  • Procurement Procedures Manual

    Washington Metropolitan Area Transit Authority

    Date: August 2017 Version: 7.9

  • Page | i

    PREFACE

    This Procurement Procedures Manual (“PPM”) consolidates all Washington Metropolitan Area Transit Authority (“Authority” or “WMATA” or “Metro”) procurement procedures into a single volume. The PPM along with the Procurement Policy Statement adopted by the Authority’s Board of Directors (“Board”) and implementing procedures issued by the General Manager/Chief Executive Officer (“GM/CEO”) and Chief Procurement Officer (“CPRO”) are intended to function as a complete guide to the Authority’s procurement process for procurement staff and interested Authority personnel. The PPM is a supplement to sound business judgment in procurement and contracting.

    The PPM is issued in accordance with Policy Instruction 8.4/5 which authorizes a Procurement Manual and Policy Instruction 1.1/0 which authorizes Departmental manuals to deal with matters affecting the entire Authority, but in areas of responsibility clearly within the authority of an Assistant General Manager or GMGR Staff Office Director.

    CHANGES TO THE PROCUREMENT PROCEDURES MANUAL

    Only the Board may make changes to the Authority’s Procurement Policy. Only the GM/CEO and/or CPRO may make changes to the implementing procedures. Changes in Federal and/or local laws, the Federal Transit Administration’s (“FTA”) Master Agreement, Circulars 4220.1 and 5010.1 or other governing regulations and best practices may require changes, corrections, or additions to this PPM. Other proposed changes, corrections, or additions to the PPM should be sent to the CPRO. The CPRO will assign or coordinate as necessary the proposed changes or additions with the appropriate individuals or offices. If substantive changes are made to this PPM resulting from any of the above referenced actions, the proposed changes will be submitted for review to Counsel (“COUN”), Office of the Inspector General (“OIG”), Safety (“SAFE”), and Authority Transit Police (“MTPD”) as appropriate.

    A record of all changes to this PPM will be maintained in the Version History on the following page(s).

  • Page | ii

    VERSION HISTORY

    Revision # Description Date 1.0 Procurement Procedures Manual Updated per Resolution 2011-30

    Passed June 23, 2011 PPM revised to update procedures to match current practices.

    December 2012

    2.0 PPM revised to reflect changes in Revision 4 to Circular 4220.1F dated March 15, 2013 as follows:

    1. Adequate Third Party Contract Provisions - Sections 3-10; 9-26; 10-5; and 12-6 were modified to require that the “Basis for Award” clause include a provision allowing for the right to request additional information or clarification from a bidder or proposer to resolve ambiguities in bids or proposal prior to award.

    2. Record Keeping/Access to Records – Section 6-11 was modified to comply with record access requirements of 49 U.S.C. Section 5325(g) in contracts financed with Federal assistance.

    3. System for Award Management – Section 15-10 and the definition of this system was changed to add information concerning how to access information from the web site.

    4. Period of Performance and Rolling Stock Special Requirements – Section 3-9(b) was revised to add additional description concerning the change in the limit of rail rolling stock and replacement parts contracts from five to seven years.

    5. Intelligent Transportation Systems – A new Section 6-8 was added to reflect these requirements.

    6. State or Local Government Purchasing Schedules or Purchasing Contracts – Section 3-6(c) was revised to reflect the guidance that FTA only recognizes joint procurement s to be the only type of intergovernmental agreement suitable for use by grantees and subgrantees.

    May 2013

    3.0 PPM revised for Non-Competitive Contracts-Public Interest, Chapter 11-2(a)3

    June 2013/August 2013

    4.0 PPM revised for Advanced Procurement Planning-General, Chapter 3.3(a) and Cost or Price Analyses – Reserving Audit Rights, Chapter 16-1(a) and Audit Assistance, Chapter 16-11(a)

    July 2013

  • Page | iii

    5.0 PPM updated per Board Resolution 2014-19 passed April 7, 2014. The resolution has modified and/or replaced portions of resolution 2011-30 as noted. in addition, sections

    • 2.1 purpose and scope; • 2.3 controls and limitations; • 2.4 integrated procurement management; • 2.5 procurement procedures manual and annual training; • 2-9 organizational conflicts of interest; • 2-10 standards of conduct; • 2-16 procurement record and checklists; • 2-20 accountability standards; • 2-21 review of procurements by the office of general counsel; • 3-5 independent cost estimate; • 3-6 competition; • 3-7 procurement action: determination and findings; • 3-10 methods of procurement; • 3-15 stock replenishment procurement guidelines; • 4-12 indefinite-delivery contracts; • 4-13 indefinite-quantity and requirements contracts; • 6-3 contractor labor requirements; • 7-1 socioeconomic programs – purpose and scope; • 7-2 disadvantaged business enterprise requirements; • 7-3 small business and local preference program; • 8-6 non-competitive simplified acquisition procedures; • 8-9 documentation and records; • 9-31 contract file assembly and documentation; • 10-27 unsolicited proposals; • 10-30 contract file assembly and documentation; • 11-1 sole source and other less than full and open competition

    procurements – purpose and scope; • 11-2 general; • 11-3 sole source procurement; • 11-4 sole source justification and approval; • 11-7 emergency justification and approval; • 11-9 contract file assembly and documentation • 11-10 federal supply schedules; • 12-16 contract file assembly and documentation; • 13-9 design-build turnkey; • 13-11 design-bid-build construction; • 13-13 specifications; • 13-22 contract file assembly and documentation; • 14-4 bid bonds or other security; • 18-6 contract execution by the authority; • 18-10 contract modifications; • 18-11 change order requirements; • 18-13 ordering procedures; • 19-2 claims and litigation actions – general; • 19-7 litigation actions; • 20-4 real property acquisitions; and • 20-9 assurance for use of real property

    have been updated to reflect the requirements of Resolution 2014-19 and to be consistent with FTA requirements and updated procedures. Appendix A has been added to include procurement checklists.

    August 2014

  • Page | iv

    Revision # Description Date

    6.0 PPM revised to reflect changes in Revision 5 dated October 15, 2013 as follows:

    • 2-15 contractor employee criminal background check • 2-16 procurement record and checklists; • 10-30 contract file assembly and documentation; • 11-9 contract file assembly and documentation; • 12-16 contract file assembly and documentation; • 13-22 contract file assembly and documentation; • 18-13 ordering procedures; • Appendix A Procurement Requirements Review Checklists

    have been updated to reflect updated procedures in accordance with the

    October 2014

    7.0 PPM revised to reflect changes in Revision 6 dated July 2015 as follows: • 2-8A purpose • 2-8B scope • 2-8C definitions • 2-8D policies and procedures • 2-8E responsibility • 2-8F enforcement • 2-8G related policies, regulation & resolutions • 2-8H list of appendices, attachments or forms

    o attachment A-Delegation of Authority to Ratify Unauthorized Procurements

    o attachment B-Determination to Ratify Unauthorized Procurement Commitment

    • 2-10 standards of conduct • 4-16 time-and-materials contracts • 7-2-6 solicitation requirements • 8-3 simplified acquisition threshold • 8-5 competitive simplified acquisition procedures • 8-6 non-competitive simplified acquisition procedures • 11-2 general • 11-6 competition exemptions • 18-11.1 changes clause in solicitations and contracts • 18-11.2 equitable adjustment negotiations • 18.11.3 change order process

    o C-35A wmata form for work authorization o C-35B pending change order

    July 2015

    7.1 PPM revised to reflect changes in Revision 7.0 dated July 2015 as follows:

    • Increases to WMATA micro-purchase threshold

    December 2015

  • Page | v

    Revision # Description Date 7.2 PPM revised to reflect changes in Revision 7.1 dated December 2015 as

    follows:

