andsurplus ceiling land in the Project affected villages. Preference in the allotment of landwill be te displaced persons, weaker sections of the project affected families, otherproject affected families and landless affected families in that order. The livingstandards of the project affected persons are also proposed to be restored or improvedby providing irrigation benefits to the balance land left with the family by developmentof ground water and by undertaking other economic assistance programmes which areland-based, industrial, business or service sector oriented.

6.06 In order to obtain baseline information on all the families displaced/affectedunder theProject, a socio-economic survey is proposed to be conducted. As far as

! 9tt/7 7

Page 43: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

24 Resettlement and RehabilitaionThe Policy

possible, land for the resettlement of the displaced families will be selected in thecommand area of the Project and will be as near to the displacement site as possible.This is envisaged to avoid much of environmental differences and to allow displacedpersons who are left with agricultural land un-affected to cultivate even after shifting.The site selection for resettlement centre shall take into account the perceptions of thedisplaced families as far as possible and involve them in preparation of layout of theresettled sites.

6.07 Wherever lands belonging to some small and marginal farmers are sought to beacquired, possibility of avoiding such acquisition is to be technically examined andspecific permission of Government taken in order to prevent displacement of small andmarginal farmers.

6.08 Further, the process of acquisition should be completed within a period of 2years of the declaration under the L.A. Act.

Entitlements c 4 X r

a) Land Acquisiton

1. compensation at prevailing market value for the lands, trees,structures and other assets shall be provided. In addition, a sumequivalent to the 30% of the value of compensation as solatiumshall also be provided for the co`4lsory deprivation of the asset;

2. full compensation for damage, if any, to the standing crops ortrees due to the acquisition;

3. payment of ex-gratia equivalent to market value to the assigneesof government land whenever such land is taken over for theproject purpose;

4. to seek wherever feasible negotiated settlement with thedisplaced/affected persons, for fixing the market value of theassets acquired under the Project. If there are disputes relatingto the fixation of the rates, the same shall be expeditiously andamicably settled through the judiciary;

b) Resettlenent & Rehablitaion:

1. provision of developed house site of 5 Cents area to all dispiacedfamilies free of cost;

2. allotment of government or ceiling surplus land to the extent ofloss or upto a limit of 2 ha. of dry land or 1 ha. of wet land oran equivalent thereof to the displaced persons, the projectaffected persons and the landless affected persons by mutualconsultation, preferably, in the same revenue village. Whileallotting the land, preference will be given to persons belongingto weaker section;

3. if government land is not available in the project affected village,

Page 44: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

25 Reseuneme and Rehabilitatior.The Policy

then a package of economic support programme will beimplemented for improving the economic status of thedisplaced/project affected persons/landless affected persons inagriculture, industry, business, animal husbandry or servicesectors. The package will consist of the following:-

a) productive assets grant upto Rs. 8,000/- to all Projectaffected/landless affected persons.

b) preference to weaker sections in granting fishing rightsin the proposed reservoir;

c) permission to take up horticulture or social forestryplantation in the foreshore area of the reservoir andalong the canal banks and to allow them to use itsincome, with priority to weaker sections;

d) provision of smokeless chullas free ofcost;

e) initiation of group activity for women in order toinculcate thrift and provide financial assistance to suchgroups upto Rs.1 5,000/- for income generating activity;and

f) provision of vocational training in relevant economicactivities, based on the preference of thedisplaced/project affected/landless affected persons;

4. each displaced family shall be provided with economicassistance of Rs. 14,000/- for the construction of a house at thenew resettlement site in addition to permitting them to use thematerial of the old structure.

5. provision of free transport facility to tranship usable householdmaterials from the old site to resettlement site;

6. wherever a whole village or a group of families numbering about100 are displaced, civic amenities such as electricity, drinkingwater facility, internal roads, community building shall beprovided free of cost;

7. displaced/projelt affected persons/landless affected personsshall be provided with maintenance allowance of Rs.500/- permonth for nine(9) months to cover their initial expenses till theirregular economic activity gets streamlined.

8. cattle maintenance of Rs.2001- per month shall be provided tothe displaced/project affected/ landless affected persons for aperiod of six (6) months to maintain their cattle population;

9. resettlement Centre to provided with a Farm-Service Centreunder the management of a Non-Governmental Organisation or

Page 45: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

26 Resekmet and RehabilitationThe Policy

Association of the displaced family members with an outlay ofRs. 2.00 lakhs in order to provide services for various farmactivities to the displaced families.

Involvement of Non-Govemmental organisations (NGOs)

6.09 The resettlement and rehabilitation involve human problems and tackling suchproblems require special skill and sociological background on the part of theimplementing agency. Therefore, efforts will be made to post the staff for resettlementand rehabilitation with proper concern for the problems for displaced families andinvolvement of Non-Governmental Organisations would be encouraged in thepreparation and implementation of the R & R Plans. Availability of committed voluntaryorganisations in the project area is limited. Still efforts will be made to identify such anorganisation and to involve it in the preparation and implementation of the economicrehabilitation plan.

Participatory Planning and Implementation

6.10 The involvement of aH displaced/Project Affected/landless affected Persons interms of providing inputs for planning, for resettlement and rehabilitation is envisagedthrough participatory Rural Appraisal in order to have a realistic nban and avoid futureconflicts. A special effort shall be made to involve womenl affected members in theprocess of planning and implementation.

Page 46: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

ANDHRA PRADESH IRRIGATION PROJECT - IIISRI RAMA SAGAR PROJECr

PROJECT AFFECrED PERSONS ECONOMIC REHABILITATION PROGRAMME

ACTION PLAIN

CHAPTER VIl

PARTICIPATION AND CONSULTATION

Page 47: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

Vil

PARTICIPATION AND CONSULTATION

7.01 One of the most important aspects of development planning is the involvementand participation of the target group/community in planning, implementation andmonitoring of the programme. In case of an irrigation development project where thedifferent components related to asset acquisition is involved providing necessaryeconomic support to the affected lot through a positive approach of theirr acquisition,resettlement and rehabilitation is a sine-qua-non in order to enable the affectedhouseholds to regain their economic status prior to acquisition. Participation of the localpeople including those affected and targeted beneficiaries in various stages ofimplementation of different components of the irrigation infrastructure developmentwould enable the successful completion of the project within the designed time frame.

7.02 The land acquisition procedure adopted by the Governr-ent does have thiecomponent of participation of those likely to be affected under the project in terms oftheir willingness and acceptance for such acquisition of assets, compensation, etc. The'Consent award' which the government has adopted in the area reflects theinvolvement and parrticipation of the affected people in good measure for expeditiousdisposal of the land acquisition cases.

7.03 There are different stages of acquisition oi assets in whichSTAGES the affected households need to be involved for smooth and quick

procesing of the acquisition. They include:

Stage - I: Awareness: The first stage involves creating awareness amongaffected households of project benefits in terms of employment, irrigation,better crop production and overall area development. To achieve this the SDC,

Page 48: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

28 'articipation and (wSiftation

LA would conduct group discussions with local villagers including those likelyto be affected under the project and impress upon them, the benefits thatwov'd accrue from the project and the need for acquisition for implementationof the project and obtain their geneval consent for such acquisition. The staffof the irrigation depaprtment and local NGO would also be actively involved inthese deliberations.

Stage-II: Compensation -A positive approach of payment of compensationthrough 'Consent Awards' is adopted by GOAP in respect of SRSP. Thecompensation is fixed in consultation with and after obtaining the consent ofthe affectei people through groups discussions meant to arrive at an acceptablevalue to the land being acquired. This process smoothens the process ofimplementation, reduces substantially the time delays in acquisition andpayment of compensation to the affected community.

Stage-ill: Resettlement: Involving the displaced and affected households ingroup discussions for free expression of their preferences in respect ofresettlement sites and provision of basic infrastructure related to education,health, electricity, drinking water, approach roads, etc. with adequate socialamenities and incorporate their perceptions and preferences in the resettlementplan would ensure that their resettlement sites are conducive to theirresettlement.

Stage-IV: Rehabilitation: Involvement of affected households is crucial forsuccessful implementation of the rehabilitation programmes. Village Committeescomprising 15 or more of affected households in each vi1Uage would be formedfor effective implementation of rehabilitation programme. Non-governmentalorganisations operating preferably at district level would be involved informationof these Committees. The NGOs would assist and guide the Committees andhelp in creating awareness among the households about their entitlements tobring them to their later levels of economic standards. The NGOs would alsoinvolve themselves in the implementation and monitoring of the rehabilitationprogramme.

Stage-V: Partitipation in Construction: The able bodied and willing workforcein each village may also be employed under the construction of the canal andminors. Alternatively the construction of minors and subminors may beentrusted to the local groups to ensure active eraticipation of the affectedhouseholds and beneficiary households in the construction of irrigationinfrastructure.

Stage-VI: Water Management: The last aspect is the water managementthrough water users association to be formed after release of irrigation watersfor active involvement of local groups in the water management aspects.

7.04 Grievance Redressal MechanismGRIEVANCE REDRESSAJJ Committee shait include representatives from theAPPEAL MECHANISM project, Government land acquisition agencies,

rural development agencies, local NGOs, so as totake care not only of the issues of land acquisitionbut also provisions and entitlements of all

affected households including non-titled and landless persons which go beyond the

Page 49: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

29 Paicipaton and Consultation

provisions of the LA act for their economic rehabilitation and resettlement under theproject. As prescribed in the institutional aarrangement, the Land Acquisition Officershall be the first agency to attend to the grievances in respect to land valuation andacquisition. The LA Act itself provides for a mandatory grievance redressed in the formof reference to Courts as and when awardees are dis-satisfied about the compensationpaid to them by the Land Acquisition Officer. Similarly, the Project Director, DistrictRural Development Agency and Resettlement and Rehabilitation Officer will form thefirst level Redressal Mechanism for redressing the grievances of the displacedpersons/project affected persons. A detailed Flow Diagram is given indicating the levelsof grievance redressal mechanism and the alternative course of action for the displacedpersons/ project affected persons for the redressal of their grievances (Chart-I).

Page 50: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

30 Paticipation and Consukation

CHART-I

GRIEVANCE REDRESSAL/APPEALING MECHANISM

Displaced family/Project Affected Person

Grievance

Spl. Deputy Collector (LA) PD,DRDA (R & R Officer)

-Redressed Redressed

Not Redressed Not Redressed

Judiciary Proj.Lev.Reh.Cel1

Redressed

Redressal Not Reddressed

State Lev.Reh.Cell

>-Redressed

Not Redressed

Minister

-Redressed

-- Not Redressed

Page 51: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

AIND>RA PRADESH IRRIGATION PROJECT IIISRI RAMA SAGAW PROJECT

PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMI

ACTION PLAN

CHAPTER Vill

ACTION PLAN

Page 52: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

_. v1I

ACTION PLAN

8.01 The socio-economic survey was carried for 8208 households out of the totalaffected households of 10216 covering an area of 4213.81 acres out of the totalacquired area of 4689.43 acres under APIP-III SRS Sub Project. In otherwords itcovered about 90 per cent of the total acquired area anid about 80 per cent of the totalaffected households. The socio-economic survey carried out for 8208 affectedhouseholds has identified 1579 PAPs eligible for Economic Rehabilitation assistance.Project Affected Persons Economic Rehabilitation Programme (PAPERP) has beenformulated based on the entitlements agreed upon by the GOAP as already discussedin Chapter VI.

8.02 The basic objective of the economic rehafEilitationOBJECTIVE programme is to enable the PAP households to reach their prior

levels of economic status by increasing their earning capability and_ _11111 improving their production levels through economically viable and

sustainable household schemes based on their preferences,available skills, demand and marketability of the outputs. The sub-objectives of theaction plan are:

1. identify feasible schemes to each affected household for utilisation of theeconomic rehabilitation grant.

2. Identify major dependent children in each household in order to provide themwith economic rehabilitation grant to supplement the household income.

3. Identify the women folk of PAP households for provision of revolving fund forformation of women thrift groups.

Page 53: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

'- 32 ~Acien Plan

4. Provision of maintenance allowance to each affected household basides'V provision of smokeless chulia.

5. Provision of cattle maintenance allowance to the displaced houaseholds if any forenabling them to maintain cattle.

6. Identify the displaced PAP households for provision of house construction grant

7. Identify the training needs for educated unemployed youth among the membersof PAP households.

8. Provision of self employment schemes to trained youth through adequate creditsupport from the financing institutions;

9. Assess the cost of project management and admninistration to meet M & E costsbesides providing for the costs of equipment, furniture, stationery, training

, >o > needs and any other contingencies;

10. Provision of land compensation to the balance acquired area if any;

11. Assess the financial needs of Retrofit for provision of adequate infrastructureand rehabilitation support in uncovered areas of resettlements of the ousteesof LMD.

12. Formulation of action plan for PAPERP indicating the sources of funds,scheduling, etc.

8.03 The plan component comprises two aspects

PAN COMPONENT namely: i. acquisition of assets; and ii. rehabilitation.

8.04 Acquisition: The available records with the SDC land acquisition and discussionswith the SRSP Irrigation divisions revealed that the entire area required for AP-III wasacquired except a few patches in DBM-40 and 4BM-48 to the extent of 129 acreswhich is programmed to be acquired by the end of Dec, 1995. The total area so faracquired for canal infrastructure as per the records of the SDC (LA' is 4689.43 acresunder APIP-III SRSP Project.

8.05 In case of ayacut roads an area of 1247.82 acres is under the process ofacquisition though the Depaprtment has taken possession of the land. The land wasacquired mostly for widening of the existing road network. The compensation was paidfor an area of 76.18 acres acquired from 516 households.

8.06 In otherwords an area of 1247.82 acres is still under the process of acquisitionand for 1046.62 acres awards are awaiting clearance. The averace ' ,]d loss perhousehold under ayacut roads is less than 0.15 acres while it is 0.51 acres average perhousehold in case of irrigation infrastructure.

8.07 Strategy for Fixing Compensation: The strategy for acquisition of land and otherassets is as per the procedure stipulated in the AP Land Acquisition Act. However, theGOAP has resorted to a novel procedure of payment of compensation through consent

Page 54: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

33 Ation Plt

awards after getting the concurrence of the affected households through deliberationsand negotiations for compensation to the land acquired as per the agreed land value ineach village. The consent award minimises the abnormal time delays, legal holdupsinherent in the normal acquisition procedure as the compensation payable is accordingto the land value acepted by the affected households and there is no place fordiscontentment and dissatisfaction. Similar strategy can be adopted for futureacquisitions also.

8.08 Payment of Compensation: The payment of compensation to the affectedhouseholds has been made through cheque to the owner/legal heir identified by therevenue officials and SDC, Land acquisition on the basis of the land records regardingownership of the holding. In some cases few members of the same community orhousehold are grouped together and payment is done through cheque in the name ofa person accepted by each one in the group. This process may be dispensed with sincemany such cases are reported to have run into complications leading to the actualowner receiving either delayed payment or less payment, Threfore, it is desirable toissue individual cheques to each affected member legally recognised and identified onthe basis of official land records.

8.09 The study identified 1579 PAP households (19.24

RtEHABILITATION per cent) out of 8208 total iffected households undercanal infrastructure and 29 PAPs (about 5.6 per cent) outof 516 affected households under ayacut roads. As perthe strategy of R & R policy adopted by the GOAP for

resettlement and rehabilitation of the project affected persons as already discussed inChapter - VI, the PAP (head of household) and the dependent major children of eithersex are eligible for Economic Rehabilitation Grant of Rs. 8000 each. All women in thePAP household are eligible for DWCRA assistance of Rs. 1000 grant per woman for l forming thrift groups comprising 15 women in each group. Each PAP household iseligible to get one smokeless chulla costing Rs. 600 provided as grant. Educatedunemp loyed youth are eligible for training grant i.e. Rs. 3000 as grant and Rs. 6000 aslian'for meeting the cost of the tools, raw material and establishing their ownentreprise. The PAP household is also provided with subsistancel maintenanceallowance of Rs. 4,500 per househol. In case of displaced persons the PAP householdis provided with housing grant of Rs. 14000 per house and cattle maintenanceallowance of Rs. 1200 as grant in case of cattle loss.

8.10 While the above are the details of rehabilitation support as per R & R policy ofGO4P. the PAPs may also be provided with benefits from the ongoing development andwelfare oriented schemes namely:

1. Subsidised rice scheme;

2. Subsidised Electricity for Agriculture;

3. Benefits under SC and ST development programmes both centraland state sponsored;

4. Hostel facilities for children of PAPs with provision of socialwelfare scholarship for SCs and STs;

5. Priorities to the members of PAP households under employmentgurantee programmes like JRY, PRY, employment assurance

Page 55: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

34 Action Plan

schemes and other construction oriented activities;

6. Provision of protected drinking water; and

7. Adult literacy programmes.

8.11 Linkages with other development progranunes: The PAPERP for its effectiveimplementation should be linked with the ongoing development programmes namelyIRDP, TRYSEM and DWCRA. The District Rural Development Agency (DRDA) shouldbe mae-as the nodal agency for implementation of the Action Plan. The KVIC andKVIB besides the AP Dairy should be involved for ensuring marketing of the milk andother products. Formation of village committees through involvement of local NGOs aresome of the crucial aspects in the implementation process of Action Plan.

8.12 The Schemes: The study teams after holding discussions with the individual /household members have identified suitable schemes based on their preferences,availability of raw material, marketability of the outputs and other needed infrastructuralsupport. Based on the field stuidies land based and asset oriented schemes capable of?generating additional income to the households are identified. The unit cost of proposedasset based household schemes are in Appendix Xl. The details of eligible members foreconomic rehabilitation assistance in each village are presented in Annexures VilnandIX. The villagewise PAPERP action plan indicating the financial needs as per the R & Rassistance of GOAP is shown in Annexure XII.

C~~~~~~~~~~

2 ,,

Page 56: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

ANDHRA PRADESH IRRIGATION PROJECT - fi1SRI RA4A SAGAR PROJECT

PROJEC AFFECrED PERSONS ECONOMIC REHABILITATION PROGRAMME

ACTION PLAN

CHAPTER IX

ORGANISATION AND MANAGEMENT

Page 57: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

lx

ORGANISATION AND MANAGEMENT

Institutional Set up and Functions for SRS Project

a) At the Government level

T he Principal secretary I & CAD heads the department of Irrigation andCommand Area Development with overall control of the administrationsupported by the Secretary (projects)-among others

'The secretary (Projects) I & CAD, GOAP at Secretariat has overall control of allthe major irrigation projects in the state including SRSP. He is responsible interalia for the implementalon of the constructfion of the SPSP nciuding the R &R plan.

b) At Department level

There is one Engineer-in-Chief called Director General, incharge of Training and.Research institute called WALAMTARI.

There is a central Project Preparation and Monitoring (PP & M) unit at state levelheaded by a Chief Engineer for preparation of the project reports of majorprojects including SRSP and monitoring the progress of their implementation.

Page 58: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

ORGANISATIONAL CHART FOR ERP

PRL. SECRETARY (I & CAD)

DIST. COLLECTOR

.~~~~O(A JT- COLCO DMHU

CE(PROJ) SPL.COLLEC TOR(L JT. COLLECTOR PD DRDA & RR OFFICER DDO ZPP DM HOUSING

SE (PROJ) SDC LA DRO MDO EE

EE DIVN DY. TAHSILDAR MRO ASST. PROJ. OFFR.R&R

DY.EE REV. INSPECTOR REV. INSPECTOR MDO/MRO VDO |Y. E]

AEE VAO VDO/VDO WOMEN

Page 59: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

37

Organisadon and Mananeme2

c) At Proje-t Level

- There is one Chief Engineer stationed at Hyderabad exclusively in charge ofconstruction activities of the SRS project supported by superintendingEngineers, Executive Engineers and other staff both at field and office.

- There is one Special Collector (land acquisition) stationed at Hyderabad forprocessing, finalising the land acquisition cases of SRSP and submitting themto Government for approval- supported by special deputy collectors at the fieldlevel.

d) At District Level

- At district level, the District administration is headed by the District Collectorsupported by a Joint Secretary, Project Director DRDA and other staff.

9.01 The organisation for implementation of the R & & plan is presented in the chart.Implementation of the R & R action plan requires involvement of and co-ordinationamong various departmental agencies in the district. As the District administration hasthe overall control of all development activities in the district, it is considered,appropriate that the implementation of the R & R plan be entrusted to the District(administration for close co-ordination among various disciplines and for effectivelmonitoring and implementation of the plan.

9.02 It is considered that the DRDA with its present organisational set up would beable to handle the implementation of the R & R plan without any need for strengtheningthe unit as it is already involved in the implementation of similar development activitiesin the district.

- At the district level, the district administration headed by the District collectorwould therefore be made, responsible for implementation of the PAPERP.

The Superintending Engineer of the project, stationed at Huzurabad along withhis team of Executive Engineers would be actively involved in theimplementation of the PAPERP.

- g'The special Collector, land acquisition would ensure expeditious disposal of landacquisition cases duly assisted by the two Special Deputy Collectors (SDC) landacquisition (LA) for canals one stationed at Hanumkqnda and the other forayacut roads stationed at Karimnagar.

- A non governmental organisation by name operating in Warangal District wouldbe involved for formation of vaiage PAP groups/committees (VCs) to bring in'create awareness among the PAPs about their entitlements, guide and assist insecuring for them their entitled benefits. The NGO would motivate thecommittees for active participation of the PAPs in the irmplementation of the

,action plan and facilitate their utilisation of the compensation/rehabilitationprovided by the government for productive purposes and thus restoring theirearlier standards of living.

9.03 The NGO would organise Village Committees (VCs) not exceeding 50 innumber. If more than 50 PAPs exist in a village, the number of committees may beenlarged suitably.

Page 60: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

38

Organisation and Management

A. Distict Level Rehabiltai Conwnittee

9.04 A District Level Rehabilitation Committee (DLRC) would be constituted with thefollowing members for co-ordination of the various activities required forimplementation of the project.

1. District Collector - Warangal Chairman

2. Project Director DRDA(Resettlement and Rehabilitation Officer) Member Convenor

3. Superintending Engineer of SRSP Member

4. Special deputy Collector Land Acquisition-1,Hanamkonda Member

5. Special deputy Collector Land Acquisition-2, Hanamkonda Member 1

6. Executive Engineer Hanamkonda Main Canal MemberKM 268-284 KM

7. Executive Engineer, Chintagattu DBM-31 km 0-17 Member

8. Executive Engineer, Huzurabad DBM-31 km 17-42.8 Member

9. Executive Engineer, Chintagattu -DBM-38 KM 0-20 Member

10 Executive Engineer, Hanamkonda DBM-38-km 20-40and DBM-48 km 20-28.5 Member

11. Executive Engineer, Hanamkonda DBM-40 km 0-20 Member

12. Executive Engineer, Hanamkonda DBM-40 Km 43-250 Member

13. Executive Engineer. Hanamkonda DBM-48 Km-0-20 Member

Functions

9.05 The functions of the DLRC would be to:

1. Critically review the implementation of the R & R plan;

2. Approve the proposals formulated by the Project Director (Resettlement andRehabilitation officer) for timely imptefmetation of the plan;

3. Identify crucial areas/components of the plan likely to be detayed and taketimely steps to remove the bottlenecks encountered during the implementationof the plan;

4. Gievance redressal body for considering the representations of the village PAPcommittees or individual PAPs;

5. Take policy decisions on R & R issues from time to time and recommendingproposals to the state level committee for approval;

Page 61: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

39

Organisation and Management

6. Dovetail the economic rehabilltatiaon plan of the project in the district annualcredit plan for necessary funding;

7. Provide overall guidance and leadership for smooth and effective resettlementand rehabilitation of the affected families.

8. The Committee would meet not later than once in month;

B. State Level Rehabiltation Commntee (SLRC)

9.06 A State Level Rehabilitation Committee would be constituted for review of theimplementation of the PAPERP with the following members

1. Principal Secretary to Government ChairmanIrrigation and CAD Department

2. Secretary to Government Irrigation andCAD (Projects) Department Member

3. Secretary to Government works and Projects(Finance & Planning wing) Member

4. Secretary to Government, Revenue Department Member

5. Comrnissioner Panchayat Raj, Rural Development Member

6. Chief Engineer, SRSP Member

7. Director, Ground water Member

8. Special Collector, Land Acquisition Member

9. Special Officer Project preparation Member, ConvenorMonitoring Cell

Functions

9.07 The functions of the SLRC would be to:

1. Review the implementation of the R & R plan with particular emphasis onpayment of compensation to the affected people for land acquisition;

2. Review the R & R plan with reference to the policies finalised for the project.

3. Examine the suitability of sites for establishing resettlement centres.

4. Review the civic amenities provided at the resettlements centres.

5. Take all necessary steps for timely and effective implementation;

6. Approve proposals on R & R policies recommended by the district levelrehabilitation committee

7. The committee would meet once in three months.

Page 62: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

ANDHRA PRADESH IRRIGATION PROJECT - IIISRI iAMA SAGAR PROJECT

PROJECT AFFECTED PERSONS ECONOMIC REHABILTATION PROGRAMME

ACTION PLAN

CHAPTER X

MONITORING AND EVALUATION

Page 63: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

x

MONITORING AND EVALUATION

10.01 The acquisition of assets for the construction of canal infrastructure of SriRamasgar Project under APIP-l1l affected number of households mostly due to land lossand to a very limited extent loss of houses/house sites but without causing anyinvoluntary displacement of any of the households. The impact of this acquisition ismore pronounced in the vulnerable groups comprising small and marginal farmers, landless labour and communities falling below poverty line leading to problems of theirimpoverishment, mal-nutrition, increased morbidity, dependency, etc. through acomprehensive economic rehabilitation aimed at generating higher income levelsthrough various government sponsored development schemes to bring the affectedhouseholds to their earliar levels of living standards. Therefore, the economicrehabilitation programme during the process of construction of irrigation infrastructurecan not be successful and effective without an in-built and efficient monitoring systemas one of the components of the designed project. This rehabilitation programmeinvolving mostly weaker sections of the community requires critical monitoring andongoing evaluation as distinct from the monitoring of construction scheduleimplementation and requires motivated staff to tackle the unusual issues that may cropup during the rehabilitation process.

10 G' Therefore, the monitoring and ongoing evaluation should be an effective toolin MIS for assessing the progress of rehabilitation, and identifying the problem areasfor takinJ necessary timely corrective measures.

10.03 While the socio-economic survey conducted under the studv provides baselineinformation on individual PAP househiilds on their social, economic and culturaldimensions, the monitoring and ongoing evaluation of implementation of the PAPERP

Page 64: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

41

Monitorin and Evauation

would provide the management the levels of success achieved in terms of itsperformance, vis-a-vis 'ts objectives, Threfore, it is desirabte to evolve suitableindicators for monitoring the implementation process.

Monitoring Indicators

10.04 While assisting the vulnerable and economically weaker sections throughmulti-pronged economic rehabilitation approach, the primary indicators for monitoringits implementation should include:

I. InputsH. ImpactIll. External Conditions

1. Inputs: Project inputs generally relate to establishing backward and forwardlinkages to the designed economic system in terms of finances, schemewiseresources including raw material and assured marketing of the outputs of eachscheme to generate expected employment and incomes. Timely provision ofsuch inputs needs to be taken care of while implementing the PAPERP.

11. 'Impact: Any development programme including the PAPERP aimed at providinghigher dividends to the affected households can not be without positive impact.Therefore, monitoring should also take into consideration, the impact of theprogramme in terms of socio-economic and cultural dimensions of the affectedhouseholds as well as others in the project area and needs to be measured asa part of the ongoing process of monitoring cystem.

Ill. External Conditions: External conditions related to natural calamities, socialdisturbances, political changes, resources crunch some times may cause delaysin implementation, extending the programme scheduling. Monitoring should takenote of such external conditions that may affect the project implementation andadequate cushion to be provided to meet such external conditions whiledesigning the economic rehabilitation programme.

10.05 While the above are the primary indicators of monitoring, there are otherindicators closely related to the monitoring which include:

1. Availabilty: The plan should make budgetary provision atleast six months priorto implementation of the PAPERP. The agencies involved in the implementationprocess of the PAPERP should also be notified much in advance of the requiredinputs for various schemes for which the provision was made in the PAPERP.The availabilty of resources in terms of money, material and marketing shouldbe monitored from time to time for ensuring prior budgetary approvals ahead ofthe implementation of each phase of the programme.

2. Relevance: The APIP-III though did not cause any involuntary displacements, theresettlement and rehabilitation process should be kept free from environmentalhazards effecting the flora and fauna, problems of water logging, disruption oftransportation network like cart tracks, etc. Therefore, the relevance of suchissues needs to be carefully monitored from time to time with marginaladjustments in the designed parameters for ensuring maximum benefit to theaffected households and to the area in general.

Page 65: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

42

Monitoring and Evaluaton

3. Accessib:ky: The PAPs being the vulnerable groups should be ensured ofaccessibility of the needed inputs viz. Money, material and marketability.Accessability to timely grants, credit, training needs, marketability shouldcarefully be monitored through suitably designed schedules.

4. titlisaion: Economically backward developing countries can not afford wastageof resources and such resources are more valuable when they are meant fordevelopment of socially and economically weaker groups like the PAPhouseholds. Illiteracy, ignorance, lack of awareness, inadequate skills, etc. areperhaps the root causes for their beckwardness while the compelling economicconditions do have a major role. Therefore, careful monitoring of the utilisationof resources by each beneficiary should form part of the monitoring systemwithout which the expected dividends can not be achieved and the basicobjective of the PAPERP gets defeated. Therefore, utilisation of inputs of eachindividual PAP household should be monitored though a properly designed PAPmonitoring pass book.

5. Coverage: The PAPERP is scheduled to cover a number of target householdsin the first year itself and the schedule of implementation of PAPERP would befar ahead of the construction schedule as the affected households are alreadyidentified and implementation of PAPERP need not be linked to the constructionschedule. Monthly targeted households and targeted villages should form oneof the most important aspects.

6. Qualty: Under PAPERP, quality of inputs provided to the PAP household isof utmost importance in order to derive the desired outputs. Since the inputs aremostly related to primary sector quality of machinery equipments, animals etcis vital for providing ensuring service to the beneficiary. Once the inputs areprovided, proper maintenance of the assets for deriving outputs in expectedquantity and in quality has to be monitored and necessary technical guidanceshould be provided to the beneficary on proper maintenance of the productiveassets with adequate 'tips' to get quality output in anticipated quantity.Monitoring of inputs and outputs is to be done by the technically trained fieldstaff.

7. Effort: The next most important indicator of monitoring is the effort madetowards investment, man power deployment, etc both at individual beneficiarylevel and departmental level right from initiation of the action plan. Timelyidentification of the productive household asset prompt release of productiveasset grant, tied up with release of loan component, trainind of the individualbeneficiary wherever needed, overseeing the maintenance of the productiveassets and time to time monitoring of the outputs coupled with adequate timelytechnical support form part of the programme implementation.

8. Efficiency: The efficiency of any entreprise depends on the proper utility of thegiven resources. Closely related to the above indicators, efficiency of theproductive asset has to be monitored. Diseases, natural calmities, etc. may,cause hurdles in efficient functioning of the unit while proper utility of inputswith caution would ensure better efficiency from the unit. The deployment oftechnically trained field staff in required number each capable of monitoringexpected units in a given area would be serve to imrpove the efficiency of theproductive asset.

