Page 1: Presented by: Aldo Mazzaferro Director of Project ... · Phase I Results •After implementation is complete, Measurement & Verification (M&V) phase begins to prove success of the

Presented by:Aldo MazzaferroDirector of Project DevelopmentECG Engineering, P.C.

Page 2: Presented by: Aldo Mazzaferro Director of Project ... · Phase I Results •After implementation is complete, Measurement & Verification (M&V) phase begins to prove success of the

PhaseIResults•After implementation is complete, Measurement & Verification (M&V) phase begins to prove success of the project

•In Phase I, Johnson Controls (JCI) guaranteed $1,913,955 in annual savings for the District

•If those savings were not achieved, JCI would write the District a check to make up for the shortfall

•Findings of M&V Report• Ph I savings exceeded guarantee by ~20% ($201,041)• PSE&G Rebate achieved $1.0M vs the expected $869,000

Page 3: Presented by: Aldo Mazzaferro Director of Project ... · Phase I Results •After implementation is complete, Measurement & Verification (M&V) phase begins to prove success of the

An Energy Conservation Plan

Commack School DistrictSeptember 19, 2016

Page 4: Presented by: Aldo Mazzaferro Director of Project ... · Phase I Results •After implementation is complete, Measurement & Verification (M&V) phase begins to prove success of the

Agenda

4

Phase 2 Project Overview Energy Efficiency Measures Cost and Savings Summary Johnson Controls Qualifications Next Steps Questions and Answers

Page 5: Presented by: Aldo Mazzaferro Director of Project ... · Phase I Results •After implementation is complete, Measurement & Verification (M&V) phase begins to prove success of the

Phase 2: Project Overview

Page 6: Presented by: Aldo Mazzaferro Director of Project ... · Phase I Results •After implementation is complete, Measurement & Verification (M&V) phase begins to prove success of the

Project Overview

District Annual Energy Savings: $752,510 - 32%

Project Cost: $14,575,507

Facility Improvement Measures (FIM) :

10

Payback Period: 17.9 years

Savings Guarantee: 100%

6

Energy Performance Contracting is:Energy Performance Contracting is:

An agreement that allows school districts to take budgeted utility and operational costs and reallocate them into energy saving capital

Improvements without the need for Increased Taxes.

Page 7: Presented by: Aldo Mazzaferro Director of Project ... · Phase I Results •After implementation is complete, Measurement & Verification (M&V) phase begins to prove success of the

Energy Efficiency Measures

Page 8: Presented by: Aldo Mazzaferro Director of Project ... · Phase I Results •After implementation is complete, Measurement & Verification (M&V) phase begins to prove success of the

8

Energy Conservation Measures – Lighting Upgrades with Ceiling Replacement

Total Districtwide LED Upgrades: Over 17,000

New Ceilings at the High School Art Gallery –Approx. 2,800 Square Feet

Commack Middle School Auditorium Lighting upgrade

Retrofit Exterior Lighting Fixtures with LED

Total Exterior Fixtures to be retrofitted : 353

Annual Savings: $172,630

Art Gallery Ceilings

Page 9: Presented by: Aldo Mazzaferro Director of Project ... · Phase I Results •After implementation is complete, Measurement & Verification (M&V) phase begins to prove success of the

9

Energy Conservation Measures –Energy Management System

Air Handling Unit DDC Refit Districtwide : 53 Units Pneumatic Repair & Refurbishments Districtwide

Unit Ventilators: 392 Radiators/Convectors: 587 Day/Night Zones: 71

Optimal Start & Front-End User Interface Upgrades at Burr and Sawmill DDC Control of Relief Dampers at Commack High School: 11 Units DDC Controls of Exhaust Fans: 83 Units Districtwide

Annual Savings: $63,046

Page 10: Presented by: Aldo Mazzaferro Director of Project ... · Phase I Results •After implementation is complete, Measurement & Verification (M&V) phase begins to prove success of the

10

Energy Conservation Measures – Boiler Replacement

New Dual Fuel Condensing Boilers at North Ridge Primary & Rolling Hills Primary

Annual Savings: $6,332

North Ridge

Rolling Hills

Building Proposed Units Proposed Qty.

