PROFILE OF KATHUA DISTRICTS. No Item Magnitude
1 Geographical Area 2502 Sq. Kms
2 Population as per Census, 2011 615711
3 Sex Ratio 877
4 No. of Constituencies 05
5 No. of Blocks 08
6 No. of Border Blocks 03
7 No. of Panchayats 244
8 No. of Villages 512
9 Govt. Ayurvedic Dispensaries 4510 Govt. Allopathic Health Institutions 193
a) District Hospital 01
b) Mahatma Gandhi Hospital 01
PROFILE OF KATHUA DISTRICTS. No Item Magnitude
c) Community Health Centres 05
d) Public Health Centres 24
b) New Type PHCs 11
c) Sub Centres 151
11 Asha Workers 657
12 Rogi Kalyan Samities 42
13 Vill. Health Sanitation Committees 517
14 No. of Vety. Institutions 118
15 No. of Sheep Extension Centres 53
16 Govt. Educational Institutions 1428
a) Govt. Degree Colleges 06
b) Higher Sec. School 37
PROFILE OF KATHUA DISTRICTS. No Item Magnitude
c) High School 104
d) Middle School 365
e) KGBV 04
f) Pry.School 912
17 Literacy Rate (2011) 73.50
a) Male literacyb) Female literacy
81.4064.56
18 Drop-out rate 2012-13(Elementary Level)
03.25
19 ITIs 04
Plan Performance, 2012-13(Distt. Plan)
# Component Approved Outlay 2012-13
Availability 2012-13
Exp. ending March 2013
%age of Exp against availability
I Revenue 3971.93 2866.92 2788.38 97.26
II Capital
1 State Share 2087.45 1383.91 1382.74 99.92
2 NABARD Loan 1713.12 1642.46 1617.81 98.50
3 LIC Loan 160.00 0.00 0.00 0.00
4 Tied Grant 1420.00 628.20 628.20 100
5 Projectized 1020.46 1210.81 1187.47 98.07
Total Capital 6401.03 4865.38 4816.22 98.99
Grand Total 10372.96 7732.30 7604.60 98.35
(Rs. In Lacs)
Financial & Physical Progress
under
Different Programmes
2012-13
FINANCIAL ACHIEVEMENT 2012-13 (PHE-MNP) #
# Sector 2012-13
Approved Outlay
Availability Exp. ending March, 2013
%age of Exp
1 Revenue 294.61 283.20 283.20 100
2 Capital
State Share 121.00 121.00 121.00 100
NABARD 190.00 165.00 165.00 100
LIC 160.00 0.00 0.00 0.00
Additionality 0.00 33.00 33.00 100
Total Capital 471.00 319.00 319.00 100
Grand Total 765.61 602.20 602.20 100
(Rs. In Lacs)
District Plan
HABITATIONS COVERED BY PROVIDING POTABLE DRINKING WATER
# Particulari) Total habitations 1019
ii) Habitations fully covered 537
iii) Habitations partially covered 482
PHYSICAL ACHIEVEMENT 2012-13 PHE (MNP)
# Name of the Sector / Scheme
2012-13
Unit Target Achievement
1 PHE
Targeted Schemes Nos. 1 1
Habitation to be covered
Nos. 3 1
Mohras to be covered
Nos. 13 10
Population covered
Souls 4412 1141
District Plan
MAJOR FLAGSHIP PROGRAMME-NRDWP
# Particulari) No. of schemes 149ii) Estimated cost Rs. 196.06 Cr.iii) Cumm.Expenditure ending 3/2012 Rs. 72.08 Cr.v) Approved Outlay Rs. 23.69 Cr. vi) Funds available during 2012-13 Rs. 20.25 Cr.
vi) Exp. during 2012-13 ending 03/2013 Rs. 17.94 Cr.