Page 66: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

43

Monitoring and Evaluation

9. Inputs: The ultimate objective of the PAPERP is to derive expected benefits tothe targeted beneficiary household within the stipulated time frame. Monitoringthe impact of the PAPERP from time to time with suitable corrective measuresin implementation process has to be done. The impact of the PAPERP has to beassessed in terms of implementation of quality and quantity of the socio-culturalfabric of the community in the targeted area.

I. Monitoring and Evaluaton

10.06 The monitoring and evaluation of the R & R plan would be entrusted to theexisting Project Preparation and Monitoring (PP & M) Division situated at Hyderabadheaded by the Special Officer of the rank of Chief Engineer. '

10.07 One senior Executive Engineer will be kept in exclusive charge of themonitoring and evaluation of the various components of the plan. Computerisedmonitoring system would be evolved in this unit for implementation of the plan.

10.08 Necessary formats would be evolved by the PP & M cell of I & CAD formonitoring the progress of variou p nts of the plan and fortnightly progress /reports would be obtained in these formats from the District Rehabilitation cell andfurnished to the Secretary (projects), in the government.

-7~'J

Page 67: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

ANDHRA PRADESH SRIGATION PROJECT - lIISRI RAMA SAGAR PROJECr

PROJECr AFFECrED PERSONS ECONOMIC REHABILITATION PROGRAMME

ACTION PLAN

CHAPTER Xi

IMPLEMENTATION SCHEDULE

Page 68: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

xi

IMPLEMENTATION SCHEDULE

11.01 The implementation schedule is to be phased out so as to link it with theconstruction schedule of the project.

11.02 In the normal course, the process of land acquisition goes in concert with theprogress of execution of the canal infrastructure and the affected households wouldbecome known during this process. As the process of land acquisition in the study areahas b&en completed except for casendingwit-thcourts,''all the project affectedhouseWo-i dare idenitified- and socio-economic survey of these households completed.

11.03 As all the project affected persons in the study area are identified in thesurvey there is no need to implement the plan linking it with the construction scheduleof the project which may extend for considerable period. It is therefore considered thatthe implementation of the plan could be taken up straight away once the R & R plan isapproved.

11.04 The implementation schedule indicating the assistance proposed to beprovided to the PAPs under various Government sponsored schemes. DBM-wise andMain canal wise implementation schedules are presented in Charts l-X.

Page 69: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

ANDHRA PRADESH JRRIGATION PROJECT -AllSRI RANA SAGAR PROJECr

PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME

ACTION PLAN

CHAPTER Xli

PAPERP: THE BUDGET

Page 70: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

Xii

PAPERP:THE BUDGET

12.01 The socio-economic survey carried out in the study area has enabled theidentification of Project Affected Persons (PAPs) eligible for Economic RehabilitationAssistance under Project Affected Persons Economic Rehabilitation Programme(PAPERP). As per the R & B Policy of GOAP, the major dependent children of either sexin the family are also eligible besides the head of the household (PAP) for productiveasset grant of Rs. 8000. The women in the family above 18 years are eligible for agrant of Rs. 1,000 under DWCRA programme of GOI for their economic support bybringing under a thrift gtoup with 15 women in a group. The educated unemployed ineach family are identified for vocational training supported by Rs. 3,000 grant forpurchase of required kits and provision of Rs. 6,000 as loan enabling them to establishtheir own enterprise. One smokeless chulla (Rs. 600) is provided to each PAPhousehold besides a maintenance allowance of Rs. 500 per month for 9 months toeach famiiy. In case of displaced, the family is eligible for housing grant of Rs. 1,4000and provision of 5 cents of land for construction of house and also cattle maintenanceallowance of Rs. 200 per month for six months if he owns cattle. All these measuresare aimed at enabling each PAP household to regain their prior economic status.

12.02 While preparing the budget the above norms have been adopted for theidentified PAP households under canal infrastructure (1579) and ayacut roads(29).Since the study covered about 90 per cent the acquired area as reported by SDC(LA)for the balance uncovered (10%) area an indicative budget has been provided. Similarlyin case of ayacut roads also an indicative budget is provided for the uncovered areasince the land compensation proceedings are under way.

Page 71: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

46

12.03 The Irrigation Divisions have reported about 297 acres under DBM40 and 80DBM-48 as under process of acquisitioin though the Department has already takenpossession of the land. Since some of the acquired area is under dispute in the Couttadaitional provision has been made keeping in view the future contingencies asadditional variations in land acquisition/compensation and PAPs identified during theprocess of implementation. Additional provision has also beenl made for spill over worksof AP -11 project and also for retrofit support to the oustees of Lower Manair Reservoirin their resettlements.

12.04 Annexure -XIII provides the overall General Budget to theetent of Rs. 296millions af.grant and Rs. 40.26 millions as loan component from the local financinginstitutions. Tho of ifinancial needs for resettlement and rehabilitation as per thesurvey are in Annexure-XIV. Annexure-XV provides the breakup of Indicative Budgetunder different heads for Resettlement and Rehabilitation. The villagewise PAPERPAction Plans showing the breakup of budgetory needs as per the R & R Policy areprovided in Annexure Xli. The PAPwise Action Plans of each Project Affected Villageare furnished seperately reachwise in Appendices Volume 11 i.e Part-lf of this report.

12.05 As already spelledout that the scheduling of the implemenitation of PAPERPAction Plan has been proposed over a time span of three years. The ongoingdevelopment programmes like IRDP, DWCRA and TRYSEM are integrated with the :PAPERP Action Plan during the process of impelementav,,on and the Actiqn Plan will be 'implemented through the District Rural Development APgency (DRDA) by the I & CADof GOAP. The budget in brief for implementation of PAPERP Action Plan is as follows: 24

(Rs. in millions) LI 5 ,,__

Description Budget Indicative Total ;Budget Budget ,,.

I. GRANT

A. Land Compensation 150.81 100.41 251.22B. Resettlement; 0.13 0.03 0.16C. Rehabilitation 36.90 13.58 50.48D. Project Management 4.00 2.00 6.00E. Project Admninistratiotn 4.00 - 4.00F. Additional Provision - 13.26 13.26

Total(A-F) 195.84 129.28 325.12

Total (B-F) 45.03 ' 28.87 73.90

11. LOAN

1. Rehabilitation 21.15 7.9° 29.142. Ar; ..onal Provision - 1.48 1.48

Total 21.15 9.47 30.62

GRAND TOTAL(I+ll) 216.99 138.75 355.74

Page 72: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

ANNEXURES

Page 73: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

47

Annexure IANDHRA PRADESH IRRIGATION PROJECT - III

SRI RAMA SAGAR DROJECT

REACH WISE PROJECT AFFECTED VILLAGES

Reach Inandal Vi1aqe

DBM-31ATHM*AKUR 1 ATHMAKUR

2 LALrLLA. 3. IMALAKPET4. DORUGONDA5. SINGARAJPALLY

DUL,GOND I I 6. LAXMT,IPUR

G&E.SUGONDA 7. GEE5UGONDAg v _8. MANUC'ONDA

HIASANPARTHI 9. KESHAVAPUR10 . AREPALIY11. HASANPARTHY12. MALLAREDDYPALLY13. MUCHERLA14. NAGARAM15. PEMBARTHY16. SIDDAPUR

MOGULLAPALLY 17. AKNEPALLY18. KURUKSHELA19. METPALLV20. MOGULLAPALLY21. MULKAPALLY22. PARLAPALLY23. PEDAKOMTATIPALLE24. PIDICILLA25J. POTIIUGAL.26. RAGHiAVAREDDYPET27. RANGAPUR

PARKAL 28. CHERLAPA-LY2<,. ILLIPET30. KAMAREDDI GPALI. I31. KOUKONDA32. LAKS11hIPURv53. dMADARAM34. iiMALAKPET_>. NADIKUDA36. NARLAPOOR37. PARKAL38. POCHARAvii39. PULIGILLA

- -- - - - - - - - - -

Page 74: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

4$Annexure I Contd...

Reach imandal Vi sae

40. RAIPARTHY41. RAJIPET42. SARVAPOOR43. VELLAMPALLY44. VENKATAPUR

REGONDA y 45. REPAK

SHAYAMPET 46. GATLIAKANAPARTHY47. KOTHAGATTU

K> 48. HYLARAM49. SHAYVAPET50. SINGARAN51. THARAPUR

_ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - --- --- - --- - - - - - - - -

Page 75: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

49

Annexur-e I Contd..

Reach M~anda1 Village

DBM4-37ATliMAKUR 52. AGRAflAPiPAD

53. MUSHYAtLPALLY

PARKAL 54. CHOUTAPARTHY

REGONLDA 5 DAHMANNAPET56. REGONOA

Page 76: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

-::S~~~~~~~~~~~~~~~~~~~ :0t;

roAnnexure I Conto.

Reach Mandal Vi l lage

DBM-38ATHMAKIJR 57 . NEERUKULLA

58. PASARUICON[A)59. PENCHII(ALPET

CHITYAL 60. jOCKAL

DUGGONDI 61. DUGGONDI62. KESi HAVAPUR63. MADNOOR64. MAHfMADAPUR65. MALLAMAPALLY56. NACHJINAPALLY67. RANGAPUR68. REBELY69. THIMMAPET70 VENKATAPUR

GEESUGONDA 71. ELUKUR'i'HY72. RAMACH[NDRAPUR

i4ULlUGU 73. MALLAMPALLY

NALLABELLY 74. ARSHANPALLY75. LAKNEPALLY76. MUCHIMPULA77. NALLABELLY78. NARRAKAPET79. RAMATHEERTHAM80. RANGAPUR81. RELAKUNTA82. SHANIGARA1

NARSAMPET 83. BANJIPET84. IIIKYALPALLY85. KAHMEPALLY86. LAKNEPALLY87. MAHESHiWARAM88. RAMAVARAM

REGONDA 89. KANAPARTHY

Page 77: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

5051

Annexure I Contd...

JReach Mandal Vi I1age

DBM-40

C HENNARAOPET 90. AKKALCHED91. A,ME[NABAD9z. GUR I IALPA93, . IILLALYaAD&94, JALLY95. K CN'AP U96. MUGDUMPURAN97. PAPAIPET9. j oSIRIPALLY99. UPPARAPALLY

100. YELLAJGUDEH

DUG6ONDI 101. CHALPARTHY102. MADIRAMANDAPALLY103. MANDAPALY

GEESUGONDA ' 104. OCKAL

CUDUR 105. GAJULAGATTU106. GUNDENGALOT, PONUGODU108. RAJAMPALLY

HANAMKONDA 109. DESAIPET

NEKKONDA 110. MADIGONDA

SANGhA 111. CHINTAPALLI112. LOHITHA113. MONDRAI114. MUMMADIVARAM115. NALLALELLi116. NARLAVI117. PALLARIGUDA118. SHAPOORil-9. THiLEGARAJUPALLY12 0 . THIMMAPUR

Page 78: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

Annexure I Contd...

Reach analVIe

DBM-48

CHENNARAOPET 121 ClIENNARAOPET122. L-INGAPURAi1123. THJWiARAiNIPADU

KESAMUDRAM 124. BERIWADA125. DHANSARAI126. ENUGURTHY127. JAMAL.PUR128. KALVALA129. KESAMUDRAM130. KOMATIPALLY131. KORUKONOAPALLY132. MANMOODPATNAM133. PENUGONDA134. UPPARAPALLY

MAHA3BUBABAD 135. EDULAPOOSAPALLY136. VEMNODR

- -NKKONDA 137. ALAMKfhANIPETi138. APPALRAOPET139. BOLLIKONDA140i. CHANDRAGONDA141. CHINANEKKONDA(NEKK

ON8DA)142. GOTLAKONDA143. GUNDRAPALLY144. PATHIPAKA145. PEDDAKARPOLA146. REDLWADA147. THOPANPALLY148. VENKATAPUR149g CHiINAMUPPARAM15E. CHINANAGARAM151. KACHIKAL15?. MADANTHRUTHY153. METHRAJPALLY154. NAINALA155. NtELLIKODUR156. RAJULAKOTHAPALtLY157. RAMANJAPUR1l58. RAVIRALA159. VEVILAL1.60. YERRABELL IGUDEM

Page 79: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

v v N4 O0s A89TAla1OV'SX1VAdVd *gl91

v A i v W, 0E N 991V(331W'4 ' S9T

1YDrIN3 t9

A-ilVdVlnlOHO '91V('1WOQ3NV lINIH3 Z19T

vioVNnn.ndln3 ' 19T INIIWVHIVXSJVcA

-..pwo3 I L LLA qnxeau

* * pluoo I ainxauuV

Page 80: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

54

Annexure I Contd...

Reach landal 'illa

MAIN CANAL

HANAMKONDA 169. MATWADA

PARVATHAGIRI 170. GOPANPALLY

SANGAM 171. SANGAM

WARDHANNAPET 172. ILLANDA173. KATRIAL174. UPPARAPALLY

p ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ -- - - -

Page 81: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

55

Anexure - 11

FIELD WORK TEAMS

FIELD TEAM - 1

1. Shri M.R.K. Radhkrishna SharmaField Organiser

2. Shri S. KrishnaField Supervisor

FIELD INVESTIGATORS

3. Shri R.Krishna Murthy

4. Shri Shashikaladhar

5. Shri Ch.Vikram Dev

6. Shri V.Krishna

7. Shri Adil Shetty

8. Shri T.Mukeshwar

9. Shri A.Satyanarayana

10. Shri E.Narayana

FIELD TEAM - 2

1. Shri Ramakrishna RaoField Organiser

2. G- AManohar -RaoField Supervisor

FIELD INVESTIGATORS

3. Shr M.A.Bhashid

4. -- M.- ;Shtsdh

3. SM K.Gangadhm

6. S1-.w, M PS Marrmsh Babu

7. Shri Sanjay gopal

8. Shri M.Ramu

9. Shri T.Shashidhar

10. Shri M.Venkateshwarlu

Page 82: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

56

FIELD TEAM - 3

1. Shri S.K.AnandField Organisor

2. Shri O.Maheshwar ReddyField Supervisor

FIELD INVESTIGATORS

3. Shri B.Sreedhar Reddy

4. Shri A.Purushotham Reddy

5. Shri D.Sridhar

6. Shri Purna chandar Rao

7. Shri Devender

8. Shri Rama Krishna

9. Shri B.Venkatanarayana

10. Shri T.Sudhakar Reddy

FIELD TEAM - 4

1. Dr.P.V.KrishnaField Organiser

2. A.YadaiahField Supervisor

FIELD INVESTIGATORS

3. Shri T.Srinivas

4. Shri M.Prabhakar

5. Shri M.Sampath Reddy

6. Shri N.V.R. Verma

7. Shri S.Bikshapathi

8. Shri Srikanth Reddy

9. Shri G.Ashok Ku-nat

10. Shri K.V.N.Venugopal

FIELD TEAM - 5

1. Shri V. Ram MohanField Work Coordinator

2. Shri G.MahenderField Supervisor

Page 83: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

57

FIELD INVESTIGATORS

3. Shri V.Krishna Murthy

4. Shri A. Venketeshwarlu

5. Shri N.Krishna

6. Shri J.Pitambaram

7. Shri D. Swamy Rao

8. Shri K.Radhakrishna Rao

9. Shri Md.Zakir Hussain

10. Shri G.Koteshwar Rao

Page 84: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

58

Annexure - III

FIELD VISITS OF THE STUDY TEAMSCHEDULE OF SOCIO-ECONOMIC SURVEY

SI.No. Name of Mandal Period of Visit

1. Parvathagiri 144-95 to 244-95

2. Kesamudram 16-4-95 to 21-4-95

3. Mahabubabad 22-4-95 to 274-95

4. Sangam 24-5-95 to 27-5-95

5. Chennaraopet 27-4-95 to 06-5-95

6. Duggondi (KS) 07-5-95 to 07-5-95

7. Narsampet(KS) 14-5-95 to 28-5-95

8. Geesugonda 19-5-95 to 23-5-95

9. Nallabelly(KS) 21-5-95 to 28-5-95

10. Hanamkonda(KS) 28-5-95 to 29-5-95

11. Parkal (DRP) 07-5-95 to 15-5-95

12. Regonda (DRP) 16-5-95 to 21-5-95

13. Wardhannapet 07-5-95 to 09-5-95

14. Mogullapally(DVP) 24-5-95 to 31-5-95

15. Shyampet 17-5-95 to 18-5-95

16. Hasanparthy 29-5-95 to 31-5-95

17. Chityal 22-5-95 to 23-5-95

18. Nellikodur 284-95 to 06-5-95

19. Nekkonda 254-95 to 6-5-95

20. Gudur 15-5-95 to 16-5-95

21. Atmakur 12-5-95 to 14-5-95

22. Mulug 10-5-95 to 11-5-95

Page 85: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

Appendix IV.0

MANDALWISE AFFECTED HOUSEHOLDS COVERED IJNDFR SOCIO-F.CONOMIC S-URVEY

Si. Tzt aJ No,; of Hou 11 ho1sE ds; .Z of PAPs}>no. Ma1ndal Aw.ardee; covered i d nt. BT ied'

A. CANAL INFRASTRUCTIJRE

1. Parvathag:ir:i 1330 10 1 S 62. Kesamudram 68s 559 133. Mahboobabad 133 }16 244. Sangam 495 3505. Chennaraopet. 882 846 1746. Duggondi 689 496 1057. Narsampet. 443 354 928. Geesgonda 201 142 449. NallabeJly 477 337 8310. Hanamkonda 22 17 411. Parka] 1022 769 1'5212. Regonda 270 227 5313. Wardhannapet. 143 129 3714. Mogullapally - 424 422 515. Sbyampet. 134 138 2416. Hassanparthy 281 254 2>317. Chityal 40 3718. Nellikodur 786 577 10s19. Nekkonda 1097 911 12120. Gudiur I.31 113 '321. AtT:akur 489>4 386 4i122. Mulug 40 30 it

Sub-Total 10216 8208 157G

B. AYACUT ROADS *

1. Milug ] 7u 2. Venkatapur 115 12r. 133. Duggondi 34 3i44. Ghanpur 57 57 5. Mugul1 apal I i 76 766. Regonda 41 4t 37. Shyampet. 87 878. Nachanpalli 17 17-9. Polaram 8

Sub-Total 5)16 5 6 29

* Funllmerat.-ioln of al] affected houlseholds (516) under ayacui. roads has beencarriedout to identi.fv the PAPs for detai.led household survey.

Page 86: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

Annexure IV.1

ANDHRA PRADESH IRRIGATION PROJECT - IIISRI RAMA SAGAR PROJECT

VILLAGE WISE NUMBER OF AWARDEES COVERED UNDER THE ST UDY

S.NIO Mandai Vili1i3qes r,ot 11i No. of NO. OYHOUsehol ds PA-urveved l fi' L f r l

I. PAVARTHAGIRI1 u3ur-U;f ia6iE 872 Ch;ntanekkonda 3-553 Choulapal 1 y 225 5,4 Er!uoai 87 155 Gopanpanual I v6 Kal11eda 63 7 Konkapaka 60 128 Parvathaqiri 55 69 Sornaram 74 7

a.r1~1S 176

II. KESAMUDRAM1 L e r -oe 4 13

2 Dhansari 30'3 Enuqurthy s-t.4 Kc23auudramn 79 i9

1- Komatipall 7i4 ] 06 Koruukundapa' 19 1§ 7ilahmoodpatnam 06 368 Penugonda 66 269 Upr,orapa I v 5 6

559 133

III. MAHABUBABADEulapusaaaliy 52 12v vo a;noor 64 1

116

IV. SANGAM1 h hinthapa 1 v 462 l ohitha

i-f,ondira i 1J35 9li Nal iabol , -1 i, '-

5 FIIa r iquca o3 66 Sapoor 5 1

f ,he(eQc3ra i,upa 1 I

necqa, ~ ~ r zi p '3ThimmoQ.-)0ur

60i

Page 87: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

Annexure IV.1 1--ontd..

J.No lMandal Vi I i . ,ee lotal No. or Nc .t,

Houz-ch- o1 ds PAs-Survefvcd ontT i Ld

V. CHENNARAOPET1 Akka Ichcd2 Arnmnabad 3W ,93 Jal v 1524 Konapur Z,5 LInqapuram 466 lquqdutmuram 51 1, 7himmarainpadu+Papaip 1038 Upparaoally 90,9 Ye iaicuden i7

8346 i74

VI. DUGGONDI1 Chalparthy 712 Duqqorndi 64 773 KeshavaDur 25 44 Laxmnipur 19 55 lMadi ramnandapal1 366 iMiadnoor 47 Viahxadapur 74 -6U maflamPal7 4 4 1ii9 Mlandapal?y 33 6

10 Nachinapally 11 111 Rebelly 41 612 Thimmapet 22 Si3 Venkat.-.ur4Ramachandr 37

496 1ViS

VII. NARSAMPET1 Banjipet 49 ';2 Itikvalapalli 633` Kammepalsy 53 Zi:'4 Lakoepaily 869 24A5 hlaheshwaram 7 i946 Ramavaram

35

VIII. GEESUGONDA

Ceezuqonda 462 tlanuqonda 20 i

Ookai 76 .S

142 4 ,

Page 88: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

6 -2

Annexure IV.1 Contd..

S.No Handal Vi1haIe.: q otal No. k" No. or-

curve-v cd rdeni -I ; ed

IX. NALLABELLYl Arshanpalth 2572 Laknepalliy 603 Nlalabe&Ii 7 4 Narrakpt 30 C

S Ramatheecrtharm 21 i6 Rekulakunta 847 S;haliQaram 11

317 J

X. HANAMKONDAI Desaipet 14 42 harwada 3 -

17

XI. PARKAL1 Cherlapally 682 Choutaparthy 443 Koukonda 23 34 Laxnmiput- 775 Madaram 856 Malakpet 337 Nadikuda 57 l8 Narlapoor 79 Pocharaw-Kanareddipal 37 -i10 Puliqilla 16 5j RaiparthY 132 7112 Raiipet 713 Sarvapoor 8 614 Vellampally 10215 Venkatapur 73

769 152

12. REGONDA1. DarnmannaPt 21 2 Kanapar'wv 71u3 Reqonda i 34 Repaka 7

227

Page 89: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

63

Annexure IV.1 Contd..

S.No Mandal Y-llaOcI- iota! No. of No. ocItouschol & Acurvcycsrsed Ident i cd,

13. WARDHANNAPETi Illanda2 Katrial 7 Lb

3 Upparapall y3

129

14. MOGULLAPALLYI Aknepallv 83 132 KuruksheIa il3 lletpal 1 y 274 oXioqul 1 apal 1 v 82D i4ulkapaly 146 Parlapal 7 y 247 Pedakomatipalli 24 4-8 Pidicilla 889 Pothuqal 32

10 Raqhavareddypet 2031 Ranqapur 17 5

422

15. SHYAMPET1 Gat] akanaparthy 23 72 Kothaqattu 73 iMvl aram 18 14 Shyampet 76 9S Sinqaram 13 76 Tha rapur 1

16. HASANPARTHYi Keshavapur 53 52 Arepall Y3 HasanparthY r1J -/4 Mallareddvpallv 31 5 AI

' Nucherla 73 J6 Naqaram 19 17 PFembarthv8 Siddapur 21 4

254 )2-

17. CHITYALI Jo0kal 37 _

37 5

Page 90: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

Arwnexure IV.! Corntd..

¾lio ~~Mandial V lllaziC e Toial Plo. j, PlO. ofHourscho~ oFA':~urveyccIT e

18. NELLIKODUR1ChiramnupparamnS 1.

2 Ch I n a c,,r,ow n 48 1'3 K1achikal 2 4 4Mtadantlhurthv 3 5 iethr aipa I Iv 65 136 Nainala 1287N I likodur 1 61 348R iaulakotilapali 239 Raman iar)ur 14

16 Ravira-la 17 .

iiJ Yerrabeltiqudcrm 7

19. NEKKONDAIAlarnkhan ipet '602Appalaraopet 352

3 Bo! I ikonda 198 4 O4 Chandraqonda 129 S Chinanekkonda 66 76 Got] akonda _46

7 Gundr-apally 66 98 Pathipaka 19 Peddakarpola 3 a

16 Redliawada 177 i1 Thopanpally 48 0l

'12 Venkatapur 53

20. GUDUR1G Guricnc,- ena 89 I142 Ponuqodu 133 Raiampallv -1

4 Thiqalaveni

113 721. ATHMAKUR -

1kArahamipad J 32 72 At-hniakur 1

I Musthyal a;)al v. 79 655 Neerukullia 416O oruqonda 26

8 Pench iikai pet i

22. MULUGI vmailampalivy 36 "~

82'.08 ~ 1 57 IS

Page 91: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

Annexure V

ANDHRA PRADESH IRRIGATION - PROJECT IIISRI RAMA SAGAR PROJECT - KAKATIYA MAIN CANAL (234 KM - 284 KX)

CASTE AND SEX WISE DISTRIBUTION OF PAPs AND LAND ACQUIRED IN DIFFERENT AREAS

MA's,tSiAL VILLAGE MALE FEMALE SC ST BC OC TOTAL TOTAL COMPENSATIONACQUIRED PAID Rs.

DM8-31

ATMAKUR ATMAKUR 8 0 F) 0 4 4 8 6.48 502F45LADELLA 9 O 2 $ 7 0 9 9.91 126403MUSHYAPALLI 2 40F 0 2 0 2 1.30 16429NEERUKULLA 3 0 F) 0 1 2 3 6.78 40683OORUGONDA 3 0 Fa 0 0 3 3 5.38 96355

GEESGONDA GEESGONDA 8 0 i 0 5 3 8 17.95 388326HASANPARTHY HASANPARTHY 7 0 a 0 5 2 7 3.91 121419

KESHAVPUR 8 I 4 3 8 5 61 159498 0,MALLAREDDIPALLI 4 0 3 0 4 0 4 1.33 26089MUCHERLA 3 6 F) 3 0 3 3.13 61685NAGARAM I 0) 0 B 1 I 1 0.47 14168PA8BARTHI 2 0 9 0 2 0 2 1.03 20559SIDDAPUR 4 B 1 5 2 1 4 , 79 46599

MOGULLAPA,L9 AKNEPALLY 16 0 a 0 7 1 16 9.50 112321METPALLY 5 8 1 0 4 0 5 1.64 35212OGULLAPALLY 6 0 1 0 4 1 6 5.88 88745MIULKAPALLY I 0 1 F 0 F 1 1.28 1369PARLAPALLY I 0 0 0 1 0 1 0.35 14800PEDAKONEPALLI 1 0 0 0F 1 l 1 0.58 5088PIDICILLA 15 8 3 0 9 3 15 15.37 167578POTHUGAL 5 0 4 F) 1 0 5 2.78 29157RANGAPOOR 5 O O Fa 4 1 5 0.57 4845

PARKAL CHERLAPALLY 9 0 0 0 1 8 9 6.03 28638CHOUTAPARTHY 12 1 2 0 3 7 12 6.53 138184KOUKONDA 4 0 1 8 3 . 0 4 5.75 73161LAXW1PUR i4 F 0 11 2 14 5.48 29635

Page 92: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

Annexure V Contd..

MANDAL VILLAGE . MALE FEMALE SC ST BC OC TOTAL TOTAL COMPENSATIONACQUIRED PAID Rs.

---------- -- -- ~# ,- ----- -------- ~ ------- ---- s------- --- ---- -------- ------ -- - -----------

HADARAM 20 2 0 0 21 1 22 19.57 218222MALLAKPEI 5 0 0 0 4 1 5 2.22 31293NADIKUDI 11 1 1 0 8 3 12 12.59 128636POCHARAN+KAMAREDDYPA 6 1 D 6 4 3 7 3.84 29791PULLIGILLA 4 1 1 0 4 D 5 3.35 12127RAIPARTHY 21 a I 1 16 5 21 14.33 141756RAJIPET 2 D D 1 1 2 1.53 19761SARVPOOR . 3 3 2 2 4 0 6 7.26 137727VELLAMPALLY 22 a I I 8 14 22 17.49 255323VENKATAPUR 8 I 1 2 2 4 8 6.63 34331

SHYAMPET GAULAKANAPARTHY 7 5 1 D 6 0 7 1.99 24933KOrHAGAITU 2 D 0 0 2 0 2 3.63 9596KOTHAGAITU4SINGARAM 2 5 D 0 2 D 2 1.25 3998MULARAM 3 1 1 0 1 2 4 2.65 57125SHYAMPEI 9 D 1 1 6 1 9 8.98 384151

Sub-Total 281 9 31 5 177 77 290 233.46 3739722

--------------- -..------. -- ....-------------------------------------.............------.......--------------------------- -------------------------------

Page 93: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

Annexure V Contd..

- - v-- -- - - , ~X. .- ..- - --- ---- - --- --- .S---------- ------------ ----- -- ------ -- -----------

MANDAL VILLAfiE MALE FEMALE SC ST BC cc TOTAL TOTAL COMPENSATIONACQUIRED PAID Rs.

DBM-37

ATMAKUR AlRAhM'PAD 7 0 1 0 5 1 7 6.52 80991 2

- SUHYAPALLI 4 0 0 a 4 0 4 4.76 58691 f2-

PARKAL COIOUIAPARIiHY 3 0 2 1 D 1 3 2.22 13385 C e -

REGONDA DAWANNAPET 3 0 0 1 3 0 3 1.56 47932

KANAPARIINY 5 0 O 1 5 D 5 6.20 227797

KANAPARIHY DAMMANNAP I I I i I 1 1 1.58 17711

REW(DNDA 26 1 2 0 9 16 27 28.41 1639335

Sub-Toial 49 1 5 0 26 19 50 50.25 1485842------------ ---------- ---. __-V-A-,,-,_-,,___-_ __ _ -_-----__-_-_____-__--___-----__-__--_-

-4

Page 94: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

Annexure V Contd..

MANDAL VILLA(4 MAL.E FEMALE SC ST BC OC TOTAL TOTAL COMPENSATIONACQUIRED PAID Rs.

D64-38

ATMAKUR NEERUKULLA 5 0 3 0 2 0 5 6.26 43309CHITYAL JOOKAL 4 1 0 0 5 0 5 4.32 226024DUGGONDI CHALPARIHY 8 2 1 0 9 0 10 3.34 154694

DUGGONDI 7 0 0 0 7 0 7 6.72 85178KESHAVPUR 4 0 0 0 1 3 4 1.58 19957KONKAPAKA 3 0 0 0 2 1 3 4.45 27887LAXMIPURAM 3 2 0 0 5 0 5 5.55 183171MADNOOR 2 1 2 0 0 1 3 1.85 65150MALLAMPALLY 12 1 2 0 10 1 13 11.63 205821MEHMADAPOOR 23 0 7 0 15 1 23 12.33 283345NACHINPALLE 1 0 0 6 1 I 1 0.45 180D0REBELLY 6 0 1 1 3 1 6 4.00 34493TINNAPET 3 0 0 0 2 1 3 1.21 15942VENKATAPUR 2 0 0 0 2 0 2 1.33 18688

GEESGONDA MANUGONDA 1 0 0 0 0 1 1 2.95 19314MULUGU MALLAMPALLY 7 3 0 0 8 2 10 24.37 394824NALLABELLY ARSHANPALLY 4 3 0 0 7 0 7 3.77 43544

LAKNEPALLY 15 a I 0 15 0 15 16.72 192268NALLABELLY 29 3 9 0 16 7 32 18.92 835183NARRAKAPET 1.1 2 3 0 10 . 13 5.58 118294RANATHEERTHAM 4 0 1 1 2 0 4 3.54 44574RELAKUNTA 9 1 1 6 8 1 10 4.90 60854SHANIGARAM 2 0 0 0 2 0 2 9.66 14145

NARSAMPET BANGIPET 10 1 1 0 7 3 11 5.69 52938ITIKYADIPALlY 20 1 2 2 17 0 21 12.69 227989KAMMERAPALLY 18 2 3 10 8 2 20 14.61 327172LAKNEPALLY 24 0 8 1 11 4 24 15.59 539190MAHlESWARAM 14 0 2 3 8 1 14 5.69 133293RAHAVARAM 2 0 0 0 1 1 2 1.63 62630

Page 95: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

Annexure V Contd..

