  • 8/3/2019 Problematic Natural Gas Power Plant Pumping

    1/23

    Problematic Natural GasPower Plant

    Pumping/Irrigation(Station Lightning Protection Success

    Story)

    Presented by:Rollon, Mary Liza M.

  • 8/3/2019 Problematic Natural Gas Power Plant Pumping

    2/23

    ABSTRACT :

    This report documents activities from the

    formation of a design and engineering teamcreated to implement an effective solution toprevent damage from lightning.

  • 8/3/2019 Problematic Natural Gas Power Plant Pumping

    3/23

    I. INTRODUCTION:

    Cunningham Station, owned and operated by XcelEnergy.

  • 8/3/2019 Problematic Natural Gas Power Plant Pumping

    4/23

    As per requirements issued by New Mexico StateEngineers Office (NMSEO), all cooling towerblowdown water is used for agriculturalprocesses that minimize any impact ongroundwater.

  • 8/3/2019 Problematic Natural Gas Power Plant Pumping

    5/23

  • 8/3/2019 Problematic Natural Gas Power Plant Pumping

    6/23

    At the end of year 2008, Xcel Energymanagement became concerned with thedamage inflicting on Cunningham Facilitypumping installation equipment becauseof the two thunderstorms from west Texasand Eastern New Mexico.

  • 8/3/2019 Problematic Natural Gas Power Plant Pumping

    7/23

    VARIABLE FREQUENCY DRIVES (VFDS)

  • 8/3/2019 Problematic Natural Gas Power Plant Pumping

    8/23

  • 8/3/2019 Problematic Natural Gas Power Plant Pumping

    9/23

    WASTE WATER PUMPING STATION

  • 8/3/2019 Problematic Natural Gas Power Plant Pumping

    10/23

    OTHER DEVICES WHICH ALSO

    EXPERIENCED DAMAGE

    Remote telemetryequipment

    Electronic leveltransmitters

  • 8/3/2019 Problematic Natural Gas Power Plant Pumping

    11/23

    An example thunderstorm that passed throughthe area in early September 2008 damaged one of

    the two VFDs, destroyed the input rectifierboard of one of the VFDs and destructed anearby level transmitter.

  • 8/3/2019 Problematic Natural Gas Power Plant Pumping

    12/23

    II. MANAGEMENT ACTIVITIES

    Engineering review of the existing design associatedwith the ff.:

    Power distribution

    Variable frequency drives ( VFDs )

    Water pump motors

    Flow metering equipment installation

  • 8/3/2019 Problematic Natural Gas Power Plant Pumping

    13/23

    THE REVIEW ALSO INCLUDES:

    Survey of the site

    Review of the electrical drawings

    Measurement of capacitance and resistancebetween power distribution and equipmentpoints and earth ground

    Anecdotal evidence regarding previous failures

  • 8/3/2019 Problematic Natural Gas Power Plant Pumping

    14/23

    FOCUS OF THE ACTIVITY

    Attachment points

    Surge protection

    Grounding effectiveness with regard tolightning protection

  • 8/3/2019 Problematic Natural Gas Power Plant Pumping

    15/23

    Late November 2008, a field visit at Cunningham

    Station was done to survey the installation andinterview involved personnel.

    TEST EQUIPMENTS WAS USED TO MEASURE:

    resistance

    capacitance voltage

    AC and DC current

  • 8/3/2019 Problematic Natural Gas Power Plant Pumping

    16/23

  • 8/3/2019 Problematic Natural Gas Power Plant Pumping

    17/23

  • 8/3/2019 Problematic Natural Gas Power Plant Pumping

    18/23

    IV. IMPACT ON EQUIPMENT SURVIVAL

    RATE

    There had been zero incidents of equipmentdamage or failure since the implementation of the

    teams suggestions.

    The pumping station has successfully weathered

    storms with electrical activity with no problems.

  • 8/3/2019 Problematic Natural Gas Power Plant Pumping

    19/23

    V. ENGINEERING IMPLEMENTATION

    An inadequate repair to the ground grid waslocated and replaced with an exothermic weld.

    A ground well was installed to the water table.The ground well was connected to the groundgrid.

    An overhead static catenary was installed andconnected to the ground grid on both ends.

  • 8/3/2019 Problematic Natural Gas Power Plant Pumping

    20/23

    Ground loops eliminated where found.

    Grounding on telemetry equipment and leveltransmitters was verified and improved.

    A radio mast was shortened to be below thecatenary wire.

  • 8/3/2019 Problematic Natural Gas Power Plant Pumping

    21/23

    VI. COST BENEFITS

    Cunningham station had spent in excess of$27,500 in the course of one year.

    The cost to implement the improvements wasroughly $25,000

    The reliable and trouble free operation of acritical system cannot be overstated.

  • 8/3/2019 Problematic Natural Gas Power Plant Pumping

    22/23

    VII. SUMMARY

    The team was able to provide findings thatprevious failures associated with CunninghamStation equipment was caused by ineffectiveearth ground and ineffective direct attachmentprevention.

  • 8/3/2019 Problematic Natural Gas Power Plant Pumping

    23/23

    It was corrected with the single point groundconcept, elimination of ground loops, andenhanced earth ground through loweringresistance and impedance.

    The findings were correlated to and implemented

    in the Maddox Station Wastewater installationand have been acquired as an effective solution tosimilar problems at other sites.