    • Chapter 1, Board Approval, Delegation & Reprogramming Requirements

    • 2-4 Integrated Procurement Management • 2-8 Unauthorized Procurements • 2-8B Scope • Definitions • 5-5 Progress Payments • 9-23 (c) Cancellation of an Invitation for Bid After Opening • 11-4 (d) Justification and Approval • Appendix A

    April 2016

    7.3 PPM revised to reflect changes in Revision 7.2 dated April 2016 as follows:

    • Replaced “Justification and Approval” with “Determination and Findings”

    • 11-6 Competition Exemptions • 19-4 Contract Disputes • 19-5 Appeals to the ASBCA

    October 2016

    7.4 PPM revised to reflect changes in Revision 7.3 dated October 2016 as follows:

    • Deleted paragraph 7-3-3(b) Small Business Participation in Simplified Acquisitions, “Contracts Above the Simplified Acquisition Threshold”

    August 2017

    7.5 PPM revised to reflect changes in Revision 7.4 dated August 2017 as follows:

    • Section 7-1(b) Purpose and Scope • Section 7-2-1 Definitions • Section 7-2-3 Small Business Participation in the DBE Program

    September 2018

    7.6 PPM revised to reflect changes in Revision 7.5 dated September 2018 as follows:

    • 19-4 Contract Disputes

    September 2018

    7.7 PPM revised to reflect changes in Revision 7.6 dated September 2018 as follows:

    • 2-16 Procurement Record and Checklists • 5-4 Advance Payment • 10-25 Contract Award • 10-29 Design Build Selection Procedures • 18-12 Out of Scope Changes • 23-5 Incorporating Provisions and Clauses

    September 2019

  • Page | vi

    7.8 PPM revised to reflect changes in Revision 7.7 dated September 2019 as follows: Removed the following references to Policy Instruction (P/I) 8.7 because the P/I has been rescinded:

    • 2-16 Procurement Record and Checklists • 8-9 Documentation and Records • 9-29 (b) Contract Award • 9-31 (c) Contract File Assembly and Documentation • 10-30 (c) Contract File Assembly and Documentation • 11-10 (c) Contract File Assembly and Documentation • 12-16 (c) Contract File Assembly and Documentation • 13-22 (c) Contract File Assembly and Documentation • 18-3 (a) Contract Award Approval • 18-10 (f) Contract Modifications • 193 (b) FTA Authority Requirements • Appendix A

    December 2019

    7.9 PPM revised to reflect changes in Revision 7.8 dated December 2019 as follows:

    • Removed the acquisition threshold limitation on DBE procurement actions at section 7-1

    January 2020

  • Page | vii

    VALUES AND GUIDING PRINCIPLES OF AUTHORITY PROCUREMENT

    Accountability Taking ownership and being responsible to the Authority and our customers for our actions is essential to preserve the public trust and protect the public interest.

    • Apply sound business judgment; • Be knowledgeable of and abide by all applicable laws and regulations; • Be responsible stewards of Authority funds; • Maximize competition to the greatest extent practicable; • Promote effective, economic, and efficient acquisition; and • Use procurement strategies to optimize value to the Authority and our customers.

    Ethics Acting in a manner true to these values is essential to preserve the public’s trust.

    • Act and conduct business with honesty and integrity, avoiding even the appearance of impropriety; and

    • Maintain consistency in all processes and actions. Impartiality Unbiased decision making and actions are essential to fairness.

    • Be open, fair, impartial, and non-discriminatory in all procurements; and • Treat vendors equitably, and without imposing unnecessary constraints.

    Professionalism Maintain high standards of job performance and ethical behavior.

    • Continually contribute value to the organization; • Continually develop as a professional through education, mentorship, innovation and,

    partnerships; and • Develop, support and promote the highest professional standards in all procurements.

    Service Always seek to assist our customers.

    • Be a resource and partner to our customers; • Develop and maintain relationships with customers; and • Maintain a customer service focus while meeting the needs of the Authority.

    Transparency Policies and procedures that are accessible and understandable to demonstrate the responsible use of public funds.

    • Be discrete in the release of confidential information; • Maintain current and complete policies, procedures and records; and • Provide timely access to procurement policies, procedures and records.

  • Page | viii

    CONTENTS PREFACE ......................................................................................................................................................... i

    CHANGES TO THE PROCUREMENT PROCEDURES MANUAL .......................................................................... i

    VERSION HISTORY ......................................................................................................................................... ii

    VALUES AND GUIDING PRINCIPLES OF AUTHORITY PROCUREMENT ......................................................... vii

    1 – BOARD APPROVAL, DELEGATION & REPROGRAMMING REQUIREMENTS ............................................. 1

    2 – PROCUREMENT INTEGRITY AND CONTROL ............................................................................................ 4

    2-1 PURPOSE AND SCOPE ......................................................................................................................... 4

    2-2 REQUIREMENT OF GOOD FAITH ......................................................................................................... 4

    2-3 CONTROLS AND LIMITATIONS ............................................................................................................ 5

    2-4 INTEGRATED PROCUREMENT MANAGEMENT ................................................................................... 5

    2-5 PROCUREMENT PROCEDURES MANUAL AND ANNUAL TRAINING .................................................... 7

    2-6 AUTHORITY AND RESPONSIBILITIES OF CONTRACTING OFFICERS ..................................................... 8

    2-7 DELEGATION AND REVOCATION OF CONTRACTING OFFICER AUTHORITY ........................................ 9

    2-8 UNAUTHORIZED PROCUREMENTS .............................................................................................. 10

    2-8A PURPOSE ..................................................................................................................................... 10

    2-8B SCOPE .......................................................................................................................................... 10

    2-8C DEFINITIONS ................................................................................................................................ 11

    2-8D POLICIES AND PROCEDURES ....................................................................................................... 11

    2-8E RESPONSIBILITY ........................................................................................................................... 12

    2-8F ENFORCEMENT ........................................................................................................................... 13

    2-8G RELATED POLICIES, REGULATIONS & RESOLUTIONS .................................................................. 14

    2-8H LIST OF APPENDICES, ATTACHMENTS OR FORMS ...................................................................... 14

    2-9 ORGANIZATIONAL CONFLICTS OF INTEREST ..................................................................................... 34

    2-10 STANDARDS OF CONDUCT .............................................................................................................. 35

    2-11 REPORTING OF SUSPECTED IMPROPER OR UNLAWFUL CONDUCT ............................................... 37

    2-12 PROHIBITION AGAINST CONTINGENT FEES .................................................................................... 37

    2-13 REVOLVING DOOR RESTRICTION .................................................................................................... 38

    2-14 TECHNOLOGY PROCUREMENTS ...................................................................................................... 39

    2-15 CONTRACTOR EMPLOYEE CRIMINAL BACKGROUND CHECK .......................................................... 39

    2-16 PROCUREMENT RECORD AND CHECKLISTS .................................................................................... 41

    2-17 ACCESS TO PEOPLESOFT PROCUREMENT APPLICATIONS .............................................................. 42

    2-18 PLAN OF CONTRACTS ...................................................................................................................... 43

  • Page | ix

    2-19 MAINTAINING THE PLAN OF CONTRACTS DATABASE .................................................................... 45

    2-20 ACCOUNTABILITY STANDARDS ....................................................................................................... 56

    2-21 REVIEW OF PROCUREMENTS BY THE OFFICE OF GENERAL COUNSEL ....................................... 56

    3 – PROCUREMENT PLANNING AND METHODS ......................................................................................... 59

    3-1 PURPOSE AND SCOPE ....................................................................................................................... 59

    3-2 RESPONSIBILITIES .............................................................................................................................. 59