MANDAL VILLAG[ MALE FEMALE SC ST BC OC TOTAL TOTAL COMPENSATIONACQUIRED PAID Rs.

- --- ---- ~j. .- ...- .. A ..-- - .. ----- --- ----- --------- - ------------

REGONDA KANAPARTfHNY I1 .1 1 6 3 1I 8.26 328915KANAPARTHY 3 D 0 3 D 3 2.83 92538REGONDA 3 D D 0 2 1 3 4.06 136890

-------- ----- I------ ------- ----------- ---------------- - --------------- - --- --

Sub-Total 270 23 44 19 195 35 293 217.48 5006122--------------------- I-------A--------.------- - -------------- --------- ------------------------

Page 96: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

Annexure V Contd..

MANDAL VILLK(C[ MALE FEMALE SC ST BC QC TOTAL TOTAL COMPENSATIONACQUIRED PAID Rs.

- - -~ - - - - - - - - - ... - - - -. - - - - ... - - - - - - -... - - - - - -~ - - - - - - - - - - -- -- - - -- -- ------ ------------------------------

DBM-41

e CHENNARAOPET AKKALCHED 5 O 0 1 3 1 5 12.71 1182837AMENABAD 56 2 1 37 18 2 58 76.69 2761896KOMAPUJR 24 3 9 7 11 I 27 21.61 718827LINGAPUR I 0 D 0 1 1 2.10 86520MU)DUIMPURAM I I I 1 I I 1 1.11 4D003PAPAIPET I2? 1 11 I 3 12 11.42 354583THIMMARAINIPADIU I O 1 I I 1 2.38 9533UPPARAPAIEY 17 0 3 1 13 O 17 19.93 747118YELLIMGU01D[ 27 O 7 15 5 O 27 34.48 1124869

.DUGGONDI CHALPARTIIY t l I I I 11 I 11 4.82 170741MADIRAMANDAPALLY 5 3 0 a 5 I 5 4.37 74856MANDAPALLY 5 1 1 0 5 0 6 2.61 131490RANACHANDRAPUR 1 I I 0 3 1 1 2.63 104t00

