John Deere Process Verification Audit - Instructions Background Instructions Data Storage Completed audits can be viewed in Supplier Evaluation Tracking at this link: This on-site audit is intended for parts with a high level of criticality to determine the effectiveness and conformance of process controls when performing work for John Deere. The work performed can include manufacturing operations at a John Deere or supplier' facility, or operations sub-contracted (sub-tier). This audit may also be performed on similar parts when the work has not yet been sourced, or when preparing for full production. It is intended to be conducted by John Deere personnel familiar with the requirements of the JDS-G223 Supplier Quality Manual, the requirements of the This audit is not intended to cover the supplier's or John Deere's entire quality system. To conduct a thorough review of the supplier's quality system, an audit must be conducted an using the JDS-G223 Supplier Quality System Audit Questionnaire and led by a qualified Lead Auditor. A review of John Deere's quality system is conducted with The lead auditor and team members must be qualified to conduct a Process Verification Audit. Prior to the on-site audit, review the most recent part specifications (drawing) and Control Plan on file for relevance, design level, and date. Also, review any other pertinent data or documents, such as key characteristics, Gage R&R studies, capability study information, Materials Engineering report / material certification, inspection data, FMEAs, internal and external failure data, and/or the supplier's internal Schedule the on-site audit with the part manufacturer at a time when the identified parts are being produced with the processes to be audited, and when manufacturing personnel are available to help guide the audit. The on-site audit is led by a qualified John Deere auditor trained in the Process Verification Audit process, and who is familiar with quality processes and tools. The audit team should have representatives who are familiar with the processes and parts being audited. The audit sequence should follow the order of Score each question on the checklist with a whole number from 1 to 3, with 3 being the highest possible score. If the question is not applicable, select NA in the scoring field. NA questions are excluded from the final score Total Point and Percentage calculations. Scoring definitions are on the checklist. Up to five part numbers or When all the questions are scored, a total score and percentage is automatically calculated. To display scores to the supplier, you may want to group the data by selecting "1" in the top left corner of the spreadsheet. This will hide the comment fields. Select "2" to display the comments. Non-conformances (all questions scored as 1) require corrective action. List the corrective action request description and other follow-up actions in the Audit Summary and Corrective Action section. Enter corrective After completing the audit report, please send it to your division quality audit system coordinator to file in Supplier Evaluation Tracking system located in JD Supply Network. Delete the audit instructions and change history prior to filing the audit. http://www.90.deere.com/suppmgmt/business_processes/strategic_sourcing_process/tools/ supplier_evaluation_tracking/supplier_evaluation_tracking_index.htm

Upload: buzz-me

Post on 01-Feb-2016

255 views

Category:

Documents


0 download

DESCRIPTION

this template is useful when performing process audits

TRANSCRIPT

Page 1: Process Verification Audit Checklist (2)

John Deere Process Verification Audit - Instructions

Background

The lead auditor and team members must be qualified to conduct a Process Verification Audit.

Instructions

Data Storage

Completed audits can be viewed in Supplier Evaluation Tracking at this link:

This on-site audit is intended for parts with a high level of criticality to determine the effectiveness and conformance of process controls when performing work for John Deere. The work performed can include manufacturing operations at a John Deere or supplier' facility, or operations sub-contracted (sub-tier). This audit may also be performed on similar parts when the work has not yet been sourced, or when preparing for full production. It is intended to be conducted by John Deere personnel familiar with the requirements of the JDS-G223 Supplier Quality Manual, the requirements of the selected parts, and processes used in manufacturing the selected parts.

This audit is not intended to cover the supplier's or John Deere's entire quality system. To conduct a thorough review of the supplier's quality system, an audit must be conducted an using the JDS-G223 Supplier Quality System Audit Questionnaire and led by a qualified Lead Auditor. A review of John Deere's quality system is conducted with internal audits by trained auditors or consultants.

Prior to the on-site audit, review the most recent part specifications (drawing) and Control Plan on file for relevance, design level, and date. Also, review any other pertinent data or documents, such as key characteristics, Gage R&R studies, capability study information, Materials Engineering report / material certification, inspection data, FMEAs, internal and external failure data, and/or the supplier's internal procedures.