Physical Target & Achievements 2012-13
Target Achievement
a) No. of schemes 16 13b) No. of Habitations 50 40c) Total population benefited 13124 10844
C S S
CONSTRUCTION OF 20000 GLNS GSR AT TUEN UNDER WSS JANNU (NABARD) ESTIMATED COST = RS 4.99 LACS
WSS JANNU BLOCK BASOHLI EST. COST = RS 111.96 LACS
Date of Start 04/2012 Target dt. of completion of Scheme 2014-15
CONSTRUCTION OF 0.30 LAC GLNS GSR AT VILLAGE UPPER KHAROTE = Rs 5.75 Lacs
WSS DRALLAN KHAROTE (NRDWP COVERAGE), ESTIMATED COST = RS 193.12 LACS
Dt. of start 06/2012 Target dt. of completion of Scheme 2014-15
CONSTRUCTION OF DUG WELL AT KHABEL IN PROGRESS = Rs 11.79 Lacs
WSS JUTHANA (NRDWP COVERAGE), ESTIMATED COST = RS 215.74 LACS
Dt. of start 01/2013 Target dt. of completion of Scheme 2014-15
CONST. OF 5000 GLNS RAPID SAND FILTERATION PLANT AT KHALIAD = RS 25.00 LACS
CONSTITUENCY – BASOHLI , WSS KHALAID (NRDWP COVERAGE), ESTIMATED COST = RS 160.24 LACS
Dt. of start 04/2012 Target dt. of completion of Scheme 2014-15
AVAILABLE INFRASTRUCTURE OF POWER DEV. DEPTT. (POWER) #
# Item Status
1 Grid Stations 04 Nos.
2 Receiving Stations 41 Nos.
3 33/11, 66/11 KV Power Transformers 56 Nos.
4 Distribution Transformers 3418 Nos.
5 Total Install Capacity 446.15 MVA
6 Total Line length (66KV) 187.50 Km
7 Total Line Length (33 KV) 191.55 Km
8 Total Line 11 KV 2765.48 Km
9 Total LT Line 6706.19 Km
10 Total No. of 11 KV Feeder 112 No.
PHYSICAL/FINANCIAL ACHIEVEMENT 2012-13 (POWER)
# Item Status
1 Approved outlay 57.50 lacs
2 Funds Available 67.50 lacs
3 Expenditure 67.50 lacs
4 Transformers Repaired 424 Nos.
District Plan
REPAIR OF ELECTRIC TRANSFORMERS UNDER DISTRICT PLAN
RAJIV GANDHI GRAMEEN VIDYUTIKARAN YOJNA
VILLAGE WISE STATUS
1 No. of villages under RGGVY (548-72) 476
2 Villages Electrified 476
3 Taken over certificate (TOC) issued by PDD 470
HAMLET WISE STATUS
4 No. of hamlets under RGGVY 1123
5 Completed 1123
6 TOC issued by PDD 1117
Flagship/CSS #
FINANCIAL ACHIEVEMENT 2012-13 (EDUCATION SECTOR) #
# Component Original Outlay
Availability Expdt. 2012-13
%age
1 Elementary Education
1610.61 1510.61 1451.09 96.06
2 SSA 1368.00 221.63 221.63 100
3 Adult Edu. 81.89 00 00 00
4 Sec. Edu. 893.96 811.96 784.09 96.56
5 Teachers Edu. 3.56 3.56 2.39 67.13
6 RMSA 510.89 2.25 2.25 100
Total 4468.91 2550.01 2461.45 96.53
(Rs. In Lacs)
District Plan
PHYSICAL ACHIEVEMENT 2012-13 (EDUCATION)
# Name of the Sector / Scheme 2012-13
Unit Target AchievementElementary Education
Opening of Pry. Schools (SSA) Nos. Nil 25 (Against the target of 2009-10)
Mid Day Meal Stds 56837 56837
Free Supply of Text Books Nos. 74000 78000
Scholarship to G&B Students. Stds. 5114 4959
Const. of Kitchen sheds. Nos. 239 192
Const. of ACRs in MS. Nos. 39 11 Completed 28 in progress
Const. of ACRs in HS Nos. 34 2 completed, 32 in progress
District Plan
PHYSICAL ACHIEVEMENT UNDER SSA
S. No
Item Ach. 2012-13 Cumm. Ach.