6GEESGONDA OOOKAL 24 3 19 0 3 2 24 4.38 133148G 6UDUR GUNDENGA 14 D 1 13 O 0 14 13.23 468523

PONUGODU 3 3 0 1 2 3 3 3.43 72766RAJAMPALLI 1 I a I 1 1 1.15 5588TEEGALAVENI 2 1 2 3 a 0 2 0 .47 18955

SANGAN CHINTAPALLI 8 0 0 0 8 0 8 6.64 151184LOHITHA 3 0 1 0 2 0 3 3.44 82692MONDRAI 39 0 13 0 29 O 39 34.05 1251275NALLABELLY 4 0 0 0 4 a 4 3.23 183881PALLARIGUDA 23 2 9 4 8 1 22 19.57 596876SHAPOOR 1 I D 1 1 30.5 1750THIGARAJUPALLI 2 0 0 3 2 O 2 1.33 6646THIMAPUR 1 0 1 III 1 2.33 113795

~~~~~-- -- ---- - -- ,#,~------ ------- - ----- __ - - - - ------- -,---- -- - ----- -- -----------------

Sub-total 288 8 64 93 132 7 296 286.38 13593319… -__- - - -_ - ------ -------------- _- - - -

Page 97: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

Annexure V Contd..

NANDAL VILLAGE MALE FEMALE SC ST BC OC TOTAL TOTAL COMPENSATIONACQUIRED PAID Rs.

- ----- .- v_~~~~~.--,t- - ------ ------ -- --- ------------------------ ------------ -----------

DBH-48

- CHENNARAOPET AMENABAD 9 0 0 6 3 - 9 8.51 271197JALLY 1 1 0I I 1 1.55 9625LINGAPUR 4 0 2 1 1 4 5.18 176510THIMMARAINIPADU 4 D 0 2 2 1 4 2.75 97189UPPARAPALLY 7 O O 0 5 2 7 16.46 389149

DUGGONDI CHALPARTIlY 2 0 3 6 2 O 2 1.96 45175KESAMUDRAH BERIWADA 13 O 0 11 2 0 13 13.51 586268

DHANSARI 5 O 0 3 2 O 5 4.41 98751ENUGURTHY 21 1 1 10 9 2 22 28.72 765458KESAMUDRAN 17 2 1 6 9 3 19 18.86 648781KOHATIPALLI 1O I 1 6 3 O 1O 6.23 228834KORUKONDAPALLI 8 1 1 7 1 0 8 8.63 161919MAHMOODPATNAN 28 2 4 18 8 0 31 32.53 2156799PENGONDA 19 1 1 f 19 O 21 15.12 369298UPPARAPALLY 6 O D O 6 0 6 5.49 189425

MAHBOOBABAD EDULAPUSAPALLY 11 1 1 6 6 0 12 4.98 177527VENNOOR 12 i O 11 1 0 12 7.45 7461D

NEKKONDA ALANKANIPET 4 0 I 1 4 0 4 4.18 124423APPALARAOPET i 1 D 2 1 0 2 1.35 19292BOLLIKONDA 41 D 1 32 8 3 41 56.24 2124822CHANDRA60NDA 6 0 0 2 4 O 6 5.23 88893CHINANEKKONDA 7 0 i 3 4 O 7 8.27 141500GOTLAKONDA 6 O 1 5 O - 6 7.37 149700GUNDRAPALLI 9 a 2 O 7 0 9 11.66 167712PATHIPAKA 1 O 0 1 0 1 1 1.OO 31001REDLAWADA 34 4 1 4 26 7 38 64.89 2311316THOPANPAILI 3 0 0 1 2 1 3 2.63 117061VE:NKATAI'UR 5 0 1 3 1 i 5 4.66 158463

--------------- _. ------------- _ -------------. ------ _ -------------------------- - --- _----------------.... ~ ~ _ ~ ~ _ _

Page 98: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

Amexure V Contd..

MANDAL VILLAGE MALE FEMALE SC ST BC OC TOTAL TOTAL COMPENSATIONACQUIRED PAID Rs.

kNELLIKODUR CHINNAMUPPARAM 9 1 0 2 7 1 18 7.99 203859CHINNANAGARAM 14 0 1 8 4 1 14 16.95 549478KACHIKAL 4 1 0 1 2 2 5 4.86 137562MADANTHURTIiY 1 I 0 1 I a 1 1.67 21543hETHARPAiP I 13 D 0 13 2 1 13 7.78 223412NAINALA 25 I 1 21 4 3 25 26.57 742345NE LLIKO UP 33 1 2 27 4 1 34 23.36 824062

- RAANAPUR 3 0 0 3 0 a 3 3.83 63925RAVILALA .3 0 0 0 3 0 3 1.72 91521

4ARVATHAGIRI BURGUMADLl i2 3 0 13 2 O 12 13.31 352836CHINTANEKhKONDA 58 1 1 22 31 6 59 63.17 1642299CHOUTAPALLY 52 1 6 22 15 10 53 59.67 2153916ENUGAL 15 D 0 7 8 0 15 10.67 403521GOPANPALLY 4 S 1 0 4 G 4 4.14 156875KALLEDA 8 0 0 4 2 2 8 6.68 151437KONKAPAKA 12 3 2 0 8 2 12 16.15 296632PARVATHAGIRI 5 1 0 3 3 0 6 6.17 172187SOMARAM 7 I S 4 2 1 7 6.78 103855Sub- Toa -71 1- 3.. 285 232 42 89 .27.99 1995--5-5-2 --

Sub-Total 571 18 30 285 232 42 589 .............................. 627.99 19955523.. --.-- . -- . . . . . -------... .---------- -----.----.--..----. -------..... -- --- -----------.-----------.

Page 99: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

Annexure V Contd..

MANDAL VILLAG[ MALE FEMALE SC ST BC OC TOTAL TOTAL COMPENSATIONACQUIRED PAID Rs.

----- --- --- ------- ,.,.------.....- - - -....---------------------.... - - - - -----------.------. ------------.--------------... ~ w -~ --- -- ----

MAIN CANAL

GEES6ONDA OOOKAL 1 1 5 O 8 3 11 17.08 739643

HANANKONDA DESAIPET 3 1 I 1 4 0 4 1.68 126749

SANGAN PALLARIGUDA 4 0 0 O 3 1 4 3.46 156125THIHAPUR 5 5 3 6 2 Q 5 11.18 268391

WARDHANNAPET ILLANDA 8 0 0 O 7 1 8 14.31 625714KATRIAL 26 a 1 d 22 3 26 32.34 942628UPPARPALLY 3 0 1 0 2 Q 3 2.15 48055

Sub-Total 59 2 5 5 48 8 61 82.19 2917252

Grand Total 1518 61 179 402 810 188 1579 1494.65 43657782--------------- ----- ___--..-__ ---.-- _--_---A.-._--- _ _ _______________. _________ __________________ ______ _______ ___ _n__

Page 100: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

Annexure VI

ANDHIRA PRADESH IRRIGATION PROJECT -IIISRI RAMA SAGAR PROJECT

DETAILS OF COURT CASES UNDER LAND ACQUISITION

(Area in Acres and Guntas)

No. of No. of Extent at-eano.- cases Famr-ers pending in

Na in/1Ais tt', i bLt or y pending affectedl the Court

1'. D6 I1 61 1086 479.04512. £DBI' ~3 38 661 706.0714

3. M'AIN CANAL 2 12 10.2200

101 1759 1195.3365

Page 101: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

Annexure VI Contd..

(Area in Acres and Guntas)

Si, Land Acquisition No. of Extent areano. ------------------- Famrrers pending in

-11ain/Vist:ributoiv * iiMandal Village Year Extent affected the Court(in acres)

... -. . . . . -- -- ,--- ----- ---......--------. . ... -- ............--- ------ ----- ------ ----.

I. DB0-131 12R of DBM 16 KM 0.NO0 to 6.10 MOGIULAPALLY Mogullapally 1988 4.3200 18 4.32DD2. DB01-31 13R of 814,31 KM 1.00 to 0.975 MOGULAPALLY Mogullapally 1988 2.4125 9 2.41253. DBM-31 11R of DBM--31 KMl .00 to 09,50 MOGUlLAPALLY Mo9.llapally 1988 3. 8M0 15 3.08004. DBN-31 EIGFE KM 5.D50 To 9.250 To 8,350 PARKAk Varikola & Narlapoor 1988 14.010 60 14.015. D81M-31 3L DMIK31Kl 0.R00 TO 1.9N PARKAL Varikola 1988 5.1306 11 5,11b306. DBII-31 3l DB1431 KM 0.0.0 TO 1.950 PARKAL Cfoutapally 88-89 3.2900 6 3.27. DBM-3121 of 7L of DBM-31 KM 0.00D to 0.925 KULLAPALLY Varikola & Puligilla 1988 3.3400 24 3,340fl8. DB4-31 7R to D8-31 KM 1@ .00 to 6.2'i Venkatapur,Varikola,Rayaparthy.Puligilla 1988 17.2600 69 17. 26009. D84-31 7L OF 41. Of DBM-31 KM 0.00D 0 1.250 PARKAl Narlapur 1%98 2.3500 11 2. 26011. D84-31 5L KM O.000 TO 1950 PARKAL & MOG.LAPALLY Puligilla & Raiparthy 1988 4.3200 12 4 320WI11. D08t31 6R 4L OF DBM-31 KM 0.00 10 1.275 MOUlLAPALLY Puligilla & Cherlapally 1988 4.0400 21 1.040012. DBM-31 6R 4l OF DBN-31 KM 0.000 TO i.275 MOGULLAPALLY Issipet & Rangapur 1988 2.2600 0 0,001b13. DBM-31 7R DBM-31 KM .000 TO 0.971 PARKAL Rangapur 1988 2.5438 10 2.210014. D0131 1R4R TO DB1-31 KM 0,000 TO O 550 Mallakapet 1988 1.3200 9 1.320015. 081431 2R of D0 31 KM O.0DO to 1.925 PARKAL Raiparthy 1988 3.25N 14 3,250016. D01-31 3L 4L DB1-31 KM O.lI to 2.651 PARKAl Choutaparthy & Cherlapally 1988 17.280 73 17.2N017. D81-31 4L DBM131 KM 1. 1 to 5.050 Narlapur,Puligilla,Choutaprthy,Cherlapal 1988 18.01N1 42 18.01i018. D0M-31 KM 1.000 to 1.651 PARKAL Venkatapur 1988 2.0200 12 2,.02619. DBM-31 KM 0.00I to 0.651 PARKAL Nadikuda 88-89 21.3100 0 21.310029. DB04-31 KM L.O to 1.653 PARKAL Venkatapur 1988 2.020W 12 2.0W021. D81-31 KM ON.00 to 1.650 PAkAL Nadikuda 88-89 21.3100 0 21.310022. 0814-31 KM 0.00 to 1.730 PARKAL Issipet 1988 1.0190 3 1.0MO23. DB01-314L TO 08-31 KM 0. ON TO 2.0D PAKAL Raiparthy & Choutaparthy 1988 7.3438 30 7.343.24. DB01-314L TO DBM-31 KM 0.0WI TO 2.00 PWA Raiparthv 88-89 12.370 0 12.370025. D1-31 KM 31.011 TO 33.X01 PARKAL VerAatapur, RgWur & Issipet 1988 8.2500 29 8.2$0026, DB01-31 KM 1R Of 16R OF KM 2.N00 TO 2.500 Laxripur 1988 8,14N 45 8.140027. DB1-31 KM 1R OF 16R OF KM 2.000 TO 2.500 Issipet 88-89 3.0500 21 3. 05028. DB1-31 KM 0011 TO 1.00 Issipet 1988 1.1810 81 1.1800

--- , . - - , - - . . . . . . . - - - - - - - - - - - - - - - . - - - - - _ - . . - - . . . - - - -

Page 102: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

Amxure VI Contd..(Area in Acres and Guntas)

SI. Land Acquisition No. of Extent areano. ------------------- Famrers pending in

Main/Distributory KidaI Village Year Extent affected the Court(in acres)

29. DBM-31 12L OF DBM-31 KM 1. NO TO 1.70 Issipet & logullapally 1988 7.1410 33 7,148831. DBN-31 12l OF DBM-31 KM l.3 TO 1.70 Issipet & Rangaur 88-89 11.313i 3 11.31N331. DBN-31 12L OF D6M-31 KM 3.3IN TO 1.73 Venkatapur & Rangpur 88-89 7.323 3 7.320032. DB-31 6R OF DBM-31 AT KM 0. rTo 4.511 PARKAl Venkatapur,RanWr,Laxmipur 19889 18.12N3 58 18,12333. DBM-31 6R OF 8M-31 AT KM 0.01T10 4.500 PARKAL Issipet & Madarametla 88-89 12.153 0 12,158834. D8M-31 IL OF 3l OF 4LOF D8W-31ATKN O.31t1. 233 PARAL Cerlapally & Narlapur 19 4.88NM 19 4.8NM35. DBM-31 2R OF DBM-31 Al KM 1.1310 tO 17613 PARKAL Raiprthy 1988 2.3600 11 2.363336. DB131 KM 5.ON TO 1.325 Raiprthy, Chutapally & Nadikuda 1988 4.22D 22 4.228837. DB-31 KM A.3NO TO 1.325 Cherlapally 88-89 2.1600 D 2.163338. DB-31 KM .0030 TO 1.325 Moqullapally, Issipet & Madarametla 88-89 28.1803 0 28.18M39. DB-31KM 0.001 TO 1.325 Issipet 88-89 5.1203 I 5.128843l, DB-31 KM O1M TO 1.325 Madarasetla & Issipet 88-89 2,3933 0 2.3960 0'

41. DBM-31 KM 0.000 TO 1.325 Mogullapally, Issipet & Madarawetla 88-89 28.1833 O 28.183342. 08-31 KM 0.D00 TO 1.325 Issipet 88-89 S.12N1 0 5.12N43. DBN-31 KM 3. IN TO 1.325 Madarauetla & Issipet 88-89 2.3933 0 2.39344. D6-31 KM 3.388 TO 1.325 Madarametla & Rarnapur 88-89 4.383 3 4.380045. DBM-31 KM 35.00 TO 363 00 lssipet 198 5.3, 5 5.383346. DBM-31 KM 35.00 TO 36,00 Raiparthy & Puligilla 88-89 25.6875 0 25.687547. DBM-31 KM 35.33 TO '36 00 Raiparthy, Venkatapur, Nagaraa 88-89 14.2433 0 14.24348. DBM-31 KM 3.33 TO 6.33 Oblapoor & Mustyalpally 1988 2.1733 2 2,173N49. DBM-31 AT KM 2.209 10 6,500 Pocharam & Kamareddypally 1988 8.3233 34 8.320D50. 08-31 AT KM 2,2N Tn 6.533 Peqadapally 8 Mucherla 86-87 16.34N 0 16.343N51. D8M-31 4R km 0.225 to 3.9'; Raiparthy,Venkatapur,Malakpet,Nawram 1988 14,2433 46 14.24N352, DBM-31 KM 10R .NO 10 U.850 ladarametla, Issipet 1988 2.3930 16 2.39353. DBM-31 KM 10R 0.000 10 0.8' Vemped 89-90 6.9375 0 6.937554. DBII-31 KM IR Of SR Of D06i3- Gotlakanaparthy 1988 6.333 12 6.38855. DBM-31 KA 0309. to 3',,553 Pulkurthy & Gotlakanaparthy 1988 17.3133 25 17.313356. D06-31 KM 5. 00 to 6.03 GEESS A 1988 5.383 5 5.3857, D01-31 KM IR OF DHIM il ATrAKUR Xothagattu 1988 6.2433 6 6.24N

-- - - - -- - - - - - - - - - - - -- - - - - - - - - --- -.-- - - - - - - - - - - - - - - - - - - - - - - - - - - - -

Page 103: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

OMexure VI Contd..(Area in Acres and Gtintas)

Si. Land Acquisition No. of Extent areano. ------------------- Famrers penrcinq in

liainiGiotribtilorf lMandal Village Year Extent affected the Court(in acres)

58. DM-31 K 5.105 GE:ESUGONDA Manuoioda 1988 5.07N 4 5.178059. DBM-31 2R-IL MINOR Naqaram, Kawaparthy & Malakpet 1988 14.3200 40 14.32D060. DBM-31 KM IR 6l Of1 2R Of D8M 31 KM O000 10 0,277tj Vellampally & Madaram 1988 4.16D 19 4.160161. DBk-31 KM 18.D0 , 0 19.09 Pulukurthy 1988 5.2200 3 S.222N

Total 47941451 1086 479.10451- - ..... - .... - .. - -. ... .. .. I- - -.... -... .. - .. - -. - .. - . . . .. -- - I - - - - - - - - - --- - - - - - - - -- ---- - - - - - - -

Page 104: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

Arexure VI Contd..(Area in Acres and Guntas)

SI. Land Acquisition No. of Extent areano. ------------- r------ - FamrEs pendinq in

Main/Distributory manlal Village Year Extent affected the Court(in acresj

1. DBM-38 FROM KM 19. 8OI TO 200 Mallampally 1988 3.280 10 3.28002 DBM-38 FROM KM 35.100 TO 38.iN MallampalIy 1988 25.D60 8 25.0603. DBM-38 FROM KM 35.500 lO 38.1110 allalpally & Nallabelli 88-89 15.1875 18 15.18754. DBh-38 KM 3.400 Dtbyal, Mallampally, Raqhavareddypet 89-90 22.1300 0 22.138N5. DBM-38 6L& 1L DUGGONDI Laxnipur 1988 1,3888 1e 1.30WD6. DBM-38 6L & 1L DUlGOII Teegarajpally, 88-89 0.3700 1 2.37N7. DBM-38 6L & 1L DUGONDI Verkatapur 88-89 1.3800 8 1.30W8. D81-38 KM 9L R 1L OF DBM-38 DUGGONDI Venkatapur 1988 6.2600 26 6.26N9. DBM-38 KM 9LR 6L DUGGNDI Laxaipur 1988 4.8688 11 4.611. DBM-38 KM 9LR 6L Bhanipet 1988 17.138 55 17.13N811. DBM-38 15LR NALLABELLI Laknepalli 1988 15.21D0 16 15.21N12. I)Bh-38 15L OF DM-38 Mallampalli 1988 5.3588 7 5.350013. D81-38 KM 1lR OF DBMI-38 itikyalpally 1988 7.6163 24 7.606314. DBM-38 KM 15L OF DBM-38 Madnoor 1988 19.8875 96 19.087515. DB14-38 IIR Kamepally 1988 31.2688 67 31.268816. DBM-38 11R of DBM-38 Malhadapoor 1988 26.9375 65 26.937517. D8M-38 KM 0,8 TO 3.1l Rebelly & Venkatapur 1988 17.35D0 50 17.350018. D0-38 15l 1R FROM 0. 8 TO 2.80 &15L 4R KM 0.0 7.00 Muchimpula Laknepally Nallabelly 1988 20.2400 36 20.24N

_ __ _ __ __ ____ __ __ ...............----------- ---- -_-_-- ------.- ,._--- --.-------------- __ ... .I---- ------- _--_--,--__-_-_-___-_-_-______-__-__-_--_____--_-_-________-_______--__ _ _____-__- -_--__-__-____-___

Page 105: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

Amexure VI Contd..

(Area in Acres and Gunat-as)

Si. ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~Land AcQuisition No, of Extent are-ano. ------------------ ~~~~~~~~~~~~~~~~~~~~~~- Famrers pending in

Main/`Distributory Manidal Village Year Extent affected the Court(in acres)

19. DBM4-38 15t. IR FROM (0.884 TO 2.841 &15L IR KM 41.88 Rebelly & Venkatapur 1988 17.33500 541 17.35992e. DB44-38 15t IR FROM 1.~ 41 10 2,.841 &15L 4R KM 41.00 Laxmipuram, Ramchandrapuram~ 8-89 34.35014 41 34. 35N821. DB44-38 15L iR FROM 41.0041T0 2.801 &15L 4R KM 41.88 Mustya1pally 88-89 6,1125 41 6. 112522. OBM-38 1SL. IR FRCHOM4.41 10 2.84 &i5L 4R KM 41.8N Keshavapuram,LaxmiDuram, N~~erukulla 88-89 241.3625 41 241.3625,23. D84438 15t IR FROM 41.400 T0 2.801 &15t 4K KM 41.414 Mahiadapur 88-89 4.5375 41 4.537524. D841-38 15t. IR FROM 41.4 T 14141 .841 &15L 4R KM 41. N4 Keshavapurama Laxmipurama 88-89 241.7875 1 H4. 787525. OBM-38 15t. IR FROM 41 4141410 2.80 &15t. 4K KM 41. N4 Ramaachandrapuram, L.axmipuram, Elkurthy 88-89 34, 35N14 4 34.3541026. D84-381ISt. R FROMi 41 0 4110 2.88 &15St 4R KM 41.4 Nmallarapally 941-91 43.3588 41 43.3541427. DB44-38iSt. 1R FROM 0, i0414 10 2.688 &ISL 441 KM 41.88 Mallampally 941-91 241.3288 4 21. 328828. 054-38 b5L iRFOir 0.0 TO 6441 0 .8 &15t. 4R KM 41.004 Mal IanipallIy 941-91 22. 3788 4 22.37N829. DB8-38 I i F R 'D, . V288 !0 2,88 A II KX 41.88 Mallanipally 901-91 41.38141 41 41.34188341. DEsMI 8 iS' ~'O H 41,0410 151. 41 KM 41.8 Katrepally Sanqam 88-89 3.9625 41 3.9625

M. 0644 j 38 t p 0i~ mirA104 I 0 :1 KM 41.414 Thimmnapur 941-91 11, 1488 4 11>41432. 16m 30i I 5 ii R RAfjVv 4,1110.00 16l i) 415 KI KM 1,04 Mustyalpal'ly 83-84 21.141. 4N 41 21.8N33, DM6n- i'8 151 ORL F011 1041 020 11 &I SL 410 K(M 41.414 Varikola 88-89 5.1388 41 5. 1341434. DM -38 1511KR FROM 4,414O410 2.1)414 t51 IR KM~ U0 Shapur 85-86 43.4174141 4 43.417N135. 084- 36 KM 41444 1000M 41.2374201 1.5050. & 1.,0 S6 0T 3,0541 Mahadapur, Venkatapur, Ma'larupally 1988 23.3125 59 23.3416336. 0544-38 KM 198,151T Mahmadapur, Mallamupally 1988 1.2188 5 11.218837. 084-38 KM O. (If 014M 031 Laxmiipur & Rebelly 1988 21.28414 35 21.2884138. D844-38K 7 0 i 'L Dr(b-38 Nandiqania,Much~impjl a,R.anqapur,RebelI1 i,Arshanpal 11988 43,2408 11 43.24N8

Total 7416.17i4 661 7016.01714

Page 106: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

Amexure VI Contd..

(Area in Acres and Guntas)

Si. Land Acquisition No. of Extent areanio. -------------------- Fanrers pending inn

Main/Distriib to,ry Hdan(al Villaqe Year Extent affected the Court(in acres)

1. KAKATIYA KAIN KM 2?4 .NO IO 274.220 Lohitha 1987 5.1D00 8 51102. KAKATIYA MAIN CANAI. K. I213 TO '74 Lohitha 1988 5.1200 4 5,i220

Total 10.220i 12 i0.2208. .. . . - - - - .. . . - - - - . . - .. .. .. -- - .- - - --- - - - - -- - - - - - - - - - - - - - - - -

Di

Page 107: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

Amiexure VII

AM PRNDESH IRRIGATION - PROJECT IIISRI RMH SAN PROECT - KAKATIYA NAIN CANAL (234 KM - 284 KM)

NOBILITY ATRIX OF PNS FRON PRE (UISITION PERIOD TO POST ACQUISITION PERIOD

AFTER -> 0.0-.5 0.5 - 1.O 1.0 - 1.5 1.5 - 2.5 2.5 - 5.0 5.0 - 10.0 OVERALLBEFORE No Area No Area NO Area No Area No Area No Area No Area No Area

- ------------- --------------- - ---.-------- --- --------- I------------------ --------------------------------- I--------------------------------------------

0.1 - 2.5 42 17.11 371 118.93 81 25.17 9 2.N 2 %. 2 0 2.22 0 2.20 494 161.600.5 -1.5 8 13.38 98 113.58 218 157.98 229 156.34 35 23.38 2 2.22 a 2.22 588 464.661.5 - 2.5 4 13.07 2 2.2 28 65.06 31 62.99 206 281.21 122 168.19 2 2.N 393 595.122.5 -5.0 2 D.20 2 6.50 0 K.22 2 9.32 3 10.69 77 172.72 15 40.44 122 250.185.2 -1.1. 3 17.03 0 2.20 2 2.2 1 0.00 2 0.22 2 O.22 3 16.32 3 16.32

10.D -20.2 0 2.22 2 0.22 2 2.22 2 O.22 D 2.2 1 6.87 0 0.22 1 6.87- O---5-6-59 47--3---32-242---- 2---------- 62-226.65-244-315.28-222--------------------------------------------------------6 18------ 566 17 1-----------6-----

TOTAL 57 611.59 471 239.01 327 248.21 262 226,65 244 315.28 200 347./6 18 56.76 1579 1494.65.- ---------------- ---- --- ------ - , ------ ------------ --------------- . ---- --- --------------- ----------------- ------- ---- --------------------------- -- ---------------

Page 108: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

*~~~~~~~~~~ i

Annexure - VIIANDHRA PRADESH IRRIGATION - PROJECT III

SRI RAMA SAGAR PROJECT

PROJECTED AFFECTED PERSONSDETAILS OF ELIGIBLE FAMILY MEMBERS FOR PRODUCTIVE A:.ET GRANT AND OTHER ECONOIIC ASSISTANCE

ReachiMandal VilIaqc Losing Major Total Losing Major All Castewise PAPsLand child House Chiid Total Total SC ST BC OC

DMB-31ATMAHKUl AilAKUR 6 6 14 I 0 D 14 0 0 4 4

LADELLA 9 9 18 0 0 0 18 2 I 7 0MUUSHYAPALLI 2 1 3 0 0 8 3 D Q 2 8EPi.KULLA 3 0 3 8 $ O 31 85 d 1 2

GOR'u.ONDA 3 4 7 0 8 0 7 0 0 0 3CEESGCONDA GCESGONDA 3 7 15 O 0 0 15 I 0 54 liASAiNP ARTHY IHASANPARTHY 7 5 12 8 0 0 12 0 0 5 2

KESHAWPUR & 11 18 8 l 0 18 1 I 4 3 (14ALLAREDDIPALLI 4 3 7 I 0 0 7 8 8 4 .0IlUCHERLA 3 1 4 0 0 0 4 I 9 3 0'A'ARAM 1 0 1 D 0 8 1 0 0 0 1PMKARTH! 2 1 3 C . 8 3 9 2 2 USIDDAPUR 4 2 6 8 f 6 1 0 2 3

iMOGULLAPALLY AKNlPALLY 16 16 32 6 8 8 32 8 a 7 1METPALLY 3 8 l 0 8 8 1 8 4 8iCCGULLAPALLY b 7 13 0 6 0 13 1 0 4 1wIlKAPAJ.Y 1 0 1 8 8 0 1 1 8 8 0PARLAPAI-LY I 8 1 8 8 8 1 8 1 0PEDAKONEPAILI 1 0 1 0 8 8 1 8 8 1 PPIDICILLA 15 17 32 8 0 8 32 3 8 9 3POTHUGAL 5 2 7 0 8 V 7 4 0 1 0RANGAPOOR 5 2 7 8 8 0 7 8 0 4 1

PARKAL ChE RI,'iPALLY Y 6 15 0 0 8 15 8 0 1 8CHOUTAPARTHY 12 12 24 0 i 8 24 2 8 3 7KOUKONDA 4 2 6 0 0 0 6 1 0 3 0

PA', KAL LAXMIPUR 14 22 36 0 3 I 36 1 8 11 2HAD3SARAM 26 24 46 0 8 8 46 0 8 21 I,MAlLAKiT T 1 6 ' 8 86 8 8 4 1~~~~~~~~~~~~~~- ...... .........- ... .v- ,. @..w......A.-~- ~-- - - .- -- - - -,.- - - - ~.- - ^- .. - - - v....- - -~-- - - --- ,- -- .,- - .-- ,- - - - .-- ----- ---------

Page 109: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

Annexure VIIBContd..

Reach/Mandal Village Losing Major Total Losing Major All Castewise PAPsLand child House Child Total Total SC ST BC OC

NADIKUDI 12 15 27 0 D 0 27 1 0 8 3POCHARAM+KAMAREDDY 7 3 10 D 0 0 10 0 0 4 3PULLIGILLA 5 7 12 0 0 a 12 1 D 4 0RAIPARTHY 21 18 39 0 O 0 39 0 0 16 5RAJIPET 2 2 4 a 6 a 4 0 0 1 1SARVPOOR 6 5 11 0 I 0 11 0 2 4 0VELLAMPALLY 22 16 38 a I 0- 38 0 0 8 14VENKATAPUR 8 7 15 0 0 0 15 0 2 2 4

SHYAMPET GATLAKANAPARTHY 7 4 11 a 0 I 11 1 D 6 IKOTHIAGATTU 2 2 4 0 D 0 4 0 0 2 0KOTHAGATTU+SINGARA 2 1 3 a a 0 3 0 e 2 D

MULARAM 4 0 4 0 0 0 4 1 0 1 2SHYAMPET 9 7 16 0 O D 16 1 1 6 1

- - - - - - - - - - - - - - - - - - - -~ ~ ~ ~ _ .d _ _ ~ _ _ ~ _ _ _ _ ~ ~ _ _ _ _ ~ _ _ _ A. _-_ __ _- ......-......-.......-......-..-..-..-..-..--..-..-..- - - - -__ _ - -.. - - - - -

Sub- Total 290 250 540 0 a a 540 31 5 177 77~ ~~ ~ ~_ __ __ _~ _ __ .M .._ .._A.. _._----------- - - -.. ----------- __- __ __ __ _ ---------------------------------------------- _--------- ~~ ~_ __ _ ~~ ~~ ~~ ~~ ~ _~ ~~ ~~ ~~

Page 110: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

Annexure VIIl Contd..

Reach/Mandal Village Losing Major Total Losing Major All Castewise PAPsLand cllild House Child Total Total SC ST BC OC

DBN-37

ATMAKUR AGRAHAMPAD) 7 8 15 0 0 D 15 1 0 5 1MUSHYAPALI.1 4 2 6 0 0 0 6 9 0 4 0

PARKAL CHOUTAPARTiY 3 D 3 6 0 0- 3 2 0 0 1REGON&A &AMANNAPET 3 9 12 0 8 0 12 $ 0 3 0

KANAPARTHY 5 7 12 0 D D 12 0 5 . 5 0

KANAPARTIIY lDAMMANN 1 1 2 0 8 0 2 0 0 0 1REGONDA 27 8 35 5 0 D 35 2 0 9 16

Sub-Total 5D 3 35 85 5 0 D 85 5 5 26 19-- - - - - - - - .. - .. - - .. - - - - .. ., - .. -- -A. - - - - - - - - - -- -- -- -- ---- - - - - - - - - - - - - -- .,, - - - - - - - - - ----------------------------- ,

Page 111: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

Annexure VIIJContd..

Reach/Mandal Villaq( o i I) (I Major Total Losinq Major All Castewise PAPsL and ch ilId House Child Totali Total SC ST BC OC

DBN-38

AIMAKUR NEERUKULIA 8 13 0 0 0 13 3 0 2 0CHITYAL JOOkAL 5 6 11 0 0 0 11 0 0 5 0DUGGOND1 CHALPARTHY 10 t 18 0 0 a 18 1 0 9 0

&UGGONO1 7? 2 9 0 0 9 0 0 7 0KESHAVPU(1 4 3 7 0 0 0 7 0 0 1 3KONKAPAKA .3 4 7 0 0 0 7 0 0 2 1LAXMIPUPAM 5 6 11 I 0 0 11 0 0 5 0MADNOOR 3 0 3 a 0 0 3 2 0 0 1MAL[ARPAI fV 1.3 1l 23 0 0 0 23 2 0 10 1MEHMADAPOCIR 23 14 37 0 0 0 37 7 0 15 1

NACHINPAII I 1 3 4 0 0 0 4 0 0 10REBELLY 6 10 16 0 O 0 16 1 1 3 1TIMMAPET 3 3 6 0 0 0 6 0 0 2 1VENKATAPUR 2 3 5 0 0 0 5 a 0 2 0

GEESGONDA MANUGONDA 1 1 2 0 0 0 2 0 0 0 1WJLUGU MALLAMPALLY 10 7 17 0 O 0 17 0 0 8 2NALLABELLY ARSHANPALLY 7 10 17 0 0 0 17 0 0 7 0

LAKNEPALLY 15 12 27 0 0 O 27 0 0 15 0NALLABELLY 32 22 54 0 0 0 54 9 0 15 7NARRAKAPET 13 8 21 0 0 0 21 3 0 10 0RAMATHEERTHAN 4 1 5 0 0 05 1 1 2 0RELAKUNTA 10 8 18 I 0' 18 1 0 8 1SUANIGARAN 2 2 4 0 0 0 4 0 0 2 0

NARSANPET BANGIPET 11 8 19 0 0 0 19 1 0 7 3ITIKYADIPALLY 21 16 37 0 S 0 37 2 2 17 0KAMMERAPALLY 20 12 32 0 0 0 32 0 10 8 2LAKNEPALLY 24 16 40 0 0 0 40 8 1 11 4NAHE-SWARAM 14 13 27 0 0 0 27 2 3 8 1RAMAVARAN 2 1 3 0 0 0 3 0 0 1 1

Page 112: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

Annexure VIII Contd~.

Reach/Mandal Villaqe Losing major Total Losing- Major All Castewise PAPsLand child House Child Total Total SC ST BC DC

REGONDA KANAPARTHHY 11 8 19 5 5 5 19 1 1 6 3KANAPARTHY 3 4 7 I 3 REGONDA 3 4 7 S 5 5 7 5 5 2 1

Sutb-{otal 293 233 526 5 5 5 526 44 19 195 35

------------ -------------

Page 113: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

Annexure VIIlContd..

Reach/Mandal Vi1laqc Los;ing Major Total Losing Major All Castewise PAPsLand child House Child Total Total SC ST BC DC

DBN-41

CHENNARAOPET AKKALCHED 5 4 .9 0 0 0 9 0 1 3 1AMENABAD 58. 36 94 0 0 094 1 37 18 2KOMAPUR 27 14 41 0 0 0 41 9 7 11 LiLINGAPUR 1 0 1 0 0 a 1 0 0 1 0MUGIDUMPURAH 1 0 1 0 0 0 1 0 1 0 0PAPAIPE'T 1.2 6 18 0 18 1 11 0 IH I MMARAI N I P AU 1 0 1 0 1 0 1 0 'UPPA RA PA i. Y ['7 15 32 0 0 0 32 3 1 130YI IL A I GUliATh 12 39 00 0 39 7 15 5 0

DUCCONDI CHALPART~f W( 4 3 14 0 0 0 14 0 011 0 -

MAD IRAt1ANDAPAI 4Y 51 6 0 0 0 6 0 0 5 00 NO Ai'Al. L.Y 6 3 9 0I 0 9 1 05 0RAMACHAN~DRAPUR 1 4 5 0 0 5 0 00 1

GEESGONDA OOOKAL 24 29 53 0I 0 53 19 0 3 2GUDUR GUNDENG-A 131 7 20 1 0 1 21 1 13 0 0

PONUGODU 3 3 6 0 0 0 6 0 1 2 0RAJ AMP Al,LI 1 1 2 0 0 0 2 0 0 1 0TEEC.,AL AV EN 2 0 2 0 0 0 2 2 0 0 0

SANGAM CHINTAPAI.LI 8 4 12 0 0 0 12 0 0 8 .0LOHITHA 3 3 6 0 0 0 6 1 0 2 0MONORAI 3 9 20 59 0 0 0 59 10 0 29 0N A L. AB E LL.Y 4 1 5 0 0 0 5 0 0 4 0PAL L.AR]GUU (1)A 21 1.4 35 1 3 439 9 4 8 1SHiAPOOR 101020 THiI GAR AJ ItAL .I 2 6 8 0 0 0 8 0 0 2 0

T IiI MAP UR 0 1 0 0 0 1 0 1 0 0

Su b Io ta I 294 186 480 2 3 5 485 64 9 3 132 7

Page 114: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

Annexure VIrContd..

Reach/Mandal Village Los in':- Maor Total Losing Major All Castewise PAPs.i.r0d child House Child Total Total SC ST BC OC

DBM-48 -

CHENNARAOPEl AMENABAD 9 113 22 0 0 0 22 0 6 3 D

JALLY 1 2 3 0 0 0 3 1 2 0 OLINGAt'UR 4 3 7 0 0 0 7 2 0 1 1THIMMARAINIP ADII 4 l 5 I 0 0 5 0 2 2 0

UPPARAPALY 7 9 16 0 0 0 16 0 0 5 2DUGGONDI CHALPARTHY 2 1 3 0 0 2 3 0 0 2 0

KESAMUDRAM BERIWADA 13 12 25 0 D 2 25 0 11 2 0DHANSARI 5 6 11 0 2 0 11 0 3 2 0ENUGURTHY 22 27 49 0 0 0 49 1 10 9 2

KESAMUDRAM 19 14 33 0 0 0 33 1 6 9 3KONATIPALLI 12 1.D 20 0 0 0 20 1 6 3 0KORUKONDAPAlLI 8 9 17 0 I 0 17 1 7 0 0MAHMOODPATNAM 30 27 57 0 0 0 57 4 18 8 0

PENGONDA 20 31 51 9 I I 51 1 0 19 0

UPPARAPALLY 6 2 8 0 0 0 8 0 D 6 0

MAHBOOBABAD EDULAPUSAPALLY 12 5 17 I 0 . 17 0 6 6 0

VEMNOOR 12 6 18 0 0 D 18 0 11 1 0

NEKKONDA ALANKANIPET 4 2 6 0 2 0 6 2 0 4 0

APPALARAOPET 2 2 4 0 0 0 4 0 2 0 0BOLLIKONDA 40 31 71 0 0 2 71 0 32 8 0CHANDRAGONDA 6 0 6 0 0 0 6 0 2 4 0

CHINANEKKONDA 7 4 11 2 0 0 11 0 3 4 0GOTLAKONDA 6 4 10 2 2 2 10 1 5 0 D

GUNDRAPALLI 9 2 11 0 2 I 11 2 0 7 2PATHIPAKA 1. 1 2 0 0 0 2 2 1 0 DREDLAWADA 38 30 68 0 0 0 68 1 4 26 7THOPANPALLI 3 3 6 0 D 0 6 0 0 2 1VENKATAPUR 5 4 9 2 2 0 9 1 3 1 0

- --- -- ~-*.. .~^^--- ------ -- - - - --.- --- -- -- - ---.- ------------------------- ---------

Page 115: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

Annexure VIlIIContd..

Reach/Mandal village Losing 'Major Total Losing 4ajor All Castewise PAPsLand child House Child Total Total SC ST BC o

NELLIXODUR CHINNANUPPARAN II 9 19 5 5 5 19 5 2 7 1CHINNANAGARAN 14 16 30 5 5 30 1 8 4 1KACHIKAL 5 5 15 I I I 15 I 1 2 2MADANTHURTHiY 1 I 1 I I I 1 5 1 5 5METHARAJPALIJ 13 I5 23 5 5 5 23 5 13 5 5NAINALA 25 15 45 5 5 5 45 1 25 4 0NELLIKODUR 34 35 64 5 5 5 64 2 27 4 1RANANJAPUR 3 3 6 0 5 0 6 0 3 0 RAVILALA 3 3 6 5 5 0 6 5 0 30

PARVATHAGIRI BURGUMADLUJ 12 6 18 0 0 0 18 I10 2 0CHINTANEKXDNDA 59 72 131 5 5 5 131 1 22 35 6CHOUTAPALLY 53 43 96 5 5 0 96 6 22 15 15

ENUGAL 15 12 27 5 5 5 27 0 7 8 0GOPANPALLY 4 4 8 I 0 I 8 0 0 4 0KALLEDA 85 13 0 5 5 13 5 4 2 2KONKAPAKA 121 24 0 0 0 24 2 0 8 2PARVATHAGIRI 6 3 9 0 0 5 9 0 3 3 0SOMARAN 7 to 17 0 0 0 17 0 4 2 1

Sub-Total 589 51I9 1108 0 0 0 1108 30 285. 232 42

Page 116: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

Annexure VIfl Contd..