Schedule the on-site audit with the part manufacturer at a time when the identified parts are being produced with the processes to be audited, and when manufacturing personnel are available to help guide the audit. The on-site audit is led by a qualified John Deere auditor trained in the Process Verification Audit process, and who is familiar with quality processes and tools. The audit team should have representatives who are familiar with the processes and parts being audited. The audit sequence should follow the order of the steps of the process.

Score each question on the checklist with a whole number from 1 to 3, with 3 being the highest possible score. If the question is not applicable, select NA in the scoring field. NA questions are excluded from the final score Total Point and Percentage calculations. Scoring definitions are on the checklist. Up to five part numbers or families may be audited per worksheet.

When all the questions are scored, a total score and percentage is automatically calculated. To display scores to the supplier, you may want to group the data by selecting "1" in the top left corner of the spreadsheet. This will hide the comment fields. Select "2" to display the comments. Non-conformances (all questions scored as 1) require corrective action. List the corrective action request description and other follow-up actions in the Audit Summary and Corrective Action section. Enter corrective action requests into NCCA. Document the NCCA number on the audit report.

After completing the audit report, please send it to your division quality audit system coordinator to file in Supplier Evaluation Tracking system located in JD Supply Network. Delete the audit instructions and change history prior to filing the audit.

http://www.90.deere.com/suppmgmt/business_processes/strategic_sourcing_process/tools/supplier_evaluation_tracking/supplier_evaluation_tracking_index.htm

Page 2: Process Verification Audit Checklist (2)

document.xls Page 2 of 6 Print Date: 04/22/2023

John Deere Process Verification Audit - ChecklistSupplier Name: Survey Date(s):

Supplier Number: Supplier Contact(s):

Supplier Address:

Supplier Phone Number:

Supplier E-Mail: Supplier Fax Number:

Audit Team Leader: Audit Team Members:

Reason for Audit:

Date of Last John Deere Assessment or Survey (if any):

Process(es) / Product(s) Audited:

Note: Secure copy of certification(s) if not provided in advance

Quality System Certification, Registrar, and Date of Certificate Expiration (ISO, ISO/TS, etc.):

Environmental System Certification, Registrar & Date of Expiration (ISO 14001):

Health & Safety System Certification, Registrar & Date of Expiration (ISO 18001):

Audit Summary and Corrective ActionTotal Audit Points: 0 Total Possible Points: 0 Percent: NOT SCORED

Audit Summary:

Corrective Action Required (if any): NCCA #(s):

GENERAL SCORING CRITERIA

Rating Score ** Ability to meet requirement in question: Corrective Action

Does Not Apply NA Requirement is not applicable. No action required

Does Not Comply

1

Needs Improvement

2

Complies3 No action required

** A supplier must have a score of 2 or greater on each of the questions to be acceptable.

Requirement is not met or partially met. There is no evidence of implementation or documentation, or major inconsistencies in implementation or documentation (major non-conformance).

Requires Corrective Action Request (CAR), Document

in NCCA

Requirement is met but there are minor inconsistencies in implementation or documentation, or is in the early phases and only preliminary evidence of implementation effectiveness exists.

Opportunity for Improvement.

Recommend CAR, but not required

Requirement is met, effectively implemented, and fully documented.

Page 3: Process Verification Audit Checklist (2)

document.xls Page 3 of 6 Print Date: 04/22/2023

John Deere Process Verification Audit - ChecklistSupplier Name: Survey Date(s):

Score each question using a 1 to 3 point scale, where 3 is the best possible score. Input NA for non-applicable questions.

Process Verification Audit ChecklistPart Number(s) or Families:

A. Document Control# n Question Score1 Is the part print to the current Revision Level?

Comments:

2 Are the Control Plan documents being used up-to-date? Comments:

3

Comments:

4 a

b

c

d

e Are cleanliness requirements documented on the Control Plan? Comments:

5

Comments:

6

Comments:

7

Comments:

8

Comments:

B. Material and Process Control 9 a

b Is the frequency of inspection being performed as described in the Control Plan?c Are the inspection method and equipment being used as described in the Control Plan?

d Do the operator instructions reflect the requirements of the Control Plan? Comments:

10

Comments:

If the Control Plan at the supplier is not the same version as the one at John Deere, was the change process followed per JDS-G223?

Do the process control documents adequately address all process parameters and product characteristics?

Are the Product and Process Key Characteristics known, visible, and is there a documented control plan in place to continuously monitor the process control and capability?