    3-3 ADVANCE PROCUREMENT PLANNING .............................................................................................. 59

    3-4 SPECIFICATION, PURCHASE DESCRIPTION AND STATEMENT OF WORK .......................................... 60

    3-5 INDEPENDENT COST ESTIMATE ........................................................................................................ 62

    3-6 COMPETITION ................................................................................................................................... 63

    3-7 PROCUREMENT ACTION: DETERMINATION AND FINDINGS (D&F) .................................................. 66

    3-8 CONTRACT TYPES AND RISK .............................................................................................................. 67

    3-9 ESTABLISHMENT OF CONTRACT TERM/PERIOD OF PERFORMANCE ................................................ 68

    3-10 AUTHORIZED METHODS OF PROCUREMENT .................................................................................. 69

    3-11 PUBLICIZING CONTRACT ACTIONS .................................................................................................. 69

    3-12 ELECTRONIC COMMERCE ................................................................................................................ 70

    3-13 CONTACTS WITH PROSPECTIVE CONTRACTORS ............................................................................. 71

    3-14 PREQUALIFICATION CRITERIA ......................................................................................................... 71

    3-15 STOCK REPLENISHMENT PROCUREMENT GUIDELINES .................................................................. 71

    4 - TYPES OF CONTRACTS ............................................................................................................................ 73

    4-1 PURPOSE AND SCOPE ....................................................................................................................... 73

    4-2 GENERAL PROVISIONS ...................................................................................................................... 73

    4-3 SELECTING CONTRACT TYPES ........................................................................................................... 73

    4-4 FACTORS IN SELECTING CONTRACT TYPES ....................................................................................... 73

    4-5 FIRM-FIXED-PRICE CONTRACTS ........................................................................................................ 74

    4-6 FIXED-PRICE CONTRACTS WITH ECONOMIC PRICE ADJUSTMENTS .................................................. 74

    4-7 FIXED-PRICE INCENTIVE CONTRACTS ................................................................................................ 75

    4-8 COST-REIMBURSEMENT CONTRACTS ............................................................................................... 75

    4-9 INCENTIVE CONTRACTS .................................................................................................................... 76

    4-10 TYPES OF INCENTIVES ..................................................................................................................... 76

    4-11 FIXED-PRICE INCENTIVE CONTRACTS .............................................................................................. 77

    4-12 INDEFINITE-DELIVERY CONTRACTS ................................................................................................. 77

    4-13 INDEFINITE-QUANTITY AND REQUIREMENTS CONTRACTS ............................................................ 78

    4-14 DEFINITE-QUANTITY CONTRACTS ................................................................................................... 80

    4-15 ORDERING ....................................................................................................................................... 80

  • Page | x

    4-16 TIME-AND-MATERIALS CONTRACTS ............................................................................................... 80

    4-17 LABOR-HOUR CONTRACTS .............................................................................................................. 81

    4-18 LETTER CONTRACTS ........................................................................................................................ 82

    4-19 REVENUE CONTRACTS .................................................................................................................... 83

    4-20 MULTI-YEAR CONTRACTS ................................................................................................................ 83

    4-21 USE OF OPTIONS ............................................................................................................................. 85

    4-22 SOLICITATION OF CONTRACTS WITH OPTIONS .............................................................................. 86

    4-23 EXERCISE OF OPTIONS .................................................................................................................... 86

    5 - CONTRACT FINANCING, FUNDING AND PAYMENT ............................................................................... 88

    5-1 PURPOSE AND SCOPE ....................................................................................................................... 88

    5-2 PROVISION AND USES OF CONTRACT FINANCING ........................................................................... 88

    5-3 CONTRACT FINANCING PAYMENT METHODS .................................................................................. 88

    5-4 ADVANCE PAYMENT ......................................................................................................................... 89

    5-5 PROGRESS PAYMENTS ...................................................................................................................... 89

    5-6 PROGRESS PAYMENTS BASED ON A PERCENTAGE OR STAGE OF COMPLETION.............................. 90

    5-7 CONSIDERATION FOR PROGRESS PAYMENTS ................................................................................... 91

    5-8 SUPERVISION AND APPROVAL OF PROGRESS PAYMENTS................................................................ 91

    5-9 REVIEW OR AUDIT OF PROGRESS PAYMENTS .................................................................................. 92

    5-10 SUSPENSION OR REDUCTION OF PROGRESS PAYMENTS ............................................................... 92

    5-11 PROTECTION OF AUTHORITY TITLE ................................................................................................. 92

    5-12 RISK OF LOSS ................................................................................................................................... 93

    5-13 PROGRESS PAYMENTS TO SUBCONTRACTORS ............................................................................... 93

    5-14 CONTRACT DEBT DETERMINATION AND COLLECTION ................................................................... 93

    5-15 DEMAND FOR PAYMENT OF CONTRACT DEBT ............................................................................... 93

    5-16 NEGOTIATION OF REFUND TO RESOLVE CONTRACT ...................................................................... 94

    5-17 TYPES OF FORM FOR REPAYMENT .................................................................................................. 94

    5-18 DEFERRED PAYMENT AGREEMENTS ............................................................................................... 94

    5-19 CONTRACT DEBT INTEREST CHARGES AND CREDITS ...................................................................... 95

    5-20 CONTRACT FUNDING ...................................................................................................................... 95

    5-21 LIMITATION OF COST OR FUNDS .................................................................................................... 95

    5-22 ASSIGNMENT OF CONTRACT PAYMENTS BY CONTRACTORS ......................................................... 96

    5-23 PROCEDURES FOR ASSIGNMENT OF CONTRACT PAYMENTS ......................................................... 96

    5-24 AUTHORITY PAYMENT PROCESS ..................................................................................................... 97

    6 - SPECIAL FEDERAL AND GRANTEE REQUIREMENTS ................................................................................ 98

    6-1 PURPOSE AND SCOPE ....................................................................................................................... 98

  • Page | xi

    6-2 RESPONSIBILITY ................................................................................................................................. 98

    6-3 CONTRACTOR LABOR REQUIREMENTS ............................................................................................. 98

    6-4 LABOR SURPLUS .............................................................................................................................. 100

    6-5 FEDERAL POLICIES FOR ELDERLY AND DISABLED ............................................................................ 100

    6-6 FEDERAL FOREIGN TRADE REQUIREMENTS .................................................................................... 101

    6-7 ENVIRONMENTAL AND CONSERVATION REQUIREMENTS ............................................................. 101

    6-8 INTELLIGENT TRANSPORTATION SYSTEMS ..................................................................................... 102

    6-9 RESTRICTION ON LOBBYING ........................................................................................................... 102

    6-10 AUDITS OF ROLLING STOCK PURCHASES ...................................................................................... 103

    6-11 PRIVACY ACT REGARDING FEDERAL RECORDS ............................................................................. 104

    6-12 ADDITIONAL FEDERAL INTEGRITY PROVISIONS ............................................................................ 104

    6-13 DRUG AND ALCOHOL TESTING ..................................................................................................... 104

    6-14 FTA REQUIRED CLAUSES ............................................................................................................... 105

    7 - SOCIOECONOMIC PROGRAMS ............................................................................................................. 106

    7-1 PURPOSE AND SCOPE ..................................................................................................................... 106

    7-2 DISADVANTAGED BUSINESS ENTERPRISE REQUIREMENTS ............................................................ 106

    7-2-1 DEFINITIONS .................................................................................................................................... 106

    7-2-2 DBE POLICIES ................................................................................................................................... 108

    7-2-3 SMALL BUSINESS PARTICIPATION IN THE DBE PROGRAM .............................................................. 110

    7-2-4 DBE GOAL-SETTING PROCEDURES ................................................................................................... 110

