Page 1: Presentation PDF- Islamabad - World Banksiteresources.worldbank.org/INTPAKISTAN/Resources/... ·  · 2007-04-26Bringing in technology to ensure transparency ... Plasma Gasification

Karachi Karachi Development with a Vision

How Karachi is Progressing & Future How Karachi is Progressing & Future PlansPlans

PAKISTAN DEVELOPMENT FORUM- 2007

26th April 2007

City District Government Karachi

Page 2: Presentation PDF- Islamabad - World Banksiteresources.worldbank.org/INTPAKISTAN/Resources/... ·  · 2007-04-26Bringing in technology to ensure transparency ... Plasma Gasification

Direction of the present Direction of the present

reform effortreform effort

What we want to do?

A simple vision:

….want to make life of the

people of Karachi decent.

Page 3: Presentation PDF- Islamabad - World Banksiteresources.worldbank.org/INTPAKISTAN/Resources/... ·  · 2007-04-26Bringing in technology to ensure transparency ... Plasma Gasification

How can we make How can we make

life decent for a life decent for a

common man?common man?

Page 4: Presentation PDF- Islamabad - World Banksiteresources.worldbank.org/INTPAKISTAN/Resources/... ·  · 2007-04-26Bringing in technology to ensure transparency ... Plasma Gasification

Our StrategyOur Strategy� Improved and integrated Planning-- Holistic Approach

�Better Governance & emphasis on Institutional Dev.

�Provision of basic necessities of life

�Safe & clean water

�Proper sewerage & drainage system

�Improving health service delivery

�Improving standard of education

Page 5: Presentation PDF- Islamabad - World Banksiteresources.worldbank.org/INTPAKISTAN/Resources/... ·  · 2007-04-26Bringing in technology to ensure transparency ... Plasma Gasification

Our Strategy Our Strategy (cont..)(cont..)

�Integrated Mass Transit and transport system

�Bringing in technology to ensure transparency

and efficiency.

�Involving community in decision making, service

delivery and security issues

Page 6: Presentation PDF- Islamabad - World Banksiteresources.worldbank.org/INTPAKISTAN/Resources/... ·  · 2007-04-26Bringing in technology to ensure transparency ... Plasma Gasification

Our Strategy Our Strategy (cont..)(cont..)

�Investment Promotion leading to more

employment.

�infrastructure development with strategic

planning.

�Strengthening local revenue base and efficiency

in expenditure.

Page 7: Presentation PDF- Islamabad - World Banksiteresources.worldbank.org/INTPAKISTAN/Resources/... ·  · 2007-04-26Bringing in technology to ensure transparency ... Plasma Gasification

Priority AreasPriority Areas� Master Planning,

� Water & Sewerage,

� Transport & Environment,

� Education,

� Health

� Solid Waste Management

� Information Technology

� Community Development

Page 8: Presentation PDF- Islamabad - World Banksiteresources.worldbank.org/INTPAKISTAN/Resources/... ·  · 2007-04-26Bringing in technology to ensure transparency ... Plasma Gasification

Priority Areas Priority Areas (cont…)(cont…)

� Industrialization/ Investment Promotion with emphasis

on Public Private Partnership

�Organizational Development/ HRD

�Revenue (Land & Katchi Abadis)

�Parks & Horticulture,

� infrastructure development

Page 9: Presentation PDF- Islamabad - World Banksiteresources.worldbank.org/INTPAKISTAN/Resources/... ·  · 2007-04-26Bringing in technology to ensure transparency ... Plasma Gasification

FY 2006FY 2006--07 CDGK Budget07 CDGK Budget

�Total CDGK Budget Rs. 44.20 billion

�Development Budget Rs. 22.80 billion

�Off-Budget Dev. Funds Rs. 01 billion (aprox)�DERA/ ESR/DSSP etc.

