DISCUSSIONS ON PROJECT PROPOSALS FOR TAMILNADU
By
Dr. G.Kumaravelu. I.F.S/ (Retd.), Full Time Member, Tamil Nadu State Planning Commission, Chennai-600 005.
1. ALLEY CROPPING- (FOOD AND WOOD)
2. BAMBOO FARMING
3. BIOMASS GASSIFIER
![Page 2: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/2.jpg)
Global Warming Assault
cannot be solved by
‘Promises and band-aid measures
![Page 3: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/3.jpg)
The significant problems that we faced today, cannot be solved with the same level of thinking we were at, when we created them.
![Page 4: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/4.jpg)
Our challenge right now is to determine how a different land use would have either a net benefit or a net cost in terms of carbon storage capacity.
-Achim Steiner,
Executive Director,
U.N. Environmental Programme
![Page 5: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/5.jpg)
His Excellency The Governor of
Tamil Nadu addressed the Legislative
Assembly on 06.01.2010
![Page 6: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/6.jpg)
He said that recognising the fact that the humanity is a mere thread in the fabric of nature and this thread cannot exist independently. This Government will implement schemes for protection of the environment and promotion of clean energy.
For this purpose, an ‘Environment Protection and Renewable Energy Development Fund’ will be established by this Government.
![Page 7: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/7.jpg)
Institutional governance systems should influence the ability of public policies, industries and corporations to adapt and transform their activities for meeting the issues associated with climate change.
(Griffith Haigh and Rassias, 2007)
![Page 8: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/8.jpg)
‘Climate Change’ is a ‘megathing’
while the tools of Economics are for
micro changes at the margins.
Nevertheless.........
![Page 9: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/9.jpg)
Programmes have to be ……..
•Economically Viable
• Ecologically emphathetic
•Environmentally ameliorating
•Aesthetically appealing
![Page 10: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/10.jpg)
•Location specific• Cost effective• Adoptable• Acceptable• Pragmatic• Time bound
![Page 11: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/11.jpg)
Need
Shift from Hydrocarbon Economy to Carbohydrate Economy
(Biochemical from Petrochemical) Tilling not Drilling Biology not Geology Depletable resource to renewable resource Subsistence economy to surplus economy
![Page 12: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/12.jpg)
To uplift the contribution of the Tamil Nadu Primary sector to Economy, from – to +, the land based asset sectoral activities need to be rectified, diversified and developments integrated
![Page 13: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/13.jpg)
We should aim at building up- an efficient and comfortable life in
Rural Areas.- achieve an agro-industrial structure- conquer rural unemployment.- stop rural decay.- arrest the seemingly irresisteble drift of
destitute people from the country-side
into BIG CITIES.
![Page 14: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/14.jpg)
FAO Projections for INDIA - 2010
Fire wood and char coal.. 344 million tonnes
Industrial round wood .. 37 million cu.m.
Sawn timber .. 33 million cu.m.
Paper/Boards .. 5.7 million tonnes Wood based Panel ..1.3 million tonnes
![Page 15: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/15.jpg)
Total mismatch between demand and supply
Forest resources cannot meet the growing demand.
Hence Agro-Forestry plantations and imports play major role in bridging the demand availability gap.
![Page 16: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/16.jpg)
SCHEME I
tu¥nghu« ku« eLnth«tu¥nghF« Ja® j鮥ngh«
Cogeneration of Wood and Food
![Page 17: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/17.jpg)
Trees to be planted on the Bunds of cultivated lands and inside in rows
![Page 18: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/18.jpg)
Participants
T.N.F.D. T.W.D.C. S.S.F.R.D. School Education Department Research Institute Tree growers Association
![Page 19: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/19.jpg)
MODEL IOnly bund planting (4 acre plot)
+ + + + + + + + + + + + + ++ + + +++++++++++ + + + + + + + + + + + + + + + +
++++++++
++++++++
+ + + + + + + + + + + + + + + +
![Page 20: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/20.jpg)
Model IIBund + ‘+’ model
+ + + + + + + + + + + + + ++++++++++
+ + + + + + + + + + + + + +++
++++++++
++++++++
+ + + + + + + + + + + + +++
![Page 21: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/21.jpg)
Only ‘+’ model (1 acre)
![Page 22: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/22.jpg)
Model-I : Only Bund/acre : 320 Nos.