    7-2-5 GOAL WAIVER/SUBSTITUTION PROCEDURES ................................................................................. 111

    7-2-6 SOLICITATION REQUIREMENTS ....................................................................................................... 111

    7-2-7 BID AND PROPOSAL REQUIREMENTS .............................................................................................. 113

    7-2-8 CONTRACT ADMINISTRATION REQUIREMENTS .............................................................................. 114

    7-2-9 DBE/SBE ACTIONS MONITORING STEPS BY DEPARTMENT ............................................................. 115

    7-2-10 CONTRACT FILES ............................................................................................................................ 116

    7-3 SMALL BUSINESS AND LOCAL PREFERENCE PROGRAM.................................................................. 117

    7-3-1 DEFINITIONS .................................................................................................................................... 117

    7-3-2 SMALL BUSINESS AND LOCAL PREFERENCE POLICY ........................................................................ 117

    7-3-3 SMALL LOCAL BUSINESS PARTICIPATION IN SIMPLIFIED ACQUISITIONS ........................................ 117

    7-3-4 MAXIMIZING SMALL LOCAL BUSINESS PARTICIPATION .................................................................. 117

    7-3-5 EVALUATION REQUIREMENTS ......................................................................................................... 118

    7-3-6 DOCUMENTATION ........................................................................................................................... 118

    7-3-7 DATA COLLECTION AND REPORTING ............................................................................................... 118

    8 - SIMPLIFIED ACQUISITION PROCEDURES .............................................................................................. 120

  • Page | xii

    8-1 PURPOSE AND SCOPE ..................................................................................................................... 120

    8-2 SIMPLIFIED ACQUISITION AUTHORITY ............................................................................................ 120

    8-3 SIMPLIFIED ACQUISITION THRESHOLD ........................................................................................... 120

    8-4 USE OF SIMPLIFIED ACQUISITION PROCEDURES ............................................................................ 120

    8-5 COMPETITIVE SIMPLIFIED ACQUISITIONS PROCEDURES ................................................................ 121

    8-6 NON-COMPETITIVE SIMPLIFIED ACQUISITION PROCEDURES ......................................................... 122

    8-7 EVALUATION OF QUOTATIONS OR OFFERS .................................................................................... 123

    8-8 BASIS FOR AWARD .......................................................................................................................... 123

    8-9 DOCUMENTATION AND RECORDS .................................................................................................. 124

    8-10 SIMPLIFIED ACQUISITION METHODS ............................................................................................ 125

    8-11 AUTHORITY PURCHASE CARD ....................................................................................................... 125

    8-12 PURCHASE ORDERS ....................................................................................................................... 126

    8-13 BLANKET PURCHASE AGREEMENTS .............................................................................................. 127

    8-14 PETTY CASH FUND ......................................................................................................................... 128

    9 – PROCUREMENT BY COMPETITIVE SEALED BIDDING ........................................................................... 129

    9-1 PURPOSE AND SCOPE ..................................................................................................................... 129

    9-2 INVITATION FOR BIDS ..................................................................................................................... 129

    9-3 LIVING WAGE POLICY ...................................................................................................................... 130

    9-4 IFB PREPARATION ........................................................................................................................... 130

    9-5 BID PREPARATION INSTRUCTIONS .................................................................................................. 131

    9-6 TIME FOR THE SUBMISSION OF BIDS .............................................................................................. 131

    9-7 ELECTRONIC BIDS ............................................................................................................................ 131

    9-8 BID SAMPLES ................................................................................................................................... 132

    9-9 DESCRIPTIVE LITERATURE ............................................................................................................... 132

    9-10 SOURCE LISTS ................................................................................................................................ 133

    9-11 PUBLIC NOTICE .............................................................................................................................. 133

    9-12 SOLICITATION RECORD ................................................................................................................. 133

    9-13 PRE-BID CONFERENCES ................................................................................................................. 134

    9-14 AMENDMENT OF INVITATIONS FOR BIDS..................................................................................... 134

    9-15 CANCELLATION OF A BID PRIOR TO OPENING .............................................................................. 135

    9-16 SUBMISSION OF BIDS: GENERAL PROVISIONS .............................................................................. 135

    9-17 MODIFICATION OR WITHDRAWAL OF BIDS PRIOR TO OPENING ................................................. 136

    9-18 LATE BIDS, LATE MODIFICATION, AND LATE WITHDRAWALS ...................................................... 136

    9-19 NOTICE TO BIDDERS OF LATE ACTIONS ........................................................................................ 137

    9-20 RECEIPT AND SAFEGUARDING OF BIDS ........................................................................................ 137

  • Page | xiii

    9-21 BID OPENING................................................................................................................................. 138

    9-22 POSTPONEMENT OF THE BID OPENING ....................................................................................... 138

    9-23 CANCELLATION OF AN INVITATION FOR BIDS AFTER OPENING ................................................... 139

    9-24 RECEIPT OF A SINGLE BID .............................................................................................................. 139

    9-25 UNREADABLE ELECTRONIC BIDS ................................................................................................... 139

    9-26 BID EVALUATION ........................................................................................................................... 140

    9-27 BID MISTAKES ............................................................................................................................... 142

    9-28 EXTENSION OF THE BID ACCEPTANCE PERIOD ............................................................................. 145

    9-29 CONTRACT AWARD ....................................................................................................................... 146

    9-30 TWO-STEP SEALED BIDDING ......................................................................................................... 146

    9-31 CONTRACT FILE ASSEMBLY AND DOCUMENTATION .................................................................... 149

    10 – PROCUREMENT BY COMPETITIVE PROPOSALS ................................................................................. 151

    10-1 PURPOSE AND SCOPE ................................................................................................................... 151

    10-2 AUTHORITY TO NEGOTIATE .......................................................................................................... 151

    10-3 RESPONSIBILITIES .......................................................................................................................... 152

    10-4 LIVING WAGE POLICY .................................................................................................................... 152

    10-5 EVALUATION FACTORS ................................................................................................................. 152

    10-6 SUBMITTAL REQUIREMENTS ........................................................................................................ 155

    10-7 PRESOLICITATION NOTICES AND CONFERENCES .......................................................................... 156

    10-8 REQUIREMENTS FOR REQUESTS FOR PROPOSALS ....................................................................... 156

    10-9 PRE-PROPOSAL CONFERENCES ..................................................................................................... 157

    10-10 AMENDMENT OF SOLICITATIONS ............................................................................................... 158

    10-11 CANCELLATION OF A REQUEST FOR PROPOSALS ....................................................................... 158

    10-12 RECEIPT, REGISTRATION AND DISCLOSURE OF PROPOSALS ...................................................... 159

    10-13 MODIFICATION OR WITHDRAWAL OF PROPOSALS .................................................................... 159

    10-14 LATE PROPOSALS, MODIFICATIONS AND WITHDRAWALS ......................................................... 159

    10-15 HANDLING PROPOSALS AND INFORMATION ............................................................................. 160

    10-16 ADEQUACY OF PROPOSALS......................................................................................................... 161

    10-17 SOURCE SELECTION PROCESS ..................................................................................................... 161

    10-18 COMPETITIVE RANGE .................................................................................................................. 162

    10-19 CLARIFICATIONS WITH PROPOSERS ............................................................................................ 162

    10-20 ORAL PRESENTATIONS ................................................................................................................ 162

    10-21 PRE-DISCUSSION OBJECTIVES ..................................................................................................... 163

    10-22 DISCUSSIONS ............................................................................................................................... 163

    10-23 BEST AND FINAL OFFERS (“BAFOS”) ........................................................................................... 165

