presentation of mr. ch. imashov, minister of finance
TRANSCRIPT
Financing economic recovery and ensuring fiscal sustainability
in the Kyrgyz Republic
Ch. Imashev, Minister of Finance of the Kyrgyz Republic
1
Presentation outline
I. Current situation
II. Tasks related to economic recovery and ensuring
fiscal sustainability
III. Overall financing needs2
I. Current situation
3
Consequences of this year’s events
• Civil conflict in the southern regions:• Thousands of casualties• Tens of thousands left homeless• Hundreds of thousands of refugees, and internally displaced
• Natural disasters affect parts of Osh, Jalal-Abad regions• Withdrawal from Kyrgyzstan’s largest private bank bring losses
to Social Fund, and others• Trade constraints create serious losses for: • Farmers • Textile and trading companies
• Falling GDP, loss of development progress4
Economic projections for 2010
GDP growth -5.4%
Inflation (December 2010 on December 2009)
11%
Budget revenues USD 1.14 billion
Budget expenditures USD 1.76 billion
Budget deficit USD 619 million5
GDP: actual and forecasts for 2010
6
Budget in the first half of 2010
• National budget is in critical state, due to:• Drastic increase in expenditures after conflict• Falling revenues• Past quasi-fiscal arrears
Budget deficit for 2010:
• Will exceed USD 619 million (13.5 % of GDP) • USD 345 million unsecured—financing gap
7
Fiscal trends, 2003-2010 (cash flow basis)
Revenues Expenditures
Deficit
8
Tasks expected in 2011
• Economic reconstruction will have started• Completion expected by end-2012
• Budget revenues to grow, but by less than social commitments (time frame is too short)• 2011 budget deficit could exceed USD 433
million (8.6% of GDP)9
Why timely donors’ assistance is crucial:
• If financing for this deficit (USD 433 million) is inadequate (will not be received), budget expenditures will be dramatically reduced on:– Public investment programme (energy infrastructure, roads,
bridges, schools, hospitals, etc.): USD 211 million – Operational expenses (maintenance, procurement of goods and
services, utilities, etc.): USD 222 million• The state would be able to pay only salaries
– This would substantially restrict the country’s future development
10
Public debt scenarios2010 2011 2012
Optimistic scenario loan 30/70 grant
58.1% 57.8% 56.4%
Intermediate scenario loan 50/50 grant
61.0% 63.8% 62.3%
Pessimistic scenarioloan 70/30 grant
70.3% 78.1% 71.8%
11Public debt as share of GDP. Sources: Kyrgyz authorities,
Emergency measures already adopted
• 2010 state budget spending already reduced:• 3.4% in nominal terms, almost 10% in real terms• Most discretionary expenditures have been cut• International commitments, entitlements not touched
• USD 27 million in additional budget revenues found• Emergency measures reflect needs for long-term fiscal
sustainability
12
Nevertheless…
• The scope of damage and consequences of tragic events is enormous
• Domestic resources are limited• Economic recovery, reconstruction, and ensuring
fiscal sustainability—only possible with support from our development partners
13
II. Economic recovery, reconstruction, and fiscal sustainability tasks
14
1. Challenges to fiscal sustainability
• Current situation:• Budget revenues are falling, expenditures are growing• 2010 deficit expected to be USD 350 million higher
than forecast at the start of the year
• Within two years we have to pay USD 145 million of principal and interest on external debt
15
2. Ensuring energy securityTotal amount required
Of which :
USD 170 million
Procurement of coal, gas and fuel oil
USD 50 million
Repair and reconstruction of equipment and electricity transmission lines
USD 70 million
Repair of heating stations in Bishkek and Osh
USD 50 million
16
3. Ensuring food security
USD 50 million needed
USD 35 million to create state reserve
USD 15 million for the mechanization of agriculture
to improve sector’s productivity
17
4. Support to the most vulnerable social groups-USD 50mln
• Social support to internally displaced persons will require USD 20 million
• Social support to persons living in difficult climatic conditions will additionally require USD 30 million
18
5. Ensuring public order and security
TotalOf which :
USD 50 million
Salary increases USD 17 million
Uniforms and equipment
USD 25 million
Procurement of technical facilities
USD 8 million
19
6. Infrastructure construction, reconstruction
Total : of which :
USD 230 million
Repair of public and commercial buildings and objects
USD 61 million
Construction of ring road in Osh and intra-urban highways in Osh and Jalal-Abad
USD 120 million
Modernization of Manas, Osh airports, improvement of runway in Osh airport USD 20 million
20
7. Support for economic growth
• Confidence building and stabilization of commercial banking system (AUB) will require USD 76 million
• Creation and capitalization of the Development Bank will require USD 200 million• Small-scale strategic investment projects• Access clean development mechanism (CDM) funding, other
sources of carbon finance• Small hydro, solar, wind power• Energy efficiency
21
8. Capitalization of economy for “catch-up growth”
State budget
External assistance
National economy
Agricultural Bank
State Savings
Bank
$100 million
$100 million
Transition economy has high potential to grow
22
9. Reconstruction of Osh and Jalal-Abad regions – 285 mln
Humanitarian aid USD 80 million
Housing construction USD 100 million
Restoration of engineering infrastructure
USD 30 million
Procurement and installation of temporary mobile shelters
USD 20 million
Procurement of medical equipment, medicines and special machinery
USD 10 million
Support for damaged businesses USD 45 million
23
10. Recovery from natural disasters in Osh and Jalal-Abad regions
• The repair of infrastructure and housing damaged by natural disasters in Osh and Jalal-Abad regions requires USD 30 million
24
III. Overall financing needs: USD 1.24 billion,
Except Kambar-Ata and Kemin – Datka projects
25
Current budget Development HumanitarianElections 8.7 Fuel procurement 50 Food, seed purchases 35
Lost budget revenues 62 Repair of electricity transmission lines 70Agricultural equipment purchases 15
Social protection 30 Heating plant repairs 50 Procurement of mobile shelters 20Public order and security 12 Road construction, repair 120 Humitarian assistance 80
Reconstruction of public buildings 21 Airport modernization (Osh, Manas) 20Support for internally displaced persons 20
Response to natural disasters 30 Creation of Development Bank 200
Cover losses of Pension Fund, and others 76 Infrastructure reconstruction 40
Financing of Southern Directorate 100Reconstruction of privately owned buildings 40
Procurement of equipment 10 Capitalization of economy 100TOTAL 350 TOTAL 690 TOTAL
Aggregate table of financial needs—USD 1.24 billion
Note: All figures are in million USD
200
To finance only urgent measures in 2010 and some of the measures planned for
2011-2012, the Government of the Kyrgyz Republic needs external financial support in
the amount of USD 1.24 billion
27
Types of financial assistance expected
Kyrgyz RepublicHumanitarian
assistance
Grants and concessional budget financing
Wide access to credit for business
Debt restructuring, debt swaps
Ensuring of effectiveness of assistance
• Transparency in distribution• Accountability to the public• Participatory of local community• Monitoring of implementation (audit,
surveillance, financing mechanisms of control)• Evaluation of results
Our medium term Goals
• to move to the trajectory of sustainable economic growth,
• to improve the standard of living of our citizens
• to build faire state
Thank you for your attention!
31