1 RETs Engaged 133 2194
2 RETs Regularized 61 1466
3 New Schools Opened
25 528
4 PS upgraded to MS
24 227
5 No. of RETs engaged in EGS upgraded as NPS
130 416
Flagship/C S S
STATUS OF CIVIL WORKS TAKEN UP UNDER SSA
# Particular Target Completed
i) PS buildings 571 372
ii) Additional Class Rooms 561 348
iii) Upper Pry School Buildings 21 15
iv) CRC buildings 37 31
v) BRC buildings 06 05
Flagship/C S S
PROGRESS UNDER RMSA
# Particular
i) MS upgraded to HS during :
2009-10 03
2010-11 09
2011-12 23
2012-13 -
Total 35
ii) Buildings approved for const. in Newly Upgraded HS :
35
iii) Buildings taken up for construction. 12
(iv) Building completed 01
Flagship/C S S
RMSA
PHASE Ist AAA Cost = Rs. 52.80 Lacs
Targeted Date of Completion May 2013
ADDITIONAL ACCOMMODATION IN NEWLY UPGRADED HIGH SCHOOL AT SUMWAN UNDER RMSA (2012-13)
RMSA
PHASE IInd AAA Cost = Rs. 39.91 lacs
ADDITIONAL ACCOMMODATION IN NEWLY UPGRADED HIGH SCHOOL AT BHALLAR COMPLETED UNDER
RMSA (2012-13)
04 NOS. CLASSROOMS IN H.S.S AT PARANALLA
AAA COST= Rs 52.58 Lacs Expt. Rs 23.50 Lacs
Date of Start 01/ 2010 Date of Completion 03/ 2014
ADDL.CLASSROOMS IN H.S.S AT PARANALLA UNDER STATE SECTOR
FINANCIAL ACHIEVEMENT 2012-13 (HEALTH) #
# Component 2012-13
Approved Outlay
Availability Expenditure %age of Exp
1 Revenue 107.43 107.43 106.39 99.03
2 Capital
Projectized 296.85 302.20 296.85 98.23
NABARD Loan 110.00 64.34 39.69 61.69
Total Capital 406.85 366.54 336.54 93.18
Grand Total 514.28 473.97 442.93 93.45
(Rs. In Lacs)
District Plan
PHYSICAL ACHIEVEMENT 2012-13 (HEALTH)
# Name of the Sector / Scheme
2012-13Unit Total
schemesStatus
1 Const. of PHC Blds. Nos. 08 1 completed 7 in progress
2 Const. of S/C Blds. Nos. 34 10 completed 24 in progress
3 Const. of NTPHC Blds. Nos. 04 Work in progress
4 Repair of SC buildings Nos. 02 1 completed,1in progress
District Plan
District Plan
S. No Name of the work/ scheme`
Works taken up
Works completed Estt. Cost Exp. during
2012-13Cumm. Exp.
ending March 2013
a) PHC (Normal Plan) 6 1 417.69 52.62 330.46b) PHC (NABARD) 2 0 332.69 46.07 278.692 NTPHC 4 0 386.70 72.82 254.923 Sub Centre 34 10 1142.19 142.53 936.574 Others 2 2 5.50 4.00 5.50
Distt. Plan Total 48 13 2318.62 348.04 1806.14
STATUS OF HEALTH BUILDINGS
CHC AT BASOHLI
AAA COST= Rs 1027.43Lacs. Expt. = Rs 899.91Lacs
CHC AT BASOHLI UNDER STATE SECTOR
AAA COST= Rs 1027.43Lacs. Expt. = Rs 899.91Lacs
Dt. of Start 2003-04 Target Dt. of Compl. 03/2014
Completed under Distt. Plan Est. Cost = Rs. 28.09 lacs
(under Distt. Plan Est. Cost Rs. 206.35 lacsExp. Rs. 154.33 lac Target dt. of comp. 03/2014
FINANCIAL ACHIEVEMENT 2012-13 PWD (R&B) #
# Component 2012-13
Approved Outlay
Availability Expenditure %age of Exp
1 CapitalProjectized 160.00 312.00 312.00 100NABARD
Loan1413.12 1413.12 1413.12 100
Total Capital 1573.12 1725.12 1725.12 100
Grand Total 1573.12 1725.12 1725.12 100
(Rs. In Lacs)
District Plan
PHYSICAL ACHIEVEMENT 2012-13 PWD (R&B)
# Item 2012-13
Unit Target Achievement
a) Black Topping Km. 24.75 27.50
b) Metalling Km. 23.80 21.80
c) Shingling Km. 34.00 32.89
d) Fair weather road Km. 34.60 31.00
Schemes completed No. 05 05
District Plan
FINANCIAL ACHIEVEMENT 2012-13 PWD (R&B)
# Component 2012-13
Approved Outlay
Availability Expenditure %age of Exp
1 CapitalProjectized 1121.00 1116.92 1116.92 100NABARD
Loan89.00 89.00 89.00 100
Total Capital 1210.00 1205.92 1205.92 100
(Rs. In Lacs)
State Plan
PHYSICAL ACHIEVEMENT 2012-13 PWD (R&B)
# Item 2012-13
Unit Target Achievement
a) Black Topping Km. 48.90 52.90
b) Metalling Km. 28.30 25.50
c) Shingling Km. 30.35 28.40
d) Fair weather road Km. 18.05 28.25
e) Bridges No. 04 04
State Plan
PWD (R&B)
CONST. OF BALTA TO STOE ROAD UPTO PLAILUnder State-Plan-NABARD Date of start 01/2012Est. Cost. Rs. 323.86 lac Target date of completion 08/2014Exp. 03/2013 Rs.111.41 Lacs
CONSTRUCTION OF DIARA SUNARI LINK ROADUnder District Plan Est. Cost. Rs. 64.97 lac Target date of completion 03/2014 Exp. 03/2013 Rs.34.61
Pradhan Mantri Gram Sadak Yojana #a) Schemes sanctioned (Phase-I to VIII)
55
b) Sanctioned cost Rs. 121.46 Cr.