  • Page | xiv

    10-24 SUMMARY DISCUSSION MEMORANDUM .................................................................................. 165

    10-25 CONTRACT AWARD ..................................................................................................................... 166

    10-26 DEBRIEFING ................................................................................................................................. 166

    10-27 UNSOLICITED PROPOSALS .......................................................................................................... 167

    10-28 EVALUATION OF UNSOLICITED PROPOSALS ............................................................................... 168

    10-29 DESIGN BUILD SELECTION PROCEDURES .................................................................................... 168

    10-30 CONTRACT FILE ASSEMBLY AND DOCUMENTATION .................................................................. 170

    11 - SOLE SOURCE AND OTHER LESS THAN FULL AND OPEN COMPETITION PROCUREMENTS ............... 172

    11-1 PURPOSE AND SCOPE ................................................................................................................... 172

    11-2 GENERAL ....................................................................................................................................... 172

    11-3 SOLE SOURCE PROCUREMENT ...................................................................................................... 174

    11-4 SOLE SOURCE DETERMINATION AND FINDINGS .......................................................................... 174

    11-5 SOLE SOURCE PROCUREMENT PROCEDURES ............................................................................... 176

    11-6 COMPETITION EXEMPTIONS ......................................................................................................... 176

    11-7 EMERGENCY PROCUREMENTS...................................................................................................... 177

    11-8 EMERGENCY DETERMINATION AND FINDINGS ............................................................................ 177

    11-9 EMERGENCY PROCUREMENT PROCEDURES ................................................................................. 178

    11-10 CONTRACT FILE ASSEMBLY AND DOCUMENTATION .................................................................. 179

    11-11 FEDERAL SUPPLY SCHEDULES ..................................................................................................... 180

    11-11-1 ORDERING PROCEDURES FOR FEDERAL SUPPLY SCHEDULES ..................................................... 181

    11-11-2 ORDERING SUPPLIES AND SERVICES NOT REQUIRING A STATEMENT OF WORK ....................... 181

    11-11-3 ORDERING SERVICES REQUIRING A STATEMENT OF WORK ....................................................... 183

    11-11-4 BLANKET PURCHASE AGREEMENTS (“BPA”) ............................................................................... 184

    11-11-5 PRICE REDUCTIONS ...................................................................................................................... 185

    11-11-6 SMALL LOCAL BUSINESS .............................................................................................................. 185

    11-11-7 LIMITED SOURCES DETERMINATION AND FINDINGS .................................................................. 186

    11-11-8 DOCUMENTING AWARD DECISION AND ORDERS ....................................................................... 187

    11-11-9 ORDER PLACEMENT ..................................................................................................................... 187

    11-11-10 INSPECTION AND ACCEPTANCE ................................................................................................. 188

    11-11-11 REMEDIES FOR NONCONFORMANCE ........................................................................................ 189

    11-11-12 TERMINATION FOR DEFAULT .................................................................................................... 189

    11-11-13 TERMINATION FOR CONVENIENCE ........................................................................................... 190

    11-11-14 DISPUTES ................................................................................................................................... 190

    12 - ARCHITECT-ENGINEER AND RELATED SERVICES ................................................................................ 191

    12-1 PURPOSE AND SCOPE ................................................................................................................... 191

  • Page | xv

    12-2 DEFINITION ................................................................................................................................... 191

    12-3 PUBLIC ANNOUNCEMENT ............................................................................................................. 191

    12-4 COMPETITION ............................................................................................................................... 192

    12-5 SELECTION CRITERIA OF FIRMS FOR A-E CONTRACTS .................................................................. 192

    12-6 TECHNICAL EVALUATION TEAM (“TET”) ....................................................................................... 193

    12-7 NEGOTIATIONS ............................................................................................................................. 194

    12-8 ARCHITECT-ENGINEER SIMPLIFIED PROCEDURES......................................................................... 194

    12-9 CONTRACTOR PERFORMANCE EVALUATIONS .............................................................................. 195

    12-10 COST ESTIMATE FOR ARCHITECT-ENGINEER WORK ................................................................... 195

    12-11 COST AND PRICE ANALYSIS ......................................................................................................... 196

    12-12 RELEASE OF INFORMATION ON FIRM SELECTION ...................................................................... 196

    12-13 ERRORS AND OMMISIONS INSURANCE ...................................................................................... 196

    12-14 A-E CONTRACT REQUIREMENTS AND PROVISIONS .................................................................... 196

    12-15 RETENTION OF A-E RECORDS ...................................................................................................... 197

    12-16 CONTRACT FILE ASSEMBLY AND DOCUMENTATION .................................................................. 197

    13 - CONSTRUCTION CONTRACTS ............................................................................................................. 199

    13-1 PURPOSE AND SCOPE ................................................................................................................... 199

    13-2 GENERAL POLICY ........................................................................................................................... 199

    13-3 METHODS OF CONTRACTING ....................................................................................................... 199

    13-4 CRITERIA FOR METHOD SELECTION .............................................................................................. 200

    13-5 LEASE, BUY, OR BUILD ................................................................................................................... 200

    13-6 GENERAL DESCRIPTIONS ............................................................................................................... 201

    13-7 SINGLE PRIME CONTRACTOR ........................................................................................................ 202

    13-8 MULTIPLE PRIME CONTRACTORS ................................................................................................. 202

    13-9 DESIGN-BUILD TURNKEY ............................................................................................................... 203

    13-10 CONSTRUCTION MANAGER ........................................................................................................ 204

    13-11 DESIGN-BID-BUILD CONSTRUCTION ........................................................................................... 205

    13-12 PHASED DESIGN AND CONSTRUCTION ....................................................................................... 205

    13-13 SPECIFICATIONS .......................................................................................................................... 206

    13-14 ESTIMATE OF CONSTRUCTION COSTS ........................................................................................ 206

    13-15 DISCLOSURE OF MAGNITUDE OF CONSTRUCTION PROJECT ...................................................... 207

    13-16 LIQUIDATED DAMAGES ............................................................................................................... 207

    13-17 FIXED-PRICE CONSTRUCTION CONTRACTS ................................................................................. 207

    13-18 CONSTRUCTION LABOR STANDARDS .......................................................................................... 208

    13-19 LIVING WAGE POLICY .................................................................................................................. 209

  • Page | xvi

    13-20 VALUE ENGINEERING .................................................................................................................. 210

    13-21 TWO-PHASE DESIGN-BUILD SELECTION PROCEDURES ............................................................... 211

    13-22 CONTRACT FILE ASSEMBLY AND DOCUMENTATION .................................................................. 211

    14 - BONDS, OTHER SECURITY AND INSURANCE ...................................................................................... 213

    14-1 PURPOSE AND SCOPE ................................................................................................................... 213

    14-2 DEFINITIONS.................................................................................................................................. 213

    14-3 GENERAL PROVISIONS .................................................................................................................. 214

    14-4 BID BONDS OR OTHER SECURITY .................................................................................................. 214

    14-5 PERFORMANCE AND PAYMENT BONDS ....................................................................................... 215

    14-6 ACCEPTABLE TYPES OF SECURITY ................................................................................................. 216

    14-7 SURETY BONDS AND OTHER SECURITY ......................................................................................... 217

    14-8 SURETIES ....................................................................................................................................... 217

    14-9 INSURANCE REQUIREMENTS ........................................................................................................ 218

    15 - CONTRACTOR RESPONSIBILITY AND DEBARMENT ............................................................................ 219

    15-1 PURPOSE AND SCOPE ................................................................................................................... 219

    15-2 RESPONSIBLE PROSPECTIVE CONTRACTORS ................................................................................ 219

    15-3 SPECIAL STANDARD OF RESPONSIBILITY ...................................................................................... 219