Reach/Nandal 0iliaqe L.0s i nq Major- Total Losing Major All Castewise PAPsL,an d child House Child Total Total SC ST BC oc

MAIN CANAL

GEESGONDA 0 OO@(AL I 24 24 8 3HANAHKONWA i 1 1 ii I 4 SANGAM '15 9 9 3 1

TI I APlu:- 7 7 3 2WARDHANNAPEI I LL. ANO A 9 17 17 7 1

WARIAL 26 I19 45 45 1 22 3UP PAiP ALY J 3 I I 3 1 I 2 I

Su b , io I a 61 i5 116 I I I 116 5 a 48 8

Graind Tol.al 1.5,?7 12/8 2855 2 3 5 2861 179 482 810 188--- -- -- --- - -- --- -- -- --- - -- --- -- -- - - -- -- --

257 -j

Page 117: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

Annxure-IX

AMM PRADES1 IRRIGATION - PROJECT IIISRI RMW SMGMR PROJECT

PRIECTED eUFTED PERSONS ISR ECOIIC R1fILITATION PROGAEDETAILS OF DISPUCED FMILIES uz

Reach/Mandl Village Losing Major Total Losing Major All Castewise PAPsLand child House Child Total Total SC ST BC QC-~~-~-~-~~^^^~~~1wa- -^ n "-~---e~~~~~ -w v-- ----v--z-- ----------------- ------ I -------- -- ------------ --------- -------------~~~~~~~

GUJUR GM MENA 13 7 21 1 l 1 21 1 13 0 1PALLARTIGI[A 21 14 35 1 3 4 39 9 4 8 1

Stb-Total 34 21 55 .2 3 5 60 12 17 8 1~___~__ ......... ~__ ...._ ^ _ ...._ n._.~ ...... *. 1 ~~~ ~__~~~~~o. _~-----------------------------------------. - - ----------------------------------------...................................... ~~~ ~~~~~ _~~~

Page 118: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

9?

Z< Annexure X

AhfRA PRADESI IRRIGATION PROJECT -IIISRI RAM SAGAR PROJECT

PAPs: DETAILS OF LAND ACQUISITION AND COMPENSATION PAIDREACU"ISE AND VILLA%EiISE

(Area in Acres)

Land Acquired(Acres- Compensation Averaqe------------------------------- Paid conPensa-

REACH Households Wet Dry Total Rs. ticn per/ac

A. CANAL INFRASTRUCTURE

DBR-31 2171 ' 4.6890 825.6345 830.2345 16073316.65 19368 VDbB-37 432 10.081 114.9676 114.9176 . 1387488.35 12075 0 O-OBN-38 1626 58.8437 798,5554 848.5991 .20804i63.14 236 e 9 tDBN-41 1718 16.4125 748.3713 764.7838 32538188.64 4253508N-48 4876 5.6125 1996.1817 2801.7942 73641230.49 367T8 8MAIN CANAL 193 6.6588 130.4751 137.1251 5565338.25 4S586 r 9

TOTAL 18216 83.3187 4606.1256 4689.4443 149281645.52 31817

8. AYACUT ROADS 516 76.1808 76.18ff 1685121.gi 2187

' tS'' ' 2 ~~~~~~~~~~~~~.y ,,0 i,

- - - --- - - - - - - -- - - - -- - - -- - - - - - - -- - - - - - - - -- - - -- - -- - - -

Page 119: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

-0-I

Annexure X Con-td.

v.rea inAcres',

SI. Land Acquired Compensationno . ---- -----

Reach/Village Wet Dry Rs.

DBfM-31

1. -. 000 19.3500 456431.252. CHERLAPALLY 0.0000 18.4624 230095.403. LAXMIPUR 0.0000 23.5125 231649.054. SHYAMPET 0.000 13.6876 163473.605. ILLIPET 0.0000 0.3376 3327.156. SARVPOOR 0.0000 9.2000 133789.357. VENKATAPUR 0.0000 28.7504 302114.808. HASANPARTHY 0.0000 10.1750 488399.009. POClARAM1 & KAMAREDDYPAL 0.0000 8.8000 79370.0010.RAJIPET 0.0000 2.9250 36047.7511 REBELLY 0.0000 12.4562 1744998.0412 GOTLAKANAPARTHY 0.0000 0.9000 85693.9013 RANGAPOOR 0.0000 2.7250 26586.5014 SINGARAJAPALLI 0.0000 4.1000 48762.6015 MALAKPET 0.0000 4.4313 49760.1516 PEMBARTHY 0.0000 3.9750 87399.8617 KOTHAGATTU 0.0000 1.3000 19993.5018 NADIKUDA 0.0000 28.5066 394221.9519 MYLARLAM 0.0000 7.7750 79711.3020 AREPALLI 0.0000 0.9250 14022.3521 NAGARAM 0.0000 3.5125 212339.0022 VELLAMPALLY 0.0000 53.6125 807674.4023 PULLIGILLA 0.0000 7.5873 104617.7524 RAIPARTHIY 0.1000 71.2674 938953.9625 MALLAREDDY PALLI 0.0000 9.4500 189315.0026 MADARAkM 9.000 46.2500 963588.2927 KOUKONDA 9.0000 16.7250 246889.9528 ;-TPA;LY 0.0000 13.60O0 315895.5029 P A R AL a. 9 1.2750 16493.9530 PE2AKONZ'PALLi 0.0000 10.4750 330562.00

_.0000 8.4250 353319.0032 KALPi LL .W-0 7.0687 61812.50

,tJHQ -- 0&: A ULAPA 0.i90 6.Q625 157444.50-1 .4741 3---6 8£t

h' tALJJK AL AP ALLY 0.v0,' 1.0I1t 10-432. 5_; i C | _ ._ D gg, su,, ,s,,, ~~~~~~~~~~~~~~~~~~~~~~ 2 22 1 . -:, fL53; 5j -1 _7 ;

R rLAPALLY 0.0000 5.3250 99169.25

-' TI I U UGAL 0.0000 13.9500 366420.0040 MiALLAKPE! 0.0000 11.6501 135225.5511 LAXHJPUR 0.0000 18.0250 302949.0042 AKNEPALL Y 0.0000 42.8250 846891.8543 PENCHILKALPET 0.0000 2.9438 64323.0044 SIDDAPUR 0.0000 5.2750 31528.4545 PASARUGONDA 0.0000 10.0625 113800.15

_ . ___ ____ _ ____ ___ _..- .- __ - _ - _ - . _ _ -.. - _ _ _ _ _ _ _ -___________,___

Page 120: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

94

Annexure X Contd .

(Area in Acres)

Si. Land Acquired Compensationno. - ----------

Reach/Village Wet Dry Rs.

46 VEVILAL 0.0000 7,4750 186280.7547 MANUGONDA 0.0000 11.6500 231841.7048 KOTHAGATTU & SINGARAM E.0000 0.350D 7197.0749 SHYAMPET & TARAPUR 3.6500 8.6751 116747.8550 OORUGONDA 0.0000 18.3500 375784.6051 GOTLAKANAPARTHY 0.0S00 7.6875 13475.2052 KESHAVAPUR 0.0000 5.4750 247209.0053 NARLAPOOR 0.00 7.9252 96697.1354 SINGARAM 0.0000 1.4750 23582.6755 ATMAKUR 0.0000 35.7415 863108.0056 MUCHERLA 0.0000 36.0189 792469.0257 LADELLA 0.8500 49.8500 749569.45

Sub-Total 4.6000 825.6345 16073316.65

- -- - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - -

Page 121: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

Annexure X Contd..

\Are[ in Acres)

S l . ~~~~~~~L and t.cqIi red £-ro."npensat ionno ______-__

Reach/Village Wet Dry Rs.

DBM-37

1. CHOUTAPARTHY 0.0000 16.2z450 216511.602. MUSTYALAPALLI 0.8000 57.5626 634978.753. AGRAHAMPAD 0.00X0 41.1000 535998.00

Sub-total m.0000 114.907i6 1387488.35

Page 122: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

966Annexure X vont..

kArea in Acres)

Sl. Land Acquired Compensat ionno. ---------

Reach/Village Wet Dry Rs.

DBM-38

1.DRAPUR& 0.0E00 0.5000 10295.652. U UCfHli IPUL4A 8.0000 10.7062 296587.25

3. ITIK ADlPALlY 4.4375 31,3938 535825.864. RANGAPUR 8.0000 0.3000 2957.155. HA.NIGARA 0.0000 2.7500 61586.006. TIMNAPET 2.1500 19.7250 284729.007. KESHAVPUR 0.0000 8.1000 141574.138. JOOKAL 0.0000 26.7625 1669697.009. MALLAMPALLI 0.0800 55.8250 1585693.7010 DUGGONDI 0.8080 23.4125 328324.6011 KANAPARTHY 0.8000 45.6003 1586671.0012 VENKATAPUR 12.4625 19.5500 262415.8513 MADIRAMANDAPALLI 0.0000 9.6501 491401.0014 NACHINAPALLE 0.2750 2.2750 34065.2515 NEERUKULLA 0.0000 22.7000 295423.3516 MADNOOR 0.-0000 1.5000 6450.0017 LAKNEPALLY 118000 42.9875 417442.7918 KAHMERAPALLY 5.1687 25.3375 552651.0019 RELAKUNTA 0.0000 27.8000 330403.0020 REBELLY & VENPUR 0.0000 8.7875 108163.9021 LAKMEPALLY 0.2500 40.7003 1981330.2522 NiALLAMPALLY 6.9375 35.7500 714603.0023 ARSHANPALLY 2.9625 21.8814 307429.0024 M'EMHADAPOOR 4.2250 30.7939 575879.0225 RANGAP3-IR 8.0000 4.40 22987.88a- LLcn\IW nT X.0$WIJ YU4I w.w

27 NALLABEL-Y 0.1250 34.2437 813410.465,> .m^.Et^- :.-A- ~-- -uu-9 -5;,0

°.0 ii*A.'..ErRT,AM 8.8800 34.304530 NARRAIKAPET 0.0000 18.7375 30f i

LA _ RA.h.Rv.HnAPIhPU 0.0000 1'S 7_J3

3 r'.>;vIP,T ~~~~~~~~9.8500 8 .,50 28'37<5-3 ;Lt 0vi.-w--> .2000 71.r0 wb8 7 7 0.

. A .Y�~PAK IeX0.000 2.6880 143616 0U 0.8000 0 1.1156

36 KIANDAPAR A +DAiMANNAPET 0.0000 1087686 14388.00I37 , 1.AN N.8.i i 88 8i.004403 331676. 7

Sub- Total 50.0437 790.5554 20004163.14

Page 123: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

97

Arnnexure X Contd..

Are a ini fA crCas)

Land A-quired Com~pensationno .- - - - - - -- - -

Reach/Village Wet DyRs.

DBM~-40

1. JALLY±AMEENABAD 0.0000 2.5500 91750.002. OOKAL 2.4250 8.5738 319941.753. jAL-LY 0.0000 0.7813 62459.004 . P 0 N iOD I00000 5.7437 457752.785. THIMMAPUR 0.0000 13.95,00 778785.606. MADIGONDA 0.0000 7.1500 155084.007. C£IINTiHAAPALLJI 00000 19.0125 945168.008. MuUGDUMPURAM .0000 8.2752 368029.009. MONDRAJ 3.4375 78.3086 4070316.4010 THIGARAJAPALLI 0.0000 0.5250 9799.1011 GURIJALA 0.0000 2.8750 61832.5012 CHALPARTHY 0.Q0000 17.5002 976409.6213 M'UHMAflIVARAM 0.0000 3.1715 115374.0014 SHAPOOR 0.0000 10.6750 509825.5015 NALLABELLI 0.0000 40.2750 1860260.4016 KONAPUR 0.0000 1.9000 47179.0017 PALLARIGUDA 7.1750 7.0751 380248.0018 LOHITHA 0-0000 11.9750 353037.2019 MANDAPALLY 0.0000 17.8320 933595.0020 AKKALCHED 0.0000 10.6750 458563.0021 YELLAIGUDEM 0.0000 47.5700 3927233.0022 DEISAIPET 0.0000 53.7437 45775-2.78'233 KOMAPUWR 0.0000 60.6763 1574852.7524 AMENABAD 0.2500 154.8936 6000537.0025i SI RIPALL I 0.0000 0.2500 10752.0026 GuNDtT. hA 0.~0000 0 .9S25 0 14022.25';

R~AjAMALLI .~0 2 .08 i 19i712.2523 PAPAiPET 0.0000 32.4750 745288.06

29ENA3DpYLLIGDM125 3.0250 91028.0030 U rPrA rIAPnA'L'LI 0.0000 9IL. 5939 357235

31 2IALYBAD 0.0000 0.7750 624539.007~~~~~~ ~~2.0000 16.4500 070530.30

Su- tl16.4125 743.3713 32530103.64

Page 124: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

Annexure X Contd..(Area in Acres)

51 Land Acqui re., Compensationnoa _____ ___-_

Reach/Village Wet Dry Rs.

DBM-48

1. PEDDAKARPOLA 0.00-0 14.5014 487616.502. KACHIKAL 0,0000 315.0000 1089236.003. KALVALA 0000 .07375 26094.004. CHINNANEKKONDA 0.0080 14.1751 532127.005. CHINNANAGARAM .0000 40.6500 1491050.006. GUNDRAPALLI 3.0808 24.1189 1043683.507. CHOUTAPALLI 0.9250 148.6376 5719950.408. SOMARAM 36.3691 1055369.509, CHINNAMUPPARAMi+RAJULAKO 0.000 3.3000 89172.0010.APPALRAOPET 0.0000 41.2128 1551342.1011 PENUGONDA 0.0000 20.2125 750152.5012 ENUGAL- 1.2375 96.6601- 4285071.0513 PATTIPAKA 0.0000 18.8249 737794.0014 REDLAWADA+GOTLAKONDA 0.0080 4.62J$ 103538.7515 BURUSUMADLA 40.0041 1245074.6516 CHINTHANEKKONDA 167.4751 6783632.7517 CHINNAMUPPARAM - 0.0000 12.9625 519422.0018 CHENNARAOPET 20.7500 604288.0019 VEMNOOR 0.0000 14.1751 549364.0020 CHANDRAGONDA 0.0000 48.8253 1937769.4521 RAMANJAPUR 0-0000 2.6000 910X0.0022 REDLAWADA 0.0000 159.1602 6281451.4523 PARVATHAGIRI 31.4915 1189133.7524 RAJUKOTHAPALLI 0.0000 14.8000 681402.0025 METHRAJPALLI 0.0000 22.5562 791059.5026 VENKATAPUR 0.3000 23.1750 760659.0027 THOPANPALLI 0.0000 17.1375 711345.5028 ERRA8ELLIGUDEN 0.0800 4.8125 194375.0029 MAnANTHURTHY 0 10.3205 280845.003" KORUKONDAPALLI Z1 S.1580 635389.0031 RAVIRALA 0 0800 1.5750 125375.0032 GOTLhAKONDA 0.8008 26.2563 946213.2533 NAINALA __ 2,2S@= .^ 265214-49. 00-34 JALPuR 67352.0036 KALLEDA 56. e 33 2075535.5037 SOLI TONDA ,2iA 432% 7 £5.1938 BERIWADA 1099535.7539 ALAMKHANIPET 0.00o0 31 .9187 1117359.0040 lNUGUR THI It,' . 90.3765 3112997.5041 NELLIKODUR 0.0000 88.1627 2979635.5042 UPPARAPALLI 0.0000 16.9250 692115.0043 KESAMUDRAM 0.w0000 65.2437 1857157.2544 DHANSARI 0.0000 14.3750 574769.5045 ENUGAL 0.0000 0.5749 22637.00

Page 125: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

99

Arknexure X 'Cmoti. .

(Area -in Acres)

Si. ~~~~~~~~Laind Acquired compensation~no .*- -- - - - - - -

Reachi/Village Wet Dry Rs.

46 MIATHOODPATNAMr 0.00 130.0751 4108917,0047 K(ThATIPALLI 0.00 34.9376 1357042.5048 KONKAPAKA 85. 4375 3172386.149 EDULAPUSAPALLY 0.20 25.73S31 1049841.00503 NELLIKODUR-4RAVIRALA 0.00 5.3750 1121539.00

Sub-Total 5.6125 1996.1.817 73641230.49

Page 126: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

100

Annexure X Contd..

(Area in Acres)

SI. Lanfd Acquired Comi ati t.n

no.Reach/Village Wet Dry Rs.

MAIN CANAL

1. GOPANPALLI 1.8500 17.6250 8025839.002. SANGAM 1.2500 4.7875 204678.953. M'ATWADA 0.0000 2.0813 191712.254. KATRIAL 2.3750 59.3564 2084415.055. ILLANDA . 0000 41.3499 i936100.006. UPPARAPALLY 1.1750 5.2750 345843.00

Sub-Total 6.6500 130.4751 5565333.25

Page 127: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

101I

AMMI nA PRADESH IRRIGATION PROJECT - IIISRI RANA SAGAR PROJECT

DVISTRIBUTORYWISE AND VILLAGEWISE LAND ACOUIRED FORCAN~AL INFRASTRUCTURE DtYELOPNENT LINDER 5SRSP IN WARANGAL DISTRICT

'kArea in Acres)

SI .no Reach/VilIa9e Patta Covt Forest TotalI Net % to total

Lanud K,nd Land Area Soc,wnr Land

NOGULLAP AL LY

1. Ranqapur 29.85 1.65 0.00 22.58 1314.88 1.712. Ankushapur 1.78 M.3 MO1 1.81 943.01 1.193. Madarametla 16.14 8.88 8.1 17.31 1042.11 1.664.. issipet 39.13 28.28 8.00, 67.41 953.81 7.875. Mogul1apa1ily 34.65 8.88 1.18 34.73 1845.08 1.88

PARKAL

1. Sarvapoor 16.35 4.48 .1.0 20.83 425.00 4.892. Koukonda 19.23 0.8 18.18 19.23 794.8 2.413. Vellampally 40.18 3.38 8.88 43.55 1157.10 3.754. Kantathmakur 12.15 7.61 8.1 2i.11 1942.88 1.845. -harmarar, 19.23 4.56 8.88 23.78 622.01 3.836. Rajipet 4.21 Z.00 1.88 4.21 488.80 1.877. Madaram 7.81 8.88 0.88 7.81 1219.88 0.638. Parkal 2.23 0.38 8.8 2.53 1619.10 1,159. Mallakpet 748 1.31 0,08 8.71 923.88 8.9418. NaAam, 1 915 1.41 8.88 11.35 1185.11 1.9611, Nadikuda 1848, 24.90 8.88 43.38 1551.11 2.79

311 8.88 65. 71 1981.911 33I.11 1.11 16.88 1218.01 1.39

31 2.18 1.11 26.38 933.11 2.8328 ~~. ii~. 8 11.78 2819.00 1.53

-. i.88l J 1572. 1 2.11: I .1 36.98 968.88 3.82

V e nr -9.ii t. i.88 47.11 869.01 5.41ng~~~~ 83 .81 11.53 864.8 1 .33

DBM-37

ATNA KU R

rnu 1 y aIDa 0.8 18 .88 8.88r', a I 4.85 8A18 8.88 4.85 1198.11 8.84

~n or 6.23 8.8 8.880, 6.23

Page 128: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

102 Annexure Contd.

(Area in ACreF)

Si,no Reach/Vii1gae Ratta 65Vt Forest otal Net tot totalLand Land Land Area Sown Land

2. AqrahampaMain 118.95 O 2 0 .0 86 I&.95 789.60 3.45Minor 9.28 0.00 0,90 9.28

3. ChoutapalMain 13.35 D.00 0.00 13.35 968.t 1.95Minor 5.48 0.00 G.D0 5.48

4. Kamaram Main 9.55 0.G0 U. H 9.55 712.06 1.79Minor 3.18 0.00 0.B9 3.18

5. Peddapur Minor 29.89 0.00 L.60 29.89 3'49.00 a.89

DBM-38

DUGGONDI

1 MallampalMain 34.55 1.18 0.00 35.73 2120.00 3.72Distributo 43.08 5.61 8.60 43.08

NALLABELLY

1 NallabellMain 56.25 1.95 0.90 58.20 i542.00 4.27Distributo 7.55 0.63 L.10 7.58

2 ShaniqaraMain 23.43 D.00 0.0v 23.43 1093.i1 2.703 RamatheerMain 23.43 0.60 I.I0 23.43 39l.00 6.50

Distributo 1.93 O.00 2.02 1.934 ArshanpalMain 30.63 7.75 0.00 38.38 898.00 4.99

Distributo 6.43 0.00 G.0v 3.43

NULUG

I Malla2pally 188.72 6.43 0.00 195.13 65570.00 0.29

NMLLABELLY

1 Lakrepally [email protected] 0.U9 I0 10,9° 908.0D 1.21

DU0GGODI

1 Mudhunur i9.1k G U0.00 19.10 247G.0D G.772 Duqsondi 3.08 .6ii U.0. 3.38 2260.00 0.155

MLLBELL!

1 Muchempally 28.80 w 010 0. S 28.80 950.013 3. V32 Ranaqapur 15.98 L.H0 0.0v 15.98 74I.08 2.13 Relakunta 12.85 0.v8 0.00 12.85 1285.0D i.6i4 Nandiqama(Haulet) 11.50 I.i3 0.00 10.50 NA ZI~00

GEESlSONDA

1 Manusonda 84.25 0.0D 0.00 84.25 12i7.8i

Page 129: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

03 'Arinexure Contd..-Area in Acres)

SI.no Reach/ViIIage Patta 6t fzrest .otal Net S to tota'Land Land Land Area Sown Land

2Nachanapally 8.90 Mell 88.93 Ramachandrapuram 26.53 0.d0 1.01 26.534 Elukurthy 48.55 it-, 0l,00 48.555 Nachanapally 38.10 I.00 0,09 38.10

PARKAL A REBELLY

1 Venkatapur 45.44 0.00 1.00 45.44 8693.0 5.23

DUGGONDI

1 Mallampally 18.85 g0. f.j 18.85 798.00 0.27

GEESU6@NQA

1 £Ikurthy 83.99 f.90 KOO 83.99 1397.00 6.012 Elukurthy X Manugon 31.81 0.0D 00 31.81 f.00 .63 Geesuqonda 43.55 0.90 e 9! 43z55 1615.09 2.69

DUGGONDI

1 Duqgondi 39.61 0.00 O.0 39.61 2260.00 1.752 Rebelly 12.33 1.11 D.H0 10.33 2290.0D 0.45

ATNAKUR

1 Neerukulla 43.06 1.U0 0.00 43.06 714. 6.03

PARKAL

1 Laxuipur 41.79 39U 2.99 41.711 864.t 4.83

DUGGONDI

* 1 Monauadapur 5.v. i. pi SS j i . 3071.09

6EESU6ONDA

I NachThapalYyl 5' '3 <"' @ 6i8,73 'i4 . l 62 Xcshavapcc' >.A6 *.80 MC 26.46 542. 4 4.883 Madnoor U51h 8.0 07 VI 1 L.50 I3058.D0 0.1i

.4 Ramavaram V- 0 .0i 6.65 59g0 1.155 Timapet 9>. .0 0I.0 i 19.35 i860.@ 1.04

Page 130: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

2104 Amnexure Ctd..

iArea in Acres)

SI.no Reach/VilIage Patta Govt Forest Total Net tB to totalLand Land Land Area Sown Land

-NLLABELLY

1 Narrakkapet 10.59 3.30 3.30 10.59 805.00 1.3?

NARSANPET

1 Benjipet 31.27 3.00 3.30 31.27 2172.91 1.442 Chendurqonda 1.25 3.31 0.01 1.25 612.MA 0.233 Madhavapet 28.D0 0.D0 3.33 28.30 1704.01 1.64

DUGGONDI

1 Ranqapur 22.28 1.48 13.0 22.76 1201.J3 1.89

1 Ko.atipalli 0.99 0.31 130.50 68.81 1607.06 4.28

REGONDA

i Regonda 57.51 3.33 3.33 57.51 1167.00 4.932 Kanaparthy 8.55 0.111 .19 8.55 1514.33 3.563 Repaka 21.35 3.03 3.03 23.35 964.08 2.11

CHITYAL

1 Jookal 23.91 3.33 0.80 23.91 1595.00 1.492 Thirumalapur 24.44 3.31 1.08 24.44 1639.33 1.493 Kailapur 24.01 0.00 0.00 24.01 1307.00 1.844 Nawabpet 18.26 0.W3 0.03 18.26 2454.00 3.745 Raiakrishnapura4 2.38 3.30 3.3A 2.38 497.10 1.486 Tekuaatla 15.99 i.30 0.f0 15.99 2322.3N 0.797 Panqidipally 9.26 3.13 3.30 9.26 484.1 1.918 Veichal 5.93 0.W 1.1 5.9^ 1679.33I E.

9 Ankushapur 3.14 3.3 1. 0I. 5, 4 9.13 It 1

REGOMA

inLila Ia 1.83 3.,1 8,38 1.83

DUGGONDI

I. Chalparthy 14.71 D.55 3.00 15.25 836.80 1.822. Nadirauandapally 8.43 1.60 3.56 8.43 230.03 6.71

,3. Nandapally 6.10 03.83 3.,0 6.13 948.0 03.64&EESGONDA

1. Ookal 59.53 3.9f 0.80 63.43 &51.1,4J 7.45

Page 131: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

hnnexuwae Lotd..

Si.no Reach/Village Patta &ovt Forest Total Net 3 to totalLand Land Land Area Sown ar,

NARSAMPET

1. Laknepally 36.69 2.88 3.00 39.56 1474.00 2.682. ,aheshwarat 12.55 4.54 .l00 17.09 1°55.01 @.873. Ramavaras 8.71 O.U 2.28 8.72 58A.1SU 1.51

NEKKONDA

1. Deekshakunta 31.68 @.U0 8.20 31.68 1420.08 2.23

SANGAN

1. Chintapal,i 18.64 8.2 0,.01 18.64 1531.01 1.222. Nondrai 75.36 1.93 0.10 77.28 1191.B0 7.183. Nallabelly 35.88 1.75 1.22 37.63 872;20 4.324. Narlavai 51.81 3.93 1.00 55.74 555.31 11.l45. Pallariguda 55.51 2.U1 0.P0 55.51 983.80 5.656. Shayaupet 34.95 11.73 3.02 46.68 906.06 5.15

CHONARAOPET

1. Lingapur 32.21 3.14 8.28 35.34 737.81 4.792.- Upparapalli 71.42 1.90 1.06 71.42 1917.21 53. Kouapur 86.26 0.22 2.82 86.26 3887.88 2.274. Ameenabad 181.62 25.41 3.20 207.03 5199.09 3.985. Mumiadivara. 2.65 0.00 0.00 2.65 337.00, 0.796. nudigonda 5.03 2.00 I.00 5.03 N.A.

DUGGONDI

1.. Rar.iSapur ~ 2.2v .46 ;,0 ;2 _7 :t

CtHEKNMRAOPET'

2. kkalR -I I .`

4. Chennaraopet 1-6 8& i9.14 i E 3. OS5. Deekshakunta E6 , 02 I ,i6. Jally 2,4. 1 6.- c i. 11 , 3,07. Papipe: .80 ,> 8 17, 6.60 ; : 7& . 6a jb laqattrj 1.4 X5 1?3.4 i t Ji ;'. a ara 12.43 4.0 . .

1 0;. Th imurainia7 15:1 i,04 r ' '.

12. L 5in;3.5 in3 07- L.`,

Page 132: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

106 i

Sl.no Reach/Villaqe Patta Govt Forest ?ot J Net - to tottal

Land Land Land Arta Sown

13. Madanapur 0.63 l.18 .68 1.80 - E4 --14. Sukpally O.E2 1.55 d.SI 1.595 J 12?8.1 Oi3

GUDUR

1. Rajampalli 5.89 4.1 `. 00 14002. Ponugodu 24.84 4.81 0.00 29.65 i424.800 1l3. Gundenga 43.08 27.59 8.88 "I 60 1.6 I 8 gs6.8 4. Theeqalaveni 33.31 0.96 i.61 34.26 4c$E

KESAMUDRA

1. Inpanpally 0.98 1.73 U.P8 2.6S3 480 .8 e.t 2. Katnepally 1.88 1.56 8.80 -i.5 .'94.00 i8V

Reserved ForestNayakanpaliy - - 122.70 i22 'i"

Dl8-48

KESAMDRA

i Beriwada 30.61 8.29 8.88. 3.229 621.60 4.512 Dhansari 13.85 29.75 78.20 111.26 1182.11 8.$i3 Kalvala 0.21 4.80 0.6e 4f21 i33 3. D.374 Kesa.udrau 23.45 17.18 0.06 48.63 2396.8U 1.695 Komatipally 28.25 8.15 0.0d 36.48 1789.88 2.-36 Mahuoodpatnas 98.49 61.44 0.00 159.93 1623.8t 9.8b7 Penuqonda 31.21 13.46 0.00 44.68 4,.8fi 43.88 Upparapally 17.00 0.2b 0.90 17.23 ii64.8 W29 Ranqapur 2.35 1.75 8.A C 4. 591t8 I9t12 Thalaposapally 12.25 8.68 6.00 28.33 22321.1 i.9111 Intikanne 13.26 1.83 0.00 15.09 4.f8t 1.0512 Inuqurthy 59.71 38.11 41.08 117.37 Si2 9A 3.6213 Korukondapally 23.13 8.28 U.80 31.40 b :ii 2.15

MHtOU8A8AD 1

1 Edulapusapally 25.83 4.15 25.00 36.89 , 0 1.632 Vemnoor 3i.1b 4.08 0.00 35.3 I 9 2 . 0 2963 Lakshmipur 2.43 0 L0 0.00 2.43 1 .2i iN8 8.15

NEKKONDA

1 Alaikhanipet 29.75 6.00 0.00 35.43 23., 0 35.72 Appalraopet 32.68 i.68 M.g 32.638 IZ:78 i 7i3 Bollikonda 113.06 0.00 0.00 113.06 613.88 :

4 Chandruqonda 47.36 1.00 0.6$ 4BE.2 1468 . . 1

Page 133: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

Annexure Contd..(Area in Acres)

SL.no . Reach/Villaqe Patta GoYt Forest Total Net t to total1 and Land Land Area Sown Land

S China Nekkond 28.3O 1.00 U.00 29.61 1394.00 4,456 Gotlakonda 45.63 11.32 3.33 57.61 868.33 6.64I Gundrapally 21.2t l .0D 0.0D 21.21 1323.33 1.618 Peddakarpola 2151 2.33 3.23 23.84 1477.60 1.619 Redlawada 113.16 0.33 0.00 174.09 2289.02 7.6110 Thopanpally 17,74 2.311 3.3 23.29 748.30 2.71.11 Venkatapur 23,33 8.33 3.33 32.31 1663.33 1.9412 Pathipaka )8.36 11.0 3.30 18.@6 848.33 2.1313 Chintanekkonda 17?.Y 2.00 d.00 179.69 2364.03 8.71

NELLIKODUP

C1iinanagarvi iC59 8.00 1.0i 52.74 2163.06 2.442 China.upparam 1.6.il 3.E0 0.00 19.29 4662.00 h.413 Kachikal 25.63 o.ao 0.30 25.73 1757.00 1.464 Madanthurthy 11,91 I.U3 3.33 13.91 1148.03 1.215 Hethrajpally 02.28 18.00 3.33 40.88 648.10 6.316 Nainala 66.71 22.s1 2.00 88.93 4327.00 2.067 Nellikodur 72.71 3.01 0.01 76.43 4514.33 1.698 Rajulakothapal)y 15,8 .33 0.01T 16.24 3245.03 3.509 Raiaanjpur 2.55 3.3D 8.60 2.55 421.33 8.61

10 Ravirala 3,75 3.11 1.30 3.75 1337.3U 0.3611 Yerrabelligudea 13Ai8 3.33 3.33 13.88 3693.03 3.38

PARVATHAGIR!

I Burugiadla 37.21 0.23 6.@0 37.44 1668.00 2.242 Choutapally 121.31 2.91 0.00 123.91 2572.30 4.823 Enugal 97.84 0.15 O.03 97.99 3335.00 2.944 Jamal our 1.53 i.31 3.33 1.53 1943.33 3.36S Xafleda 39354 3.38 0.30 39.61 1736.00 2.286 Konkap3ka 54.88 8.11 1.00 62.99 733.EO 8.597 Prvatuagiri 47,76 4,28 6.EO 51.99 2037.33 2.55

B Sonara~20.89 3.65 0.00 21.54 1943.63 1,11

9464k4APET

1 el, a,I, lb?8114, 7 .33 3.3 14.93 5318.30 3.282 I. 13.33 3.33 3.03 16.83 1807.71 3.933. livU,ar" i y 7.18. 0.013 3.60 11.43 1723.25 3.66

PP4WTh,AS,3 I

.. Gop i 1iEil 1i3.33 3.03 2S.13 578.00 4.352. Sh a,r, .t IS 0.33 3.3 13.35 877.00 1.15

Page 134: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

108 ~~~~~~~~Amnexure Contd..

(Area in Acres)

SEo Reach/Viliage patta Govt Forest Totai Net I~ to totalLand Land Lanid Area Sown Land

1, Shavadpet 65.55 29.38 I.9I 94.63 916.99 10.33

SAKMA

S;r,Qam 4,81 0.32 S.00 5.61 2537.U 1.222. Thimrappur 5.88 S.10 LSS 5.88 497.J0 1.18> rheeararjupally v.51 S.I 01 0.51 166U.0 1.J3

Page 135: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

Annexure XIANDHRA PRADESH IRRIGATION PROJECT - III

SRI PAKA SASAR PRSJECT

UNIT COSTS PROPOSED ASSET BASED HOUSEHOLD SCHEMES

Si. ltem Unit Costno. iRs.i

(A) Dairy Developmenti) 2 CBS Yieldinq 6 litres 11890

- do - (with shed) 1383tiil 2 CBS Yieldinq & litres 15~00

- do - (with shed) 170E2iii) 2 CBS Yieldinq A litres 19I9

- do - (with shed) 211162 i) 2 CM8sYierdinq 6 litres 129f?

I - do - (with shed) 14950ii) 2 CMBs Yieldinq 8 litres 150RLi

- do - (with shed) 179W3. CBC female calf/heifer rearing Q004. GMB female calf/heifer rearinq 45lE

(6) Sheep Rearing (2q i1)

1. Nellore breeda)14250b)165306)17260

2. Deccani/Bellari breeda)1185Sb)14251c)14950

(C) Sheep Breedinq-Cum-RaiaLarb Rearinq(254i)1. Neilore breed

a )20450b )2140K

2. Deccania ji76,50b)iSt;89

(D) Goat Rearinq (20+1)

i. Slack Bcn TaUniam2. BsTanaria/z ckvani 12Si.:3. Barc,ari/Yskhhavna I 5kIifij

Page 136: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

Annexure Xi Contd..

Sl. Ite. Ur,it Costno. , R.s.)

(E) Poultry Development

.1 1000 birds layer unit(DL) 2020002, lil birds layer unit(CS) 1 65S03. 101 birds broiler unit per weekin DIS ii 83&5

(weekly roataion system)

ii) 78106-All-in-API-out systemj

(F) Piqqery fatteninq scheme

1. 10 Exotic #eaners 350

2. 10 Cross breed weaners 41f3. 20 Cross breed woaners 66A04. Unit of 3 Sows 8050

(1)

(A) -- =?Plouqh Bullocks (one pair;

1. Non-descript (medium) 454002. Onqole breed 500

(C) Pneumatic Type carts

1. Dunlop (Capacity 3 VI) 99002. Dunlop (Capacity 2; TI 70003. Other than Dunlop(3 ST) 8004. Other than Dunlop (2 NT) 600H

(D) Bullocks (one pair) with cart

Non-descript bullocks withconventional cart 87 0

Onoic bulloks with conventionalcart 920i0

Page 137: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

ill

Annexure Xi Contd._

Sl. Item Unit CoK

3. Fish t'ets 10-000

(A) KVIC MODEL2Cum 75fftK

4Cum6Cum i"Wo6Cum 14000

1SCuu 16400

(B) JANATA MODEL2Cuu 48R3Cu. 57754Cum 641 06Cuu 77s

(C) DEENA-BANDHU MODELlum 2781Zcua - ------ 3785RCum 4454Cux 56f06Cum 7305

Pumpsets

1. 3 HP-DMPS 162BB2. 5 HP-ENPS 126003. SHP-HSD OEPS 131804. Submersible Pumpset(5HP) 264B05. 3 HP Petrol Start Kerosene i1B6. 2 HP Petrol start kerosene

operated handpuc -s 88fd7. Hand Sprayero 6H-95Z5

(A) Citrus(Acid lime sweet orqanqge) iF 7: ?1(one acre)Aspaciiiq 21X 21 &No. of plants per acre:iHj"

(B) Coconut (orne ac,e; '750!no. ofpTnts-tSpacinsq27' X 27

(D) Cashew ione acre) 5 ie(Spacinq:23' X 23' No. of plants-3i8i

Page 138: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

Annexure XI Contd..

Si. Ite Un,t Costno. (Ps.)

(F) tlanqo (one acre):without iniercop T fencing(Spacinq:33' X 33' N. of plants-4)}

- Cuava (one acre) 54Hwithout intercrop & fencing(spacing 21t X 21' No. of plants-10)

(i) Sapota (one acre) 450without intercrop & fencing(spacing 25'x 25'No. of plants-7H)

(K) Jaseine (one acre) 136(spacing 5' x 5' No. of plants-1750)

(N0 vM) ~ Poneranate (one acrc)(spacinq 14' x 14' No. of plants-22J) 18401

(0; ; iO) Ber cultivation (one acre)(spacinq 2l x 21? No. of plants-100)

.0 -P; Sericulture(one acre mulberry) 19S@

(R) Jatrepha 4075

.. (i S) 0Oyster Mushroom Cultivaiion MR,

(T) Nursery for Ornamental Plants(one acre) 370H

Page 139: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

113

Annexure XI Contd..

UNIT COST FOR DIFFERENT PLANTATION/HORTICULTURAL CROPS PER ACRE

Sl.H. Crop Total

1. Coconut 9750Jasmine 13506

-3. Gauva 65904. Rose 276555. Sapota 56d06. Mango 82507. Cashew 3v008. Ber 5in9. Seedless Grape 90000

1I. Seeded Grape 770d0ii. Posegranate 1040012. Kundru (Coccinica Indica) 277WW13. Citrus x "14. Pepper (251 standards)

in coffee Plantation 30015. Oil Palm 380@16. Coffee 25017. Citronella 462518. Lemon Grass 400019. Geranium 1375020. Palmarosa 662521. Japanese Nint son22. Bee keepinq 1023. Sericulture 1983524. Tobacco Barn(16T X 16') -25. Minor Forest Produce(one ha)

Page 140: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

P.

App,endix XII