Model-II : Bund +, ‘+’ design : 400 Nos.
Model-III: Only ‘+’ design : 80 Nos.
![Page 23: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/23.jpg)
Out of 145 lakh acres
Only 1.25 lakh acres of wood and food alley cropping with 5 crore trees.
![Page 24: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/24.jpg)
![Page 25: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/25.jpg)
![Page 26: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/26.jpg)
kaya senegalensis
![Page 27: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/27.jpg)
![Page 28: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/28.jpg)
TNFD
Tamil Nadu Forest Department –Forest Extension Centre, Neyveli.
3 years old – 50 cm girth – 400 per acre
![Page 29: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/29.jpg)
Complementing not confronting
![Page 30: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/30.jpg)
![Page 31: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/31.jpg)
Kumiz tree 1 year old – 40cm gbh Gmelina arborea
![Page 32: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/32.jpg)
Kadambam Maram .
Anthocephalus cadamba 6 year old 105 cm gbh 15 cft
Value 5000 rs per tree
![Page 33: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/33.jpg)
Casurina junghuniana Kapan kupan provenance
![Page 34: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/34.jpg)
Mist tent
![Page 35: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/35.jpg)
Mist tent
![Page 36: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/36.jpg)
![Page 37: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/37.jpg)
![Page 38: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/38.jpg)
Melia Dubia – Bund Planting 5 years old
![Page 39: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/39.jpg)
Melia Dubia – Bund Planting 5 years old
![Page 40: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/40.jpg)
![Page 41: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/41.jpg)
![Page 42: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/42.jpg)
Bund planting-Teak
![Page 43: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/43.jpg)
Harvestable Age
1. EUCALYPTUS CLONES 5 YEARS 2. CASUARINA CLONES 5 YEARS 3. TEAK 15 YEARS 4. MALAI VEMBU 6 YEARS 5. BAMBOO 4 YEARS (every year harvesting) 6. KUMIL 10 YEARS 7. KADAMBA MARAM 10 YEARS 8. NEEM 10 YEARS 9. PUNGAN 5 YEARS (every year seed harvesting) 10. RED SANDERS 20 YEARS
![Page 44: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/44.jpg)
SPECIES NO. OF SEEDLINGS
TO BE RAISED PER
YEAR (in Lakhs)
HARVEST AGE
TOTAL INCOME AT HARVEST AGE/TREE
(RS.)
AVERAGE INCOME PER YEAR PER TREE
EUCALYPTUS CLONES
345 6 YEARS 1200 200
CASUARINA CLONES
300 6 YEARS 1000 160
TEAK 10 15 YEARS 10000 660
MALAI VEMBU
02 6 YEARS 4000 640
BAMBOO 02 4 YEARS 1200 300
KUMIL 100 10 YEARS 8000 800
KADAMBA MARAM
100 10 YEARS 6000 600
NEEM 20 10 YEARS 2500 200
PUNGAN 10 5 YEARS 1000 200
ECONOMICS
![Page 45: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/45.jpg)
Advantages
COCONUT: Yields after 6th Year Net profit Rs. 100/Tree in 6th Year
Only expenditure till 6th year –100 litres water/Tree/Day
• TREES: One time harvest from 5 to 10 yearsRs.200 to Rs.300/Tree/Year generated.Rs.1200 to Rs.1800/Tree/6th Year harvest1/10th of water required than that of coconut.
![Page 46: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/46.jpg)
Magalir Thittam(kfë® Â£l«)
‘Tamil Nadu Corporation for Development of Women’
has proposed formation of an
‘International Fund for Agriculture Development and Economic activities
for women’.