c) Cum. Exp. Ending 03/2013 Rs. 65.66 Cr.
d) No. of schemes completed 28
e) Targeted Habitations 215
f) Habitations connected ending 03/2013
110
g) Length of sanctioned schemes 221.70 Km.
h) Length achieved of completed schemes
86.22 Km.
STATUS OF LAND COMPENSATION UNDER PMGSY
S.No. Item Magnitude
1 Total No. of Schemes 43 No.
2 No. of Schemes involving Land Compensation
35 No.
3 No. of Schemes Joint Inspection completed
35 No.
4 Final Award issued 21 No.
5 Land Compensation advance to various Collectors
1045.79 lac
6 Total Land Compensation disbursed 599.21 lacs
7 Addl. Land Compensation requisitioned by Collectors against Final Award cases
150.63 lacs
Name of road:- Jandrali to Bhikher under PMGSY Stage-I Completed
Name of the Road:- Kholiyan Talie to Smodth under PMGSY Work is in Progress
Name of the Road:- Sundla to Chunera
Work is in progress
FINANCIAL ACHIEVEMENT 2012-13 (MINOR IRRIGATION) #
# Component 2012-13
Approved Outlay
Availability Expenditure %age of Exp
1 Capital
State Share
125.00 209.60 209.60 100
TIED/AIBP 1420.00 628.20 628.20 100
Total Capital 1545.00 837.80 837.80 100
(Rs. In Lacs)
District Plan
PHYSICAL ACHIEVEMENT 2012-13 (MINOR IRRIGATION)
# Name of the Sector / Scheme
2012-13Unit Target Achievement
Minor Irrigation
1 Potential created
Hect 441 217
2 Stabilization Hect 206 202
3 Schemes Completed
No. 2 2 (AIBP)
District Plan
Construction of Dhalli Khul in Hiranagarunder AIBP
Est. Cost. Rs. 96.64 lac Exp. Rs. 11.11 lacDt. of start 02/2012 Target dt. of com. 03/2014
Construction of Bana Chack Khul in Hiranagar under AIBP
Est. Cost. Rs. 28.50 lac Exp. Rs. 11.11 lac Dt. of start 02/2012 Target dt. of com. 03/2014
FINANCIAL ACHIEVEMENT 2012-13 (AGRICULTURE) #
# Component 2012-13
Approved Outlay
Availability Expenditure %age of Exp
1 Revenue 16.49 17.19 17.09 99.42
2 Capital
State Share 17.83 17.83 17.82 99.88
Total Capital 17.83 17.83 17.81 99.88
Grand Total 34.32 35.02 34.91 99.69
(Rs. In Lacs)
District Plan
PHYSICAL ACHIEVEMENT 2012-13 (AGRICULTURE UNDER DIFFERENT PROG.)
# Item/crop 2012-13
Unit Target Achievement
1 Seeds DistributionAgriculture Crops Qtls 11186 10151Vegetables+Potato Qtls 340 381
2 Fertilizer Distributed Ton 10709 91543 Agri. Equipments
Spray Pumps No. 1280 1280Others (Improved Agri implements)
No. 200 168
4 Training camps held No. 171 1715 Farmers Trained No. 8143 8143
TECHNOLOGY MISSION - AGRICULTURE
FINANCIAL ACHIEVEMENT 2012-13(HORTICULTURE)-DIFFERENT PROGRAMMES
S.No.
