PRESENTATION TO NCOP SELECT

COMMITTEE ON FINANCE

SECOND QUARTER ENDING 30 SEPTEMBER 2005

2005-10-12

Page 2: PRESENTATION TO NCOP SELECT COMMITTEE ON FINANCE SECOND QUARTER ENDING 30 SEPTEMBER 2005 2005-10-12

PURPOSE

To provide information to the NCOP on performance of all conditional grants managed by the Department, and the details on achievements, challenges and remedial actions for the Quarter ending 30th September 2005.

Page 3: PRESENTATION TO NCOP SELECT COMMITTEE ON FINANCE SECOND QUARTER ENDING 30 SEPTEMBER 2005 2005-10-12

OVERVIEW6 CONDITIONAL GRANTS MANAGED BY DOH NW.CONSTITUTES 14% OF TOTAL BUDGET.NEEDS TO IMPROVE QUALITY OF BUSINESS PLANS FOR CONDITIONAL GRANTS.STRENGTHENING OF PROJECT MANAGEMENT IN RELATION TO CONDITIONAL GRANTS.IMPROVE CAPACITY FOR MONITORING AND EVALUATION.INFRASTRUCTURE DELIVERY MODEL AND POSSIBLE IMPACT.INTERVENTIONS IN RELATION TO THE ABOVE ARE BEEN PUT IN PLACE.

Page 4: PRESENTATION TO NCOP SELECT COMMITTEE ON FINANCE SECOND QUARTER ENDING 30 SEPTEMBER 2005 2005-10-12

HIV and AIDS GRANT

PURPOSE:

To enable the health sector to develop an effective response to HIV and AIDS as well as supporting the implementation of the National Operational Plan for Comprehensive HIV and AIDS Treatment and Care.

Page 5: PRESENTATION TO NCOP SELECT COMMITTEE ON FINANCE SECOND QUARTER ENDING 30 SEPTEMBER 2005 2005-10-12

COPREHENSIVE HIV/AIDS

Sub-Programmes

Budget   R’000

Expenditure for Sep. 05 R’000

Expenditure: 1st Quarter R’000

Expenditure: 2nd Quarter   R’000

Budget Balance. R’000

 PERCENTAGE

Prevention (AB4)

25 944 3755 3 813 7278 14 853  42.75

Care & Support (H89)

26 166 306 17 7 799 18 350  29.87

Programme Mx. (H90)

1 815 161 336 256 1 223  32.61

ARV (H51; H65 - H68)

46 996 8299 4 990 19 171 22 835  51.41

TOTAL 

100 921

9 155 34 504 57 262 43.26 

EXPENDITURE

Page 6: PRESENTATION TO NCOP SELECT COMMITTEE ON FINANCE SECOND QUARTER ENDING 30 SEPTEMBER 2005 2005-10-12

COMPREHENSIVE HIV/AIDS (CONT)

Expenditure grown by 40% from last month.

Actual expenditure is at 43.26% as at 30 September.

Page 7: PRESENTATION TO NCOP SELECT COMMITTEE ON FINANCE SECOND QUARTER ENDING 30 SEPTEMBER 2005 2005-10-12

COMPREHENSIVE HIV/AIDS (CONT)

Progress: The adjustment for the budget of the

Comprehensive Plan (ARV) sites has been done by the Budget section.

The funds to the tune of R6, 815m from National Treasury were transferred and the cash flow made available was spent.

There is availability of pharmaceuticals (ARV) and a growing number of professionals trained in CCMT.

We have in the Province accredited six additional sites for provision of the comprehensive plan.

Page 8: PRESENTATION TO NCOP SELECT COMMITTEE ON FINANCE SECOND QUARTER ENDING 30 SEPTEMBER 2005 2005-10-12

COMPREHENSIVE HIV/AIDS (CONT)

Challenges: The cash flow constraints especially

with the payment of NGOs where we have to effect the quarterly payment but we only getting monthly cash.