![Page 47: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/47.jpg)
Proposed activities under IFAD
On farm investment in soil reclamation and land levelling.
Development of Agro and Social Forestry.
![Page 48: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/48.jpg)
350 blocks – 5 crore seedling 1 Block – 1 lakh seedling Seedling raising TNFD Clones to be procured from TNPL.
![Page 49: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/49.jpg)
1 SHGM – FARMER SCHOOL CHILD. 5000 well performing SHGS to be selected 50,000 SHGM to be trained by TNFD –
Research and Extension Centres. Training in Bund Planting models and
planting techniques.
![Page 50: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/50.jpg)
50,000 Farmers 50,000 SHGMs 50,000 School Children 5 crore seedlings Simultaneous monsoon planting 50 days activities only for planting
![Page 51: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/51.jpg)
Benefits
Farmer: Quality seedling at subsidised price
Planting cost reimbursed Market tie up. Ensuring enhanced income and
therefore profit.
![Page 52: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/52.jpg)
Pitting and Planting cost : Rs.6.00
After the seedlings are planted, after inspection, the amount can be released to the farmer through Bankers’ cheque or Demand Draft.
![Page 53: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/53.jpg)
Maximum of 1000 seedlings per farmer as per scheme concessional cost to be supplied.
Over and above, he can purchase more seedlings, if desired, at full cost (Rs.6.00) and undertake planting at his own cost.
![Page 54: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/54.jpg)
Self-Help Group Member
Incentive for involvement
Re.1 to be paid per established seedling.
Re.1 per tree per year for ‘carbon credit’ (1 tree – 20 kg biomass per year)
![Page 55: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/55.jpg)
School Children
Involvement Appreciation Certificates of Merit Additional Marks
![Page 56: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/56.jpg)
Technology support
G.P.S. (Geographical Position System)
G.I.S. (Geographical Information System)
Digital Camera
![Page 57: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/57.jpg)
Head : FOREST Sub-Head :Increasing Tree cover outside Forest areas. Allotted to :Tamil Nadu Water Development Agency Programme :Waste Land Development
Programme Fund allotted :Rs.340 crores for 11th Plan (Rs. 300 crore available)
FUND
![Page 58: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/58.jpg)
50 crore trees, if thus planted in 5 years, Will support Rs.10,000 crore turnover per
year as wood products. Contribution of Primary sector to economy
ensured and enhanced. Could generate downstream employment to
50 lakh people. Direct income enhancement to 100 lakh
people Totally 1.5 to 2 crore people in the rural area
will be benefited.
![Page 59: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/59.jpg)
These 50 crore trees could earn Rs.500 crore/year as carbon credit apart from their biomass sale profit.
![Page 60: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/60.jpg)
Immediate Requirements
Revamping of Forest Extension Centres
Provision of vehicle, GPS, Digital camera for all the recently formed and appointed 31 Forest Extention Officers one in each District in Tamil Nadu.
Budget for seed collection and clones production.
![Page 61: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/61.jpg)
Bamboos Farming/Carbon Farming
Total cultivated Land
in Tamil Nadu : 145 lakh acres
* Block Planting of Bamboo:5 lakh acres proposed
![Page 62: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/62.jpg)
![Page 63: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/63.jpg)
![Page 64: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/64.jpg)
Vegetative propagation of bambusa balcooa, Amaravathy Research Centre
![Page 65: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/65.jpg)
Planted in 1m3 pit with 2 kgs. Vermicasting, 100 gms. VAM, 20 gms. of phosphobacteria Azosprillum
![Page 66: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/66.jpg)
Bambusa tulda – 2 Years old, 25 culms / clump. Andiyur Research Centre – Rainfed condition
![Page 67: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/67.jpg)
Bambusa nutans – 5 Years old 1 ha. at 6 m. x 6 m. espacement. Research Centre, Neyveli – Rainfed condition – Ave. 42 culms / clump
![Page 68: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/68.jpg)
![Page 69: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/69.jpg)
![Page 70: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/70.jpg)
Carbon content is 40 to 50% in total Bamboo Biomass
![Page 71: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/71.jpg)
N.L.C. Carbon emission Per day 70,000 tonnes of CO2 emitted during the production
of 2450MW ofelectricity through lignite burning
![Page 72: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/72.jpg)
Affluent Society
become
Effluent Society
![Page 73: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/73.jpg)
Wasteland Development Programme
About 9.5 lakh acres available under 3 categories of land covered under the scheme.