Scheme Approved Outlay
Availability
Exp. %age
1. District Plan 8.63 8.63 8.62 99.88
2. Horticulture Mission for North Eastern and Himalayan States (HMNEH)
120.684 60.00 51.70 86.17
3. Rashtriya Krishi Vikas Yojana (RKVY)
66.642 35.80 33.22 92.79
4. Agriculture Technology Management Agency (ATMA)
8.332 2.00 1.99 99.50
(Rs. In Lacs)
PHYSICAL ACHIEVEMENT UNDER HORTICULTURE SECTOR
# Scheme UNIT PHYSICAL TARGET
PHYSICAL ACHIEVEMENTS
1 Area covered under fruit plantation
Ha 70.00 74.9
2 Fruit and vegetables processed
MT 4.00 4.008
3 Mobile demonstrations
Nos 145 145
4 Ladies trained Nos 90 90
District Plan
ESTABLISHED MANGO ORCHARD AT SAHAR IN BLOCK KATHUA UNDER TECHNOLOGY MISSION
FINANCIAL ACHIEVEMENT 2012-13 (SOCIAL WELFARE) #
# Sector 2012-13
Approved Outlay
Availability Expenditure %age of Exp
1 Social Welfare 3.27 3.27 3.27 100
2 Welfare of SC/OBC
125.16 156.48 151.71 96.95
(Rs. In Lacs)
District Plan
PHYSICAL ACHIEVEMENT 2012-13 (SOCIAL WELFARE & SC/OBC)
# Item 2012-13
Unit Target Achievement
1 Pre-matric Scholarship
Students 17000 19234
2 Re-imbursement of examination fee
Students 80 83
3 Education up-liftment of children of Sweeper Community
Students 50 46
4 Scholarship to physically handicapped
Students 300 335
District Plan
# Item 2012-13
Fund available Expenditure Achievement(Beneficiaries)
1 ISSS 453.84 443.28 13429
State Plan
PHYSICAL/FINANCIAL ACHIEVEMENT 2012-13 UNDER INTEGRATED SOCIAL SECURITY SCHEME (ISSS)
(SOCIAL WELFARE )
PHYSICAL/FINANCIAL ACHIEVEMENT 2012-13 UNDER NATIONAL SOCIAL ASSISTANCE PROGRAMME (NSAP)
(SOCIAL WELFARE )
# Item 2012-13
Fund available
Exp. Achievement(Beneficiaries)
1 Indira Gandhi National Oldage Pension Scheme (IGNOAPS)
227.89 227.89 5127
2 Indira Gandhi National Widow Pension Scheme (IGNWPS)
12.10 11.81 252
3 Indira Gandhi National Disabled Pension Scheme (IGNDPS)
10.56 10.31 220
4 National Family Benefit Scheme (NFBS)
03.40 03.40 34
C S S
PENDENCY UNDER DIFFERENT PENSION SCHEMES (SOCIAL WELFARE )
# Scheme Pendency in Nos.
1 Integrated Social Security Scheme (ISSS) 4709
2 Indira Gandhi National Oldage Pension Scheme (IGNOAPS)
2893
3 Indira Gandhi National Widow Pension Scheme (IGNWPS)
461
4 Indira Gandhi National Disabled Pension Scheme (IGNDPS)
340
5 National Family Benefit Scheme (NFBS) 481
PHYSICAL ACHIEVEMENT 2012-13 (PMEGP/JKSES) #
# Name of the Sector / Scheme
2012-13 Unit Target Sponsored Sanctioned Disbursed
JKSES Nos. 300 293 194 179
PMEGP
DIC Nos. 22 19 16 12
KVIB Nos. 15 20 13 10
Total PMEGP Nos. 37 39 29 22
PHYSICAL/FINANCIAL ACHIEVEMENT UNDER VSA (SKEWPY)
i) No. of male candidates benefitted 1024
ii) No. of female candidates benefitted 737
iii) Amount of VSA disbursed to male candidates
Rs. 49.41 lac
iv) Amount of VSA disbursed to female candidates
Rs. 43.46 lac
Total amount disbursed during 2012-13
Rs.92.57 lac
IMAGES OF ENTERPRENEURS FINANCED UNDER JKSSES
SAMEER GUPTA,KALIBARI KATHUA GENERAL STORE
DEEPAK KAPOOR WARD NO. 1 KATHUA, AUTO LOAD CARRIER
MAJOR FLAGSHIP PROGRAMME MGNREGA #
i) Availability
a) State Share Rs. 349.00 lac
b) Central Share Rs. 2058.21 lac
c) Misc/OB Rs. 362.84 lac
Total Rs. 2770.05 lac
ii) Expenditure ending March, 2013 Rs. 2697.63 lac
iii) No. of Rural Households 83377 No.