Cash flow constraints also makes it difficult for the Department of fast rack certain activities which could be done earlier than the planned. This matter will be resolved with National.

Page 9: PRESENTATION TO NCOP SELECT COMMITTEE ON FINANCE SECOND QUARTER ENDING 30 SEPTEMBER 2005 2005-10-12

COMPREHENSIVE HIV/AIDS (CONT)

Remedial Action: Interaction between Province and

NDoH to review the transfer schedule for HIV/AIDS Grants (Possible DORA implications).

Page 10: PRESENTATION TO NCOP SELECT COMMITTEE ON FINANCE SECOND QUARTER ENDING 30 SEPTEMBER 2005 2005-10-12

HOSPITAL MANAGEMENT & QUALITY

IMPROVEMENT.

PURPOSE :

To transform hospital management and improve quality of care in line with national policy.

Page 11: PRESENTATION TO NCOP SELECT COMMITTEE ON FINANCE SECOND QUARTER ENDING 30 SEPTEMBER 2005 2005-10-12

HOSPITAL MANAGEMENT AND QUALITY IMPROVEMENT

Sub-Programmes

Budget R’000

Expenditure for Sep. 05 R’000

Expenditure: 1st Quarter R’000

Expenditure: 2nd Quarter   R’000

Budget Balance. R’000

 PERCENTAGE

Hospital Development (AE1)

14 683

3237 978 4670 9035  38.47

Klerksdorp (J80)

1 974

46 2 142 1 830  7.31

Mafikeng (J81)

836

- - - 836  0

Rustenburg (J82)

810

- - 266 544  32.84

AE3   - 171 60 -231  

TOTAL 

18 303

3283 1 151 5138 12 013  34.36

EXPENDITUREEXPENDITURE

Page 12: PRESENTATION TO NCOP SELECT COMMITTEE ON FINANCE SECOND QUARTER ENDING 30 SEPTEMBER 2005 2005-10-12

HOSPITAL MANAGEMENT AND QUALITY IMPROVEMENT

(cont)

Expenditure has grown by 109 % from last month(August).

Actual expenditure is 34. 36% of the budget as at 30 September.

Page 13: PRESENTATION TO NCOP SELECT COMMITTEE ON FINANCE SECOND QUARTER ENDING 30 SEPTEMBER 2005 2005-10-12

HOSPITAL MANAGEMENT AND QUALITY IMPROVEMENT

(cont)Progress:

Staff has been appointed and maintained in Swartruggens hospital, in line with the business plan.

Upgrading of Patient Administration And Billing System (PAAB) is going well.

Governance structures (hospital boards etc) have been relaunched and are now been trained, (service provider has been appointed).

A partnership with Cohsasa on Quality Improvement and hospital accreditation is ongoing. Two hospitals have already been accredited.

There have been two training sessions in the implementation of the Clinic Supervision Manual.

The final draft of the Hospital supervision manual is ready for submission for adoption by the Management Committee.

Page 14: PRESENTATION TO NCOP SELECT COMMITTEE ON FINANCE SECOND QUARTER ENDING 30 SEPTEMBER 2005 2005-10-12

HOSPITAL MANAGEMENT AND QUALITY IMPROVEMENT

(cont)Challenges:

The training of governance structures is continuing and expenditure will reflect in the next quarter.

Initial problems experienced in relation to a contract for the PAAB system with one of the service providers, now resolved.

Strengthen Quality Assurance unit in terms human resource.

Expenditure for Swartruggens hospital (Revitalisation site) benefiting from this grant is currently incurred under Equitable Share.

The Cost Centre Accounting project plan is being revised for faster implementation.

Page 15: PRESENTATION TO NCOP SELECT COMMITTEE ON FINANCE SECOND QUARTER ENDING 30 SEPTEMBER 2005 2005-10-12

HOSPITAL MANAGEMENT AND QUALITY IMPROVEMENT

(cont)Remedial Action:

The Business Plan is being amended to sufficiently cover for activities which have been under allocated or delayed.