(Source: Working Group report on soil and water conservation)
![Page 74: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/74.jpg)
1. Total extent distributed by the
Revenue Department : 2,11,259 acres
2. Allotted to Agri-Eng. Dept. : 1,46,102 acres
3. Extent of land reclaimed :52,689 acres
Therefore, 52,888 acres available for reclamation as on date.
We are aiming for 10,000 Acres only to be planted during 2010-2011.
![Page 75: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/75.jpg)
Reclaimed lands where land development,
pitting, planting and irrigation facilities
have been provided could be used for
planting bamboos.
NADP can be made use of.
![Page 76: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/76.jpg)
Protective irrigated farm land – Tamil Nadu Maximum income
generated per acre : Rs.10,000/acre/year Minimum income
generated per acre : Rs.3,000/acre/year. Average income
generated per acre : Rs.7,000/acre/year
![Page 77: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/77.jpg)
BAMBOO Income from 4th year onwards Thornless Bamboos can yield 10 to 20
Tonne/acre/year. @Rs.3000/Tonne, annual income of
Rs.30,000 could be assured. TNPL – Buy back: From 1 lakh acres of
Bamboo plantation, 10 to 20 lakh tonne Bamboo could be harvested every year.
![Page 78: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/78.jpg)
Production of Vermicasting
![Page 79: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/79.jpg)
Production of Bio-fertilizers
![Page 80: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/80.jpg)
VERMICASTING PRODUCTION 10 TO 20 TONNES/ACRE/YEAR UNDER BAMBOO
CANOPY
Cost of production : Rs.2000/tonne Selling price: Rs.4000/tonne Profit : Rs.2000/tonne For 10 tonnes profit : Rs.20,000/year One acre of Bamboo : Rs.20000/year
plantation profit
![Page 81: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/81.jpg)
50 lakh tonnes of vermicasting can be applied to 50 lakh acres of Agricultural lands. 1 tonne per acre after mixing with Bio-fertilizer. Dry land crops can yield 20% more.
Activated charcoal from bamboo can be used in admixture with bio-nutrient and bio-fertilisers enabling 30% addl. higher yield.
![Page 83: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/83.jpg)
![Page 84: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/84.jpg)
Mushroom cultivation under Bamboo plantation (anticipated)
1 tonne per acre@ Rs.30 per kg for
1 tonne : Rs.30,000/acre
![Page 85: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/85.jpg)
Carbon Credit
@10 US $ per tonne of CO2 sequestered, 20 tonnes/acre 200 US $ could be sourced as Carbon Credit (approximately Rs.10,000/-)
![Page 86: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/86.jpg)
![Page 87: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/87.jpg)
![Page 88: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/88.jpg)
![Page 89: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/89.jpg)
Market for Bamboo
WORLD 10 BILLION us $ AS ON 2008 50% BY
CHINA Expected to be 20 billion by 2015 (double) INDIA Rs.6505 crores in 2006 Expected growth: Rs.26,000 crore by 2015
(National bamboo mission)
![Page 90: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/90.jpg)
Bamboo Fabric
Most comfortable to wear than cotton or polyester
Antibacterial, antifungal Absorbs twice the amount of moisture
than cotton Will not hold odour Fast dryingTwice the price of cotton. International Market for innerwear
![Page 91: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/91.jpg)
Proposal
Under NADP scheme, if clusters with a minimum of 10 acres with 1 Bore well is allowed (at present a minimum of 50 acre per cluster with 3 Borewells) 5 lakh acres could be brought under Bamboo cultivation very early.