�Karachi Mega City Dev. Project (ADB funded)

�Other BOT & JV projects > US$ 01 billion

�Expenditure on Education 22.4%

�Expenditure on Health 9.3%

Page 10: Presentation PDF- Islamabad - World Banksiteresources.worldbank.org/INTPAKISTAN/Resources/... ·  · 2007-04-26Bringing in technology to ensure transparency ... Plasma Gasification

Some Major

Projects

Page 11: Presentation PDF- Islamabad - World Banksiteresources.worldbank.org/INTPAKISTAN/Resources/... ·  · 2007-04-26Bringing in technology to ensure transparency ... Plasma Gasification

Karachi Master Plan -2020

Page 12: Presentation PDF- Islamabad - World Banksiteresources.worldbank.org/INTPAKISTAN/Resources/... ·  · 2007-04-26Bringing in technology to ensure transparency ... Plasma Gasification

ELEVATED EXPRESSWAYELEVATED EXPRESSWAYEstimated Cost : US$ 350 million

Page 13: Presentation PDF- Islamabad - World Banksiteresources.worldbank.org/INTPAKISTAN/Resources/... ·  · 2007-04-26Bringing in technology to ensure transparency ... Plasma Gasification

IT TowerIT Tower

� 47-stories, 10,000-

seats Call Center

� BOT Project

� Foreign investment

of US $ 250 million

Page 14: Presentation PDF- Islamabad - World Banksiteresources.worldbank.org/INTPAKISTAN/Resources/... ·  · 2007-04-26Bringing in technology to ensure transparency ... Plasma Gasification

SOHRAB GOTH FLYOVERSOHRAB GOTH FLYOVER

Estimated Cost : Rs. 549 million

Page 15: Presentation PDF- Islamabad - World Banksiteresources.worldbank.org/INTPAKISTAN/Resources/... ·  · 2007-04-26Bringing in technology to ensure transparency ... Plasma Gasification

Signal Free Corridor from Airport to SITESignal Free Corridor from Airport to SITE

Page 16: Presentation PDF- Islamabad - World Banksiteresources.worldbank.org/INTPAKISTAN/Resources/... ·  · 2007-04-26Bringing in technology to ensure transparency ... Plasma Gasification

Signal Free Corridor from Airport to SITESignal Free Corridor from Airport to SITE

Page 17: Presentation PDF- Islamabad - World Banksiteresources.worldbank.org/INTPAKISTAN/Resources/... ·  · 2007-04-26Bringing in technology to ensure transparency ... Plasma Gasification

MALIR RIVER BRIDGEMALIR RIVER BRIDGEEstimated Cost : Rs. 1284 million

Page 18: Presentation PDF- Islamabad - World Banksiteresources.worldbank.org/INTPAKISTAN/Resources/... ·  · 2007-04-26Bringing in technology to ensure transparency ... Plasma Gasification

BEACH PARK

Page 19: Presentation PDF- Islamabad - World Banksiteresources.worldbank.org/INTPAKISTAN/Resources/... ·  · 2007-04-26Bringing in technology to ensure transparency ... Plasma Gasification

BaghBagh--ee--Ibne QasimIbne Qasim

Page 20: Presentation PDF- Islamabad - World Banksiteresources.worldbank.org/INTPAKISTAN/Resources/... ·  · 2007-04-26Bringing in technology to ensure transparency ... Plasma Gasification

BaghBagh--ee--Ibne QasimIbne Qasim

Page 21: Presentation PDF- Islamabad - World Banksiteresources.worldbank.org/INTPAKISTAN/Resources/... ·  · 2007-04-26Bringing in technology to ensure transparency ... Plasma Gasification

Route Network Rationalization

SITE

Korangi

Airport

New Karachi

Sohrab Goth

University

CBD

Kar

ach

i M

ass T

ransit C

ell

Kar

ach

i M

ass T

ransit C

ell

Induction of 8000 Environment Friendly Buses under Public – Private Partnership (2006 – 2010)

Page 22: Presentation PDF- Islamabad - World Banksiteresources.worldbank.org/INTPAKISTAN/Resources/... ·  · 2007-04-26Bringing in technology to ensure transparency ... Plasma Gasification

1

1

2

2

3

3

4

4

5

5

6

6

Page 23: Presentation PDF- Islamabad - World Banksiteresources.worldbank.org/INTPAKISTAN/Resources/... ·  · 2007-04-26Bringing in technology to ensure transparency ... Plasma Gasification