A team of three appointed to support areas that are showing poor spending.

Journals are being passed to correct expenditure.

Page 16: PRESENTATION TO NCOP SELECT COMMITTEE ON FINANCE SECOND QUARTER ENDING 30 SEPTEMBER 2005 2005-10-12

HEALTH PROFESSIONAL TRAINING AND DEVELOPMENT.PURPOSE :Support services to fund costs associated with training of health professionals and the development and recruitment of medical specialists in under-served provinces.To support and strengthen under & postgraduate teaching and training processes in health facilities, and to enable shifting of teaching activities from central hospitals to regional and district hospitals.

Page 17: PRESENTATION TO NCOP SELECT COMMITTEE ON FINANCE SECOND QUARTER ENDING 30 SEPTEMBER 2005 2005-10-12

HEALTH PROFESSIONAL TRAINING AND DEVELOPMENT

Sub-Programmes

BudgetR’000

Expenditure for ep. 05R’000

Expenditure: 1st Quarter R’000

Expenditure: 2nd Quarte  R’000

Budget Balance. R’000

 Percentage

MMACON (AA0)

23 945

3193 6 176 9225 8 544  64.32

EXCELSIUS (AB8)

26 154

3005 5 665 8251 12 238  53.21

Klerksdorp (J90)

5 065

329 67 1197 3 801  24.96

Mafikeng (J91)

4 900

130 176 361 4 363 10.97

Rustenburg (J92)

2 500

- - 2 500 -  100

Prof. Training (J69)

  - 156 - -156  0

TOTAL 

62 654

6657 12 240 21 534 28 789  53.98

EXPENDITUREEXPENDITURE

Page 18: PRESENTATION TO NCOP SELECT COMMITTEE ON FINANCE SECOND QUARTER ENDING 30 SEPTEMBER 2005 2005-10-12

HEALTH PROFESSIONAL TRAINING AND DEVELOPMENT

(cont)

53.98% has been spent to date.

This grant is on target in terms of planned activities and ideal expenditure.

Page 19: PRESENTATION TO NCOP SELECT COMMITTEE ON FINANCE SECOND QUARTER ENDING 30 SEPTEMBER 2005 2005-10-12

HEALTH PROFESSIONAL TRAINING AND DEVELOPMENT

(cont)Progress:

The fund has been used to increase the intake of nursing trainees from 100 to 180.

Community based education and problem based learning is unfolding well under this grant.

Nurses, Doctors, Community Service Personnel, Interns and Healalth Support Staff have been trained in Emergency Courses, e.g. Advanced Trauma Life Support, Paediatric Advanced Life Support and Advanced Cardiac Life Support, Advanced Medical Life Support, and Advanced Orthopaedic and Basis Surgical Skills Courses.

Page 20: PRESENTATION TO NCOP SELECT COMMITTEE ON FINANCE SECOND QUARTER ENDING 30 SEPTEMBER 2005 2005-10-12

HEALTH PROFESSIONAL TRAINING AND DEVELOPMENT

(cont)Challenges:

The grant is on target .

Page 21: PRESENTATION TO NCOP SELECT COMMITTEE ON FINANCE SECOND QUARTER ENDING 30 SEPTEMBER 2005 2005-10-12

INTEGRATED NUTRION PROGRAMME GRANT

To implement integrated nutrition activities aimed at improving the nutritional status of South Africans, based on disease-specific nutrition support, treatment and counselling focus areas, which are dependant on information, human resources and financial and administrative systems.

