Ahmed Abdul halim sedik

National Technical Concrete Industry Subcommittee (NT-CIS)

Civil Engineer

Quality & Conformity Department . M.O.E

QNCC 26th , 27th October 2014 , DOHA - QATAR

QCS 2014 Concrete Plant Inspection

2

List Contents.

Introduction ……………………………….………….....… 3

The Benefit Of New Amendment……………………….....4

Scope of Inspection ……………………..……………....…5

Check list contents ………………………….….………...6,7

Factory Requirements……………...............................8,9,10

Row Materials Requirements…………...…………....…11,12

Water and admixture Requirements………….………....13

Batching Plan Requirements……………..………………14

Laboratory Requirements………………………...………15

Questions …………………………………………………..16

3

Introduction.

QCS new and previous versions focuses on the concrete plant quality ,

the new version QCS 2014 part no. 7 in section no.5 has been amended

with a check list for concrete plants inspection , the chapter title also has

been changed to "Concrete Plants" instead of “ Batching Plant ", the new

title will be inclusive to all matters related to concrete plant .

The new amendment has been establish of trust and transparency among

governmental parties and manufacturers , and also to encourage

manufacturers to conduct self-audit their factories to improve quality,

through checking all the quality required points in the provided check list.

4

The benefit of new amendment.

New to QCS.

Focused on concrete plants.

Transparency among manufacturers and governmental parties.

Speed up the completion of inspection stage.

Minimum requirements of quality specifications for concrete plants.

5

Scope of inspection for concrete plants

at QCS 2014.

Inspection is the most important step to get the

conformity certificate or any certificate of concrete

plant .

The inspectors team mission is to visit the factory to

make sure that the following points are complying with

QCS 2014.

Factory.

Materials storage.

Production lines .

Laboratory .

Product storage.

The National Committee has approved a list of

inspection steps, to improve the quality .

6

Inspection Check List

7

Check list.

1- Factory condition.

2-Material storage and handling.

3- Water & Admixture supply.

4- Batching plant requirements.

5- Laboratory.

6- Delivery ticket requirements.

Inspection Steps :

8

1- Factory condition.

1-1 Concrete floor under mixer & silos.

1-2 Concrete floor with slope under

materials.

1-3 Hard and stable floor on axis .

1-4 Floor clean .

1-5 Drainage system .

1-6 Separated place of waste

materials.

1-7 Separated place of wash tank .

9

1-1- Concrete floor under mixer & silos.

1-2- Concrete floor with slope under materials.

1-3- Hard and stable floor on axis .

1-4- Floor clean .

10

1-5- Drainage System . 1-6-Separated Place of Waste Materials.

1-7-Separated Place Of Wash Tank.

11

2- Row materials

requirements.

F- Effective method for checking

level of materials in bins .

A- Aggregate shading .

B- Aggregate separations.

C- Aggregate scale calibration.

D- Conveyer belts cover .

2-2 Aggregate

E- Board clarify the aggregate type

A

B

A

D

E

12

2- Row materials

requirements.

A- Cleaning of C&C silos.

B - Cement scale calibration.

C - Reflective color for silo.

D - Board clarify the type .

2-3 Cement & cementations

materials

F- All cementations materials excess of

use protected under shed.

A- Water pipe protect.

3-1 Water requirements .

B – Chiller machine .

C – Ice plant or nitrogen cooling

system .

D –Water and ice plant

calibrations.

3- Water and admixture requirements.

A- Additive storage silos .

3-2 Admixture requirements

B – Additive gage calibration .

C – All admixture excess of use

protected under shad.

D –Agitation system for all tanks

or silos more than 5000 liter .

13

14

B- Computer controlled .

4- Batching plant requirements.

C- Plant type .

D- Computer print out .

E- Calibration validity .

F- Cleaning of mixer blades.

A- Certificate validity .

A – Equipment calibration

validity.

5- Laboratory requirements.

D – Temperature for curing

tank.

B – Records of test results .

C – Method and result of slump

and temp for concrete at plant .

15

16

Thank you

Eng . Ahmed Abdul Halim