North Ridge Fulton VTG 3000 2

Rollling Hills Fulton VTG 2000 2

Page 11: Presented by: Aldo Mazzaferro Director of Project ... · Phase I Results •After implementation is complete, Measurement & Verification (M&V) phase begins to prove success of the

11

Energy Conservation Measures – Roof Replacements

New Roofs at Commack High School, Indian Hollow Primary School, and Rolling Hills Primary School

Annual Savings: $18,381

HS: Approx. 152,000 Sq. ft. Indian Hollow: Approx. 47,100 Sq. ft.

Rolling Hills: Approx. 46,700 Sq. ft.

Page 12: Presented by: Aldo Mazzaferro Director of Project ... · Phase I Results •After implementation is complete, Measurement & Verification (M&V) phase begins to prove success of the

12

Energy Conservation Measures –Photovoltaic Electric Generation

Total 1,786.84 kW Roof Mounted Photovoltaic Districtwide

Annual Savings: $364,420

Site Name PV Size (kW)Commack High School 975 . 260 North Ridge Primary 341 . 000 Indian Hollow Primary 272 . 800 Rolling Hills Primary 197 . 780

Totals 1,786 . 840

Page 13: Presented by: Aldo Mazzaferro Director of Project ... · Phase I Results •After implementation is complete, Measurement & Verification (M&V) phase begins to prove success of the

13

Energy Conservation Measures –Photovoltaic Electric Generation

Commack High School Indian Hollow Primary

School

Page 14: Presented by: Aldo Mazzaferro Director of Project ... · Phase I Results •After implementation is complete, Measurement & Verification (M&V) phase begins to prove success of the

14

Energy Conservation Measures –Photovoltaic Electric Generation

Rolling Hills Primary School

North Ridge Primary School

Page 15: Presented by: Aldo Mazzaferro Director of Project ... · Phase I Results •After implementation is complete, Measurement & Verification (M&V) phase begins to prove success of the

15

Energy Conservation Measures – Cogeneration

Total Cogen Size District-wide: 200 kW

Tecogen InVerde 100 Units with Backup Power

Replaces existing diesel fired emergency generators

Annual Savings: $62,842

Building Cogen Size

Burr Intermediate School 100 kW

Sawmill Intermediate School 100 kW

Total 200 kW

Page 16: Presented by: Aldo Mazzaferro Director of Project ... · Phase I Results •After implementation is complete, Measurement & Verification (M&V) phase begins to prove success of the

16

Energy Conservation Measures – Plug Load Controllers

Over 1,300 Plug Load Controllers

System uses existing Wi-Fi network communicates to an energy management user interface

Annual Savings: $57,220

Page 17: Presented by: Aldo Mazzaferro Director of Project ... · Phase I Results •After implementation is complete, Measurement & Verification (M&V) phase begins to prove success of the

17

Other Measures

Air Conditioning Compressor Controllers (61 Districtwide) – Savings $6,351

Energy Efficient RTU Replacements (3 at HS, 1 at MS) – Savings $1,288

Page 18: Presented by: Aldo Mazzaferro Director of Project ... · Phase I Results •After implementation is complete, Measurement & Verification (M&V) phase begins to prove success of the

Cost and SavingsSummary

Page 19: Presented by: Aldo Mazzaferro Director of Project ... · Phase I Results •After implementation is complete, Measurement & Verification (M&V) phase begins to prove success of the

19

Cost and Savings Summary

Positive cash flow: $6,369,828A A1 A2 A=A1-S2 B C D=A+B+C E D+G

YrNYSED Building

Aid

NYSED Building Aid less non-aidable measures at 90%

Annual Energy Cost With Out

Savings

Annual Energy Cost with

ImprovementsAnnual Energy

SavingsAnnual O&M

savings

National Grid Rebate

Program Total Annual Savings Annual Lease Payment Annual Cash FlowCumulative Cash Flow

1 ($623,316) ($560,985) $2,293,242 $1,540,732 $752,510 $56,064 $48,000 $1,417,559 $1,293,759 $123,800 $123,800

2 ($623,316) ($560,985) $2,339,107 $1,571,546 $767,561 $57,185 $0 $1,385,730 $1,293,759 $91,971 $215,771