Page 22: PRESENTATION TO NCOP SELECT COMMITTEE ON FINANCE SECOND QUARTER ENDING 30 SEPTEMBER 2005 2005-10-12

INTEGRATED NUTRITION PROGRAMME

Sub-Programmes

Budget   R’000

Expenditure for Sep. 05 R’000

Expenditure: 1st Quarter R’000

Expenditure: 2nd Quarter   R’000

Budget Balance. R’000

 PERCENTAGE

INP (HX7) 10 981

838 852 2 467 7662  30.22

TOTAL 

10 981

838 852 2 467 7662   30.22

EXPENDITUREEXPENDITURE

Page 23: PRESENTATION TO NCOP SELECT COMMITTEE ON FINANCE SECOND QUARTER ENDING 30 SEPTEMBER 2005 2005-10-12

INTEGRATED NUTRITION PROGRAMME (cont)

Expenditure has increased by 34 % from August.

Performance is at 30.22% as at 30 September.

Page 24: PRESENTATION TO NCOP SELECT COMMITTEE ON FINANCE SECOND QUARTER ENDING 30 SEPTEMBER 2005 2005-10-12

INTEGRATED NUTRITION PROGRAMME (cont)

Progress:There is adequate supply of road to

health charts. The inputs for the budget

adjustment have been finalised to re-align the budget to the Programme needs.

One extra hospital declared baby friendly.

Page 25: PRESENTATION TO NCOP SELECT COMMITTEE ON FINANCE SECOND QUARTER ENDING 30 SEPTEMBER 2005 2005-10-12

INTEGRATED NUTRITION PROGRAMME (cont)

Challenges: The funds for the second quarter

from the National Treasury were only received on the 22nd August instead of 18th July.

Page 26: PRESENTATION TO NCOP SELECT COMMITTEE ON FINANCE SECOND QUARTER ENDING 30 SEPTEMBER 2005 2005-10-12

INTEGRATED NUTRITION PROGRAMME (cont)

Remedial Action: The programme is showing potential to

spend its entire budget. There is R2 M already that is being processed this week which will take expenditure to 45.3 % to compared to a half year target of 50%.

Transfer schedule needs to be reviewed in consultation with National Department of Health.

Page 27: PRESENTATION TO NCOP SELECT COMMITTEE ON FINANCE SECOND QUARTER ENDING 30 SEPTEMBER 2005 2005-10-12

HOSPITAL REVITILIZATION GRANT.

To provide funding to enable provinces to plan, manage, modernise, rationalise and transform the infrastructure, health technology, organizational management & development and monitoring and evaluation of hospitals in line with national policy objectives.

Page 28: PRESENTATION TO NCOP SELECT COMMITTEE ON FINANCE SECOND QUARTER ENDING 30 SEPTEMBER 2005 2005-10-12

HOSPITAL REVITALIZATION

Sub-Programmes

Budget  R’000

Expenditure for Sep. 05 R’000

Expenditure: 1st Quarter R’000

Expenditure: 2nd Quarter   R’000

Budget Balance. R’000

 PERCENTAGE

New Facilities (H3E)

8 469

927 137 1 728 6 604  22.02

Upgrading (H3F)

47 000

867 1 101 6 577 39 322  16.34

Other Facilities (H3G)

32 056

1 048 7 167 5 383 19 506  39.15

Rehabilitation (AA1)

10 531

- - - 10 531  0

TOTAL 

98 056

2 842 8 405 13 688 75 963  22.53

EXPENDITUREEXPENDITURE

Page 29: PRESENTATION TO NCOP SELECT COMMITTEE ON FINANCE SECOND QUARTER ENDING 30 SEPTEMBER 2005 2005-10-12

HOSPITAL REVITALIZATION (cont)

Expenditure has grown by 15%. Although there’s a 15% growth, actual expenditure as a percentage of the budget is still at 22.53%.

Page 30: PRESENTATION TO NCOP SELECT COMMITTEE ON FINANCE SECOND QUARTER ENDING 30 SEPTEMBER 2005 2005-10-12

HOSPITAL REVITALIZATION (cont)Challenges :

Human Resource capacity both within and with implementing agents.

Inadequate response by experienced contractors and empowered joint ventures.

Incapacity of some consultants and small emerging contractors to handle projects with the required competencies.

