primary sedimentation tank - bu shoubra/civil... · web viewprimary sedimentation tank purpose: 1-...

9
Primary Sedimentation tank Purpose: 1- Removal of 40 - 60 % of suspended solids 2- Removal of 25 - 35 % of B.O.D. 3- Sediment the organic and inorganic matters to improve the properties of the sewage and prepare it for the biological treatment. Types of primary sedimentation tanks: 1- Rectangular tank. 2- Circular tank. Factors affecting sedimentation efficiency: 1- Viscosity 2- Concentration of suspended solids 3- Retention period 4- Horizontal velocity 5- Temperature 6- Surface loading rate = 24 - 48 m³/m²/day 89

Upload: others

Post on 01-Apr-2020

20 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Primary Sedimentation tank - Bu Shoubra/Civil... · Web viewPrimary Sedimentation tank Purpose: 1- Removal of 40 - 60 % of suspended solids 2- Removal of 25 - 35 % of B.O.D. 3- Sediment

Primary sedimentation tank (horizontal flow)

Primary Sedimentation tank

Purpose:1- Removal of 40 - 60 % of suspended solids 2- Removal of 25 - 35 % of B.O.D. 3- Sediment the organic and inorganic matters to improve the properties of the sewage and prepare it for the biological treatment.

Types of primary sedimentation tanks:1- Rectangular tank.2- Circular tank.

Factors affecting sedimentation efficiency:1- Viscosity 2- Concentration of suspended solids 3- Retention period 4- Horizontal velocity 5- Temperature 6- Surface loading rate = 24 - 48 m³/m²/day

89

Page 2: Primary Sedimentation tank - Bu Shoubra/Civil... · Web viewPrimary Sedimentation tank Purpose: 1- Removal of 40 - 60 % of suspended solids 2- Removal of 25 - 35 % of B.O.D. 3- Sediment

Effluent weir of rectangular sedimentation tank

90

Rectangular primary sedimentation tank

Page 3: Primary Sedimentation tank - Bu Shoubra/Civil... · Web viewPrimary Sedimentation tank Purpose: 1- Removal of 40 - 60 % of suspended solids 2- Removal of 25 - 35 % of B.O.D. 3- Sediment

Primary sedimentation tank (Radial flow)

91Circular primary sedimentation tank

Page 4: Primary Sedimentation tank - Bu Shoubra/Civil... · Web viewPrimary Sedimentation tank Purpose: 1- Removal of 40 - 60 % of suspended solids 2- Removal of 25 - 35 % of B.O.D. 3- Sediment

7- Dimension of tank 8- Dead zones.

Design criteria: 1- Retention period = T = 2 - 3 hrs 2- Surface loading rate (S.L.R.) = 24 - 48 m³/m²/day 3- Horizontal velocity ≤ 0.3 m/min 4- Effluent weir loading (E.W.L.) ≤ 600 m³/m/day (≤ 25 m³/m/hr) 5- L = 3 – 5 B L ≤ 40 m 6- d = 3 - 5 m 7- B = 2 – 3 d 8- Φ ≤ 40 m9- Bottom slope for circular tank = 4 - 10 % for rectangular tank = 1 - 2 %V = Qd x T S.L.R = Qd / S.A

Example:For a sewage treatment plant, the following data are given:- Qave summer = 18000 m3/d- S.L.R = 30 m3/m2/dIt is required to design primary sedimentation tanks.

Solution:Qd = 1.5 x 18000 = 27000 m3/d

For rectangular tank:Assume T = 2.5 hr

92

V=Qd×T

=27000×2 . 524

=2812 .5 m3

S .L .R=Qd

S . A

S . A=2700030

=900 m2

Check :

1− vh=Qd

n×π×φ×d

=270002×π×24×3 . 1×(24×60)

=0 .04 m /min ≺ 0. 3 m /min safe

2− E .W . L=Qd

n×π×φ

=27000n×π×24

=179 m3 /m /d ≺ 600 safe

Page 5: Primary Sedimentation tank - Bu Shoubra/Civil... · Web viewPrimary Sedimentation tank Purpose: 1- Removal of 40 - 60 % of suspended solids 2- Removal of 25 - 35 % of B.O.D. 3- Sediment

Circular primary sedimentation tank:

Example:Estimate the volume of sludge produced per 27000 m3/d if the influent S.S 300 mg/l. The removal efficiency is 60%.

Solution:

93

V=Qd×T

=27000×2 . 524

=2812 .5 m3

S .L .R=Qd

S . A

S . A=270030

=900 m2

d=VS . A

=2700900

=3 .1 m

Take n=2

∴S . A of one tan k=9002

=450 m2

=πφ2

4∴φ=24 m

Weight of dry solids=60100

×300×27000×10−6=4 .86 t /d

Specific gravity of sludge=1 .03 t /m3

Volume of dry solids=weightS .G

=4 . 861.03

=4 .718 m3 /d

Page 6: Primary Sedimentation tank - Bu Shoubra/Civil... · Web viewPrimary Sedimentation tank Purpose: 1- Removal of 40 - 60 % of suspended solids 2- Removal of 25 - 35 % of B.O.D. 3- Sediment

For circular tank:

94

Moisture content of sludge =95 % (5 % solids )

Volume of sludge=4 .7180.05

=94 .37 m3 /d

Design of hopper :

Volume of sludge per tan k=94 .372

=47 .18 m3 /d

Volume of sludge per hopper=47 .182

=23 .59 m3 /d

Assumin g sludge withdrawal every 12 hours

Volume of sludge per hopper=23 .592

=11. 796 m3 /d

V=h3

(a1+a2+√a1+a2)

a1=1m×1m

a2=B2

×B2

=11.252

×11. 252

=31 .64 m2

11. 796=h3 (1+31.64+√1+31 .64 )

h=11.796×338 .265

=0 .925 m (h=1−2 )

V=π4

(φb

2+φs2

2) h

φs≥ 1mh=1−2mθ=45ο−60ο

Page 7: Primary Sedimentation tank - Bu Shoubra/Civil... · Web viewPrimary Sedimentation tank Purpose: 1- Removal of 40 - 60 % of suspended solids 2- Removal of 25 - 35 % of B.O.D. 3- Sediment

95

Design of sludge withdrawal pipe :Assume time of withdrawal 5 minutes (5−20 minutes )

Qsludge=11.7965×60

=0. 039 m3 /s

Qsludge=A×v v in sludge pipe=1−1.5m /s

0 .039=πφ2

4×1

∴φ=0 .22 m ≈ 200 mm (φ≥150 mm )v act =1 .24 m /s safe