Process ImprovementProcess Improvement

Check Do

Act Plan

Time

Qua

lity

leve

l

McGraw-Hill/Irwin Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.

Learning ObjectivesLearning Objectives Use quality tools for process analysis

and problem solving. Describe and contrast corporate

quality improvement programs. Lead a team in a process improvement

initiative. Conduct a data envelopment analysis

(DEA).

8-2

Quality and Productivity Improvement ProcessQuality and Productivity Improvement Process

Foundations of Continuous Improvement

- Customer Satisfaction- Management by Facts- Respect for People

Plan-Do-Check-Act (PDCA) Cycle

8-3

Quality Tools for Analysis and Problem Solving

Check Sheet Run Chart Histogram Pareto Chart Flowchart Cause-and-Effect Diagram Scatter Diagram Control Chart Benchmarking

8-4

Check Sheet of Problems Month Lost Departure Mechanical Overbooked Other

Luggage Delay

January 1 2 3 3 1

February 3 3 0 1 0

March 2 5 3 2 3

April 5 4 4 0 2

May 4 7 2 3 0

June 3 8 1 1 1

July 6 6 3 0 2

August 7 9 0 3 0

September 4 7 3 0 2

October 3 11 2 3 0

November 2 10 1 0 0

December 4 12 2 0 1

Total 44 84 24 16 12

8-5

Run Chart of Departure Delays

0

2

4

6

8

10

12

14

1 2 3 4 5 6 7 8 9 10 11 12

Months

De

pa

rtu

re D

ela

ys

8-6

Histogram of Lost Luggage

0

0.5

1

1.5

2

2.5

3

3.5

1 2 3 4 5 6 7

Occurrences per Month

Fre

qu

en

cy

8-7

Pareto Chart of Problems

0102030405060708090

DepartureDelay

LostLuggage

Mech. Over-booked

Other

Number of Problems

8-8

Cause-and-Effect Chart for Flight Departure Delay (Fishbone Chart)

8-9

Pareto Analysis of Flight Departure Delay Causes

Cause Percentage of Incidents Cumulative Percentage

Late passengers 53.3 53.3

Waiting for pushback 15.0 68.3

Waiting for fuel 11.3 79.6

Late weight and balance sheet

8.7 88.3

8-10

Flowchart at Departure GatePassengerArrives at

Gate

Wait for row call

Proper

BoardingPass

Directed to

Appropriate

Gate

OversizeCarry-on

CheckLuggage

PassengerBoards Aircraft

Yes

Yes

No

No

8-11

Scatter Diagram of Departure Delay vs Late Passengers

0

2

4

6

8

10

12

0 1 2 3 4 5 6 7

Late Passengers

Dep

artu

re D

elay

s

8-12

Control Chart of Departure Delays

60

70

80

90

100P

erce

nta

ge

of

on

tim

e fl

igh

ts

expected

Lower Control Limit

1998 1999

n

pppUCL

1(3

n

pppLCL

1(3

8-13

Quality Improvement Programs

Personnel Programs for Quality Assurance

Deming’s 14 Point Program Baldrige National Quality Award ISO 9000 Six-Sigma

8-14

Six Sigma DMAIC Process Steps

Step Definition

Define Define project objectives, internal and external customers

Measure Measure current level of performance

Analyze Determine causes of current problems

Improve Identify how the process can be improved to eliminate the problems

Control Develop mechanisms for controlling the improved process

8-15

Mega Bytes Restaurant

1. How is the Seven-Step Method (SSM) different from Deming’s PDCA cycle?

2. Prepare a cause-and-effect or fishbone diagram for a problem such as “Why customers have long waits for coffee.” Use Figure 7.7 as a guide.

3. How would you resolve the difficulties that study teams have experienced when applying the SSM?

8-16

The Seven-Step Method (SSM)

Step 1: Define the project Step 2: Study the current situation Step 3: Analyze the potential causes Step 4: Implement a solution Step 5: Check the results Step 6: Standardize the improvement Step 7: Establish future plans

8-17

Topics for Discussion Discuss why Deming’s 14-point program was

rejected by U.S. firms but embraced by the Japanese following World War II.

Explain how the application of the DPCA cycle can support a competitive strategy of low cost leadership.

What are the limitations of “benchmarking”? Articulate a process in which DEA can be used

to improve the performance of an elementary school district.

8-18

Interactive Exercise

Perform a walk-through audit of the class experience by recording responses on a five point Likert scale using a show of hands without the professor present. Average the student responses for each statement and use a graph to compare the results with the professor’s own assessment.

8-19