URBAN TRAFFIC CONTROL SYSTEM

Estimated Cost : 719 million

Page 24: Presentation PDF- Islamabad - World Banksiteresources.worldbank.org/INTPAKISTAN/Resources/... ·  · 2007-04-26Bringing in technology to ensure transparency ... Plasma Gasification

North NazimabadNorth Nazimabad

Gulshan Gulshan ChorangiChorangi

KarimabadKarimabad

LiaqatabadLiaqatabad #10#10

NazimabadNazimabad

DrigDrig Road StationRoad Station

Sohrab GothSohrab Goth

Tin

Tin Ha

ttiHa

tti

FTCFTC

Garden Road

Garden Road

Guru MandirGuru Mandir

MazarMazar--ee--QuaidQuaid

Old Old NumaishNumaish

KPTKPT

GulGul BaiBai

MauripurMauripur RoadRoad

TowerTower ZiauddinZiauddin RoadRoad

Baloch

Balochcolony By

colony By--Pass

Pass

TibbatTibbat CenterCenter

Empress MarketEmpress Market

MaulviMaulvi MusafirMusafir KhanaKhana

Teen Teen TalwarTalwar

Sunset BoulevardSunset Boulevard

Korangi Road

Korangi Road

Development of Transport Pollution Control PlanDevelopment of Transport Pollution Control Plan

Page 25: Presentation PDF- Islamabad - World Banksiteresources.worldbank.org/INTPAKISTAN/Resources/... ·  · 2007-04-26Bringing in technology to ensure transparency ... Plasma Gasification

Solid Waste ManagementSolid Waste Management

�Comprehensive integrated SWM system

�Garbage Transfer Stations (07)

�Material Recovery Facilities (MRF)

� Sanitary Land Fill Sites (03)

�Community Mobilization Program

� Plasma Gasification Plant and other waste to energy projects

�Bio Gas project already started

� Joint Venture Projects encouraged

Page 26: Presentation PDF- Islamabad - World Banksiteresources.worldbank.org/INTPAKISTAN/Resources/... ·  · 2007-04-26Bringing in technology to ensure transparency ... Plasma Gasification

WATER SUPPLY & SEWERAGEGOP FUNDED

�K-III Project recently

completed�Cost Rs. 6.5 billion to bring

� 100 mgd of water to Karachi

�System Strengthening�Cost Rs. 2.1 billion.

�Textile City Water Supply System

– Dedicated water supply system

– costing Rs. 700 million

�S-III Sewerage ProjectCost Rs.7.9 billion

Page 27: Presentation PDF- Islamabad - World Banksiteresources.worldbank.org/INTPAKISTAN/Resources/... ·  · 2007-04-26Bringing in technology to ensure transparency ... Plasma Gasification

FOREIGN FUNDED PROJECT

JAPANESE FUNDED (JICA)

�Master Plan for Water & Sewerage

�JICA is assisting in preparation of water & sewerage

master plan of water purification facility

�TECHNICAL ASSISTANCE BY WSP-SA

�Restructuring of KW&SB

�Institutional reforms in KW&SB underway with

assistance of Water & Sanitation Program – South Asia

(WSP-SA)

Page 28: Presentation PDF- Islamabad - World Banksiteresources.worldbank.org/INTPAKISTAN/Resources/... ·  · 2007-04-26Bringing in technology to ensure transparency ... Plasma Gasification

BOT PROJECTS (EOIs issued)

�35 MW Power Plant at Dhabeji

�Recycling of Wastewater

CDGK’s OWN RESOURCES

�Development Works at Town & UC Level

�Allocation of Rs. 2591 million for improvement of water

& sewerage

Page 29: Presentation PDF- Islamabad - World Banksiteresources.worldbank.org/INTPAKISTAN/Resources/... ·  · 2007-04-26Bringing in technology to ensure transparency ... Plasma Gasification

GOS FUNDED

�K-IV Project

�Study completed

�Consultancy job awarded.