![Page 92: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/92.jpg)
Bamboo Propagules Flowers once in 30 to 40 years Hence only vegetative propalgation
possible T.N.F.D. has established experimental and
demonstration plots of selected varieties. Plots could be harvested immediately. Soil working fertilizer application Rooting of cuttings from the felled and new
culms that merge
![Page 93: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/93.jpg)
Plots could be harvested immediately. Soil working fertilizer application Rooting of cuttings from the felled and new
culms that merge. Cost of production of rooted cuttings :
Rs.10/-
(Rs.20 to 30 in open market)
Restricted source: For 20 lakhs : Rs.2 crore 2010 : Rs.30 lakhs 2011 : Rs.170 lakhs
![Page 94: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/94.jpg)
Thorn less Bamboo
T.N.Forest.Department. : 3600 clumps
@ 30 culms / clump
@ 50 cutting/culms Total cutting for rooting : 50 lakhs
@ 50% success : 25 lakh plants could be
produced.
![Page 95: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/95.jpg)
Model - II
1 SHG = 1 Acre Bamboo plantation 1 SHG = 1 Cow 1 Cow = 10-11 Kg dung/day
@ 1 (cow dung) 8(soil+litter) ratio 365 days – 4 tonnes of cow dung + 20 tonnes of soil – litter 20 tonnes Vermicasting/acre/year.
![Page 96: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/96.jpg)
Immediate Requirement
Identification of lands – 10,000 acres Selection of SHGs – 10,000 Nos.
(1 acre per SHG) Thornless bamboo propagule production
by TNFD – 15 lakhs. By TNPL – 10 lakhs. Cuttings can be airlifted from Assam,
Tripura and propagules could be produced by TNPL under their high-tech mist chamber conditions.
![Page 97: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/97.jpg)
Total revenue for SHG per year
Bamboo sale : Rs.30,000 Vermicasting : Rs.20,000 Mushroom : Rs.20,000 Total : Rs.70,000/approx.
![Page 98: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/98.jpg)
Application of charcoal of Broad level Trees to agricultural crops reduced the use of chemical fertilisers by 1/20th increased disease resistence to plants.
![Page 99: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/99.jpg)
Water content of charcoal layer in the soil was remarkably higher at 40% even in mid summer compareed with 5% in the outside charcoal zone soil mass. (Japan Biochar Association-JBA)
![Page 100: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/100.jpg)
Growing Trees and burying charcoal is the apt method of carbon sequestration.
CARBON FARMING
to mitigate
GLOBAL WARMING
![Page 101: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/101.jpg)
In Japan, at least 100 thousand tonnes of Biochar is applied to agricultural lands annually. They contain 80% carbon and so 250 thousand tonnes of CO2 are shut in the soil and locked without leakage.
-CARBON FARMING.
![Page 102: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/102.jpg)
Clean Energy
MELIA DUBIA BASED BIOMASS GASSIFIER(electricity production)
![Page 103: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/103.jpg)
Why Green Energy?
N.L.C. Carbon emission Per day 70,000 tonnes of CO2 emitted during the production of 2460MW of electricity through lignite burning. 250 lakh tonnes per year. Total coal based power generation in Tamil Nadu 5430 MW. Around 500 lakh tonnes CO2 emitted into atmosphere per year in Tamil Nadu alone.
![Page 104: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/104.jpg)
Why energy?India
Electricity demand and supply gap is more than 20%
10 out of 28 States on deficit.
![Page 105: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/105.jpg)
For commercial and industrial power use alone, so far, Rs.1 lakh crore have been spent on buying ‘Invertors’ in INDIA.
This amount could be utilized to generate 20,000 to 30,000 MW power.