iv) No. of Job Cards issued 50329 No.
v) Mandays Generated 12.44 lac
vi) Women persondays generated 0.904 lac
vii) No. of households provided 100 days employment
498 households.
vii) Works taken up/completed 7746/5462 Nos.
C S S
AWARD UNDER PANCHAYAT EMPOWERMENT
ACCOUNTABILITY INITIATIVE SCHEME
Out of three Panchayats of the State, two Panchayats of Kathua District namely Kootah of Hiranagar Block and Nagrota of Barnoti have been awarded under P E A I S
CONST. OF POND AT LOKHALLY PYT.. CHILAKH WEST BLOCK HIRANAGAR UNDER MGNREGA
Est. Cost. Rs. 03.00 lacs completed during 2012-13
CONST. OF POND AT JUMBLE PYT.MANGLOOR BLOCK HIRANAGAR UNDER MGNREGA
Est. Cost. Rs. 1.50 lacs completed during 2012-13
INDIRA AWAS YOJANA (IAY)
# Scheme Outlay 2012-13 Availability 2012-13
Expdt.
S/S C/S
1 IAY Normal 58.00 301.06 373.12 337.61
2 RHS 14.50 0 14.50 14.36
G. Total 72.50 301.06 387.62 351.97
(Rs. in Lac)
# Scheme 2012-13
Taken up Completed
Construction of Houses - -
1 IAY Normal 1103 854
2 Rural Housing Scheme 41 32
C S S
Constt. of House under IAY, 2012-13
Sh. Bodh Raj R/o Rappad, Pyt. Bhajwal, Block, Kathua
PHYSICAL UNDER NIRMAL BHARAT ABHIYAN (Erstwhile TSC) #
# Scheme Total Target
Ach. Ending 3/2012
Target2012-13
Ach. During 2012-13
Cum. Ach.
Ending 3/2013
1. IHHL 25978 8108 15962 5518 13626
2 School Toilets 1049 1037 12 11 1048
Anganwari Toilets
33 07 12 03 10
Community Sanitary Complexes
60 36 24 17 53
Note: Low physical achievements was due to less availability of funds and late start of works after the completion of Base Line Survey under NBA conducted during Oct. 2012
BORDER AREA DEV. PROGRAMME(FINANCIAL)
i) Approved Outlay 2012-13 Rs. 418.00 lac
ii) Funds operated centrally for Skill Dev.
Rs. 20.51 lac
iii) Funds released to the District
Rs. 397.49 lac
iv) Additionality/Revalidated Amount
Rs. 42.17 lac
v) Total availability Rs. 439.66 lac
vi) Expenditure Rs. 436.11 lac (99.20%)
C S S
BORDER AREA DEV. PROGRAMME(PHYSICAL)
1 No. of Rural Dev. works taken up/completed
41/33
2 Creation of new Sub Stations 8
3 Shallow Hand Pumps 172
Road constructed/upgraded
I) Black topping 5.80 Km
II) Metalling 13.60 Km
iii) Shingling 9.90 Km
iv) Fair weather 7.15 Km
C S S
AUGMENTATION/CREATION OF SUB STN. UNDER BADP
Augmentation of Sub Station at Mirpur RamEst. Cost Rs. 01.00 lac Completed 03/2013
Creation of Sub Station at Mirpur RamEst. Cost Rs. 03.01 lacs Comp. 03/2013
CREATION OF SUB STN. UNDER RURAL ELECTRIFICATION PUMP SETS (CSS)
Creation of 100 KVA S/STN at JarmalEst. Cost Rs. 04.30 lac Completed 03/2013
Creation of Sub Station at HaripurEst. Cost Rs. 04.51 lacs Compl. 03/2013
WIDENING/STRENGTHENING OF KALIBARI-KATHUA-HATLI MORE ROAD UNDER ADB BY ERA PACKAGE
Cost = Rs 32.86 Cr. Target date of completion – 04/2013 #
Item Scope of Work Upto date progress
Earth Work 6.57 Km 6.57 Km
Drain 12500 RM 12485RM