CDGK FUNDED PROJECT CO FINANCING BY GOP& GOS

� Industrial Areas Development

�Rs. 4.5 billion earmarked for development of water, sewerage & drainage in 04 industrial areas to boost economy

�Work has commenced

Page 30: Presentation PDF- Islamabad - World Banksiteresources.worldbank.org/INTPAKISTAN/Resources/... ·  · 2007-04-26Bringing in technology to ensure transparency ... Plasma Gasification

Karachi Mega City Karachi Mega City DevelopmntDevelopmnt

Project Funding for KWSBProject Funding for KWSB

� New Water Filtration Plant Extensions at existing NEK and

COD plants—185 MGD water

� Extension of Lyari outfall sewer to divert wastewater

currently flowing into Lyari river

� Organizational Development and Corporatization of KWSB

� Distribution Improvement Program

� Disaster Management Program

� IT Tracking Platform

� Industrial waste water recycling project

Page 31: Presentation PDF- Islamabad - World Banksiteresources.worldbank.org/INTPAKISTAN/Resources/... ·  · 2007-04-26Bringing in technology to ensure transparency ... Plasma Gasification

Karachi Mega City Development Karachi Mega City Development

Project (ADB funded)Project (ADB funded)

� Infrastructure Development Project-800 m US$

� Sectors:

�Master Planning & strategic planning Unit

�Transport & Mass Transit

�Solid Waste Management

�Water & Sewerage

�Organizational Development & Capacity Building

�Forestation & Environment

�Investment & Industrial Promotion

Page 32: Presentation PDF- Islamabad - World Banksiteresources.worldbank.org/INTPAKISTAN/Resources/... ·  · 2007-04-26Bringing in technology to ensure transparency ... Plasma Gasification

Development Schemes inDevelopment Schemes in

I.T.I.T.

Name of the Scheme Cost (million)

� E-Govt. in CDGK 998.00

� Citizen Complaint & Information 140.00

System

� Development of HIS for Abbasi 84.00

Shaheed Hospital, Karachi

Page 33: Presentation PDF- Islamabad - World Banksiteresources.worldbank.org/INTPAKISTAN/Resources/... ·  · 2007-04-26Bringing in technology to ensure transparency ... Plasma Gasification

Development Schemes in Development Schemes in

HealthHealth

�Trauma Center in Abbasi 218 million

Shaheed Hospital

�Revamping & Capacity Building 500 million

�KIHD Phase-II 125 million

� Study on Prevalence of water 100 million

borne diseases

Page 34: Presentation PDF- Islamabad - World Banksiteresources.worldbank.org/INTPAKISTAN/Resources/... ·  · 2007-04-26Bringing in technology to ensure transparency ... Plasma Gasification

Development Schemes in Development Schemes in

EducationEducation

�Expenditure on Education 21%

in Budget 2006-07

�36 Model Campuses 486 million

�Teachers Training 300 million

Page 35: Presentation PDF- Islamabad - World Banksiteresources.worldbank.org/INTPAKISTAN/Resources/... ·  · 2007-04-26Bringing in technology to ensure transparency ... Plasma Gasification

Other Important onOther Important on--going going

projectsprojects

�Computerization of Revenue Record

�Multi-storied car parking plazas.

�28 Steel Flyovers- a JBIC Project

�A network of pedestrian bridges.

�Women sports complex.

�Women’s library

�Sports stadiums

Page 36: Presentation PDF- Islamabad - World Banksiteresources.worldbank.org/INTPAKISTAN/Resources/... ·  · 2007-04-26Bringing in technology to ensure transparency ... Plasma Gasification

Summing Up.…….Summing Up.…….� Karachi is Mini Pakistan…… Developing Karachi is

developing Pakistan.

� Karachi stands low in infrastructure development as compared to other regional, Asian as well as world mega cities.

� Present approach on Karachi’s development is not economically, environmentally and socially sustainable……… A new approach is required.

� Karachi has tremendous potential which is yet to be exploited.

� We have changed the pace of development, brought in transparency and touched real issues instead of going for fire fighting approach……….but there is lot to be done………….. And we are going to do it Insha Allah!

Page 37: Presentation PDF- Islamabad - World Banksiteresources.worldbank.org/INTPAKISTAN/Resources/... ·  · 2007-04-26Bringing in technology to ensure transparency ... Plasma Gasification

ThanksThanks