![Page 106: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/106.jpg)
Melia dubia Biomass Gassifier
Electricity Production
1 MW production : 24 tonnes/dayFor 365 days : 8760 tonnes/years@ 50 tonnes per acre/year : 175 acres to be planted
![Page 107: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/107.jpg)
HIGH YIELDING CLONES
Only recently, very high yielding varieties of Melia dubia, capable of yielding 50 tonnes/acre/year have been evolved.
- TNFD – Research and Extension wing.
![Page 108: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/108.jpg)
By manipulating the environment and maintaining quality planting stock of clones of these species, it is possible to scale up the yield to 100 tonnes/acre/year, which can be world record.
- TNPL can enhance the clonal production through their high tech mini cutting macro propagation centres. 90% rooting without harmone have been achieved recently by TNPL in Melia dubia.
![Page 109: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/109.jpg)
High yielding trees
![Page 110: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/110.jpg)
Date of Planting: Febraury 2008 20 Months old
![Page 111: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/111.jpg)
![Page 112: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/112.jpg)
50 kg per tree/50 tonnes/acre/year
![Page 113: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/113.jpg)
1 Year Old – 55kg weight - 43cm gbh
![Page 114: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/114.jpg)
![Page 115: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/115.jpg)
![Page 116: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/116.jpg)
![Page 117: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/117.jpg)
![Page 118: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/118.jpg)
![Page 119: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/119.jpg)
![Page 120: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/120.jpg)
PPP Model (1 MW)
1 Farmer : 2 Acres Melia 200 Farmers : Rs.2 lakh each Total : Rs.4 crore TNPL, TNEB : Rs.1 crore GOI-DNE subsidy : 1.5 crore
![Page 121: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/121.jpg)
ECONOMICALLY VIABLE 1 MW –Machinery and
erection cost :Rs.6 crore Cost of production of electricity
@ Rs.2000 per tonne of wood :Rs.2/per unit Selling rate of electricity :Rs.4.50/unit Profit/unit :Rs.2.50 For 24,000 units/day : Rs.60,000/day Activated charcoal : Rs.20,000/day
(2 tonnes/day)
Total :Rs.80,000/day
Breakeven in 3rd year
![Page 122: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/122.jpg)
ACTIVATED CHARCOAL
15% of 9000 tonnes of wood 24 tonnes per day wood 3 tonnes per [email protected] per tonne Income : 15,000/day or Rs.5 crore/year
![Page 123: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/123.jpg)
5000 Melia based Biomass gassifier could be established in Tamil Nadu to produce 5000 MW electricity.
About 10 lakh acres are required out of 145 lakh acres of total cultivable lands.
![Page 124: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/124.jpg)
The success of this Green energy programme can pave way for establishing even upto 10,000 MW power production in Tamil Nadu using alongwith Melia, other fast growing species like bamboo, Gmelina, Acrocarpus, Anthocephalus etc.
These are winning horses. For this to happen, the land required
will be 20 to 25 lakh acres of the 145 lakh cultivable lands available in Tamil Nadu.
![Page 125: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/125.jpg)
Environmentally ameliorating
Total CO2 emitted by
coal/lignite based
Power plants in T.N.: 500 lakh tons/yr.• 10 lakh acres of melia
can sequester : 500 lakh tons/yr.
(for production of 5000MW electricity)
Biomass gassifier is carbon neutral.