    15-4 APPLICATION OF WALSH-HEALEY ACT .......................................................................................... 220

    15-5 APPLICATION OF OTHER RESPONSIBILITY STANDARDS ................................................................ 221

    15-6 SUBCONTRACTOR RESPONSIBILITY .............................................................................................. 221

    15-7 OBTAINING INFORMATION FOR DETERMINING RESPONSIBILITY ................................................ 222

    15-8 DETERMINATIONS AND DOCUMENTATION ................................................................................. 222

    15-9 PRE-AWARD SURVEYS ................................................................................................................... 223

    15-10 LIST OF EXCLUDED PARTIES ........................................................................................................ 223

    15-11 DEBARMENT AND SUSPENSION ................................................................................................. 223

    15-12 DEBARMENT AND SUSPENSION DEFINITIONS ............................................................................ 224

    15-13 EFFECT OF LISTING ...................................................................................................................... 225

    15-14 CONTINUATION OF CURRENT CONTRACTS ................................................................................ 225

    15-15 RESTRICTIONS ON SUBCONTRACTING ........................................................................................ 225

    15-16 DEBARMENT ............................................................................................................................... 226

    15-17 DEBARMENT PROCEDURES ......................................................................................................... 226

    15-18 PERIOD OF DEBARMENT ............................................................................................................. 227

    15-19 SCOPE OF DEBARMENT............................................................................................................... 228

    15-20 SUSPENSION ............................................................................................................................... 228

    15-21 SUSPENSION PROCEDURES ......................................................................................................... 229

  • Page | xvii

    15-22 PERIOD OF SUSPENSION ............................................................................................................. 230

    15-23 SCOPE OF SUSPENSION ............................................................................................................... 231

    15-24 CERTIFICATION REGARDING DEBARMENT OR INELIGIBILITY ..................................................... 231

    16 - COST AND PRICE ANALYSIS ................................................................................................................ 232

    16-1 PURPOSE AND SCOPE ................................................................................................................... 232

    16-2 DEFINITIONS.................................................................................................................................. 233

    16-3 PRICE ANALYSIS ............................................................................................................................. 233

    16-4 COST ANALYSIS ............................................................................................................................. 236

    16-4-1 COST REALISM ANALYSIS ............................................................................................................... 237

    16-4-2 COST PROPOSALS .......................................................................................................................... 238

    16-4-3 TECHNICAL ANALYSIS .................................................................................................................... 238

    16-5 TOTAL COSTS ................................................................................................................................. 239

    16-6 DETERMINING COST REASONABLENESS ....................................................................................... 239

    16-7 DIRECT COSTS ............................................................................................................................... 239

    16-8 INDIRECT COSTS ............................................................................................................................ 240

    16-9 COST ANALYSIS TECHNIQUES ....................................................................................................... 241

    16-10 PROFIT/FEE ................................................................................................................................. 243

    16-10-1 WEIGHTED GUIDELINES FOR PROFIT MARGIN CALCULATIONS .................................................. 243

    16-10-1-1 RISK FACTOR MATRIX ............................................................................................................... 243

    16-10-2 DEGREE OF RISK ........................................................................................................................... 244

    16-10-3 DEGREE OF DIFFICULTY OF THE WORK ....................................................................................... 245

    16-10-4 MAGNITUDE OF THE WORK ........................................................................................................ 246

    16-10-5 PERFORMANCE PERIOD ............................................................................................................... 246

    16-10-6 CONTRACTOR’S INVESTMENT ..................................................................................................... 246

    16-10-7 AUTHORITY ASSISTANCE ............................................................................................................. 246

    16-10-8 AMOUNT OF SUBCONTRACTING ................................................................................................. 246

    16-11 AUDIT ASSISTANCE ..................................................................................................................... 247

    16-12 ANALYSIS TEMPLATES ................................................................................................................. 253

    16-12-1 VERIFICATION OF LABOR BILLING RATES .................................................................................... 253

    16-12-2 COST ANALYSIS FOR PROFESSIONAL LABOR RATES .................................................................... 253

    16-12-3 COST ANALYSIS FOR MATERIAL OR EQUIPMENT ........................................................................ 254

    16-12-4 SUBCONTRACTOR/SUBCONSULTANT COST ANALYSIS ................................................................ 254

    16-12-5 OTHER DIRECT COSTS .................................................................................................................. 254

    17 - PROTESTS ........................................................................................................................................... 255

    17-1 PURPOSE AND SCOPE ................................................................................................................... 255

  • Page | xviii

    17-2 WRITTEN SUBMISSION ................................................................................................................. 255

    17-3 TIME FOR FILING ........................................................................................................................... 256

    17-4 AUTHORITY RESPONSE TO PROTESTS ........................................................................................... 256

    17-5 AUTHORITY REVIEW OF PROTESTS ............................................................................................... 257

    17-6 DECISIONS BY THE AUTHORITY ..................................................................................................... 257

    17-7 REMEDY ........................................................................................................................................ 258

    17-8 PROTESTS FILED WITH FTA ........................................................................................................... 258

    17-9 AUTHORITY ADMINISTRATION OF PROTESTS ............................................................................... 258

    17-10 NOTICE OF PROTEST POLICY REQUIREMENT .............................................................................. 259

    18 - CONTRACT COMPLIANCE AND ADMINISTRATION............................................................................. 260

    18-1 PURPOSE AND SCOPE ................................................................................................................... 260

    18-2 AUTHORITY AND RESPONSIBILITY ................................................................................................ 260

    18-3 CONTRACT AWARD APPROVAL .................................................................................................... 260

    18-4 PRE-AWARD ORIENTATION........................................................................................................... 261

    18-5 POST-AWARD CONFERENCE ......................................................................................................... 261

    18-6 CONTRACT EXECUTION BY THE AUTHORITY ................................................................................. 262

    18-7 CONTRACT EXECUTION BY CONTRACTORS .................................................................................. 262

    18-8 CONTRACT DISTRIBUTION ............................................................................................................ 263

    18-9 AUTHORITY CONTRACT FILES ....................................................................................................... 263

    18-10 CONTRACT MODIFICATIONS ....................................................................................................... 263

    18-11 CHANGE ORDER REQUIREMENTS ............................................................................................... 265

    18-11.1 CHANGES CLAUSE IN SOLICITATIONS AND CONTRACTS ......................................................... 265

    18-11.2 EQUITABLE ADJUSTMENT NEGOTIATIONS .............................................................................. 265

    18.11.3 CHANGE ORDER PROCESS ........................................................................................................ 266

    18-12 OUT OF SCOPE CHANGES (“TAG-ON”) ........................................................................................ 267

    18-13 ORDERING PROCEDURES ............................................................................................................ 268

    18-14 SUSPENSION OF WORK/STOP ORDER ........................................................................................ 269

    18-15 CONTRACT TERMINATION .......................................................................................................... 270

    18-16 LIQUIDATED DAMAGES ............................................................................................................... 271

    18-17 DELIVERY AND PERFORMANCE SCHEDULES ............................................................................... 271

    18-18 CLOSEOUT OF CONTRACT FILES .................................................................................................. 272

    18-19 CONTRACT CLOSEOUT TIME PERIODS ........................................................................................ 273

    18-20 AUTHORITY PROPERTY................................................................................................................ 273

    18-21 DELEGATION OF APPOINTMENT TO COTR/COR ......................................................................... 274

    19 - CLAIMS AND LITIGATION ACTIONS .................................................................................................... 276

  • Page | xix

    19-1 PURPOSE AND SCOPE ................................................................................................................... 276

    19-2 GENERAL ....................................................................................................................................... 276

    19-3 FTA AND AUTHORITY REQUIREMENTS ......................................................................................... 276