Bituminous Macadam 6.57 6.49
Major Bridge 1 1 (Completed)
Canal Bridge 2 2 (Completed)
Kerb Stone 5 Km 4.825 Km
Retaining Wall 300 RM 300 RM
KALIBARI – KATHUA – HATLIMORH AFTER DEVELOPMENT
ARIEL VIEW OF KALIBARI – KATHUA – HATLIMORH ROAD
CATEGORY-WISE FAMILIES,RATION/KEROSENE OIL DEPOTS AND LPG AGENCIES
S. No. Item
1 Total Population (Census 2001) 511455
2 APL Families 86887
3 BPL Families 23778
4 AAY Families 10173
5 APS Souls 512
6 Total No. of families 120838
7 Govt. Ration Depots 33
8 Cooperative Ration/K.Oil Dealers 04 / 34
9 Private Ration/K.Oil Dealers 225 / 181
10 No. of LPG Agencies 08
11Total No. of LPG domestic Connections 61863
REQUIREMENT/ALLOTMENT OF FOODGRAINS AND SUGAR
S. No. Item Requirement Allotment Shortfall
1 APL Families 30410 17338 13072
2 BPL Families 8323 8323 --
3 AAY Families 3561 3561 --
4 APS Souls 51 51 --
Total 42345 29273 13072
5 Levy Sugar 3582 3582 --
Fig. In Qtls.
PROGRESS UNDER RIGHT TO INFORMATION ACT. 2009
Total Application received upto 31-03-2013
Disposed of Ist Appeal received
Ist Appeal disposed off
219 205 08 08
PROGRESS UNDER PUBLIC SERVICE GURANTEE ACT
Total Application
received upto 31-03-2013
Disposed off
Pending under
time limit
No. of appeals received by Ist
Appellant Authority
Fine/Penality imposed
76890 74785 2105 01 00
PROGRESS UNDER LAND ACQUISITION
# Item National Highway Border Fencing
PMGSY
1 No. of Vill. involved in LA
48 No. 17 No. 39 No
5 Final Award 29 --- 32
6 Land involved 996 --- 1690
7 Handed over 461 --- 1183
8 Balance 534 17 507
(Fig.in No.)
1 Amt. deposited 13.72 Cr. --- 07.03 Cr.
3 Amt. disbursed 09.73 --- 04.72 Cr
4 Balance 03.69 --- 02.31 Cr
5 Addl. Funds required 20.00 --- 01.00 Cr
PROGRESS UNDER LAND ACQUISITION
# Item National Highway Border Fencing
PMGSY
1 Amt. deposited 13.72 --- 07.03
3 Amt. disbursed 09.73 --- 04.72
4 Balance 03.69 --- 02.31
5 Addl. Funds required
20.00 --- 01.00
(Rs. in Cr.)
PHYSICAL ACHIEVEMENTS OF LAST THREE YEARS OF REGIONAL TRANSPORT OFFICE,KATHUA,H.Q. LAKHANPUR
S.No. Particulars 2010-11 2011-12 2012-13
1 Registration of Vehicles4591 4506 5627
2 Route Permits Fresh298 245 349
3 Route Permits Renewed1357 1246 1401
4 Fitness Fresh551 588 586
5 Fitness Renewed1868 1980 1451
6 Driving License Fresh 7979 4937 4470
7 Endorsement for HGV/LMV 616 584 662
8 Endorsement for PSV 218 167 39
9 Driving License Renewed 3348 2894 3401
10 Learner License 7723 7205 9080
PHYSICAL ACHIEVEMENTS OF LAST THREE YEARS OF REGIONAL TRANSPORT OFFICE, KATHUA,H.Q. LAKHANPUR
S . No.
Particulars 2010-11 2011-12 2012-13
1 Token Tax 02.31 02.70 03.35
2 Registration fee 0.16 0.23 0.37
3 D/ License fee 0.25 0.24 0.31
4 T.Permission Fee 0.09 0.13 0.11
5 Fitness Fee 0.13 0.12 0.136 Route Permit 0.34 0.33 0.247 Road Checking 0.30 0.38 0.298 Toll Posts 03.36 03.26 03.629 Tax under SRO 137 06.36 06.55 05.62
Total:- 13.30 13.94 14.04
Rs. In Cr.
