Firstly we login desktop PNMT Icon then OK
User name: admin User name: admin then PNMT(USB) then login then PNMT(USB) then login
When connect IDU then we go to When connect IDU then we go to
configuration then equipment setupconfiguration then equipment setup
At first maintenance onAt first maintenance on
From equipment setup we From equipment setup we go to setup then configurego to setup then configure
TX-Power setup hereTX-Power setup here
Put Frequency herePut Frequency here
Capacity ,modulation, frame id Capacity ,modulation, frame id setup heresetup here
Receive level show –Receive level show –process-1process-1
Tx-power and receive level Tx-power and receive level show-2show-2
Port check-1Port check-1
Port check-2(enable and Port check-2(enable and disable)disable)
IP-File configureIP-File configure
User InterfaceUser Interface
NTFS setupNTFS setup
LAN Port UsageLAN Port Usage
At last antenna alignment Mode At last antenna alignment Mode On before start alignmentOn before start alignment
INSTRUCTION SHOULD FOLLOW INSTRUCTION SHOULD FOLLOW BEFORE & AFTER ALIGNMENTBEFORE & AFTER ALIGNMENT
• After complete commissioning must ‘antenna alignment mode ON’
• During alignment IDU should not switched Off.
• After complete alignment then must be ‘Alignment mode OFF’
•THANK YOU
• MD AZIZUL HOQUE• FUTURE RF TECHNOLOGY LTD.• For any query Please contact