Machine A Machine B
Investment 50,000 80,000
Intwerest on
Capital invested 15% pa 15% pa
hourly charges(Wage+power) Rs 10 Rs 8
Pieces per hour
produced 5 8
Annual operating
hours
12
3
Which machine will have the lower cost per unit
whole year? (2000 Hrs)
If only 4000 pieces are tobe produced in ayear,
Will your answer to (i) above vary if you are info
output of machine B gets rejected at the inspecti
-
7/28/2019 Problems in LOcation Analysisfvgggg
2/18
of output, if run for the
hich machine would have
med that 12.5% of the
on stage. If so what could
-
7/28/2019 Problems in LOcation Analysisfvgggg
3/18
Selection the location alternatives which has the maximum sum o
Given below are the various factors considered for location decision and the factor rat
to each factor based on its importance for location decision and location rating for the l
basedon the ,merit of each location in each of the factors considered.
FactorsFactor
ratingsA B A B FACTOR
Tax Advantage 4 8 6 32 24
Suitable Labour Skill 3 2 3 6 9 Which location w
Prox. To Cust. 3 3 6 9 18
Prox. To Supp. 5 5 2 25 10
Adeq. Of Water 1 1 3 1 3
Community Accep. 5 5 4 25 20
Qlty Education System 4 4 1 16 4
Rail & Air Transportationn 3 3 10 9 30
Suitable of Climate 2 2 7 4 14
Power Supp 2 2 6 4 12
131 144
Location Rating
-
7/28/2019 Problems in LOcation Analysisfvgggg
4/18
the product ratings as the choice
ings assigned
location alternatives
RATING METHOD
ll you select?
-
7/28/2019 Problems in LOcation Analysisfvgggg
5/18
After evaluating two potential sites A &B by comparing costs and finding them a
from cost point of view, a manufacturer decided to evaluate the intangible facto
by point rating.
Comparative ratings assigned to major intangible location factors to determine t
for each factorand the points assigned toeach location alternative for each of the
FactorsMax Possible
pointsA B POINT R
Future Fuel
Available 300 200 250 Which loTpt flexibility &
Growth 200 150 150
Adequacy of WaterSupply 100 100 100
Labour Availabilty 250 250 220
Pollution
Regulations 30 30 20
Site Topography 50 50 40
Living Condition 150 100 125
880 905
Points assigned to locations
-
7/28/2019 Problems in LOcation Analysisfvgggg
6/18
proximately equal
rs for these twolocations
e relative importance
factors are given below
TING METHOD
cation will you select?
-
7/28/2019 Problems in LOcation Analysisfvgggg
7/18
Potential locations A B & C have the cost structuresshown for producing aproduct expected to
Find the most economical location for an expected volume of 2000 units/year.
Also determine the range of annual volume of production for which each of the location A B &
Locations A B C
Fixed Cost/year 25,000 50,000 80,000
Volume cost/unit 50 25 15
Locations A B CFixed Cost/year 25,000 50,000 80,000
-
7/28/2019 Problems in LOcation Analysisfvgggg
8/18
sell at Rs. 100 per unit.
C would be most economical?
Locational Break-Even Anlysis
Which location will you select?
-
7/28/2019 Problems in LOcation Analysisfvgggg
9/18
A manufacturer is evaluating four locations for a new plant and has weighted the relevent scores a
Scores have been assignedwith higher values indicative of prferred conditions.
Using these scores, develop a qualitative factor comparison for the four lo
Relevent Factors Assigned Wt. A B C D Qualitat
Production Cost 0.35 50 40 60 30 Which lo
Raw Material supply 0.25 70 80 80 60
Labour Availability 0.2 60 70 60 50
Cost of living 0.05 80 70 40 80
Environment 0.05 50 60 70 90
Markets 0.1 70 90 80 50
17.5 14 21 10.5
17.5 20 20 15
12 14 12 10
4 3.5 2 4
2.5 3 3.5 4.57 9 8 5
60.5 63.5 66.5 49
-
7/28/2019 Problems in LOcation Analysisfvgggg
10/18
s given below
ations.
ve factors Method
cation will you select?
-
7/28/2019 Problems in LOcation Analysisfvgggg
11/18
A company is to decideon the location of a new plant. It has narrowed down the choi
Data in respect of which is furnished below,
Data A B C Qualitat
Wages & Salaries 20,000 20,000 20,000 Which loPower & Water Supply
Exp. 20,000 30,000 25,000
Raw Material &
Supplies 80,000 75,000 60,000
Total initial
investment 200,000 300,000 250,000
Distribution Exp. 50,000 40,000 60,000Misc Exp. 40,000 25,000 30,000 0.075 0.2
Expected salesper year 225,000 250,000 225,000
210,000 190,000 195,000 15000 60000
Total Exp. 2,10,000 1,90,000 1,95,000
Profit 15,000 60,000 30,000
-
7/28/2019 Problems in LOcation Analysisfvgggg
12/18
ices to locations A,B & C.
ve factors Method
cation will you select?
0.12
30000
-
7/28/2019 Problems in LOcation Analysisfvgggg
13/18
Two locations A & B are being examined for location of a new manuf
Two production processes X & Y are being examined
Location Fixed Cost Variable Cost Fixed Cost
A 15,00,000 Rs 5.9 34,00,000
B 12,50,000 Rs 6.4 30,00,000
In what range of outputs would each location-production combinatio
2
Process X Pr
-
7/28/2019 Problems in LOcation Analysisfvgggg
14/18
cturing plant.
Variable Cost
Rs 3.8
Rs 4.1
be preferred?
cess Y
-
7/28/2019 Problems in LOcation Analysisfvgggg
15/18
1 Location A would result in fixed costs of Rs 3,00
and revenues of Rs 68 per unit.
Annual fixed costs at location B are 8,00,000 wrevenue of Rs 68 per unit. Sales volume is esti
Which location is most attractive?
2
A company has to select one location out of the
The annual operating costs and other intangibl
Factors A B
Labour Costs 1,20,000 1,10,000
Tpt Costs 10,000 8,000
Local Taxes 17,000 20,000
Cost of Power 21,000 29,000
Other Costs 16,000 11,000
Community Attitude V good fair
Labour Avail good V good
Quality of Tpt fair Acceptable
Quality of Life Acceptable fair
On the basisof annual operating costs, which si
-
7/28/2019 Problems in LOcation Analysisfvgggg
16/18
Devise a method of quantifying the intengible c
cost data into the overall evaluation. Which is
3
-
7/28/2019 Problems in LOcation Analysisfvgggg
17/18
,000 with variable coss of Rs 63 per unit
th variable costs of Rs 32 per unit andated to be Rs 25,000 units/year.
five alternatives considered for a new plant
factors are given below for these five locations.
C D E
1,60,000 85,000 75,000
7,000 12,000 14,000
25,000 19,000 17,000
25,000 18,000 23,000
12,000 16,000 18,000
good fair V good
fair Outstanding Acceptable
Outstanding Acceptable fair
good V good Outstanding
e would you choose?
-
7/28/2019 Problems in LOcation Analysisfvgggg
18/18
osts and integrate them with the
he best?