    19-4 CONTRACT DISPUTES .................................................................................................................... 276

    19-5 APPEALS TO THE ASBCA ................................................................................................................ 277

    19-6 AUTHORITY CLAIMS AGAINST THE CONTRACTOR ........................................................................ 278

    19-7 LITIGATION ACTIONS .................................................................................................................... 278

    19-8 COST OR PRICE ANALYSIS.............................................................................................................. 278

    20 - SPECIAL AGREEMENTS ....................................................................................................................... 279

    20-1 PURPOSE AND SCOPE ................................................................................................................... 279

    20-2 MASTER AGREEMENTS ................................................................................................................. 279

    20-3 MASTER AGREEMENT: WORK AUTHORIZATIONS AND INVOICES ................................................ 280

    20-4 REAL PROPERTY ACQUISITIONS .................................................................................................... 280

    20-5 REAL PROPERTY DISPOSAL ............................................................................................................ 281

    20-6 PERMITS AND EASEMENTS ........................................................................................................... 281

    20-7 BUS CHARTER SERVICE AGREEMENTS .......................................................................................... 281

    20-8 OTHER CONTRACTS AND AGREEMENTS ....................................................................................... 282

    20-9 ASSURANCE FOR USE OF REAL PROPERTY .................................................................................... 282

    20-10 JOINT DEVELOPMENT PROCUREMENT REGULATIONS ............................................................... 282

    21 - QUALITY ASSURANCE AND WARRANTIES .......................................................................................... 283

    21-1 PURPOSE AND SCOPE ................................................................................................................... 283

    21-2 AUTHORITY RESPONSIBILITIES ...................................................................................................... 283

    21-3 CONTRACTOR RESPONSIBILITIES .................................................................................................. 283

    21-4 CONTRACT QUALITY REQUIREMENTS .......................................................................................... 284

    21-5 TYPES OF CONTRACT QUALITY REQUIREMENTS .......................................................................... 284

    21-6 QUALITY ASSURANCE REQUIREMENTS ......................................................................................... 285

    21-7 CONTRACT QUALITY ASSURANCE AT SOURCE .............................................................................. 285

    21-8 CONTRACT QUALITY ASSURANCE AT DESTINATION ..................................................................... 285

    21-9 CONTRACT QUALITY ASSURANCE FOR SIMPLIFIED ACQUISITONS ............................................... 286

    21-10 CONTRACT QUALITY ASSURANCE OF SUBCONTRACTS .............................................................. 286

    21-11 NONCONFORMING SUPPLIES, SERVICES, OR CONSTRUCTION .................................................. 286

    21-12 ACCEPTANCE ............................................................................................................................... 287

    21-13 RESPONSIBILITY FOR ACCEPTANCE ............................................................................................. 287

    21-14 PLACE OF ACCEPTANCE .............................................................................................................. 288

    21-15 CERTIFICATION OF CONFORMANCE ........................................................................................... 288

  • Page | xx

    21-16 TRANSFER OF TITLE AND RISK OR LOSS ...................................................................................... 288

    21-17 WARRANTIES............................................................................................................................... 289

    22 - PATENTS, COPYRIGHTS, AND PROPRIETARY INFORMATION ............................................................. 290

    22-1 PURPOSE AND SCOPE ................................................................................................................... 290

    22-2 GENERAL PROVISIONS .................................................................................................................. 290

    22-3 PATENT AND COPYRIGHT INFRINGEMENT ................................................................................... 290

    22-4 INDEMNIFICATION ........................................................................................................................ 291

    22-5 LICENSING AND ROYALTIES........................................................................................................... 291

    22-6 PATENT RIGHTS UNDER AUTHORITY CONTRACTS ........................................................................ 294

    22-7 PATENT RIGHTS ............................................................................................................................. 295

    22-8 RIGHTS IN DATA AND COPYRIGHTS .............................................................................................. 295

    22-9 PROPRIETARY OR CONFIDENTIAL DATA IN BIDS AND PROPOSALS .............................................. 296

    22-10 PROVISIONS AND CLAUSES ......................................................................................................... 297

    23 - PROCUREMENT FORMS AND PROVISIONS ........................................................................................ 298

    23-1 PURPOSE AND SCOPE ................................................................................................................... 298

    23-2 RESPONSIBILITY ............................................................................................................................. 298

    23-3 LIMITATIONS ................................................................................................................................. 298

    23-4 PROVISIONS AND CLAUSES: NUMBERING SYSTEM ...................................................................... 298

    23-5 INCORPORATING PROVISIONS AND CLAUSES .............................................................................. 298

    23-6 IDENTIFICATION OF PROVISIONS AND CLAUSES .......................................................................... 299

    23-7 MODIFYING AND COMPLETING PROVISIONS AND CLAUSES ........................................................ 299

    23-8 FORMS: CURRENT EDITIONS AND NUMBERING SYSTEM ............................................................. 299

    23-9 TYPES OF FORMS .......................................................................................................................... 299

    23-10 DISTRIBUTION OF FORMS, CLAUSES, AND PROVISIONS ............................................................. 300

    24 - DEFINITIONS ....................................................................................................................................... 301

    24-1 PURPOSE AND SCOPE ................................................................................................................... 301

    24-2 DEFINITIONS.................................................................................................................................. 301

    APPENDIX A ............................................................................................................................................... 317

    APPENDIX B ............................................................................................................................................... 334

  • Page | 1

    Washington Metropolitan Area Transit Authority Board Approval, Delegation & Reprogramming Requirements

    Adopted By the Authority Board of Directors September 24, 1992

    Revised: July 24, 1997, September 27, 2007, June 25, 2009, July 16, 2009, June 23, 2011, April 7, 2014, November 19, 2015

    ________________________________________________________________________________

    1 – BOARD APPROVAL, DELEGATION & REPROGRAMMING REQUIREMENTS

    SECTION 100 – GENERAL 101. Purpose. This Chapter 1 sets forth the Policy guidance and requirements that will govern the

    Washington Metropolitan Area Transit Authority (“Authority”) procurement activities, budget reprogramming activities, non-procurement activities, and conduct of personnel engaged in those activities. This chapter augments the Authority Compact, Section 73, as amended, which sets forth the general policy guidance and requirements that affect Authority procurements and approvals.

    102. Procurement Regulations Background. The Authority’s Procurement Policy, as defined in

    this Chapter 1, establishes the broad framework for its Procurement Regulations. The Regulations consist of the Procurement Policy approved by the Authority Board of Directors (“Board”), and procedures that are developed and issued by the Chief Procurement Officer (CPRO) and approved by the General Manager/Chief Executive Officer (GM/CEO).

    103. Certification of Procurement System. The Authority Procurement System is fully certified

    by the U.S. Department of Transportation (DOT), Federal Transit Administration (FTA), to carry out the Authority’s procurement functions, in accordance with federal guidelines and Authority policy. However, certain functions identified in DOT/FTA Circulars 4220.1F and 5010.1D, as amended, may require approval or concurrence by the FTA Administrator.

    104. Reference to Statutes or Regulations. Reference in the Authority’s Procurement Policy to

    any federal state, or local statute, regulation, or circular or other guidance, shall be deemed to include any revision, amendment, or replacement therein, effective after the date of the adoption of this Policy by the Board.

    SECTION 200 – RESPONSIBILITY AND AUTHORITY 201. Responsibility. With respect to this Policy, the following responsibilities apply:

    (a) Board of Directors. The Board is responsible for approving procurement policies; approving deviations from procurement policy; authorizing the GM/CEO to initiate, award and modify procurements consistent with the approved Authority operating and multi-year capital budgets; delegating contracting officer authority to the GM/CEO; authorizing the GM/CEO to delegate contracting officer authority and authority to approve procurement initiation and award activities to subordinate officials of the Authority.