MMOf~ PRADESH IRRIGATION PROJECT IIISRI RA" SAGAR PROJECT

PROJECT AFFECTED PERSO ECONOIC REAILITATION PROGAI (PAPERP)REAHWISE ACTION PKM

(Amout in Rupees)

Reach ---- 1i,n-t en"ar, e Ctl H`ous-inrtq ---Bel]o,w, PJo,ve ---T,otal -Ot,he-r E-conm-ic- PrdcieAsset TRYSEM Grand TotalAllowance Mlainte- Grant Poverty Poverty Assistance

nance Line Line-- - - - - - - -- - - - - - - - - - - - - - -- - - - - --- - - - - - -AllIowance Chulla DWCRA Grant Loan Grant Loan Grant Loan

D8t4-31 13~~5~2 'i -,'i - -22i 49 i743W 4'130"N, 4-3-2- N- M 2950,50 493-509, ~ 6~7f 3,975,6-DBM-37 2250RM o 6 44 59 3909 720~ 6810 84165~ 420~ 8400 1049,00 9256trDB438 13185N ~ ~ 121 172 293 1750~ 439M 42M~ 16881M2 318M 633603 645~398 23241w

DBM-40 133233. 0 28O33 87 2~9 29,6 177600 383w0 388RSU 495535~ 258MM 516wf 6~586W1 5471350[06-48 265i~5N ~ ~ 238 351 589 353400 867M 8864ff 697815~ 38702 774WO l31219MY 77521S9MAIN CAMk 2745Si 0 ~ 19 42 61 366w0 870M 928HE 298651 63~RM 1260OS 138910O0 424651AYACUT ROADS 37600§ ~ ~ 29 29 174w0 44LM 13MS 10179~ 570N 114wM 6249N 215790

T-ot 7l18,1,5- 238 f N 5 7 103,8 -1-608 96D3 i2941k 23 78'487'4w0 1~6230O 3240M2 3YS4K 3, 4

Page 141: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

Arimxure - XIIMDHRA PRADESH1 IRRIGATION PROJECI - III

SRI RN~ SKAG PROJECT

CANk ItFRASTRtICTURE: DW4-31VILLAGE ACTION KMN

me of the Name of the below Above Pro6uctive Asset Othe-r Economic TRYSEM llosinq Maintenance C1attle Mainte- Granid Itoidr&dl Vjllawe Poverty Poverty -------- - ------ Assistance Alliowance nance AllIowan,ce

ine Line Niuaibcr- Grant Loar --------- -------- - - ----------Chu1la VWC1A M!umber Granit Loan Ncmber Granit NLuMbCr Gr-ant Ncnber Grant G r ant LoaIn

MAKU AIbIAKUR 0 8 1AA 111280 36550 4 SO 903 5 1500 3000 0 0 3 36008, 8 03 169 66558LADELLA 2 7 18s 144000 2.6350 5430 12808o 4 1200 2400 0 0 9 40580 3 8 213 30 `1 5330AJSk1APALLI 1 1 3 248800 76N0 12N0 30N0 I 0 i 0 0 2 9030 0 8 :372031 7600KEMROYLA 8 3 214000, 4800 1O 2000 1 3088 6000 0 8 3 135080 8 8 44388 385A03lMOURGiNA 8 3 7 56000 15800 1830 50NO 3 0 1800 0 0 3 13500 0 0 853UP0 3.34,10

'ESGOA GEESGONDA 4 4 15 120000 29,350 4800 1400 7 21000 42W0 0 VI 8 36080 8 0 19539 710 ?i 'LlW10~PTHY 1AGANPARTHY 4 3 12 96300 29500 42N0 100302 60 20 35803 178 10

KISHAVPUR i 8 1414080 37250 4888 14088 9 27000 5,4000 0 0 8 36000o 0 0 2258805 91 2) 8MKILARC3DIP&Lt 1 7 56000 7750 24N0 5330 0 0 I 0 0 4 18880 8 0 814 HZ 7 7350 ,IC$iRLA I 4 32008 11950 1500 43333 1 380 000 0 3 3 13580 0 0 6433al J2P NAGARAM 8 1 880 3950 680 13008 0 8 8 0 1 4500 0 3 14{I PANBART!ll 1 1 3 2 4808ll 775o 128 288I 3800 6301I 0 0 2 9000 VI 8 1 3926-,I

SIDDArVk ~ 2 2 6 48080 149N0 2400 4003 1 300 68 0 0 4 1303 0 3 75400 UtLAPALLY AKNEPNLLY 3 13 32 25,6808 57950 968 23380 2 6380 1200 0 8 16 72000 3 8 ?1~1(6E00

KTIPALLY 2 3 5 64308 23450 38309 600 2J30 100 220 0 1139 3M1GULAPALLY 2 4 1l3 V 01 0480 12700 3680 wu0 4 12000 24000 8 0 6 27008 8l 0 3500 3167`7

RiLXAPALLY 0 I 1 800 395tpe M 1000 0 0 0 0 8 4500 8v 0 1,438 33958PARLAPAML I I 1 380 000 IO 688 0 0 8 0 0 0 1 4500 8 8 33I12 0 I P0PIDWAONPALL I 0 1 1 9880 3800 630 18'0 0 0 0 0 1 4500 31 8 141 3 6: 10128PIDICILLA 1 14 32 256080 130250 9000 215883 7 21030V 12000 8 0 15 675800 0 31l 3 738 17225POTHJG i 4 7 5600NO 15980 3380 5083o 1 3033 6080 0 0 5 22533 0 3 89U,89 715RANGAPOR 3 2 7 6008 15650 3833 5030 2 6000 12000 01 0 5 225 0 0 0 0l 9,25 00 27

PKkL DiERAPALLY 0 9 15 12308,0 2199~20 5400 1280 8 243080 48008 0 3 9 40530o 3 8) 20~ 1 0 0 2-67953"rJ0TAPPART1!Y 0, 32 24 1978108 47350 7280 28000 8 24000 4818370 8 0 12 SUM 8 297200 25350

8 4 ~~~6 48888 18388 2408. Z000 2 60609 1280j 8 0 4 MO00 0 8 79~ t~0 I6, 38…~~~~~~~~~~~~------ --- ----- ---- I-,- ------ - .- --- -- - ------ --- -- -- - -- -

Page 142: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

Appendix XII Contd.,

of the Nla,;o of the Below Above Productive Asset Other Economic TRYSEM Housing Maintenance Cattle Mainte- Grand Ttoaljai Villaqe Povertv Povcrtv - Assistance Allowance nance Allowance

Line Line Number Grant Loan ------------------ ----------------- ----- ------------ ---------------- ---------------------------------Chulla DWCRA Number Grant Loan NRnber Grant Number Grant Number Grant Grant Loan

~AL LHLAXMIR 6 8 36 288M 227852 8411 242N 13 39122 781 I 6 14 63066 0 0 4224N 3E255W RM 3 19 46 36822 1419N 132N 42ND 10 30101 6222 0 0 22 9900 0 0 552221 20191HNLAKPET 1 4 6 48ON 1972S 31 721 2 61 122 2 0 5 225N 6 0 8650D 22922NADIKiJDI 2 1 27 2161 66451 7212 21202 6 18022 3622 0 2 12 542N 2 0 3162'00 i02450POCHARM+KA1hREDDY 1 6 19 33450 42N 512 5 151 3 S 6 0 7 3152 0 0 i35700 63459PiL16LlA 1 4 12 96 3962 3220 7222 3 9020 182N I 0 5 225M! 2 0 137 57600RAIPARTHY 9 12 .39 31201 26489 12622 26009 20 62N2 1222 2 2 21 9452 6 0 I551N 384850RAJIPET 1 1 4 3202 I1 12N 102 1 32N 622 0 0 2 902 0 0 4620D 16830SARVPOOR 6 6 11 882N 26075 36N 1222 3 91118 N I 2 6 272 2 0 1376 2227875VELLtI'ALLY 5 17 38 342 6'31250 132M 2522 1.7 512 19220 0 2 2,2 99O12 0 l 92228 733254l,VE{ATAPUR 3 5 15 12N28 53N1 481 12101 6 18i 35MM 2 0 8 36P22 2 2 1909i 'im 2-

PET GATLAKANAPRIHY 0 7 11 8820 178 1 4200 9200 2 6R2N 12204 0 0 7 31i50 0 2 :32010 296M2KOTHAGATIU 1 1 4 322N 71/5 12N 42N 0 i 0 0 2 9222 8 0 4620i 7750KOIH GATTU, iNl6ARPA 2 l 3 24720 7751 1211 322 02 0 0 0 2 %028 0 0 37222 7BMKLARAN 2 2 4 32021 182511 24N 4N22 0 I 2 0 4 1800D 0 0 5642i 2.9SHYAMPET 4 5 J6 12280F 59300 5400 J6000 7 2i606 4M2O0 0 0 9 405@0 0 0 212920 131103

S'k-Total 70 220 541 4320202 2985052 174000 413CDR 165 49518 992000 0 0 290 13052000 0 2, 67D7D00 39750520……… --*. -. …………………………….--- -- -- ------- - - - - - --------------- ----------------------- ----- _ --. '- ------- ^ ^ ^ ^-^-^

Page 143: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

Ci IFRWTIEM: DeN37VILLM~~~~~~~ ACTI~~~~~~J4 ~~~~~ ppJendiix Xii Contd..

Name of the Name of the Bel ow Aboye Productive Asset Other Economic TRYSEM Housing Maintenance Cattle Mainte- Grand TtoalManal vi'llaqe Poverty Poverty ------- ~------------------ Assistance AllIowanc nance AllIowance

Line Line Number Grant Loan … …-- - -…--------- ------------- --------- --------- -------------------Chulla DKICR Ikaer Grant Loan Numer Grant Number Grant Numbr Grant Grant Loan

AThAKLR AGRNMAAD 2 5 15 12M 175N 421W 12NM 5 15M 0 7 315N 0 0182700 475MMUSHAPALLI 4 >6 48M 58K 24K0 5~11 I I I 5 4 I8K5 S 73490 58K

p "OA CHOUTAPARTHY 1 3 24N251955 1855 202 1 3105 605 5 5 3 13552 5 544325255521KrM WA~NNAT 3 119%NK 82 1852 75K 5 5 3 1352 2 S1183K 892

KANAPARTIH~ 5 1296525 27255 30251INN 4 1222 2422 I 2 5 225N2 I 2143522 51252KANAPARTHYADAMMANN 2 1 216IK 3952 625 222N 2 62521222 2 2 1 45N I I 291N 1595AREGCNA 2 25 35 2825257587N 1625534525 2 62521212 I 2 27 121525 2 24577N27 72752'

Sub-Total 6 44 85 6 841652 3222 7222 14 42K '8412 a 2 55 225252 I 1 154922 925652

---- --- --- ---- --- --- ---- --- --- --- -- - --- --- ---- --- --- ---- --- -- --- --- --- --- ---- - - -- --- --- --- -- ---- --- --- --- --- --- ---- --- --- ---

Page 144: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

CMN. I1FRS1ILJI: DUN-38VILAhE NTIG PLMN

Appendix XII Contd..

Name of the Name of the Bel ow Above Pr6ductive Asset Other Economaic TRYSEM Housing Mainteranxe Cattle Mainte- Grand TtoalMandal village Poverty Poverty-----------------Assistarce All1owanc namce Allowanue

Line Line Number Grant Loan - - - - ------ ……-------- ------------- --- - -- --------- -------- -- …

Chulla DWCRA bMber Grant Loan Niaber Grant Wuber Grant NAer Grant Grant Loan

ATMAKUR NEERtilLA U 5 13 1043 32858- 318 911 3 91881801 I a 5 22511 U 81475N8HilTYAL JO1(Ak 1 4 >11 8811 25711 3111 1111 2 6888 218 U U 5 22511 U 8 129588 3771WUGONOI CHALPARTHY 2 18 14411N 33151 6111 1588 5 1581 3111 I I 18 4511 I U 22501 63151

DUGNI 4 3 9 72111215951 42N1 888 U I I I 8 7 31511 U 8115785 215958KESHAVR8 1 3 7 5611 146N8 2418 511 1 318 6M1 a U 4 1IB I 1 84418 2KO WPAKA 2 1 7 56118 881 1811 411 I I I I 8 3 13518 S 8 75388 88LAXO4IPURM 3 2 11 881 118N8 311 711 4 1211 2411 U U 5 225N1 U 8132511 34818MIADOOR 2 1 3 2488 3858 18N8 3111 U U U U 5 3 13511 U U 42388 3850MALLAMPkLLY 6 7 23 18481144588 78N1 2318 1 3M1 611 U U 13 58511 8 I276388 5U5U

*RWAPOOR 16 7 37 296018 11135 13888 29N1 4 12111 2481N U U 23 113510 U U 45431l 12435UIANAC1WALLE I 1 4 3281 IN1 612 388 1 311 6118 U U 1 4588 8 U 43181 711U

REBELLY 2 4 16 1238 28551 3688 123 8 243 48888 U U 6 27N11 U 8194618 68558TII*APET 1 2 6 4808 834 1881 5882 U U U U U 3 13151 U U 68311 88NVEWA1AUR U 2 5 4111 143 1288 4W1 4 129ll 2430 U U 2 911 U U 66208 38811

GTSWDA KAW)M)A U 1 2 1611 U 688 ION 1 3118 6818 U I 1 45N8 U U 25118 6814U.-U MLLA84kLY 4 6 17 136188 118318 608 15118 1 3118 6N88 I U 10 4511N U U 21518 114388

NkJN1,00,LY ARSAM'ALLY 5 2 17 13681 214858 42NU 1111 5 1588 3881 U U 7 315N8 I U 1977N8 234151LAKNEPALiY 7 8 27 21681 46751 901 2388 2 6088 1281 U I E 6758 U 8321511 58758NALLABELLY 18 14 54 43211 26581 19282 443N 21 6311 12681 U U 732 144181 1 U 70228 391811NARAKAPET 9 4 21 16 25851 7811 238O 3 9111183 U U .L 58511 U 8263388 43858RWNTIERTHAM U 4 5 4M 235N8 24N8 43 1 318 611 U U 4 1811 I I 6748N 295N8RELAXI4A 3 7 18 1443 36458 63 143 U U U U I 18 45181~ U 82890 36450SHMNIGARAM I 1 4 328N8 3958 12N8 1N 2 60123 I U 2 9188 U U 492N 15958

SAMPU BANIPE-T8 3 19 15208845651 6685 1388 1 388 688 U U 1.1 4951 8 8 2241N8 51651ITIKYADIPkLLY 18 11 37 29611 61851 12615 3201 1 3388 6611 U U 21 94518 U U 46811N 126851KAMERAPkLLY 4 16 32 25688124758 123 3118 51533888 I U 219 9 U 841WON1154751LAXHkALY 2 22 4 32188 6895 14481 340 7 21014218 U U 241181 1 8 4974N811l958Mt%"~RA 2 12 27 21681 5711 8418 2181 4 123 248 U U 14 63111 U 5321481 81811RAKAVARAN U 2 3 243 768N 1281 288 2 63N 1288 U U 2 911 U U 422N 196N1

Page 145: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

CNAL IRASTRUCTURE: D6N-38VILLAGE ACTION PLAN

Appendix XII Contd..

of the Name of the Below Above Productive Asset Other Economic TRYSEl Housinq Maintenance Cattle Mainte- Grand Tto3lII Villaqe Poverty Poverty ------------…------------- Assistance Allowance nance AlI owancL

Line line Mumber Grant Loan ------------------ --------------------- --------- - - - -

Ululla OWCRA Hber Srant Loa NUber Grant humber Grant Nkxbtr Grant Grant Loan------- ~------------ -- -- X-- --- # A.....~ w ... ~~~~A~ A.......... ------- .--- ~--- - - ..----------- -- -----.........---- ------ t--- -- ---- - -H----->-~------ ---.-----. ..-. 9---..

KANAPARIWY I it 19 1520 55201 66N 189 5 10 3MM 9 11 495U 0 0 2'Tl1F 85211NKANAPARTHY 1 2 7 560 90 1800 50M D 0 0 0 0 7 13i00T l 7630 W19,REGONDA 3 7 560T 11950 186 40 2 6m 12D00T 1 3 1350TI0 0 3i3D3i 2235K

. ~~~~- ---- ----- ----- -. ,1- .--- ----- ..........- . - -- ^---- ..... . ..---- . ------- ----- F--- ---- ------------------ ------- ............................................*~---^s~---~-~-P- -- --.---~-- ----~-h-A--

Sub-Total :q1 172 526 42 085N 1688100' 1758TI 4303N 106 3180T 636TI0 O 0 293 1318500 6I 6 945I3T1T 0321IT…-- ----- - ---- - - - - -…- - - - - --- - - - - - - - - - - - - - - - - - -- - --.--------- - -_- - -_- - - ----------- ---

I')Fo,

Page 146: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

CNNL IIRSITJCI1RE: D1)M4VILLYE ATION PLAN

Appedix XII Contd..

Name of the Name of the Bel&. Above IProductive Asset Other Economic IRYSEM Housing Maintenance Cattle Mainte- Grand Ttoallandal Vilaqe - Poverty Poverty …Assistance Allowance nance Allowae

Line Line Nuberr Grant Loan ------------------ ------------------------- ------------ --- -------------- ----------------------------------Chulla DWRA Kober Grant Loan hNier Grant Nsber Grant luer Grant Grant Loarn

- -. ---------- .. -- - -- -------------------------------------------- ------------------- ---- ---- --- ------ --------- ------- ---------------- - --- ---- -------- -- -----. -- --- ----------- - ---

iR.WAOPET AKKALCHED 0 5 9 72N0 3833 3006 6 2 6808 121 11 0 5 2253 0 0 195 5038AMENABAD 9 49 94 75231 468188 3483 7780 8 2431 4801 0 0 58 261N1 0 8 114883 508100KOA 9 18 41 328M 14453 162N 353 4 12008 2408 0 8 27 12153 8 8 51273 168LiGAPUR 0 1 1 838 7000 688 188 e 0 0 8 o 1 458 8 0 141N 788MiWAN I 0 } 88 78 68 1888 8 8 8 0 0 1 45a 0 8 14188 780

P,A1PAi 6 6 18 144888 5398 7288 1588 1 388 688 3 0 12 540 0 0 223285 9908,Hl{iRAINIPACU 8 1 1 8 39 68 131 I G I 0 1 450 8 0 141N 3958LPPARAPALLY 0 17 32 25688 154188 1028 2388 9 27888 54M I 0 17 76500 0 0 .39278 2813 YELLAIGUE 10 17 39 31201 586152 1628 33000 4 1288 2431 8 2 27 1215' 8 0 494700 530150 O

NDlx',M, CHLPARTIY 5 6 14 112888 567188 6608 9088 3 9888 1888 8 0 11 495' 0 0 186100 585110)0,DWIRANDAPALLY 3 2 6 488 188258 31 68 8 8 8 8 8 52 225N 0 0 7953 188 258MAOAPALY 3 3 9 72088 543188 3608 1888 4 1288 2431 0 8 6 27080 , 0 124688 567188RA, RCHAU 1 0 5 4888 3888 6 4810 4 123 2431 8 0 8 450 0 0 6118 2783

G£ESO CKAL 5 19 53 42480 78588 14488 3208 .21 63888 126888 O , 24 108,00 0 8 641488 204500G,DL GUKkWENGA 4 18 21 1I 445601 8488 2 6 2 680 12088 11488 14 13083 0 $ 29341 45769

PO?8JGOOU ~ 0 3 6 4808 1288 188 588 2 6088 1208 8 0 3 1353 l 0 7438 2483RAJAMPLLI I 1 2 168 395 68 28 D 0 O 0 0 1 45 0. 0 23108 395TE,EGALAVENI 1 1 2 168 78 128 28 0 0 0 8 8 2 9888 0 0 2823 788

SANGP CHINTAPALLI 2 6 12 9688 364N 488 188 4 312 2488 8 0 & 36NNt 8 158 684NLOHITHA 1 2 6 4 1788 188 68 3 988 1888 I 0 3 1358 0 0 8 738 3580mAI 18 21 59 4728 683458 2348 4731 5 1588 8 0 3917 550 8 73298 713458NALLABELLY , 4 5 48 28 2400 48 8 0 0 0 0 4 1800 0 0 644,8 28PALLARIG,A 7 15 39 31288 425158 13288 28888 8 24888 4888 1 148 22 998 0 0 504288 473150

IIAR 1 8 1 8181 178588 688 1888 I 0 0 I I 1 4588 0 1418 178588THIGARAJLPALLI 1 1 8 6480 3578 1288 4800 2 6881 1208 8 8 2 9888 D 842N 369000THIMAPUJR 8 1 1 8888 3958 688 1000 0 I 0 0 0 1 458 O 0 1418i8 39n

-~~~~~~~~~~~~~------ -- --- ----- ---------- - ------ ~------------------------- ----- ------------- -------- -- ------ -- --- --------- - .

Su-Total 87 289 485 388 4955358 177688 3838 86 258060 516088 2 28W8 296 13328 O 0 6886688 5471350- - ------- - - …- --- -------------- ------------ -- -------.----------------------------------------------------------

Page 147: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

CNK. IWMRAS TUREi: DN48VILLAGE ACTION PLAN

Ap~pendix xi mr..

NImw of the Name of the Bel ow Above ProWctive Asset Other Econmic TRYSEM Homsing Maintenance Cattle Mainte- Grand Ttoalmna V i 'Iaqc Poverty Poverty ------------------- Assistanc All1owanco nanxe Allowance

Line Line Number Grant Loan - -------------- ---- ---------- ---------------------

Chulla DWCRA Numbr Grant Loan NuWber Grant Mumber Grant W*aber Grant Grant Loa

H~ENNARADPETAKMEAO 2 7 22 17600033300 54N0 1500 2 60001200 0 0 9 40500 0 0 242900453N0JALLY 1 0 3 2400 700 600 200 2 60001200 0 0 1 4500 0 0 3710019800LINGJRU 0 4 7 5600 187N0 2400 6000 1 300 600 0 0 4 1800 0 0 85400 2470NTHIMMARAITNIPADU 1 3 5 4000 89550 2400 400 0 0 0 0 a 4 1800 0 0 64400 8055PPARA~PALLY 0 7 16 12800 3687N0 42001100 2 60001200 0 0 7 315N0 0 21870387

~A GO III CHALPARThiY 2 0 3 2400 10950 1200 1000 1 300 600 0 0 2 90 09 0 3800 1695XESPM NAN BERIWADA 6 7 25 228M350 7800 1700 2 6000 12000 0 1 3 5858 0 0 289900 24350

"mlSAR 1 4 1.18800 U180 300 9000 I 0 0 0 0 5 22500 01 0 22W0 11800ENMTHY 5 17 49 39200569000132N043000 618000 36000 0 0, 22, 99000 0 0565NI 05000

KESANWXRA 6 13 33 2640 247650 11400'3100 5 1500030000 0 19 85,500 0 4869002776509KOt4ATIPkLLI 8 2 2016N 213900 600 1400 3 90001800 0 0 10 45000 0 0234000231900K(M(ODAPALLI 3 5 17 13600031600 48001100 1 300 600 0 0 836000 091 37600WMA~1(ATNAMt 16 14 57 4560N03927501 1 4400 2 600 1200 0 0 30 13500 0 0 65900040475PEHA 10 1t 51 4 9210 120004400 3 9000IM0 0 0 209000 0 0 563000110100UP''AAPAkLY 3 3 8 64000 27300 3600 7000 I 0 0 a 6 2700 0 0101160 27300

MMAb8OAA EDIIPSAPAkLY 9 3 17 136000 5000 7210 1400 3 900 1800 S 0 12 5400 0 0 220200 6805VEMt 10 2 18 14400 54655 72001700 1 300 600 0 0 12 5400 0 0 225200 6650

NEI( Wm kALAIANIPET 0 4 6 48000 800 2400 400 2 600 12000 0 0 4 1800 F,? 78480 2800APPALARAOPET 1 1 4 3200 7600 1205 4000 0 0 (1 0 2 9000 0 0 46200 7600BaLLIKONDA 18 22 71 560 1790502400 48000 4 1200 2400 0 0 401 IM0 0 832000203 50CADAO NOA 2 4 6 4800 22600 36N0 6000 1 300 600 0 0 6 2700 0 0 8760080UliINAkXNEAM 0 7 11 97151 42001= 4 12000 240 0 0 7 3150 001457N 12,1150GOTLAK(M 3 3 10 M 2038N0 3600 800 0 a I 0 0 6 2700 0 0 1186002038N0GIR4RAALLI 2 7 11 229650 540 900 0 0 0 0 0 9 4050 0 0 1429 2229650PATHIPAKA I 1 2 1600 12500 600 200 5 0 0 0 0 1 4500 0 0 23105 12500REDLAWADA 10 28 68 5440005997002280 5000 16 480 9600 I 0 38 171000 0 0 835800 69570ThOAPkFALI 2 1 6 4800 1095 1800 550 3 900 1800 0 0 3 13500 0 1, 77300 28950VEW(ATAPI 1 4 9 7200 69950 300 8000 I I I 0 5 22500 0 0 1055006995…-- - - - - - - - - - - - - - - - - -- - - - - - - - - - --- - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - -- - - - - ,- - -

Page 148: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

kpendix XII Contd..

Naue of the Name of the Below Above Productive Asset Other Ecoric TRYSEM Housing Maintenance Cattle Mainte- Grand TtoalHondal villaqe Poverty Poverty - - - -- Assistance Allowance nance Allowance

Line Line NuKber Grant Loan ------------------ ------Chulla (WCRA Number Grant Loan Naber Grant wbber Grant Nuzber Grant Grant Loa

- -- .... -.----- - ---- -------- ---------- --- -- -------- ------ ----- -- --------- --------- ------------------------- ----------- ---------------- ----- --- -----

NXLLIUM CHINMIPARAM 5 5 19 15211 40900 6UN 12000 2 600 121 0 I 12 4522 O O 2212 52CHINNAC"RAI 4 1O 31 240 2319W1 84UD 22 3 9 8 1 0 I 14 632 0 0 3424N 2499NKACHIKAL 4 1 10 2 57N 32 1 3 91 12 0 0 5 2251 2 I 1225N 437N

THDNLJRTHY 1 I 1 81 38N 62 11 0 0 D 0 2 1 4520 2 0 141N 3822KlARAJPALLI 8 5 23 1841 475N 781 2 3 a I I 0 13 5588 0 I 27031 4751NAINALA 12 13 42 3i22 9772 151 332 3 911 1 8222 I G 25 112500 0 G 489 11572tfLLIKOOU2 21 13 64 512001 6825 2241 5311 9 2721 541 0 0 34 153M I 9 76542 722252RAMAtUAPN 1 2 6 4822 11552 181 4M 0 0 9 9 2 3 13512 0 0 673 11551RAVILALA 3 9 6 481 362 1822 5 1 30 62 0 0 3 1352 I O 7132 3695

PARVATHAGIRI ADLU 5 7 18 1440 58151 722 1520 I I I I D 12 54222 0 0 22D222 58152 CHINTANIKOtOA 14 45 131 11480 6D8751 354N 950 12 36 72M I 0 59 265522 I 2 147992 68752CITAPkLY 11 42 96 7682 8612 3182 72M 12 360 722 2 a 53 238502 0 0 114632 94212EIAL 9 6 27 21622 4931 922 2802 2 62 122 0 0 15 675 0 0 32651 6132GlOPANPALLY 3 1 8 641 18422 2402 822 I I I I 4 18 0 0 92420 1842KkLEDA. 4 4 13 142N 333N 48N1112 4 1222 2422 0 8 361 2 0 166 5732KG1(AKA 7 5 24 1922 234752 7222 222 1 M 622 2 a 12 542 2 a M52 294752PARVATHAGIRI 1 5 9 72222 3192 362 9211 1 302 6222 2 1 6 2722 0 0 114622 3792SONARAN 3 4 17 13621 198952 4222 8222 3 9002 1822 2 0 7 3152 2 2 18670 216952------ S- ----------- 3 -8 --- - ----------- ----------- -------- ------------ 8 - 2- ---- 2 5---------- -- -- - 2 2-

Sub-Total 238 351 1108 8864iDll 697815D 353400 8670fl lz 3870ll 774MD I 0 589 265950 0 0 131219IN 7752150------- -- -- - -- -- -- ---- -- --- - -- -- -- ---- -- - - -- -- -- -- - --- --- --- -- -- -- -- -- -- --- - -- -- --- -- -- -- -- - - -- -- --- - -- -- -- --

Page 149: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

CANAL IIFRIRUCTIUE: NAIN CANALVIILLA KTION PLAN

Appendix XlI Contd..

Na#e, of the Name of the Below Above Productive Asset Other Econoic TRYSEM Housinq Maintenance Cattle llainte- Grand Ttoalandd. Villaqe Poverty Poverty -------------------------- Assistance Allowance nance AlIowarae

Line Line Nkber Grant Loan ------------------ ---------------- ----------------- ---------------- -----------------------------------Chulla bWCRA NuIber Grant Loan Nnber Grant Number Grant NAer Grant Grant Loan

- --~~ - ----------- --------------- ------- - - ------- - ---- ----- --------- --- --- - ----------------- -------- ------ - .- ------------ ----- v- ---- ---

GEfSGONDA OOOKA. 2 9 24 1921 722N 66N 162 1 32N 62 0 S 11 495 I 0 2671N 7822!'.N8OO DESAIPET 2 11 1782 242 92 2 60 12N 1 4 182 0 2 12342 298NSAREA4 PALlARIGUDA i 4 9 72N 328N 24N 7222 5 152 3DO0 0 0 4 181 I 0 1144N 628W

THIWAPl 2 3 7 562 4950 322 6W 2 622122 I 2 5 2252 I 0 9352 16952WMANNAPET ILLAJtA 4 4 17 1363 452N 481 7D 8 2460 481 2I D 8 362 I 0 2278N 93222

KATRIAL 9 17 45 3611 12191 15622 390 3 90 18N a 3 26 1170 1 0 54D600 13992NUPPARPALLY a 3 3 240 382 1822 3M6 I a I I 0 3 1320 I 423N 3822

----- - --------- - ---------- - ---- ----- ---- - ---------- ----- ---------- ------ ------------ -- ------------- ---- --

Stb-Total 19 42 116 9281 298652 366N1 872 21 63222 126020 1 0 61 274502 I I 1.3891N 424651 '------ -- s- - ---------- - -- ------ - ------- ------- ----- - --- - - ----- ---- - ----- -- ---------- ------ ---- -- -.- - - ----

Grand Total 541 1038 2862 228 17746951 94682 225222 521 1563222 3126122 2 28222 1579 710550 0 0 347953N 2087295

----------- -------- ------ ----- ------ - --- -------------- ------- ----------------- /-- g3------

9/ Ž- I / ?'

Page 150: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

14

Annexusre - Xlll

ANDHRA PRADESH IRRIGATION PROJECT - IIIPROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMFE -E

THE BUDGETI' ,____________________________________ _______________ (R s. in m illions)

Si Details Financial Needs Indicative Total Budgetno as per SE Budget

_. : . ~~~~~~Survey _.;

A. LAND COMPENSATION S - |

i. Compensation due 150.81 81.11 231.92

ii. Additional for any variation in LA 19.30 19.30and land compensation duringimplementation

Sub-Total 150.81 100.41 251.22

B. RESETTLEMENT 0.13 0.03 0.16

C. REHABILITAI ION

a) Grant 36.93 13.58 50.48

b) Loan 21.15 7.99 29.14

D. PROJECT MANAGEMENT 4.00 2.00 6.0

E. PROJECT ADMINISTRATION 4.00 - 4.0

Sub-Total C-E a) Grant 44.90 15.58 60.48

:___ b) Loan 21.15 7.99 29.14

F. ADDITIONAL PROVISION

1. Probable variation in PAPs

identified during implementation of

AP IlIl a) Grant 2.51 2.51

. b) Loan | 1.48 1.48

2. Spill over of AP-li 1.75 1.75

3. Retrofit Assistance for AP II works - 9.0 9.0

Sub-Total (F) a) Grant - 13.26 13.26

b) Loan - 1.48 1.48

GRPAN 1OTAL(B-F) a) Grant 45.03 28.87 73.90

b) Loan 21.15 9.47 30.62

GRAND TOTAL (A-F) a) Grant 195.84 129.28 32;.12

b) Loan 21.15 9.47 .u.62

Page 151: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

Ainexure - Xlilf

THIRD ANDHRA PRADESH IRRIGATION PPOJECTRESETTLEMENT AND REHABILITATION

PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME(PAPERP) -

DETAILED BUDGET FOR S.R.S.P

Sl| Description Nun. er Amountno (Rs. in

lakhs)

A. Land compensation @ 1.25 lakh per ha plus 30% 4766 1508.10Solatium (in ha}) |

B. Resettlement 5 .1.25

C. Rehabilitation 2907

La) Productive asset grant @ 8000 per PAP 2907 232.56

b) Loan Component ~2907 (179.69)

ii. Economic Assistance for Smokeless Chulla @ Rs. 1608 9.65600 per head _

iii. Revolving fund for women thrift groups @ Rs. 1000 2290 22.90each

iv. Training and self employment @ Rs. 3000 530 15 90

v. Training and self employment loan component @ Rs. 530, (31.80)6000

vi. Maintenance allowance @ Rs. 4500 1608 72.36

vii. Cattle Maintenance allowance @ Rs. 1200 - -

viii Housing Construction grant @ Rs. 14,000 displaced 5 0.70

l ix. Training 15.00

D. Project Management 369.07

a) Socio-Economic Studies and Action Plan 11.00

b) Consultancy and Technical Services 3.00

C) Monitoring and Evaluation 18.00

dj Training and R & R staff 8.00

40.00

Page 152: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

124/2

l SI. Description Number Amountno (Rs. ini

lakhs)

E. Project Administration

a} Equipment, Furniture, Salary, Stationery 14.00

bl Contingencies 13.00

c) Enterpreneurship development and leadership 13.00development fv-ndre

40.0O

Total (B) to (E) 450.32

Total (A) to (E) 1958.42

Total loan comoonent 211.49

Grand total including ;and acquisition 2169.91

Page 153: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

124/3 Annexujre XlI/2

THIRD ANDHRA PRADESH IRRIGATION PROJECT -

RESETTLEMENT AND REHABILITATIONPROJECT AFFECTED PERSONS ECONOMIC REHABILITATION, PROGRAMME

(PAPERP)

INDICATIVE BUDGET FOR SRSP

SI.no Description Number Amount(Rs.in Iakhs)

A. Land compensation @ 1.25 lakh per ha plus 1545 1004.1330% Solatium (in ha)

B. Resettlement 1 0.25

C. Rehabilitation 1092 -

ii a) Productive asset grant @ 8000 per PAP 1092 87.36

b) Loan component 1092 (67.50)

ii) Economic Assistance for smokeless Chulla @ 653 3.92Rs. 600 per head

iii) Revolving -Fund for women thrift groups @ Rs. 876 8.761000 each

iv) Training and Self Employment @ Rs. 3000 206 6.18

v) Training and self employment loan component 206 (12.36)@ Rs. 6000

vi) Maintenance allowance @ Rs. 4500 653 29.39

vii) Cattle Maintenance allowance @ Rs. 1200 -

viii) Housing Construction grant @ Rs. 14,000 1 0.14displaced

ix) Training

1 ~~135.75

D. Project Management

a) Socio-Economic Studies and Action Plan 20.00

b) Consultancy and Technical Services

c) Monitoring and Evaluation

d) Training of R & R staff

=________________ .___________________ ___________________ - 2 0 .0 0.

Page 154: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

Sl.no Description Number Amotunt l

(Rs.in lakhs)

E. Project Ad.'n.inistration

a) Equipment, furniture, salary, stationery . |

l b) Contingencies |

c) Enterpreneurship development and leadership |development cadre

Total (B) to (E) 156.00

Total (A) to (E) 1160.13

Total loan Component 79.86

lL ______Grand total including land acquisition 1239.99

Page 155: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

