PLANT:
X5 IP Foaming-- 105 12-May-05X5 Small Parts Foaming--106E85 Foaming -- 122 14-May-05X5 IP Seq. Center -- 216X5 IP Assy-182 13-May-05X5 Glove Box Assy--184X5 Console -- 109 13-May-05E85 IP Assy--152E85 Console--155E85 Glove Box--156E85 Sequencing--251
X5 Door Panels -- 107X5 Edgefold -- 110Glue -- 1132 (BMW)
Assembly -- 1142 (BMW)
Hot Press -- 116GMX Shipping--117GMX Assembly--172GMX Welder--173GMX Laser--174GMX Inspection--175X5 DP Seq. Center -- 215
Injection --112Back Press -- 113Vac Form -- 101Paint -- 102X5 Bulk--183X5 Bulk and Pass-Thru -- 111X5 Waterjet -- 151E85 Waterjet--153
Shipping-Spare Parts--120
date exist
Fountain Inn
PSE deployment status
UAP Production line
Time measurement
date
Logistics Lori Morgan
UAP 2 Gerald Mentil
UAP 4 Lisa Stanton
UAP 3 David Hunter
exist existdate exist date exist date
Cycle Time Diagramm Standardised Work Chart Standardised Work
Combination TableJob instruction
(Standard Operation)
3
Measurement of Cycle TimeMEASUREMENT OF CYCLE TIME
FOR SYSA 009 e /1
Product Workstation Layout:
Process Analyzed by
Date Time
N° Basic action 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
MP:
MP:
MP:
MP:
MP:
MP:
MP:
MP:
MP:
MP:
OBSERVATIONS f
a g
b h
c i
d j
6
7
8
Cycle time
operating time without waiting
5
9
10
1
2
3
4
4
Cycle time diagram
• Eliminate cycle time fluctuation
• Challenge cycle time with Takt Time
WC = 203’’ WC = 203’’
5
Standardized Work
Operation from: Date:
to:
Takt Time Expected nb parts waiting
61 s
Cycle time
51 s
Expected number of parts waiting
3
FAU-F-PSE-006 /1
Product: panel Process: welding, assembly
Standardized work chart
Machine 4 (Welding)
Station 5 (Inspection)
FP cart12
3
4
5
6
710
8
9
Qualityinspection
Safety
Movement
w ith part
w ithout part
Productionname:
date:
Methodsname:
date:
Qualityname:
date:
6
Standardized Work
/ / / / / /
PRODUCT REFERENCE NUMBER:
WORKSTATION ANALYZED BY:
TAKT TIME: Quality
Volume:
DATE:
Production Methods
STANDARDIZED WORK COMBINATION TABLE
TIME OPERATION TIME
WALKAUTOMANUOPERATION NAME
N° 45 6015
2
3
35
3
2
4Functional inspection 3
310Position part for inspection
3 Weld
Welding inspection
2
3
Pick waiting part
2Position part
1
5 15
Place part in cart
9 Pick welded part
2
7 Pick inspected part 2
Surface inspection
5
6
8
3
50
3
34
25
2
555 10 403020
CT = 51s
TT = 61s
FAU-F-PSE-007 /1
7
Standard Operation Procedure
No.
1
2
3
4
5
6
7
8
9
10
Page No:
Work-station:
Line :Part NamePart
Number
= TIP
Document No.:STANDARD OPERATION Plant:
Operation = SAFETY = QUALITY Sketches / Photo's / etc.Time:
1/1Revision Level:
FIS-F-PS-241 / ENversion 02
P lace rejects in reject container. Record on P rocess Monitor Sheet. If 3 or more rejects found with same fault call Gap Leader.
Name: Name:
Non Conforming Product:
Function:
Signature/DateIssued Checked SKILLEDOPERATOR
Signature/Date
Function:
Signature/Date
Name:Function:
Name:
Signature/DateApproved
8
Tracking of Production (TRS)TRACKING OF PRODUCTION PLANT:- GAP:- Date:-
Product.Prog.
stops
Change-
over
Org.
prob.