REVENUE REALISED BY TOLL POSTS OF KATHUA DISTRICT DURING 2011-12 & 2012-13 #
S . No. Toll Post 2011-12 2012-13A Lakhanpur 28233.09 32361.23B Minor Toll Post1 Nagri 720.00 800.232 Goond 91.16 158.29
3 Govindsar 1359.04 1935.944 Hatmashka 08.15 09.575 Kote Punnu 104.26 153.55
6 Mandi Mandikan 68.36 117.827 Paharpur 0.35 01.21 8 Thein 35.88 40.08
9 Gandiyal (Kerian) 0 27.47
C Cost of Forms etc. 02.33 05.08
Total Revenue 30622.62 35610.52
Rs. In lacs.
REVENUE REALISED BY COMMERCIAL TAXES DEPTT. LAKHANPUR DURING 2011-12 & 2012-13 #
S. No. Item 2011-12 2012-13
1 Passenger Tax 341.86 446.68
2 Penalty 615.36 736.30
3 Security 646.28 839.98
4 Entry Tax 8688.21 9985.65
5 Advance Tax 05.36 04.55
6 Total 10297.07 12013.14
Rs. In lacs.
Some Major Projects of the
District -in pictures
OBC HOSTEL AT BASOHLI
AAA COST= Rs 163.15 Lacs Expt. Rs 97.90 Lacs. Workdone Liabilities= Rs 65.25 Lacs
OBC HOSTEL AT BASOHLI
#
EXCISE AND COMMERCIAL TAXES OFFICE, TOLL PLAZA LAKHANPUR
PARKING YARD FOR TRUCKS AT TOLL PLAZA LAKHANPUR
MATA BALA SUNDRI JI DISTRICT KATHUAWAYSIDE AMENITY AT BASE CAMP NEAR BHEENI BRIDGE BILLAWAR COMPLETED 2012-13 at Estd. Cost. of Rs. 26.00 lacs
#
WAYSIDE AMENITY AT BASE CAMP NEAR Kharote More Kali Bari at Estd. Cost. of Rs. 150.00 lacs
CONSTRUCTION OF POLYTECHNIC COLLEGE AT KATHUA ESTD. COST RS. 1450.00
EXP. 03/2013 RS. 220.00 LACS
LIKELY DT. OF COMP. 12/2014 #
Construction of 311m span bridge over Tarnah Nallah at Magloor under State Plan
Estd. Cost. Rs. 1718.00 lacsExp. 03/2013 Rs. 605.00 lacsLikely date of Com. 03/2015
MAJOR ISSUES
• Construction of 1100 mtr Span Double Lane Bridge at village, Keerian Gandyal.
Est. Cost. Rs. 9971.00 lac
DPR submited to PW (R&B) Department. Village to be benefitted = 03
Souls to be benefitted = 10,000
• Construction of drain along NH-1A from Janglote More to Kathua Khad.
Length of drain 1.3 Km.
Approx. Cost Rs. 1.50 Cr.
Matter taken up by Hon’ble CM with Hon’ble Minister of Roads, Transport and Highways. GOI.
Present Status of Drain along NH-1A from Janglote More to Kathua Khad
Illegal Extraction of River Bed Material from Ravi River.
ILLEGAL MINING IN RIVER RAVI
• Replacement of Worn-out and purchase of standby Pumping Machinery :
Total Pumping Stations 345 Nos.
P/Stns. which require standby machinery 266 Nos
Cost of purchase of stand by machinery 08.17 Cr.• Liability on account of supply of water through tanker service :
Liability Rs. 216.79 Lac
• Damages due to heavy rains and snow falls.
The year wise liability accrued:-
2010-11 - Rs 98.81 lac.
2011-12 - Rs. 87.90 lac.
2012-13 - Rs. 79.78 lac.
Total - Rs. 266.49 lac.
• Education Department 4 posts of Principals, 5 posts of ZEOs, 2 post of ZEPOs, 167 posts
of Lecturers, 34 posts of Headmasters, 91 posts of Masters and 940 posts of Teachers are lying vacant in the District.
• Health Department 139 posts of Doctors, 252 posts of Para Medical Staff and 177 posts
of Class-IV and Safai Karamcharies are lying vacant in the District.
• Construction of Inter State Bus Terminal in Village Chak Sajjan..
• Construction of Fly Over and Installation of Signal Lights.
• Untied grants