    (b) General Manager/Chief Executive Officer. The GM/CEO is delegated unlimited

    contracting authority. The GM/CEO is authorized to initiate, award and modify procurements consistent with the approved Authority operating and multi-year capital budgets and is responsible for delegating contracting officer authority to qualified

  • Page | 2

    employees of the Authority and authorizing the re-delegation of authority to other qualified employees of the Authority; approving employee standards of conduct; approving Authority procurement and related policies and procedures that augment Board procurement policy’ approving, only as authorized by the Board or this Procurement Policy, the initiation of procurement actions and awarding contracts in emergency situations; and reporting sole source and emergency contracts to the Board. The GM/CEO is also responsible for establishing a system for the timely review and approval of procurement actions, establishing policies and procedures for special agreements, and implementing procurement policies and procedures.

    (c) Chief Procurement Officer. The Chief Procurement Officer (CPRO) shall be a full

    participatory member of the Executive Leadership Team. The CPRO, with approval by the GM/CEO, is responsible for developing and issuing procurement procedures to implement Board procurement policies; establishing a system to select, recommend, appoint, and delegate Contracting Officer authority; preparing quarterly reports for presentation by the GM/CEO to the Board; acting in appointed capacity as Contracting Officer. The Chief Procurement Officer may appoint authorized representatives for the purpose of assisting the Contracting Officers in providing technical guidance to the Contractor or otherwise assisting in the administration of the contract. In limited circumstances, authority representatives may be delegated restricted contracting authority.

    (d) General Counsel. The General Counsel shall have responsibility for: providing legal

    counsel regarding procurement matters within WMATA, including to the Chief Procurement Officer, contracting officers and others, involved in the procurement process; assigning a cognizant attorney in the Office of General Counsel (COUN) for each WMATA procurement; reviewing and approving procurement policies and procedures within WMATA, and ensuring they are consistent with all applicable laws and regulations and effectively fulfill the needs and purposes of WMATA; and ensuring appropriate legal review at all appropriate steps of a procurement. The General Counsel may delegate within COUN any or all of the foregoing authorities and responsibilities. At least one attorney within the Office of the General Counsel shall have experience in procurement of information technology products and services.

    202. Delegation of Authority. On June 28, 1991, the GM/CEO delegated contracting officer

    authority to the Director, Office of Procurement (subsequently designated as Chief Procurement Officer), and thereby separated procurement from other functional responsibilities.

    203. General Manager/Chief Executive Officer Authority (Emergency Situations).

    Notwithstanding the approval requirements in § 600 of this Procurement Policy, the GM/CEO has the authority to incur obligations in emergency situations, and will report back to the Board on all emergency procurements within 60 days of the action. “Emergency” is defined as a situation (such as a flood, epidemic, riot, equipment failure, or other reasons declared by the GM/CEO) that creates an immediate threat to the public health, welfare, or safety. The existence of an emergency condition creates an immediate need for supplies, services, or construction which cannot be met through normal procurement methods, and the lack of which would seriously threaten either the health or safety of any person, the preservation or protection of property, or the continuation of necessary Authority functions.

    204. General Manager/Chief Executive Officer Authority (Special Agreements). The GM/CEO has the authority to develop policies and procedures for special agreements which include but are not limited to: utility contracts, marketing agreements, employee benefits contracts, contracts for the purchase, sale or lease of real property, and insurance contracts.

  • Page | 3

    SECTION 300 – COMPETITION REQUIRMENTS 301. Commitment to Full and Open Competition. WMATA shall conduct procurements using full

    and open competition consistent with the standards set forth herein and in applicable statutes and regulations. WMATA shall take into account and give effect to competition requirements that are contained in any statute, regulation or guidance that applies to grant funds used in the procurement - including but not limited to the following, as applicable:

    (a) Section 73 of the WMATA Compact;

    (b) Federal Transit Administration (“FTA”) enabling legislation, 49 U.S.C. § 5325(a) (FTA grant recipients to conduct all procurements financed under 49 U.S.C. Chapter 53 in a manner that provides full and open competition);

    (c) Common Grant Rule (49 C.F.R. § 18.1 et seq.); (d) FTA Circular 4220.1 (as may be am3ended and revised by the FTA); (e) American Reinvestment and Recovery Act, Pub. L. 111-5 (Feb. 17, 2009) (“ARRA”)

    (“To the maximum extent possible, contract awarded under this Act shall be awarded…through the use of competitive procedures.”)

    In conducting procurements that use non-federal funds, WMATA shall use procedures pertaining to full and open competition (and pertaining to restrictions on procurements not using full and open competition or excluding sources) that are consistent with competition procedures used in procurements using federal funds. WMATA’s procedures for procurements using non-federal funds also shall provide, as authorized by the Compact, for WMATA to: (i) made purchases using state and local sources; and (ii) make purchases using the GSA schedule.

    302. Restrictions on Procurements Not Using Full and Open Competition or Excluding Sources. Under certain circumstances, it may be appropriate to conduct a procurement using: (a) full and open competition after exclusion of sources; or (b) other than full and open competition. Procurements not using full and open competition will be reported to the Board on a quarterly basis. Such approaches may be used only after written approval of both the General Counsel and the Chief Procurement Officer of an appropriate Determination and Findings (“D&F”) – who shall approve such approaches only upon a determination that the procurement cannot reasonably be accomplished using full and open competition without exclusion of sources. WMATA procurement personnel and counsel shall comply strictly with WMATA restrictions and, to the extent applicable, federal restrictions on procurements conducted not using full and open competition or excluding sources.

    303. Prohibition Against Organizational Conflicts of Interest. WMATA shall analyze each

    planned acquisition in order to identify and evaluate potential organizational conflicts of interest as early in the acquisition process as possible, and avoid, neutralize, or mitigate potential conflicts before contract award. In any instance in which WMATA first becomes aware of an organizational conflict of interest after contract award, it shall conduct a review to determine whether the organizational conflict of interest was reasonably foreseeable and should have been identified by the contractor prior to ward. In an instance where WMATA first becomes aware of an organizational conflict of interest after award, the Chief Procurement Officer may in his/her discretion terminate the contract or if reasonable possible, take appropriate steps to avoid, neutralize or mitigate such organizational conflict of interest.

  • Page | 4

    (a) Definition. An “organizational conflict of interest” means that because of other activities

    or relationships with other persons, a person is unable or potentially unable to render impartial assistance or advice to WMATA, or the person‘s objectivity in performing the contract work is or might be otherwise impaired, or a person has an unfair competitive advantage. An organizational conflict of interest occurs when any of the following circumstances arise:

    i. Lack of Impartiality or Impaired Objectivity. When the contractor is unable, or

    potentially unable, to provide impartial and objective assistance or advice to the recipient due to other activities, relationships, contracts, or circumstances. Such an OCI would occur, for example, if the service the contractor is to perform under a contract with WMATA might involve that contractor in evaluating its own performance or the performance of an affiliate under another WMATA contract.

    ii. Unequal Access to Information. The contractor has an unfair competitive

    advantage through obtaining access to nonpublic information during the performance of an earlier contract. Such an OCI would occur, for example, if the contractor’s service under a prior contractor gave it access to non-public, proprietary information of a company competing with it for a subsequent contract. It merits note that relevant case law makes clear that no unfair competitive advantage is created by an offeror’s prior performance of particular requirement. WMATA is under no obligation to equalize other offerors with an incumbent by providing information in the hands of the incumbent due to prior performance of the requirement.

    iii. Biased Ground Rules. During the conduct of an earlier procurement, the

    contractor has establi