Break-
dow nsRemarks Product.
Prog.
stops
Change-
ov er
Org.
prob.
Break-
dow nsRemarks Product.
Prog.
stops
Change-
ov er
Org.
prob.
Break-
dow ns
15:00 23:00 7:00Total Total Total
Part No. Product O.K. Productive time Part No. Product O.K. Productive time Part No. Product O.K.
+ ++ ++ +
Total = Total = TotalTRS TRS TRS
Standard cycle tim e (s)
7:00 15:00 23:00
Standard cycle tim e (s)
Standard cycle time (s)
9:30
9:00
8:00
7:30
11:00
11:00
10:30
10:00
13:00
12:30
12:00
11:30
6:3014:30
14:00
13:00 21:30
22:00
22:30
4:30
5:00
5:30
6:00
2:30
3:00
3:30
23:30
0:00
0:30
1:00
1:30
2:00
4:00
19:30
20:00
20;30
21:00
17:30
18:00
18:30
19:00
15:30
16:00
16:30
17:00
xxx
===
xxx
===
xxx
==
=
9
Tracking of Production (PPH) TRACKING OF PRODUCTION - Assembly line PLANT: Line: Date:
06H00Product.
Prog.
stops
Change-
ov er
Org.
prob.
Break-
dow nsRemarks
14H00Product.
Prog.
stops
Change-
ov er
Org.
prob.
Break-
dow nsRemarks
22H00Product.
Prog.
stops
Change-
ov er
06H30 14H30 22H30
07H00 15H00 23H00
07H30 15H30 23H30
08H00 16H00 00H00
08H30 16H30 00H30
09H00 17H00 01H00
09H30 17H30 01H30
10H00 18H00 02H00
10H30 18H30 02H30
11H00 19H00 03H00
11H30 19H30 03H30
12H00 20H00 04H00
12H30 20H30 04H30
13H00 21H00 05H00
13H30 21H30 05H30
14H00 22H00 06H00Total Total Total
Part No. Good parts Factor Equivalent good parts Part No. Good parts Factor Equivalent good parts Part No. Good parts Factor
+ +
+ +
+ +
+ +
Total Total
Manpower Hours Manpower Hours Manpower Hours
Parts / Person / Hour Parts / Person / Hour Parts / Person / Hour
x
x
x
=
=
=
x
x
x
=
=
=
x
x
x
x == =x x
/
=
=
/
=
=
10
Tool Change Over TrackingPress:
Tool No. / part ref.
Number of parts
Start time ObservationsDate
TOOL CHANGEOVER TRACKING
Changeover time graphChangeover
Duration
FOR SYSA 005 e /1
11
Parts Board
DATE SHIFT
Hour ObjectiveGood Parts
LHDGood Parts
RHD
1
2
3
4
5
6
7
8
9
TOTAL
PARTS BOARD
Comments
GAP LEADERLINE or CELL
12
MIFA / MIFD
C/O=TT = CTO = WC =
PRIMINGC/O=TT = CTO = WC =
DRYING OVENHINGE ASSEMBLYC/O=TT = CTO = WC =
HEATERC/O=TT = CTO = WC =
FOAMING
13
Action PlanRPA n° Page : 1/1
Site : PDCA Methodology FAU-F-LS-0216/en - Issue 02
Creation date : Date revised:
N° CAUSE(S) ACTION(S) Resp. Deadline Done (date)
Checked (date) "Act"
1
2
3
Subject:
Leader: Area :
ACTION PLAN RECAP
PROBLEM
PDC
A PDC
A PDC
APDC
A
14
Kanban : Pull System
Assemblyline
B
b
Truck preparation
C
c
A
WK
Withdrawal Kanban loop
a
b
c
b
PIK
Production instruction Kanban loop
WK
WK
B
A
a
b
C
c
B
A
a
b
C
c
A
a
Supermarket
b