Tendering and procurement processes both internally and externally takes longer than expected.

Infrastructure delivery model require review.

Page 31: PRESENTATION TO NCOP SELECT COMMITTEE ON FINANCE SECOND QUARTER ENDING 30 SEPTEMBER 2005 2005-10-12

HOSPITAL REVITALIZATION (cont)

Remedial Action: Intervene on Tshwaragano business case (cross

border municipality). Complete business cases for the entire province. Commence planning for priority areas. Review the implementing strategy and process

thoroughly. e.g. MEC for Education is convinced a task team between Health, Education and Public Works.

Discussion are underway with the Provincial Treasury for the amount to only be transferred to the Department during 2006/07 financial year.

Review of the bottom structure to address human resource challenges.

Page 32: PRESENTATION TO NCOP SELECT COMMITTEE ON FINANCE SECOND QUARTER ENDING 30 SEPTEMBER 2005 2005-10-12

NATIONAL TERTIARY SERVICES.

To compensate provinces for the supra-provincial nature of tertiary services provision and spill over effects as well as providing strategic funding to enable provinces to plan, modernise, rationalise and transform the tertiary hospital service delivery platform in line with national policy objectives including improving access and equity.

Page 33: PRESENTATION TO NCOP SELECT COMMITTEE ON FINANCE SECOND QUARTER ENDING 30 SEPTEMBER 2005 2005-10-12

National Tertiary Services

Sub-Programmes

Budget   R’000

Expenditure for Sep. 05 R’000

Expenditure: 1st Quarter R’000

Expenditure: 2nd Quarter   R’000

Budget Balance. R’000

 PERCENTAGE

Mafikeng (H61)

18 966

1112 

382 3317 15 267   19.51

Klerksdorp (H62)

36 493

3 884 2 725 11 861 21 907   39.97

Rustenburg (H63)

15 823

590 1 639 2 214 11 970  24.35

TOTAL 71 282

5586 4 747 17 392 49 143  31.06

EXPENDITUREEXPENDITURE

Page 34: PRESENTATION TO NCOP SELECT COMMITTEE ON FINANCE SECOND QUARTER ENDING 30 SEPTEMBER 2005 2005-10-12

National Tertiary Services (cont)

Expenditure on this grant has grown by 34% from end of August.

It stands 31.06% of the budget.

Page 35: PRESENTATION TO NCOP SELECT COMMITTEE ON FINANCE SECOND QUARTER ENDING 30 SEPTEMBER 2005 2005-10-12

National Tertiary Services (cont)

Progress: The Programme has shown an

improvement in its expenditure compared to the previous months, however this still needs more attention.

Previously, only Klerksdorp hospital complex provided a wider range of tertiary services; now Rustenburg and Mafikeng are expanding services.

Page 36: PRESENTATION TO NCOP SELECT COMMITTEE ON FINANCE SECOND QUARTER ENDING 30 SEPTEMBER 2005 2005-10-12

National Tertiary Services (cont)

Challenges: Concluding the procurement process

and receiving tertiary equipments for all the tertiary hospitals.

Amending the specifications for CT Scans due to market demands led to the delay. Price of 16 Slice CT scans came down, and we responded accordingly. NB: For this year CT scans accounts for more than 29% of the NTSG budget.

Page 37: PRESENTATION TO NCOP SELECT COMMITTEE ON FINANCE SECOND QUARTER ENDING 30 SEPTEMBER 2005 2005-10-12

National Tertiary Services (cont)

Remedial Action: Follow up on the finalisation of the

contract of procuring hospital medical equipments expected to be concluded during October 2005.

Once delivery of this equipment takes place, this will bring the expenditure to the expected level.

Page 38: PRESENTATION TO NCOP SELECT COMMITTEE ON FINANCE SECOND QUARTER ENDING 30 SEPTEMBER 2005 2005-10-12

Malaria & Cholera Prevention Grant

PURPOSE :For the sustenance of the programmes related with pushing back the frontiers of poverty and hunger among women, Aids victims and especially to provide equipment for the food gardens and in some instances provide stipend to volunteer garden workers.