![Page 126: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/126.jpg)
ECONOMICALLY VIABLE
PROFIT FOR FARMER Sale of 50 MT/acre at Rs.2000/tonne : Rs.1,00,000/year Profit from the partnership in the gassifier unit : Rs.70,000/year for each partner(Projected dividend : 35% Assured dividend : 20%
![Page 127: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/127.jpg)
Income in the farmer's hands from sale of biomass
No. of acres belonging to each participating farmer acre/farmer 15
Area under annual crops acre/farmer 10
Area under Milia Dubia energy plantation acre/farmer 5
Yield of agro residues/farmer @ 8 MT/acre x 10 acre MT/farmer 80
Yield of Biomass from energy plantation @ 50 MT/acre x 5 acres
MT/farmer 250
Total biomass from each farmer MT/farmer/y 330
Selling price of agro residues Rs./MT 500.00
Selling price of woody biomass Rs./MT 1500.00
Income per farmer from sale of agro residues Rs./y 40,000.00
Income per farmer from sale of Milia Dubia Rs./y 375,000.00
Total income per farmer from sale of biomass Rs./y 415,000.00
Annual quantity of biomass required for a 5 MW Power Plant @ 82% Plant Load Factor
MT/year 71,800
Number of farmers No. 220
Average income from biomass sale for 10 years @ 5% annual increase in price
7,087,800.00
![Page 128: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/128.jpg)
Income in the farmer's hands from investment in the power plant
Power Plant project cost Rs. Crores 34.50
Total Equity Capital @ 30 Rs. Crores 10.35
Equity Contribution from each farmer @ Rs. 1 Lakh/farmer Rs. Crores 2.20
Equity Contribution from private investor Rs. Crores 8.15
Net profit for the first year Rs. Crores 9.16
Farmer's profit share Rs. Crores 1.95
Income per farmer from profit share Rs/annum 88,500.00
Simple Return on investment % 88.50%
Income per farmer over the next 10 years Rs/annum 11,04,900
![Page 129: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/129.jpg)
Issues to be decided1. Forest Department :
Raising seedlings 5 or 10 crores.Numbers to be decided. One per Block.350 Blocks? Involving Forest Extension centers-in training,monitoring, and
advising in maintenance. Helping in market tie up with industries. Coordinating between society to social Forestry,SHGS. Involving State Forest Research wing,IFGTB,TNAU in evaluating the
biomass/carbon sequestration status. Arranging for carbon credit access Seed collection from plus trees and quality seedling production Bamboo propagule production.Numbers have to be around 15
lakhs.
![Page 130: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/130.jpg)
2.Agriculture Department Identification of 10,000 Acres to 15,000 acres of
land and farmers for bamboo cultivation. Linking NAD Programme to this project. Support of Bamboo mission Modifying NADP norms - one Bore well for 10
Acres. Irrigation and power facilities Mushroom cultivation under Bamboo
plantation(TNAU) Vermicasting Production under bamboo
(TNFD,TNAU)
![Page 131: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/131.jpg)
3.Tamilnadu Women Development Corporation
Participation in Wood and Food Programme. Participation in Bamboo Cultivation. Selecting of Well Performing SHGS for these two
programmes. Training with TNFD Extension in low Cost seedling
production technique.
![Page 132: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/132.jpg)
4.TNPL Production of clonal plants of sissoo,malaivembu,kumil,Euc
and casuarina - Micro and Macro propagation. Production of maximum number of Thorn less bamboo
propagule upto 10 to 15 lakhs. Buying Melia dubia Bamboo for paper pulp –Buy back Lead participation in establishing I MW – Biomass gassifier or
5 MW – Biomass gassifier – turbine power plant as PPP. Partnership with TNEB? TNPPL or can there be an exclusive Tamilnadu green Power
company(TNGPL).
![Page 133: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/133.jpg)
5.Tree Growers Association 31 in existence,one per district. Involving them in nursery raising Involving in various stages of implementations of
the programmes in each district. Tie up with society for social forestry and
development. Involving in PPP for green power generation.
![Page 134: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/134.jpg)
6.Tamilnadu Government Rs.300 Crores earmarked under
FORESTRY HEAD for ‘Increasing Tree cover outside Forest Areas’ in the 11th Five Year Plan,which remains unutilized,may be transferred to newly proposed ‘Environmental Development Fund’ by the Government, to fund these proposed projects.
![Page 135: Presentation SPC - Feb 25th 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061120/546b8233b4af9f1f508b46c4/html5/thumbnails/135.jpg)
WE HAVE A DREAMAND
YOU CAN HELP TO
MAKE IT HAPPEN
THANK YOU