If the part has Key Characteristics, have a Gage R&R and capability study been performed?

If the key characteristic has a Cpk < 1.33, does the Control Plan follow the requirements of the Continuous Process Monitoring Matrix?

Are the Process flow diagrams, PFMEAs, Capability Studies, and Gage R&Rs controlled and up-to-date?

Are other pertinent process control documents up-to-date? (Examples: process sheets, inspection and test instructions, standard operating procedures, preventive maintenance instructions)

Are Suppliers' (sub-tier) documentation of the above (questions 1-6) for key characteristics controlled and up-to-date?

Are computer programs used in the manufacturing process secure, controlled and backed up? (Examples: CNC & PLC programs).

Is the Control Plan applied at each operation and being followed, from incoming material to shipping?

Do the sample size, frequency and sampling method take into account the sources of variation? (Examples: multiple machines or fixtures for same characteristic, multi-cavity molds for the same part, and changes over time, like tool wear and environment)

C48
See Section 7.2.3, pages 12-14 and Section 15, pages 38-39.
C53
Continuous Process Monitoring Matrix, JDS-G223 Supplier Quality Manual, p.47.
C58
See Section 7.5.1, Pages 18-19 of JDS-G223. See also Question 10.
Page 4: Process Verification Audit Checklist (2)

document.xls Page 4 of 6 Print Date: 04/22/2023

John Deere Process Verification Audit - ChecklistSupplier Name: Survey Date(s):

11

Comments:

12 Is inspection data retained and stored appropriately? Comments:

13

Comments:

14

Comments:

C. Tools/Gages15

Comments:

16 Are any tools/gages being used or needed but not called out? Comments:

17

Comments:

18 Is equipment, including tooling, properly maintained? Comments:

19 Are all the gages calibrated and records retained? Comments:

20 Do Gage R&R studies have acceptable results? Comments:

D. Corrective Action21 Is the Reaction Plan listed on the Control Plan effective & being followed?

Comments:

22

Comments:

23

Comments:

E. Change Control24

Comments:

25

Comments:

Are other pertinent process control documents in place and being followed? (Examples: process sheets, inspection & test instructions, standard operating procedures, preventive maintenance instructions)

Are instructions included for packaging to protect the parts (both in-process & final) from damage & contamination, & are they followed?

Are operators properly trained to perform their operations? Are appropriate personnel properly trained for performing work involving key product and process characteristics (especially for special processes)?

Is there an understanding of which tools/gages are needed for each operation, and are the needed tools/gages at the work station?

Does the operator understand the proper use of the tools/gages and is he/she using them properly?

Is there an adequate process for isolation & control of non-conforming material (inc. Customer Notification) & is it being followed?

Is an effective closed-loop corrective action process, including identification of root causes, fully implemented? Does the supplier use NCCA, as appropriate?

What is the change control process, and is it effective? (All part and process documentation, including Control Plans, must be updated.)

Are Change Control Procedures followed in accordance with JDS-G223 (Supplier Change Request)? Does this include applicable sub-tier suppliers?

C72
See Section 7.5.1, Pages 18-19 of JDS-G223.
C101
Also reference questions 1 through 6 above and Sections 4.2.3, 4.2.4, 7.2.3 and 7.3.7, Pages 5, 12-15 & 17 of JDS-G223
C103
Also reference questions 1 through 6 above and Sections 4.2.3, 4.2.4, 7.2.3 and 7.3.7, Pages 5, 12-15 & 17 of JDS-G223
Page 5: Process Verification Audit Checklist (2)

document.xls Page 5 of 6 Print Date: 04/22/2023

John Deere Process Verification Audit - ChecklistSupplier Name: Survey Date(s):

F. Scoring SummaryTotal Points 96 Maximum Points Possible 0 0 0 0 0

0% 0% 0% 0% 0%Percent of Total Points Available (NA questions are excluded.)

Page 6: Process Verification Audit Checklist (2)

document.xls Page 6 of 6 Print Date: 04/22/2023

John Deere Process Verification Audit - Change History

Date Division Who Made Changes Reason for Change

6-May-06 Ag Mark Pershing Proposed Form28-Aug-07 Adopted by Enterprise TeamAg, C&F,

C&CE, JDPS

Mark Pershing, Marilyn Dumolien, Daryl Fortin, Gary Watson, Dan Falkenstein, Todd Herzog, Theodore Tyler