Page 39: PRESENTATION TO NCOP SELECT COMMITTEE ON FINANCE SECOND QUARTER ENDING 30 SEPTEMBER 2005 2005-10-12

Malaria & Cholera Prevention Grant

Progress :A business plan has been developed

and approved for the utilisation of the rollover amounting to R1,111,460. The funds are currently under the provincial contingency reserve fund. Treasury will be transferring the money to the Department the 10th October 2005 .

Page 40: PRESENTATION TO NCOP SELECT COMMITTEE ON FINANCE SECOND QUARTER ENDING 30 SEPTEMBER 2005 2005-10-12

Malaria & Cholera Prevention Grant

Challenges: This is a once off conditional grant

resulting from the drought of 2004.The Programme has to ensure that

the roll-out of the activities is expedited to ensure spending of funds only in relation to time affected largely by a rural Bophirima district.

Page 41: PRESENTATION TO NCOP SELECT COMMITTEE ON FINANCE SECOND QUARTER ENDING 30 SEPTEMBER 2005 2005-10-12

Malaria & Cholera Prevention Grant

Remedial Action : All line expenditure items to

benefit from this grant have been identified e.g. pharmaceuticals, water tanks for clinics, food gardens and fencing for food gardens.

Page 42: PRESENTATION TO NCOP SELECT COMMITTEE ON FINANCE SECOND QUARTER ENDING 30 SEPTEMBER 2005 2005-10-12

Medico Legal Mortuaries

PURPOSE:

To facilitate the transfer of forensic pathology services from the South African Police Services (SAPS) to the Department of Health and provinces.

Page 43: PRESENTATION TO NCOP SELECT COMMITTEE ON FINANCE SECOND QUARTER ENDING 30 SEPTEMBER 2005 2005-10-12

Medico Legal Mortuaries

Progress: The Programme has the costed

operational plan for the year and the necessary staff structure has been finalised.

All facilities have been audited and are in the process of being upgraded.

Page 44: PRESENTATION TO NCOP SELECT COMMITTEE ON FINANCE SECOND QUARTER ENDING 30 SEPTEMBER 2005 2005-10-12

Medico Legal Mortuaries

Challenges: The funds from the conditional grant

of the Programme are not available yet.

The programme is presently having at its disposal its equitable share which is being used for the programme.

Page 45: PRESENTATION TO NCOP SELECT COMMITTEE ON FINANCE SECOND QUARTER ENDING 30 SEPTEMBER 2005 2005-10-12

Medico Legal Mortuaries

Remedial Action:

Funds will be transferred with effect from the 1st October 2005. However, the actual transfer will be with effect from April 2006 into provincial coffers.

Page 46: PRESENTATION TO NCOP SELECT COMMITTEE ON FINANCE SECOND QUARTER ENDING 30 SEPTEMBER 2005 2005-10-12

Expenditure on Equitable Share in relation to pressures points

Personnel – we are at 51%, and project over expenditure of R69m.( being addressed with provincial Treasury).

Administration (Indicates pool vehicles transport costs including ambulances) – we are at 65%. ( will review funding during Adjustment Estimates process).

Page 47: PRESENTATION TO NCOP SELECT COMMITTEE ON FINANCE SECOND QUARTER ENDING 30 SEPTEMBER 2005 2005-10-12

Current Pressure Points (Economic Classifications)Professional services (expected to

be a pressure point as service expand waste management).

Equipment (Expected to be a pressure point as we implement health technology audit recommendations).

Uniform for nurses ( based on new agreement ).

Page 48: PRESENTATION TO NCOP SELECT COMMITTEE ON FINANCE SECOND QUARTER ENDING 30 SEPTEMBER 2005 2005-10-12

Closure

Thank you for listening