Annexure - XIVANDHRA PRADESH IRRIGATION PROJECT - III: SRI RAMA SAGAR PROJET

PROJECT AFFECTED PERSONS ECONOMIC RE-HABILITATION PROGRAMME (PAPERPi: REACHWISE ACTiON PLAN_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ R ss. IIn I k h ss

Si Particulars [DBM.31 DBM-37 DBSI-38 DBM.40 D6M-48 MAIN CANAL. Ayacut Roads Totalno _ _ _o _t N_ i _i No Anfn o Anon o AonNo Amnount No Amount No Aon No Amount No Amut o Aort No mun Nomut

B. Resettlement - - . 5 1.25 - -5 1.25

C. RehabIlitation

I. Productive Asset Grant forPAPs and dependent majorchildren in the family

a) Grant at 8000 per PAP 540 43.20 85 6.80 526 42.08. 485 38.80 1108 88,64 116 9.28 47 3.75 9 2312.5t F

b) Loani 29.85 8.42 16.88 49.55 69.78 2.99 2.22 17,9.69

II. Economnic ansis~tance for 290 1.74 50 0.30 293 1.76 296 1.78 589 3.53 61 0.37 29 0.174 1608 9.65smokeless chulla @ Rs. 600per head (Grant)

fii. Revolving fund for womien 413 4.13 72 0.72 430 4.30 383 3.83 867 8.67 87 0.87 38 0.30i 2290 22.90thirift groups @ Rs. 1000 each (Grant)

___

iv. Training and self ernpl,yment 165 4.95 14 0.42 106 3.18 86 2.58 129 3.87 21 0.63 9 (1.27 530 15.90@Rs, 3000 pot head (at

V. Training ankd Self emnployment 168 9.90 14 0.84 106 6,36 86 5.16 129 J 7.74 2 1 1.26 9 0.54 530 31.80(loan component) @ Rs.6000

vi; Maintenance aflowance@ 290 13.05 50 2.25 293 13.185 296 13.32 589 26.505 61 LL174 . Li... 1.305 ..I08 72.364500 grant pet famnily 1v Cattle malnterrarrce allowance -- -- ..- .. .. -

Rs. 1200 (only for dfisplacedPA Ps)

viii Housing construction grant of . 0.70 . 5 0.70Rs. 14000 for displaced ____ ______

ix. Training . .___ - -- _____-15.00

Sub-Total a) Granit 67.0 7 10.49 64.50 59.89 131.91 13.89 5.89 J3907]b) Loan 39.75 9.~~ ~ ~~~~~26 2324 54.71 7.242 .6 j 1Aj

Page 156: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

Annexure XV

ANDHRA PRADESH IRRIGATION PROJECT - IIISRI RAMA SAGAR PROJECT

PROJECT AFFECTED PERSONS ECONOMIC REHABILITATIONPROGRAMME (PAPERP)- INDICATIVE BUDGET(Rs. in lakhs)

SI Description Canal Ayacut Totalno

Number Amount Number Amount Number Amount

A. LAND COMPENSATION @ Rs. 0.50 LAKH PER ACRE 297 193.05 1247.82 811.08 1544.82 1004.13PLUS 30% SOLATIUM (in Acres)

8. RESETTLEMENT 1 0.25 1 0.25

C. REHABILITATION .__ _ _ _

1. Produclive Asset grant @ Rs. 8000 per PAP 322 25.76 770 61.60 1092 87.36

a) Loan Cl-mponent 322 19.90 770 47.60 1092 67.50

2. Economic Assistance for smokeless Chulla @ Rs. 600 178 1.07 475 2.85 653 3.92per head _ - _ -_|___

3. Revolving fund for women thrift groups @ Rs. 1000 each 254 2.54 622 6.22 876 8.76

4. Training and self employment @ Rs. 3000 59 1.77 147 4.41 206 6.18

5. Training and Self Employment loan component Rs. 6000 59 3.54 147 8.82 206 12.36

6. Maintenance allowance @ Rs. 4500 178 8.01 475 21.38 653 29.39

7. Cattle Maintenance allowance @3 Rs. 1200 -- . -

8. Housing construction grant @ Rs. 14000 for displaced 1 0.14 ^ . 1 0.14

9. Training 2000 _ 20.00

Total . 59.54 96.46 156.00

Loan - 23.44 56.42 79.86

Page 157: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

- CHARTS

Page 158: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

CHART-I

ANDHRA PRADESH IRRIGATION PROJECT -IIISRI RAMA SAGAR PROJECT - KAKATIYA MAIN CANAL (KM 234 TO KM 284)

IMPLEMENTATION SCHEDULE OF LAND ACQUISITION FOR MAIN CANAL KM 234- KM 284

YearSl.no Descriptlon

1995 1996 1997

Months Months Months

5 7 9 11 1 3 5 7 9 11 1 3 5 7 9 11

1. CONSTRUCTION

LAND ACQUISITION COMPLETED

Submission of LP1. Schedule

2. Completion of Survey

3. DNIDD Publication

4. Award

Page 159: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

CHA. 'RT-II

ANDHRA PRADESH IRRIGATION PROJECT -IIISRI RAMA SAGAR PROJECT - KAKATIYA MAIN CANAL (KM 234 TO KM 284)

IMPLEMENTATION SCHEDULE OF LAND ACQUISITION FOR DBM-31

Year

s. Descriptlonno 1995 1996 1997

Months Months Months

2/94 S 7 9 11 1 3 5 7 9 11 1 3 5 7 0

i. CONSTRUCTION

II. LAND ACQUISITION COMPLETED

Submission of LP1. Schedule

2. Completion of Survey

3. DN/DD Publication

4. Award

Page 160: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

CHA 'RT-1l1

ANDHRA PRADESH IRRIGATION PROJECT -111SRI RAMA SAGAR PROJECT - KAKATIYA MAIN CANAL (KM 234 TO KM 284)

IMPLEMENTATION SCHEDULE OF LAND ACQUISITION FOR DBM-37

Year

Si. Descipton 1995 1996 1997

Months Months Months

2/94 5 7 9 11 1 3 5 7 9 11 1 3 5 7 0

COMPLETED

1. CONSTRUCTION

II. LAND ACQUISITION COMPLETED

SubrrIssion of LP1. Schedule

2. Completion of Survey _..__ _ ______l

3. DN/DD Publication

4. Award -__ __.__ - -

Page 161: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

CHAP RT-IV

F~~~~~~~~~~~~~~~~~~~~ANDHRA PRADESH IRRIGATION PROJECT -111

SRI RAMA SAGAR PROJECT - KAKATIYA MAIN CANAL (KM 234 TO KM 284)

IMPLEMENTATION SCHEDULE OF LAND ACQUISITION FOR DBM-38

Year

Si. Descriptionno 1995 1996 1997

Months Months Months

. ~~~~~~~~~~5/94 5 7 9 1 1 I 1- 3 6 7 = 9 - -- 1 3 - 7W

1. CONSTRUCTION a= = *" .

It. LAND ACQUISITION CON,r'LETED

Submission of LP1. Sch_edule

2. Completion of Survey

3. DN/DD Publication

4. Award

-f _, - _ . _ _ _ ___- - -= =___ _ - .- _- --

Page 162: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

CHART-V

ANDHRA PRADESH IRRIGATiON PROJECT -111SRI RAMA SAGAR PROJECT - KAKATIYA MAIN CANAL "KM 234 TO KM 284)

IMPLEMENTATION SCHEDULE OF LAND ACQUISITION FOR DBM-40

Year

Sl. Description1 995 1996 1997no ._ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Months Months Months

5 7 8 9 10 11 1 3 5 6 7 9 10 1 1 - 3

I. CONSTRUCTION - _____COMPLETED

II. LAND ACQUISITION COMPLETED _______

Submission of LPSch Schedule

i-- v _ _ _ +_ _ - -_ _ _ - -

2. Completion of Survey

3. DN/DO Puiblication

4. Award -_ _ ..----

Page 163: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

CHART-VI

ANDHRA PRADESH IRRIGATION PROJECT -111SRI RAMA SAGAR PROJECT - KAKATIYA MAIN CANAL (KM 234 TO KM 284)

IMPLEMENTATION SCHEDULE OF LAND ACQUISITION FOR DBM-48

Year|Si. Def ctption195_ - ___ .__1D7no D~~po 1995 1996 1997lno X" _

Months Months Months

COMPLETED J 5 7 8 9 10 11 1 3 b 7 9 10 11 1 3 5 7

1. CONSTRUCTION --COMPLETED

II. LAND ACQUISITION

Submyission of LPSch Schedule

2. Completion of Strvey

3. DN/DD Publicatlon

4. A. - -w- - = _ - -. - -

Page 164: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

CHART-VIi

ANDHRA PRADESH IRRIGATIONPROJECT - IIISRI RAMA SAGAR PROJECT - KAKATIYA MAIN CANAL (KM 234 TO KM 284)

IMPELENETATION SCHEDULE: TRAINING, SKILL, DEVELOPMENT AND SELF EMPLOYMENT

Si Name of the Activity 1995-96 1996-97 1997-98 1998-99

1 2 3 4 1 2 3 4 1 2 4 1 2 3 4

1. Identification of Youth for -_ - - - - __.__ : -training and selection of activity - -

2. Identification of Centres = = _ I=. = =-- = .

3. Imparating Training = ._. . . . . . . - == _

4. Conducting EDP

5. Completion of formatlities forestablishing unit! acti-vity tying - - - -

- UD with bank loan

6. Establishing Unit -= : . =.

7. Monitoring and Midterm - - -. - -: _ = -correction

8. Evaluation ____ ___ - . - -

9. Final correction Measures - _ _=_ ___ _ __ =L~~~~~~~~~~ ;;'.J_- ____1= __=

Page 165: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

CHART-VIII

ANDHRA PRADESH IRRIGATIONPROJECT - IIISRI RAMA SAGAR PROJECT - KAKATIYA MAIN CANAL (KM 234. TO KM 284)

IMPELENETATION SCHEDULE: PRODUCTIVE ASSET SUPPORT PROGRAMME

Si Name of the Activity 1996-97 1997-91? 1998-99 1999-2000no I-

_¢_ 1 2 3 4 1 2 3 4 1 2 3 4 ) 2 41. Preparation of District Credit Plan -= = __.__ - -

for PAPs --

2. Verification of PAPs and : . . ,.... -_ = - -_ _collection of applications __ _ _

3. Procesing of application and _ _____ __issuing sanctions - -- '

4. Release of grants -,nd loans _ _=4E ==_

5. Grounding of scheme -= _ =- =

6. Concurrent monitoring and _ = i ==corrective measures -

7. Evaluation . _ -= . -

8. Final correction measures and _ = =I=_ = = -- = __additional support _ _ _- _. _

Page 166: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

CHART-IX

ANDHRA PRADESH IRRIGATIONPROJECT - IIISRI RAMA SAGAR PROJECT - KAKATIYA MAIN CANAL (KM 234 TO KM 284)

IMPELENETATION SCHEDULE: GRUP ECONOMIC ACTIVITY FOR WOMEN

SI Name of the Activity 1996-97 1997-98 1998-99 1999-2000no |-._ __ I 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

1. Identification of Groups

2. Group formation through PRA _ = =_=

3. Commencement of thrift activity _ = _

|| 4. Identification of economic activity

5. Financial support

6. Monitoring and corrective steps - -

7. Evaluation _____.

8. Final corrrective measures and : : = -

additional support I

Page 167: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

CHART-X

ANDHRA PRADESH IRRIGATION PROJECT -111SRI RAMA SAGAR PROJECT - KAKATIYA MAIN CANAL (KM 234 TO KM 284)

IMPLEMENTATION SCHEDULE: PAYMENT OF CATTLE ALLOWANCE AND MAINTENANCE ALLOWANCE

YearSi. Description19697

Months Months

5 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 1 12

1. Collection of appiications andconfirmingl the PAPs

2. Opening of Barik Accounts

3. Depositing the Grant

4 _ Utl P_ __ _ _ __ ____ ___ _

Page 168: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

136/1

A?V1 [HRA PRADESH IRRIGATION PROJECT IIIPROJEC:T AFFECTED PSGNS ECONOMIC REHABILITATION PROGRAMML- (PAP-ERP)

|PR~JECT AFFECTED YEARLY FINANCIAL OUTLAY(Rs. in milaionsj

St. < Activity Total Upto, 95-96 96-97 97-98 98-99 99-no 94-95 2000

I Land Compensation 251.22 153.12 10.00 24.00 I 64.10 -

II. Resettlement & __

Rehabilitation _ ._

1. Productive asset supportprogramme

i) Grant 31.99 12.00 16.00 3.99ii) Loan 124.721) (9.30) (12.30) 13.12)

2. Smokeless chulla 1.36 0.20 0.60 0.56Programme

3. Revolving fund for thrift 3.17 1.06 2.11 .groups

4. Vocational training

a) Grant 2.21 1.10 1.11 -

(4.42) (4.42)

5. Resettlement and House 0.23 0.23 -

grant

6. Maintenance Grant cattle 10.18 2.26 7.92 |allowance

7. Project Management 6.00 1.10 1.00 1.00 0.90 0.90 1.10

8. Project Administration 4.00 - - 1.00 1.00 1.00 1.00

9. Training of R & R staff 1.50 - 0.75 0.75 t -

Total I 251.22 153.12 10.00 ,24.00 64.10 -

Total II Grant 60.64 1.10 1.00 7.60 26.39 10.46 6.U9ll i Loan (29.14) ( t13.721 |1t12.301 | (3.1211|

IlIl Probable variation underAP Ill

Wll Grant 2.51 1.00 1.51-liiLoan 1.48 0.60 0.38

IV Spili over & Retrofit 10.75 1.00 6.00 3.75schemes of AP II

TOTAL GRANT II TO IV 73.90 1.10 2.00 13.60 30.14 19.46 7.60LOAN II TO IV 130.62| (13.72j (12.301 (3.121

GRAND TOTAL I TO IVGrant 325.112 154.22 12.00 37.60 94.24 1 19.46 7.60

Loan (30.62) |13.72)_ 112.30) (3.12) |

Page 169: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

ANDHRA PRADESH IRPFGATION PROJECT - IIISRI RANA SAGAR PROJECT

PROJECr AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME

VOLUME - II

PART-Il

VILLAGE ACTION PLAN

Page 170: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

CHOUTAPALLIA VILLAGE ACTION PLAN

Introduction

1. The Resettlement and Rehabilitation Study contemplates a model Village ActionPlan for a selected village having large number of Project Affected Persons (PAPs)defined as per the criteria. The PAPs under the Project require Rehabilitation supportsince most of the affected households lost land either in part or full under Canalinfrastructure and Ayacut roads, who lost house/site who require resettlement forconstruction of house besides economic rehabilitation support. All these measures indifferent dimensions under R & R Programme are focussed at enabling the each PAPhousehold to regain the economic status prior to the acquisition of their assets. Adetailed resource based village Action Plan enables the implementing agencies toextend necessary supportive services to the PAP households for a conducive andhealthy environment. With this in view a model village Action Plan has been formulatedfor Choutapalli-a Project Affected village under APIP-lli SRSP Project.

Location

2. Choutapa" :_tlemeent coming under the command of SRSP APti-ill is locatedin Parvathagiri mandal of Warangal district in Andhra Pradesh. The village is boundedon its east by Chinthanekkonda, on West by Puri Shivaru (out skirts), on N.,rth byEnugal and Konkapaka, and on South by Somaram villages. A minor distributory underDBM-48 traverses on the Northern part of the villages. Alya Thanda, Lachya Thanda,Yerragutta Thanda are the three harn!ets of this village.

Page 171: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

138

Objective

3. The basic objective of the study is to formulate a detailed Village Action Planbased on the resources potentials for imrplementation under PAPERP.

Methodology

4. Detailed socio-economic survey of the affected households has been carried outin the village and participatory resources appraisal (PRA) has also been done activelyinteracting with the affected households on various problems, potentials, preferencesand prospects in the village for making future developmental strategies to theseaffected households.

Study Area

5. The Vennavaram branch canal (minor distributory) of DBM-48 passes across thenorthern portion of the village. The soils are predominently black and red soils (Figure-I).There are no minerals except black granite. The village receives an average annualrainfall of 950 mm. The temperature varies between 29.50 C in December to 41.9° Cin April and May and summer climate is relatively humid.

Demography

6. The village is having a population of 2706 (1991 census) comprising of 1372males and 1334 feemaies with a sex ratio of 973 females per 1000 males. The SCs andSTs together constitutes 13.7 per cent of the total population. The average literacy rateis 20.92 per cent while it is 29.94 per cent among males and 11.84 per cent amongfemales and the literacy rate is far below the average literacy rate of 32.6 per cent inWarangal district. Of the total population 56.13 per cent constitute the workforce and9.91 per cent are marginal workers who are employed less than 180 days in a year.63.5 per cent among total males and 49.03 per cent among total females constitutethe total workforce. About 85 per cent of the total workforce depend on primary sectornamely agriculture comprising of 42 per cent cultivators and 40 per cent agricultu'allabour. About 3 per cent are in livestock and forestry and the balance are in secondaryand tertiary sectors.

Agriculture

7. Agriculture is the primary avocation for about 84 per cent of the total population.The total geographical area of the village is 3003 acres, of which 86 per cent is netcultivated area and 3.3 per cent is under current fallows. A total area of 13.52 acresin the village is acquired for canal infrastructure. The SRSP APIP-lli on its completionwould provide irrigation to an area of 331.16 acres (see Figure-lI for proposed irrigationcommand).

8. The major sources of irrigation is through dug wells (621) for an area of 'r44acres irrigated dry (Figure -Ill) and tanks provide irrigation to an area of 205 acres.Cotton (1500 acres), ground nut (870 acres) and paddy (263 acres) are the major crops(See Figures-IV and V for kharif and rabi cropping pattern and Appendix l). The grosscropped area is 3671 acres and the cropping itensity is 145 per cent. The viilage isagriculturally progressive. High yielding varieties in paddy, chillies, cotton, groundnut,sunflower, jowar and maize are in vogue. The crop varieties used in the village are in

Page 172: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

139

Appendix-ii.Chemicals fertilisers like urea, DAP, 28:28, etc.and PP chemicals likeEndosulphon, Thimmit, Monocrotophos, etc. area being applied. In terms of agriculturalimplements and equipments, the village is having tractors (4), power tilers(2), sprayers(50) and tractor drawn implements(4) indicating the progressiveness in agriculture.

9. The village produces 720 tonnes of cereals, 818 tonnes of oilseeds and 1165tonnes of commercial crops mostlry cotton (1050 tonnes) followed by chillies (40tonnes) and turmeric (7 tonnes).

Marketable Surplus

10. The village does not have marketable surplus in cereals. However, commerciaicrop production and oilseed production are marketed outside which provide substantialcrop dividends to the households.

Livestock

11. The livestock comprises of cows (1065), buffaloes (679), milch animals (263),sheep (1356), and goats (151) which form 2514 of total heads. The poultry birds are4148. The village produces 500 litres of milk per day marketed to APDDB through itsmilk collection centre at Parvathagiri. Though the village is agriculturally progressive,it falls short of fodder requirements. The village annually produces about 2040 tonnesof crop by-product while the actual requirement is about 3290 tonnes.

Industry

12. There are no major agro-based industries in the settlement except one huller forrice milling and one sheller.

Infrastructure

13. The village is having comparatively better infrastructure related to education,transport, etc. and is having electricity. For important facilities like health, telephoneand telegraphic services, credit and banking it has to depend on its neighbouringsettlements mostly Nekkonda or Parvathigiri. The Village Development Officer locatedin the village and the Village Agricultural Officer from Konkapaka village provide theextension support besides provision of timely inputs for agriculture. An NGO (MARI) isalso operating with its activities in the village mostly related to Dairy Development,formation of women thirft groups, horticulture, and other employment and incomegenerating activities besides functional literacy programmes. In case of socialorganisations a Youth Club and a Mahila Mandal are functioning in the village.

Resource Potentials

14. The vilL.ge located in moderately high rainfall zone is endowed with mixed soilsand black soils mostly suitable for commercial crop cultivation Commercial Crops likecotton, chillies, turmeri;. and oilseeds are predominantly grown in the area. The villageis also rich in groundwater resources because of sheet rock formation. The proposedAPIP-III SRSP Project further enhances the groundwater potentials and would be ableto provide higher crop production and generate employment with enhanced incomelevels in the area. The population being predominantly agricultural, sericulture, livestockdevelopment and other agro-based activities are having aburdant scope for

Page 173: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

140

development. Metal and black topped approach roads on either side of dhe villagefacilitate the flow of materials. Weekly markets at Parvathagiri and Nekkonda provideforward linkages to the produce. The village being; well connected by roae! network hasfrequent access to Warangal city.

Action Plan

15. The Socio-Economic Study carried out among the affected households under theproject has enabied the identification of 53 PAPs who are eligible for EconomicRehabilitation Support as per the R & R policy of the Government of Andhra Pradesh.The identified PAPs are from different cross section of the Society belonging toScheduled Castes 6 and Scheduled Tribes 22 and Backward Castes 15 theeconomically weaker sections and the other castes are 10 belonging to upper castes.Keeping in view the predominant background of the community and on the basis ofdetailed discussions interacting with each of the identified PAP.household, activitiesrelated to land development/ irrigation, livestock related to milch animals, sheep andgoat, poultry, etc. have been proposed. The individual preferences, available skills,input supply, marketability, etc. have also been taken into account while proposinghousehold oriented productive asset schemes for generating employment and providingenhanced incomes to the household (Ref: Appendix-lil for a detailed list of proposedhousehold schemes and unit costs).

Human Resources Development

16. The training in electrical rewinding and repairs are preferred and some of thehouseholds expressed their desire in poultry and milch animal maintenance, sericulture,tailoring, plastic weaving, etc.

Economic Rehabilitation

17. As per the R & R policy of the Government of Andhra Pradesh, the PAPshouseholds including the dependent major children of either sex in the family are eligiblefora productive asset grant of Rs. 8000. The household is also eligible for maintenanceallowance of Rs. 500 for nine months and a smokeless chulla (Rs. 600). The displacedhousehold if any is eligible for a house construction grant of Rs. 14000 with provisionof 5 cents of house site for construction of house and a cattle maintenance allowanceof Rs. 200 per month for six months if the household owns cattle. Besides theseeconomic benefits, the educated youth in the family are eligible for training grant of Rs.3000 for purchase of kits and provision of Rs. 6000 as loan besides impartinigvocational training to such persons. The women in the family are eligible for a grant ofRs. 1000 under DWCRA programme to form into thrift groups with 15 women in eachgroup to undertake employment oriented income generating activities forempowerment of women with economic support.

Village Committee':

18. The identified PAP households would form into a Village Committee (VC) and electthe office bearers through democratic choice. The programme implementation andmonitoring would be done through Village Committee with the active support of thelocal NGO. All the PAP households expressed their willingness to form into a VillageCommittee for bettering their economic standards.

Page 174: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

141

Role of NGO

19. MARi-The local operating NGO would assist in formation of Village Committeeand provide extension support related to entitlements, input usage, marketing, etc. TheNGO also provides logistic support for application processing, receipt of entitlementsand loan components till the productive asset is received by the receipient from therespective agencies . Monitoring and ongoing evaluation would also be undertaken bythe NGO to provide adequate information support to the District level implementingagencies.

Integration of Ongoing Development Programmes

20. The economic rehabilitation programme of the PAPs in the village is integratedwith the ongoing development programmes namely IRDP, DWCRA and TRYSEM. TheSCs and STs should be given due priority by the respective weaker sectionsdevelopment financing corporations. The ongoing employment oriented programmes likeJRY and PRY would also provide necessary employment support to the households.The implementation of the ERP should done on a separate footing with priority throughthe District Rural Development Agency (DRDA) funded by the Irrigation and CommandArea Development Department of GOAP.

Financial Needs

21. The total financial needs for the Economic Rehabilitation of the PAP householdsin the village is to the tune of Rs. 21.23 lakhs and the breakup of financial requirementsfor implementation of the Village Action Plan are furnished below:

CHOUTAPALI VILLAGE: ACTION PLANFINANCIAL REQUIREMENTS

SI.No Description Number AmountRs. in lakhs

A. REHABIUTATION

1. Productive Asset Grant 96 7.68

Loan Component - 8.68

2. Smokeless Chulla 53 0.32

3. Revolving Fund for Women 72 0.72

a) Grant 12 0.36b) Loan 12 0.72

5. Maintenance Allowance 53 2.39

6. Tra.kting - 0.12

B. Organ;- .iJon and Management - 0.21

Total Grant 1 1.83

Total Loan 9.40

GRAND TOTAL 21.23

22. The details of entitlements of each PAP household are furnished in Appendix - IV.

Page 175: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

142

Appendix - i

CHOUTAPALLI VILLAGE: CROPPING PATTERN

(Area in Acres)

S.No Name of the Crop Kharif Rabi Total

1 Paddy 228 235 63

2 Jowar 100 100

3 Maize 20 120 140

4 Chillies 50 50

Turmeric 50 50

6 Cotton 1500 1500

7 Groundnut 120 750 870

8 Sunflower - 100 100

9 Others 524 20 544

Total 2492 1125 3617

Page 176: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

143

Appendix - i3

CHOUTAPALL VILLAGE: POPULAR CROP VARIETIES

Crop Varieties

Paddy i. Warangal cultureii. Dhanalaxmiiii. Hamsaiv. Vijaya Masurivi. Chaitanyavi. BDTvii. 1001

Chillies i. G-4ii. Selection-1iii. Jwala

Groundnut i. Local varietyii. GH-11iii. GH-224

Cotton i. RCH02;ii. Srieiii. Somnathiv. NNH-44v. MAICO-12-13

Sunflower i. MAICO-8ii. Megha-363iii. Sandoz-212iv. Poineerv. M odern

Maize I i. MMH-4

Jowar i. CH-5ii. CH-9i_i. CHS-1_,____ _

Page 177: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

144

Appendix III

PROPOSED HOUSEHOLD SCHEMES WITH UNIT COSTS

------------------------------------------------------------

Scheme UnitCode C0s t

I Dairy 118002 TBul I ock Cart ':0003 Bul locks 80004 P:iggery 80505 Sericulture 198006 Fisheries 10000

Mushrooms 700008 Sheep Rearing 119509 Poultry 186500

10 Ptumpset. 12000i11 Well -± Pumpset 2050012 Petty Business 1500013 lWeaving 550014 Basket Making 500015 Carpenter 5000J6 Flectrical Repair 15000t17 Motor Repair 5000

18 Cycle Repair/Tax 15000119 Gold Smith 800020 Black Smith 500021 Pottery 500022 Pick3el Papad making 1500023 Laundry 15000;24 Trainirng 1500025 La dnd 15,00026, J.and development. 1]00027 Bulloc<k + Cart 15000_ _ _ _ - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

Page 178: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

NWRA PRADESH IRRIGATION PROJECT - ApeIixISRI RANiA SAGAR PROJECT

REACH DE44-48 MANOAAL PARVATHAGIRI VILLAGE COUTAPALLI (Area in Acres)