3 ($623,316) ($560,985) $2,385,889 $1,602,977 $782,912 $58,329 $0 $1,402,225 $1,293,759 $108,466 $324,237

4 ($623,316) ($560,985) $2,433,607 $1,635,037 $798,570 $59,496 $0 $1,419,050 $1,293,759 $125,291 $449,528

5 ($623,316) ($560,985) $2,482,279 $1,667,737 $814,541 $60,685 $0 $1,436,212 $1,293,759 $142,452 $591,980

6 ($623,316) ($560,985) $2,531,924 $1,701,092 $830,832 $61,899 $0 $1,453,716 $1,293,759 $159,957 $751,937

7 ($623,316) ($560,985) $2,582,563 $1,735,114 $847,449 $63,137 $0 $1,471,571 $1,293,759 $177,811 $929,749

8 ($623,316) ($560,985) $2,634,214 $1,769,816 $864,398 $64,400 $0 $1,489,782 $1,293,759 $196,023 $1,125,772

9 ($623,316) ($560,985) $2,686,898 $1,805,213 $881,686 $65,688 $0 $1,508,358 $1,293,759 $214,599 $1,340,371

10 ($623,316) ($560,985) $2,740,636 $1,841,317 $899,320 $67,002 $0 $1,527,306 $1,293,759 $233,547 $1,573,918

11 ($623,316) ($560,985) $2,795,449 $1,878,143 $917,306 $68,342 $0 $1,546,632 $1,293,759 $252,873 $1,826,791

12 ($623,316) ($560,985) $2,851,358 $1,915,706 $935,652 $69,709 $0 $1,566,345 $1,293,759 $272,586 $2,099,377

13 ($623,316) ($560,985) $2,908,385 $1,954,020 $954,365 $71,103 $0 $1,586,452 $1,293,759 $292,693 $2,392,070

14 ($623,316) ($560,985) $2,966,553 $1,993,101 $973,452 $72,525 $0 $1,606,962 $1,293,759 $313,203 $2,705,272

15 ($623,316) ($560,985) $3,025,884 $2,032,963 $992,921 $73,975 $0 $1,627,881 $1,293,759 $334,122 $3,039,394

16 $0 $0 $3,086,402 $2,073,622 $1,012,780 $75,455 $0 $1,088,235 $0 $1,088,235 $4,127,629

17 $0 $0 $3,148,130 $2,115,094 $1,033,036 $76,964 $0 $1,109,999 $0 $1,109,999 $5,237,628

18 $0 $0 $3,211,092 $2,157,396 $1,053,696 $78,503 $0 $1,132,199 $0 $1,132,199 $6,369,828

Total ($9,349,743) ($8,414,769) $49,103,614 $32,990,626 $16,112,988 $1,200,460 $48,000 $25,776,216 $19,406,388 $6,369,828 $6,369,828

Page 20: Presented by: Aldo Mazzaferro Director of Project ... · Phase I Results •After implementation is complete, Measurement & Verification (M&V) phase begins to prove success of the

How does the Cash Flow work?

Tax exempt lease payment $(1,293,759)

Energy savings $752,510

NYSSED aid $560,985

Annual O&M Savings $56,064

Rebates Program $48,000

Annual M&V Service Cost $(0)

Net cash flow to District $123,800

Year 1

Page 21: Presented by: Aldo Mazzaferro Director of Project ... · Phase I Results •After implementation is complete, Measurement & Verification (M&V) phase begins to prove success of the

Project Timeline

21

BOE to Authorize EPC: Nov 2016BOE to Authorize EPC: Nov 2016

JCI to provide design criteria to ECG: Jan 2017JCI to provide design criteria to ECG: Jan 2017

ECG to prepare submission to SED: Feb 2017 – Apr 2017ECG to prepare submission to SED: Feb 2017 – Apr 2017

SED Approval & Financing: Nov 2017SED Approval & Financing: Nov 2017

Construction commences: Dec 2017Construction commences: Dec 2017

Construction substantial completion: Nov 2018Construction substantial completion: Nov 2018

Final Completion: Dec 2018Final Completion: Dec 2018

Page 22: Presented by: Aldo Mazzaferro Director of Project ... · Phase I Results •After implementation is complete, Measurement & Verification (M&V) phase begins to prove success of the

QuestionsQuestions?