Award Ho Name IAge Rel Caste Sex TDryHol1d TWetHold Tot Hold T DrY Akq T Wet Acq Tot Acq TD remain TW remain T remain Cattle fI.P.1.

8 SURENENI SAMPATH RAO 45 0 4 1 2.000 L000 2.0N 0.00 1. ON 0, 5S 1.45 0.0N 1.15 4e&K1ANMM 6Z 11 4 2SRI RAOLUJ 45 2 4 1SUSILA 35 1 4 2

8 MThAPA[LY ~~VIXMMUNA 32 0 4 1 8. ON 0.0ON 8.00 0.00 ~ 0.009 2.42 5.58 0.0N 5.53 0SAJ2ASWAWI 28 1 4 2

8,1, MVT iAPALL I NATAVA RAO 45 0 4 1 7.275 0.000 7.28 0.0N 0.0OM 2.63 4.65 0.00 4.65 4

S,L1 I1H iA KUiT\ 23 2 4 1

AlMKUKNi.;2

11 MaK'YA 8ICWiA 3$ 0 2 1 0.750 0.0NO 0.75 0.0 MO0~ 0. 63 0. 12 0.00 0.12 0P1ARSAMMA 2$ 1 2 2Si 1 IV AL 50 11 2 2

9 BELLI GAVTAIALLU 36 03 1 2.000 0.000 2.00 0.0 0. 000 0.5$ 1,45 MO0 LA~ S 0J$rLLA SONODANNA i . 3 1 2

9 ~~~~BELLI RAWAL/LU 15J 0 3 i 1.925 0.000 1.93 0.00 0. 00 0.53 1.10 0. 110 1.4 4

BELLY A I AliAfI 23 2 3 1rMELY KThURA I All1 2 -... ~~~~~~~~~~~~~~~~~~~~~~- -.- ------------ ---- ---- ----.- -.-.--.

12 USTHU KONtURAIAH 68J 0 3 1 M.M0 0.000 5.00 0.0 0.MOO 1.37 3.63 0. 00 3. 63 ABThU AIlUuhl 10 2 3 I AuSOIU (UjAfDRAlAH 3J 2) 4 3 1MMOI RAMULU 30, 2 3 1ABOjTU KL0hARA SWANY 25i 2 3 1MOuTU RAh/41,A 35i 3 2

-------------------..-- -.-------

Page 179: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

Appendixc IV contdo.,AMMt PRADESti IRRIGATION PROJECT -III

SRI RAMA SAWA PROJEC7PEACH D8N-48 MAITAL :PARVATHAIRI VILLAGE :CHOUTAPALLI

IRDP TRYSEN

Pap namec Comipcn KA, CA HA Scheme Un~it cost Grant Loan ChullIa DWACRA Grant Loani T CoVpen T [C Asst T LoanU-E-ifNI SAMPATH RAO 2200- 4150 0, I 1 11800 8m0 380 60 0 0 0 22000 13100 3800

&~~~HAHHA 0 0 0 00 0 0 0 ~~~~~~~~~~~~~~~~~~~~ 1000 0 0 1000 0SRIlRPNMtU 0 0 0 I 8000 I O 0 3M0 60N 0 11000 50-SM II. A 0 0 0 0 0 0 10ow 0 0 0 1080li 0MATHAMOLY VI AYKUMM300 45410 0 0 8 11950 8mu 39)5 0 600 0 00 97000 13100 3950SARASWAIHI, 0 0 0 0 0 0 0 0 0 100 3000 6000 0 4000 69MAIi APLLI MAHAVA RAO 105100 43004 0 0 12 1I00N 800 7000 600 0 0 0 10.00 13100 70SGViAK~KA 01 0 0 0 0 0 0 0 0 1000 0 0 0 10go 0SUIKIM WWMAI 0 0 0 0 i 8000 I 0 0 3000 6000 0 1 1000 6000AMANT KUMAR 0 0 0 0 0 0 8000 0 0 0 3000 600 011000 6000~UKYA MIHYA 25445j 4500 0 0 12 15000 8000 7MO0 600 0 0 0 25445 131.00 7000NIARSAKM~ 0 0 0 00 0 0 0 0 1000 I 0 0 1.000 a5JVAL 0 0 0, 0 0 0 0 0 0 100 0 0 0 1000 0BELL I U.TiM~ALLU 22~08 4500 0 0 27 15000 8so 7000 600 0 0 22080 13100 7000JELLA EOH)N 0 00 00 0 10BELLI RAMAMALLU 2100N 4500 0 0 2 9000 8000 1000 600 0 0 0 2100 1310 1NBE'LLY WAW,rM 0 0 0 0 0 0 0 1000 0 0 0 l1o0 0B[LLY AILANIA 0 0 0 0 0 0 800 0 0000 80 BELLY KYARAIA11 0 0 a I 0 0 8000 0O 0 0) 0 0 0 8000 0

ABOiHiJu KOUURAIAH 48125 45~00 0 0 11 210500 8000 1250Z 600 0 0 0 48125 13100 12500ABOTU AILAIAH 0 0 0 0 0 0 8U0 0 0 0 0 0 8000 0MO8TUCHDRA 'IAli 0 0 0 0 0 8000 0 0 0. 0I0 0 8VI 0AMU MtY~S~C' U0 0 0 0 0 8000 0 000 0 8000 0ANTU WhAPA "",A0N0 00 0 0 0 0 0 000 00 0ABOTIU)SUfUNA 0 0 00000 0000 10 0ABOTU AILAHMMA8 0 0 0 0 1 0 0 0 0 0 1VI 0!iNTU VLNKAMM 0 0 4 00 0 0 03 1000o 01 0 vi ;000 0

Page 180: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

Appendix IV Contd...

Akard No Name Aqe Rel Caste Sex TDryHold TWetHold, Tot Hold I Dry kcq T Wet kcq Tot Acq TD remaif6 TW remoain T remain Cattle B. P. L.

A8OTUJ SUGLUNA 30 3 3 2AWOTU AMLANW 25 3 3 2WTOU VENKM 20 3 2

352 1, 9 EAiTtiA 8ISH10 4 35 0 3 1 4. 42 S 0.000 4.42 $00 09000 2.90 1. 521 0.00i 1.52 2BATTULA RMAKKIA 3.0 1 3 2

2, 8 VIRIAGYAM hikLAIAH1 68 0 3 1 2.775 8.0NO 2.78 I.N 0. RN 1.78 1.0 0.00 1.0 4MYAGYAM RA3RJMA 50l 1 3 2KYPAGYAK RAJ1SWA SAIR'i 23 2 3 1

9 BELILt MAIMN2 3 1 3.008 8.00 300I 008 0.0ON 1.0 2.08 8.00 2.08 0VEL'~ KOMURAINA 45 VELL, ;dAiAfT4 40 3 3 2

2 POTHRU MNARSAIAH 30 0 1 1 1.750 8.0ON 1.75 0.0 0.00 1. 25 0. 50 0.N0 0.50 2 Y3OTIRPAJU K-1MANAMHA 2IC5 11 2

PSI RA3U K0f4kU 55 10 I I

POTARAJU ISOWMH S'1 11 1 2

'8 WR~~SIP, 10I RAJAIAHI 35Ij 1. 701 0.000 1.70 0.00, 0. 00i 0.78 1.00 0.0 1.00 2NIRMPLA 26 1 4 2CHILAKArM~ 60 ii 4 2

2 IOW~ A NARSA1A4 71 0 1 1 2.500 0. ON 2.5 0.00 0.008 1.50 1.00 0.00 1.00 4hALA~~~~HA SI~~~ I 1 2

GONNAYMA3 2 1 1SWARPOOP 3 1 2

Page 181: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

-~~~~~ ~~APpendix IV Contd..

IRDP IRYSEN

pa~p na#E Conmen MA CA HA Scheme Unit cost Grant Loan ChullIa £MACRA Gr-ant Loan T Cowen T EC Asst I Loan

&ATTIYLA B1KSIiAM 116120 4500 0 0 11 2050 dO 125N0 600 0 0 0 116120 131IN 125NBATITLA RN4b(KA 0 VI I I 0 I0 a 0 10N 0 0 0 10N0

VIRAGYAN MrLLAIAH 710W0 4500 0 0 2 9000 80W 1000 6W 0 0 0 71000 1.31N0 10VYRAGYM AM"AAi .0 0 I 00 0 0 0 1000 I 0 0 10002VYRAGYAM RAJESWAR WNMA 0 0 0l 0 0 0 800 I 0 0 300N 69000 0 1100 RN0

041LI ODAIAH 4W00 4500 0 0 27 I500 80(4 700 600 (4 0 0 4000 1.3100 7000VPLLA KO4IJPAW, -2 (4 0 0 00 0 I 0 0 0 0 0 (4 0 0MILASMANIT,AW 0 0 0 0 0 0 0 0 0 100 0 0 0 1A0 0

PTNAJU NAfRSAWN 62127 4500 0 0 1 1-1800 8000 3800 600 0 0 0 62127 13100 380f0POTARkJU KOMAR.W1M I (4 0 00I I I 0 0 100 0 0 0 I1 (4POTAPkAJU OMALU 0 0 0 0 0 0 0 0 0 0 (4 0 0 0 0POTMANAJUOMWA 0 I1 0 I I 0 0 0 IN10I 0 (4 10N0 (

VJl1fHT RAJAIAKI 24U0 4500 0 0 2 900 8an low 600 0 0 0 245WJ 1310N 1000tUiRf4A1A 0 0 0 0 0 0 0 0 0 1IN0 0 10 ilLPAKAW 0 0 0 0 0 0 0 0 a 00000 10

l(UNIAWLA NRMAZHI 316235 4500 0 0 1 11800 800 3800 600 0 0 0t 86235i 13109 3009MALLAMNA 0 ( 4 0 0000 0 0 I00 00 0BOMANOP 00 00( 0 100 IN

741,552 I17550 (4 0 175350 192000O 71350 7800O 21000 150W 3001,0 740552 294300 101350

Page 182: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

Appendix IV Contd..,

AtJRA PRISA% RRIGATION PROJECT -III* SRIR~NASAGAR PROJECT

REACH DBM-48 WMAAL PARVATHAGIRI iVILLAGE CHOTAPALLI (Area in Acres)-- -- -- -- -- --- -- -- -- --- -- -- -- -- -- ---- -- -- -- --- -- -- - -- - --- -- -- -- --- -- -- -- -- ---- -- -- -- --- --- -- -Award No Name Aqe Rel Caste Sex TDryHold TWetHold Tot Hold T Dry Acq T Wet kcq Tod A,q TD remain TW re-main, T remain Cattle B. P. ..

6 BADAWATH BICHCHYA 46 6 2 1 4.N 1. 66 4.N 6 OM6 6. 66 1,64 2.96 6.0 2.9 2aMLAVATH BICHYAi 46 6 2 1EBDA'VATH BADRI1 35 1 2 2

6 ~ ~ ~ iMEAERA MWA 58 6 2 1 2.6 NO OM 2.00 6. N6.0 O O .058 1.42 MO. 142 2AJMEERA RUf,KAMrA ~ 5 I1Z 22AJMEERA CHICH41A 26 2 2 1kJMEERA RKAWNAN 22 3 2 2AJMCERA KISHMN 26 2 2 1AiK'-'ERA RAJI 2f .32 2

9 BACftVAIH BIKNA 35j 6 2 1 6.500 MOO0 6.56 MO0 MOO0 3. 70 2.8'6 6. 2.86 2BADt-VAIH PATHI 30 1 2 2 I

9 BAGAVtTH SANGYA 45 0 2 1 3.475, 0.000 3. 47 MO N MOO0 1.42 2.05 MO0 2. 65 16

3SAmtyu 55 102 1581'Al 46 12 2RAMCHAND 28 2 2 1RAJI 25 3 2 2VDNKAT P,AO 26 22 1SUEILA 18 32 2

1o SIONKARI MkLLAIAH 56 6 1 1 1.256 MOO0 1.25 MO0 0 MgO 0.33 6.92 MO0 6.92 4SUMMI YELLAIMMA -15 1 1 2SUM4ARI VEINATIC4ALU I0 2 1 1

1O MACARAPU ILAIAH 30 0 1 1 1.450 6. ON 1.45 0.00 6. NO0 .70 0175 0. O00 .715GOUARAPU RADiANMA 25 1I1 2

1o DUJJA UPPALATAH 40 0 4 1 4.ON 0 .MOO 4. M OM 10.0NO 1.30 2.70 11.86 2.78 4UPIE NNA 31 1 4 1

…-.----…--. ----- -- -- -- - ,….. -- -1-- -- -- -- …-

11 ~~~8 MYA AQ51MHA 37 0 2 1 3.00 O. ON 3.06 M.60 MNO 1.18 1.2 08 12 4~~~~~~~~~~~~~~~-…~ ~~~ - -------- ------ ---- -- ~ …- . -~

Page 183: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

App~endix IV Contdo. .AMOtA PRAOESN IRIGIATION PROJECT - III

SRI RNAM SWGA PROJECT

REACH D6N 48 MAN)A PARVATUAGIRI VILLAGE : CHOUTAPkLII

IROP IRYSEM

pap nam Covpen MA CA HA Scheme Uniit cost Gr-ant Loan ChN11a DWACRA Grant Loan T Coivpn T EC Asst T L.om

OADAWATH BICFKMHA 41522 45N2 2 2 8 11952 8BON 3195 600 2 2 2 415N2 I3122 3952MWAN Bih6CHYA 0 0 2 0 0a 2 2 0 2 R 0 0 0. 0 0BADAVAIH MlR 2 2 2 2 0 2 2 2 2 122 2 2 20 1202 2

-- - - - -- - .-.. .. .…----- -- -- --- --- -- -- -… - --- ---- ---…

MW~ERA HAKIA 23222 4522 2 *, 6~S 1222 8222 2022 602 2 2 23222 13122 2202AX- ERA PYANKA 2 2 2 a2 0 0 2 0 W00 2i 0 0 I00 2co/tJXERA CHIC1ANIA 0 2 2 22 2 822 2 21 2 2 2 8202OA3NMEERA RANUGAMMA 0 2, 2 22 0i 2 0 2 10020 0 0 0 1200 0AJMEERA K ISHAN 2 2 2 02 8222 2 2, 2 2 MO2 2AJMEE'RA RAJ f 2 2 0 0 2 0 2 0 2 1t22 0 VI 10020 0

MAAATH BIKNIA M322 1502, 0 2 27 15202 800 7002MO 622 0 2) 138020I 13100, 7220MAAVATH PATHiI 2 2 22 2 2 2 9 12222 21 '12O2 2

SAGVAIH SAKSY A 57202 d522 2 I 11 205N2 8022 12522 602 2 2 2 5722 13122 12522$AHYU 2 2 2 0 0 0 2 0 0 0 2 0, 2 0

RAMCHAND 0 2 0 22~ 2 8202 0 0 2 2 0002 2

VEN0AiRAO 0 2 2 22 2 8UN 2 0 2 2 2 0 8222 2S9EELA 2 2 2 22 2 2 2 2 1002 a 0 2 12ON I

SUWPRI 'KALLAIAH 13022 4522 2 2 27 15222 822 722 602 2 2 2 13222 13122 7202SWKPI YELLAMA 0 2 2 2 2 2 0 2 1222 2 2 0 1022 0S, I RVEI$KATAfrA{LU 2 I 2 2 2 220 ~ 622 .2 I12 6000

KAGARAPJ ILAINH 2822 4500 2 2 1 1182 8222 3822 6M 2 2 2 2MO2 13122 180GOUPARAPU RADMAKMA 0 2 2 0 0 2 0 2 1222 2 el 0 1002

1GU3JA UPIPALAIM 12000 4522 2 10 8222 3822g 602 0 0 0 1202 13122 3822UEHORA 2 2 2 2 2 2

B,HMKA NAPSIiIyA 61542 4 02 2vl 2 8 L1952 822 3952 6Z2 2 g 2 61542 131N 3952

Page 184: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

Appendix IV Contd..,.

Award No Naie Aqe Rel Caste Sex TDrnWod TWetHold Tot Hold T Dry kcq T Wet kcq Tot kcq ID reitain IW remoain I re~mn Cattle B. PA. .

1 1 B)IJKYA BIEEHIA 78 8 2 1 1.250 8.888 1.25 8.88 8.W8 8.47 O. 78 8.88 8.78 8 VBADITA 68 11 2 2BUCfHVA 25 2 2 1

11 ',qUKYA KASM.A 58 8 2 1 8.758 8.8NO 8.75 L88 N 8. 28S 8.63 812 9, 88 8. 12 4MUM(Y StiIATIl 45 1 2 28HLKYA BUCHAPATHI 42 2 2 1BPJ(YA RAN.) 37 21 2 1BHUKYA RANG] 38 3 2 2

II BAGAVATH MITYA 68 8 2 1 1.888 8088 18N 8.88 8.88 0.53 8.47 8.8 8 .47 4BADAVATfi LIZ] 55 1 2 1WNWVM £HAND MU 45 2 2 1BADAVATHi BkLU 48 2 2 iBADAVAdH YAK! 38 4 2 2BADAVATH, SADA 28 3 2 2

II T. MUM]A 5t 8 3 1 4.250 8.8NO 4.25 8.88 8.88 1.75 2.5, 8.88 2.58 6I. MAP SMIA 451 3

- T.SRIN]IVAS RAO 28 2 3 1~~: lov'WIM l1 2. 3 1

12 MALLA SWAIMA 68 8 3 1 2.88 8.888 2.88 8.8 8.888 1.18 8. 98 8.08 8.98 2/N.LA RAWAOIAMNA 55' 1 3 2

12 K. MADAR 68 8 3 1 3. ON 8.8NO 3.88 8.88 8.88 0.91 2.89 8.8 2.09 8AL M;1B 58 1 3 2KflAJA -35 2 3 1KHAJA 81 Jo 3 3 21

4 SHQKYA mON0 A 65, 8 2 1 1.888 0. ON 1.88 0 08G 0.88 80 .63 2.3 MO0 8.37 561IMIKYA UAN] 55 1 2 25PU(Y ILAMIA 55) 1 2 2

4 EADAVAIH SRINU 35 8 2 1 3.008 MN2 IN 8. ffl 8.88 2.38 8. 62 8. X .62z 81 y3ADAVA119 MANGAWA 29 1 2 2

Page 185: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

IREP TRYSEN

P?4 nmel Comen M, CA MiA Scheme Un~it cost Grant Loan Chulla DWACRA Grant Loan) T Compen T EC Asst T Loan

BHUKYA BfEE A 190081 4502 0 2 1 118300 800 380 600 0 0 0 19M0 13102 3802&AVITA 0 0 2 I0 0 0 0 0 0 1ton 0 0 1002 0

6UC~~A 0 0 00 0 8800 ~~~~0 0 0 0l 0 0 8000 0

WUKYA KAJS,A 2`9435 4502 0 0 8 11950 8800 395 600 0 0 0 29)4 35r 1310N 3990~ W YA, li i IFt I 0 0 0 0 0 0 0 0 0 1000 0 0, 0 1000 0

Ht(A 5UUI I AP,ATi i1 0 0 0 VI 0 0 8000 0 0 0 0 0 0 8000 0MHUMYR/ I 0 0t' 0 0 0 0 8000 0 0 01 0 0 0 8000

SU APNG I 0 0 0 009 0 0 01 0 1000 0j 0 0 100o 0

BADUAATH ~,11i A 2326d 4500 0 0 1 11800 8000 0N 5§2 0 0 0 23264 13100 3300BAWAATHUllZ 0 0 0 0 0 0 1 0 0 0 0 0 0BADA'VATH CHNDRU 0 0 0 0 0 8000 0 0 0 0 0 0 300N 06ADAVATH SAWU 0 0 0 0 0 0 8000 0 0 VI 0' 0 0 800Ul0 0MAAVAThiYAK1 0 0 0 2 0 8000 0 0 1080 0 0 0 '9008t 0OADAVATHi WOA 0 0 0 0 0 0 0 0 10001 P 0 100 0

T. VENKAIAH 707008 4,010 0 0 2 "JO0 8000 101 008 600 0 0 0 7 07Y0 0 i3100 30 01,0T.NARSA40 0 1 000 0 0 0 1000 0T. SR i wvW RAO 0 0 0 0 0 8000 0 F 0 0 3800 160,00 0 11000 RN0T. HADPAYYA 0 0 0 0 0 08 0 0 3N08 600,0 0 110,00 680

AALLA StA05A1AH 4400 4500j 0 I 1H11O0 8UN 3800 600 0 0 j M 44I 131i00 3300AA{LA RAAK0TAYNA 0 0 0 0 0i 0 0 0 0 1000O 0 T, 0 10NO 0

ND. MAGAAR 841 2 9 450 0 0 8 1195 NM 3959 U60 0 0 0 34129i 1 310~0 3990J, ~ ~ ~ ~~~~~0 0 0 0 0 0 0i 0 108641 0 0 10N 5

KH A",A 0 00 3000il 0

811OKYA THODIA 5190 4500 0 0 7 7000N a 90 620010 6001 0 0 0 I1d: It1 h j3100 t' 62M003HUKYA LAGil 0 0 0 0 0 0 0 0 0 100011 0 F0 0 NOO bUMYA ILAWA 0 0 . 0 00 0 000 10)000 10

SADAVATH SPINS 9122 ~~~11920 0 2 27 19000 &8000 7000 500 00I 9 12 1341 06 7000OV2.A~~~VATH ~~~UNGAVV0. 6 0 0 0 0 0 ~~~~~~0 0 00 0 0 1000

Page 186: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

Apr:endix IV Contd,. ,

t~~~ward ~~~~o W Rcl Caste Sex Mn%13od eTkUld Tot hoId I DrY kcQ I Wet Acp rot Acq ID remain 1W rcmain I remain Cattle ~ PL

UDtAVAT11ILRYA 31 0l 2 1 1.125 @i 01 1.13 0.0 L0,,oo 036 0,77 p, 0.7~?ADRI 2 1 22077 0

BADAVATH DH0ULI 39 0 2 1 3. 475 0.O 3.47 0,0 9. ON .93 2,49 0.0 2.49 8

2 MO. ISMAIL 38 0 3 1 IN0 0.O 3.09 0 00 9-N 083 2,1.7 W.001 2.17 A1MDJ CM 1 34 1 3 2HD.NAFEES 52 4 3 2,ID,AFNOZ 32 2 3J 1

Page 187: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

Appendix IV contd...---------------------------------- ---------------------------------------------------------------------------------------------------------------------IRPP TRYSEM

----------P"p -nam Coven M CA HA ScheK Unit COSt Crant Lox Chil 1 a DWACRA Crant Loan T Compen T EC Asst f Loan

----------------------------- ------------------ I------------------ ----------------- --------------- ---------------- -------WAW)TH HLRYA 13702 15N 0 0 3 8006 silm 0 6M 0 0 13702 131N E.BADR I R 0 0 0 0 0 0 0 O 1000 M VI lilet

- - -- - - - - - - - - - - -- - - - - - - -- - - - - - - - - -- - - - -- - - - - - - - - -. 1 - - - - - - - -- - - - - - - - - - - - - - - - - - I- - - - - - - - - - - -- - - -- - - - - - - - - - - - - - - - - - - - - - -

MOVATH 'vfilNL I 40984 4-5,00 0 0 2 90,010 8000 IVIOO 600 VI 0 0 10984 13100 1 ON------------------ --------------------------------------------- ----------------- ---------

MD. JIMIL 33N� ti W 9 0 1 ilBoo RIPIO 36h.1 6010 0 9 0 33ON 1340 iez, ek. MUNIN I 0 � 0 0 � O 0 9 O ION O 0 0 1000 0�D. NPIEES 0 0 ri 0 0 0 RN 0 � 1000 0 0 0 90vie 9h D. A)" WO Z � I 0 9 0 O sm 0 0 0 0 0 NN

--------------------------------------------- -- ----------------------------------- - ----------742478 409500 0 0 290100 28klNg 138100, 114H 25ON 9000 18000 '1112478 41M 156100

------------ ---------------------------------------- -.- Il --------------

Page 188: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

Appendix IV Contd...

ANDHRA PRADESHi IRnGAfION PROJECT - IIISRI RAMA SAt-AR PROJECT

PEACH DMI- ,'r3 MAAL PARVA1HAGIRI VILLAGE CHOUTAPALI (Area in~ Ac.res~)

Awar-d No NWm AMc Rel Caste Sex fOryHold rwettHold Tot Hold T Dry Acq T Wet kcq Tot Acq TO remain TW remain T remain, Cattle B. P. L,

2 BANOTH PLEIYA 38 1 2 1 4.~ NO W,0 4.N U, 00 0.O 1.88S 2.12 &N 2.12 8

EANOTH, 5&RAHHA 35i 1 2 2

2 BANO IHU SAMXR 35, ~ 2 1 0. 87S) 2.0 0.883 .9 0. N 0. 3S .5 .S. N 05 0BAWNOTH KW" ALi 2j 1. 2 2BANTH MAIN 55 2 2 1

---------- ---------- ------------ ~~~~~~~~~~~~~~i

Page 189: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

MNDHRA PRADESH IRRIGATION PROJECT- III Appendix IV Contd,.SRI RANA SAGAR PROJECT

REACH DSM-48 HANDAL PARVATHAGIRI VILLAGE : APALLI

IROP TRYSEM

pap nown Cope A CA HA Schemce Unit cost Grant Loan ChullIa UWACRA Grant Loan T Compen T EC Asst T Loan

grjIOTH AKUI50~ 50 6 10000 0000 20U 0 00 0 0 0 715000 131N0 2000

BANOTHKAMSALi 0 0 0 0 0 0 0 i (0 10(00g (0 ( 0 100 (0SANOTH HI U 0 0 ( 0 0- 0 8000( 0 (0 0 ( VI 0 8000i (0

90(00( 4230-00 0 0 210000 24000 400N 121W0 2(000O 0 0 90000 3632N 4 0 IN

LI

Page 190: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

Appendix IV Contd...

MMA PRADESH IRRIGATION,PROJECT - IIISRI RNAM SAAR PROJECT

REACH D8J4-48 MANDAk PARVATHAGIRI VILLAGE VIUAPAtLI (Area in Acres)

Award No Namve Mqe Reli Caste Sex TDryiold TWetHold Tot Hiold T Dry kcq T Wet Acq Tot Acq TD r2lain 1W r-emain T remain Cattlc B, P. L.

8 SONNAILA VENKAIATIAH 45 8 3 1 2.258 8. 88 2.25 0,00 OM8 8. 8 1.67 8.880 1.67 0 SOPNNAILA SAKKUBAI 38 1, 3 2SONNAILA SRI NEVAS 25 2 3 1SOUNAILA RAMA 1.8 3 3 2SONNAILA NAGANDRA 18 2 3 1SONNIAILA RAJASWKAR 18 2 3 1.

1A GbLJLA NALLAliA 7$ 8 4 1 2. 358 8,888 2.35 2.00 0,00 8.68 1.75 8.88 1.75 8WMPAAIAHA 38 2 4 1UPENDRA .28 3 4 2

9 BADAVAPH LACHCHffA 21 8 2 1 1.750 8. ON 1.75 8.08 8.88 1.18 8, 65 8. 08 8.65 - 8 ySAKGHYA 68 2 2 1SONRLI 55 3 2 2

13 MMEN RAJAIAU 35 8 4 1 2.588 8. Ng 2.58 8.00 8, OOJ 1.88 1.58 8.88 1.58 3SUGENI NIRMALA 38 1 4 2

6 B. CHANDRA BAtNJ 48 82 1 2.158 8,88 2.1$ 8.8 8. 81 1.58 8.65i 8.88 8.6$ 1. K AIlI 35 1 2 2

6 PkLTIYA EERYA 35 8 2 1 2.300 8.888 2.38 8.88q 8.888f 2.38 M.N 8.88 8.08 8LAKSHNI 38 1 2 2

6 BANOTHU GHANDYA 68 8 2 1 2.675 8. NO 2.7 .08 i 0.000 8.68 1. 99 8.880 1. 99, 8 VHACHi 58 1 2 2RM. 25 22 1

CHINI ~~~~~~~~~~~~~~28 3 2 1

0 ~~~~~~~~AJIMELRA MNAKiA 58 8 2 1 1.888 8. NO 1. 008 0.8 8.00,0, 0tS 0. 5 8.5 .0 8.55 7.RUXKI. 48 i 2 2KIS1IN 22 2 2 1 RAJI 20l a2a 2,

Page 191: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

ANDHRA PRADES'H IRRIGATION PROJECT - III Appendix IV Contd,..$,RT RWN SAGAR PROJECT

REACHi -4-8 MND~AL :PARVATHAIRI VILLAGE . CHO1jTAPkLL

iROP TRYSEH

Px name ~~~Compen KA CA HA Schem~e Unit cost Grant Loan Chul a DWACRA G ran t Loani T Compen T EC Asst T Loant

SOMNAILA VEW(ATAIMi 2301g 491 0 I 18 1W.0 800 7O0 0 600 0 0 0 23000 1).310 79 "MSCAILA MKKU&Al C C 0 0 0 0 C 0 0 1oco 0 0 C 1000O 0SONNAILAi SR INCVAS 0 0 0 0 0 0 800 0 0 0 3000 6000 0 1100N 6000rSO,'TNAILA RAMA C 0 t 0 00 0 0 C 1000 0 0 0 100 0lC~ONNIAILA MAU&PA C 0 0 0 0 8000 0 0 0 300 60,00 l 11000 6000CCNA~ I R,AJA~ AKA R C 0 0 0 0 8000 C) 0 C C 0 ?I 800 0l

GU3ULA -ALLAIAh 240 50 111C0 8100 .jvC 13 0 0 24000 13100 380TIMPAT AIHA 0 0 0 00 C 0 10 0 1 0 8%.C 0

UPENUPA 0 0 0 00 ~ ~~ ~~ ~~~~~~~~~~0 0 0 0 00 C 00 10

WAAVAWF LbALKC~M, 4/100 41 500 0 0i 7 70000 8000 64Y00 600 0t 0 0 -41000 1310 U 62 t0,

&ING~~~~~YA 0 1~~~~0 i 0 0 0 8000 0 0 0 0 0 8C00 CJJNELI 0 0 0 0~~~ ~~ ~~ ~~~0 0 0 C 0 1010 3 0 0 '3

SUOGNI RAJA1AH 4C7~~~~0 4500 0 0 1 USOC 80010 IG~~"PoC C01 0 0 .4 0 R 0 j 0 WlO300SUNG'F.N,1 NIRMALA 0 0 0 C 0 10 0 O 1000 0 C 0 1 0 080 0

B. CHAWIR AI 690 4500 0 0 7 70010 8000 62N00 600 0MO 131N 620015KAPU C C C 0 0 0 0 0 100 0 0C 10010 C to

PAWT'YA E[RYA 120030 14500 0 0 7 7000 8000 62000 600 0 0 C UCCO 03iC0 67000LAKSHMI' C 0 0 0 0 0 0 0 1000 i, O 0 10N0 0

CANCThU GUANUYA 27005 iS~~~ 0 09 106500 8000 17850 600u 0 10 0 2 7 0 131M 17850

RAMA ~ ~ ~ ~ ~ ~ 0 0 000 8000 10 0 0 0 C0 8000 CHINI 0 0 0 00 0 ~ ~~ ~~ ~~0 0 0 0 0l 0 0 0. 0

AJ9EERA HANTA 160 50 0 0 1 I.1800 500 t0 13600 601, 0 0 0 180 0 13100l 3400RIM 1~~ ~~~~~ 0 0 0 0 0 0 Ii~00 0 0o 0 1O0 -

KISHMf C C 0 CC C F 000 C C C C 4,00 RM I 0 0 0 0 0 0 il 0 0 1000 0 0 101

Page 192: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

Appendix IV Contd...

Awar'd Nlo Name Aqe Rel Caste Sex iDryHold TWetiold Tot Hold T Dry Acq T Wet Acq Tot kcq TD remRain 1W remain T remain Cattle B. P, .

9 BAAVATH JAC,GU 43 3 2 1 S. NO 0.000 5. 33 3.3 3.333 1.53 3.5CI 3i.33 3,530 4BADAVATH 01R 38 1 2 2BADAVAH 'bALU 22 2 2 1BUMI 23 3 2 2BADAVATIN KAVATA 20 14 2 2

13 GCURARAPU 1LAIAH 35 3 1 1 2.753 UN0 2. 75 3. N . ON3 0. 73 2.05 3.33 2.3ri 3 VRADHAMMA 31 1 1 2

I3 &JJJALA UPPALAIAHi 33 3 4 1 5. 333 3.3 5.33 0-M 3. ON 1.33 3.73 4.3 3.73 3UPENDRA 28 J 4 2RANAXAA 48 4 4 2

13 Ml,"AALLY NARSu% RAO 53 3 4 1 5.537 3. NO 5.54 330 US3 2. 54 3.N &33- 3.00 3VIJAYAGARAO 43g 1 4 2NARSI'¶AM 35 1 4 2

18 BADAVAiH GOJEE 33 3 2 2 2.53 3NA0.3 2.5St 3.30 3. NO 83 1.67 U33 L67 6LATE 6.BICMAE 33j 18 2 1 LSiiANKAR 18 2 2 1 .

8 KA IAIY VENKAIAIA 25j 3 3 1 4. 333 3. Ai 4.33 30 . 33 000 1L32 211,98 0.33n 2.96 2RAJAMkM, 25 1 3 2LAXMI 35 2 3 1DELVAI 35 2 3 1

103/293 J)URR KGiURAIA4 6~ 3 3 1 1.533 3. 333 1.53 MO3 3.333 3,47 1'.3 3' . 1,33 2IL P-P ~L A Vi4A CIO 1 3 2SURAI AH 33 2 3 1REAUKA GANDHI 23 3 3 2

11/49293' A. KOliUPAIAII 63 3 1 3.625 21.3'0 3.635 3.33 3.Or 0. 353 3.33 3.3 0.30 3 V

Page 193: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

Appendix IV Contd.,.

IRDP TRYSEM

Pap ncain Cowien MA CA HA Schemea Unit cost Grant Loan C N111 (DAA Grant Loa m I Coinpen T EC Asst T Loa

BADMATAH I'AGGU 46000 4500 0 0 7 70000 8not 6200 600 0 0 46000 13100 6200N6ADAATHUERI 0) 0 0, 0 0 0 0 0 0 1000 0 0 0 10010 0iBAAVATWSUM 0 0 0 00 0 8000 0 0 0 0 0 0 8000 08U33 0 0 0 0 01 0 0 il 0 1000R 0 0 0 100.0 0

6AAAHKAVATA 0 0 0 1 . 0 0 8000 0 0 100N 0 lb 0 9000 0

GOUPARAPU RLATAM 238000 411500 0 0 1 1.1800 UN0' 36500 600 0 0 0 28M1 15310 3P00RA6APfIMA (1 0 0 0 0 0 0 0; 0 01(1000 0 0 0 100(1 0

&WJALA UPPALAIAH 52000 ~~~~00 Pi0 17 IN0 8OB00 600 0 0 0 52000 13~100 0LKIVI SA 0 0. 000 10 0 (1 0 1000 RAN1AiAA 0 0i 0 0ee0 0 800 10 a 0i 0 90,0 0

M ITf1TTP 1 NARS1JNG RAO I 1i 00 4500P 0 0 1 11800 8000 30040 6 0 0 0 0 101500 13100 3,800VTJAYACAPAO 8 0 0 0 0 0 0 1000 0 0 1000o 0

NARI~~~ft, O~~ 0 0 0 0O 0 R 0 Ff 1000 000 i0

('ADAVATH 603E0 465~6 4500 0 0 9 186500 600vi0 178500 600 180iCl0 0 0 46536 1410N 17850LATE MICHYAE 0 0 0 0 0 0 0 0 0 0 0 0 0 0 08flAhAR 0i 0 0 0 0 0 0 0i 0 0 0 0 0i 0 0a

KAITAM VENKATAIAI 410,00 4500 0 0 0 11,950 8we 3950 600 0 0 0 41000 13100 3950RAJA,,A 0 0 0 00 0 0 0 0 1000 0 0 0 1000 0LAXH 0 0 0 0 0 0 8000 O 0 0 3000 6000 0 11000 6000N

LiCVAIA(I . 0 0 0 0~~~ ~~~~~~0 0 8000 0 0 0 30(10 6000l 011 l000 6000

JOUI1 K MAWA 1 66 25 45N0 0 0 8 1195 8000 3950 60 0 0 16625 13IN 3950SMP PAhA~A0 0 0 0 i 0El 0 100. 0 0 UN 0PROGNU(A&Tui0 0 0 0 0 0 0 0WO 4 10 el

A, K0IUJAIA 24664 4560 0 0 1 11600 800 31,0 600 0 (4 Ol 246,64 1.31010 3800

550325 72000 0VI67700 24000 N 6427010 960 2-2000 112000 2,4000 550325 .35,5600, 6667010

Page 194: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

Appendix IV Contd..*

ANDUiRA PR AbDSH IRRIGATIOM PROJECT -IIISRI RAMA SACNAR PROJECT

REACH DVI-48 MNAL PARVATHAGIRI VILLAGE CHOUTADNA.LI (At-ea in Acres)--__----

Award No Name Age Rei Caste Sex TDryHold TNetHold Tot Hold T Dry Acq T Wet Acq Tot Aco ID, rexain TW remain I remain Catt'le U.PL.

MATTAPALLI VENKATESHWARLU 65 9 4 1 U;O" 0-90 0AI6 023~ 0. 4S .3 4AN iHIA 6 1 'I "2MAINIMR RAO 35 2 4 1SUBHADRA 30 3 1 LI

2 P~~~~~OTARAJUSWMNY 2~ I I 1 UN 9.275 0.55 OM. O. 1M 0.20 UN 0.18 0.35 0 V

Page 195: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

ANOHRA PRADESH IRRIGATION PROJECT - II Appendix TV Contd...SRI RAMA SAGAR PROJECT

REACH DSN-48 KiADk PARVAWIAGIRI VILLAGE CHOUAPALLI

(Pap nall Compen 4A CA HiA Scheme Unit cost GI-ant Loani Chul a OWACRA Grant Loan T CoAzen T EC Asst T Loan

MTiAPkiTAL VENKATESW~U 1808 4588 8 8 8 11958 888 Th8 688 0 8 8 1888 13188 3958ANTINNItA 8 I 8I88 8 8 8 m 188 8 8 8 MO8 8RAVIW)AP"RAO 8 8 8 88 8 88 8 9 8 8 8 8880 IStBMDA J 8 880 8 8 8 1888 8 0 8 188 i

POTAPkJU SWAMY 11888 V o 4Eff, 8 8 12 15888 SON, '7888 688 8 8 8 118880 13188 MO8

I 2840 98n 8 8 26958 24OW 195, 1280 2888 8 8 12888 36288 18958………… . ………… .~~~~~---- - - - -- -- - - -- - - - - -- - - -- -- - - --- - - - -- - - -- -- - - - - -- - - - -- - - - --…-- - -

Page 196: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

Appendix IV Con td..fANMORA PRADESHI IRR16AAION PRojECT - 11

SRI RA,A ShGAR PROJECT

R,-ACH D6I-48 HANDAL PARVATHAGIRI VILLAGE CHOUTAPALLI (Ar,ea in Acres)

Award No No-m Aqc Rel Caste Sex TIDrylold TkctHold Tot Hold T Dry Acq T Wet Acq lot kq TD r8mai Tn remait T remai^n Cattle B.P,l.

1 "AN1T SNAWI-; ' 3 1 0.I 1.0 2.0 M.00 I40 .93 .01 &.S4 1.D7 D..--...-------- -.-.-----..-..-..-.-...-.-.-...-..-.---.----------------...... . . .......... .. ...... ...... . .. ..X .................. .. ....... .-----.......---- . . . . . . cr.

Page 197: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

ANOHRA PRACSH IRRIGATION PROJECT - IIISRI RAMA SAGAR PROJECT

RCACH [,V4I fiANDAL PARVAUIAGIRI VILLAE CHOUTAALLI

IRDP TRYSEN

Pap n-;me (:CopCn r!A CIA HA Scheme kirit cost Grant Loan Chulla DkiACRA Grant icion T Coipen 1 EC Asst i Lo;;n

CH%AfAN I SNIl fiA,AH 47 L 5. fl C-1 0 D 2 s "NO AN 1D0 600 ?l V 4'0.l 01iu~~~~~!iASD 4so10 i~~ 'hJ 61 I00 2. 80C0C S101I iD 6I... .SC 0 fZ D I D17 f i31X, llIb

Relationship Code: Scif-o; Wife i; Son 2; ;iuihtcr in-l;w-; aushttr-l; Son-in-law-S; Elder Brother-6S Sister-in-law-7, Younger Crother-8; Nece-9; thc -11 hothr-3.3; Grandfathcr-i2: Grand coth.ri> Gr.nd ,on-4: Grand dauqhtcr-15; F hthr-in-law-16S Hothcr-in-llaw-i7: Others-i8.

Page 198: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

FIGRE-I~~~~~~~~~~~~~~~~~~ SOIL SCHOUTAPALLI VILLAGE

PARVATHIGIRI MANDAL

LECENE

___i__ s Ys= RED SOIL

8¶f -ACK SOIL.

1jfj MIXED SOIL

Page 199: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

FIGURE>.II r. {, - ';>,- COMMAND AREA PROPOSEDCHOUTAPALLI VILLAGE

J )) ,'"-K' ' C, >< ' ,K,' ' 4 , PARVATHAGIRI MANDAL/r , , '' ,; % * X 2A XDBM-48 SRSP

I WARANGAL DI I S ST ICT00 0~~~~ 33 'C '3~~~~~~~~~4;) ~~ KrnO IK'

- Q'I~~~~~~~~~~~~~N

30, ,. X3 :, 1, 30-'S:,0* 36?

'\3W''' ' l- i'-_; X,K 33..........40?.......0*... 33E1

0' 0310* 60 440'I'-4,3

/ -"'4-'-' - \3*0 " '/ A ~~~~~~~~COMM.AND AREA

/ 003 - - 33? 413 , -~~~~~~~~~~~~~~~~ -1 AN

/ 301?~~~~~~~~~44

Page 200: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

FIA1tS<X; LOCATION OF WELLS. 0 | \\° o °>x CHOUTAPALLI VILLAGE. ) ° < ° ° \PARVATHIGIRI MANDAL

DB M - 48 SRS P

0~~~~

° ° ° WARANGAL DISTRICT

0 0 ~~0 0 0

\\ wt < ~~~~~~~~~SCALE Ik

0 -lk 0 * km

00 ~~~010 ~ ~~~~~~~0r

0

0 0

U~~~~~~~ ~ ~ 0 ~~0 00 -

0o0 ° o o o oo 0 % °

0 0 0 0) 0 00 0 0 0 0

0 o ° o 0 |

0~~~~~~~~

I oo o 0 0 0 ° °

~0 0 0 0 0 0 LEGEN

0 0~~~~~~~~~~~~~~~~

| 0 0 0 0 0 00 0 2o | CANAL OUNDARY

0 ~ ~ 0 0

: \\ 01ri 0 a 0 0 00 E EN

Page 201: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

P=RE-sIV CROPPING PATTERN - KHARIFCHOUTAPALLI VILLAGEPARVATHAGIRI MANDAL

WARANGAL DISTRICT

SCALE

k m 0~ ~ ~ ~~~~~~~~~0

*n~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~:

L E G E ND

PADDY

CHIL LIES

GREENGRAM

GROUNDNUT

SEASUM

COTTON

MAIZE

Page 202: PROJECT AFFECTED PERSONS ECONOMIC …...PROJECT AFFECTED PERSONS ECONOMIC REHABILITATION PROGRAMME (PAPERP) VOLUME -11 ACTION PLAN Prepared for IRRIGATION AND COMMAND AREA DEVELOPMENT

E IGURE V CROPPING PATTERN -RABI

CHOUTAPALLI VILLAGE

PARVATHAGIRi MANDALDBM -48 SRSPWARANGAL DISTRICT

(l\ o 4 <///Xt/A\ ~~~~~~k mo k m

S | .C L E E D

| j9 X GROUNONUT

SUNFLO'WER

MAIZE