    O B J E C T I V E S

    CCC 419 Interior Upgrades

    heduled maintenance: painting and carpeting replacement

    Address existing aging materials in corridors and damage towalls

    Provide finishes and fixtures that are durable, easy to maintainand long lasting

    Improve existing lighting in main lobby

    Improve lighting in public corridors

    Provide accessibility to existing mail area

    Increase safety and security where possible

  • 8/14/2019 Presentation of Atelier 292, May 2007

    3/40

    CCC 419 Interior Upgrades

    A R E A S O F I M P O R T A N C E

    IN ORDER OF CONCERN

    Update of all finishes in common corridors (wall finish,carpet, and door signage)

    Update and add new interior hallway lighting for safety andfunctional reasons

    Install corner protection in common corridors

    Retain existing corridor trim and stain to match new wall

    panels Update light fixtures in front lobby

    Create new mail area for easier accessibility

  • 8/14/2019 Presentation of Atelier 292, May 2007

    4/40

    CCC 419 Interior Upgrades

    C O N S T R A I N T S

    Financial (budget)

    Some existing finishes are permanent and may be costly toremove or modify

    Coordination with other repairs in the building

  • 8/14/2019 Presentation of Atelier 292, May 2007

    5/40

  • 8/14/2019 Presentation of Atelier 292, May 2007

    6/40

    Lobby

    Main Corridors *

    Front Lobby Area Plan:

    CCC 419 Interior Upgrades

    ELEV. N0 4

    STAIR

    STAIR

    ELEV. N0 3

    STAIR

    LOBBY

    CORRIDOR

    CORRIDOR

    STAIR

    GARBAGE

    ROOM

    STAIR

    MailBoxes

    Lobby

    LoungeArea

  • 8/14/2019 Presentation of Atelier 292, May 2007

    7/40

    CCC 419 Interior Upgrades

    Current lighting not sufficient, space is dark and uninviting

    Existing Conditions Front Lobby:

  • 8/14/2019 Presentation of Atelier 292, May 2007

    8/40

    Existing Conditions Lobby:

    CCC 419 Interior Upgrades

    Furniture placed in awkward locationLighting insufficient for space

    Space feels sterile

  • 8/14/2019 Presentation of Atelier 292, May 2007

    9/40

    Existing Conditions Lobby Entrance:

    CCC 419 Interior Upgrades

    Poor lighting at entranceOutdated doors and hardware

    Inadequate planting material

  • 8/14/2019 Presentation of Atelier 292, May 2007

    10/40

    Existing Conditions Lobby Mailboxes:

    CCC 419 Interior Upgrades

    Mailboxes are poorly placed foraccess

    Lack of counter space

    Poor lighting conditions above area

    Mailboxes are falling apart

  • 8/14/2019 Presentation of Atelier 292, May 2007

    11/40

    Existing Conditions Common Corridors:

    CCC 419 Interior Upgrades

    Dark - Lighting not sufficient

    Carpet is worn and stretched in areas

    Walls are scuffed and wall paper torn

    Baseboard are scuffed in areas

    Signage for common doors (GarbageRoom) are not bilingual

  • 8/14/2019 Presentation of Atelier 292, May 2007

    12/40

    Main Corridors

    Typical Corridor Plan:

    CCC 419 Interior Upgrades

    Typical Floor Plan (corridors on each floor are actually different)

    STAIR

    STAIR

    ELEV. N0 3 ELEV. N0 4

    STAIR

    CORRIDOR

    LOBBY

  • 8/14/2019 Presentation of Atelier 292, May 2007

    13/40

    CCC 419 Interior Upgrades

    Carpet is worn and shrinking inareas

    Baseboards are scuffed and worn

    Wall covering is ripped and iscoming of the wall in areas

    Wall corners are damaged

    Existing Conditions Corridors:

  • 8/14/2019 Presentation of Atelier 292, May 2007

    14/40

    CCC 419 Interior Upgrades

    Corridor baseboards and door trim

    badly scuffed in areas

    Unit doors and trim need to matchbaseboard finish

    Existing Conditions Corridor Finishes:

  • 8/14/2019 Presentation of Atelier 292, May 2007

    15/40

    Existing Conditions Corridor Signage:

    CCC 419 Interior Upgrades

    Signage of doors to common areasnot bilingual for residents

  • 8/14/2019 Presentation of Atelier 292, May 2007

    16/40

    CCC 419 Interior Upgrades

    Very dark when getting off the

    elevator

    Poor signage and lack ofinteresting wall art / mirrors

    Existing Conditions Elevator area:

  • 8/14/2019 Presentation of Atelier 292, May 2007

    17/40

  • 8/14/2019 Presentation of Atelier 292, May 2007

    18/40

    Proposed Lobby Changes

    CCC 419 Interior Upgrades

    Pendant fixture

    New lobbyfuniture

    New flowerboxes

    New down lit potlights

    New artwork

  • 8/14/2019 Presentation of Atelier 292, May 2007

    19/40

    Proposed Lobby Changes - Mail Room

    CCC 419 Interior Upgrades

    New flowerboxes

    New down lit potlights

    New counterwith storageunderneath

  • 8/14/2019 Presentation of Atelier 292, May 2007

    20/40

    Lighting SuggestionsLobby: Option 1

    CCC 419 Interior Upgrades

    Pendant lighting in recessedbulkhead

    Easy to maintain

    Mechanical systems in ceiling cavity

    does not prevent installation ofthis option

    Comfortable feel

  • 8/14/2019 Presentation of Atelier 292, May 2007

    21/40

    Lighting SuggestionsLobby:OPTION 2

    CCC 419 Interior Upgrades

    Hanging florescent lights in main areaabove seating area

    ambient lighting, defineslounge space

    Additional pot-lights replaced withnew energy efficient fixtures

    Zaneen Style #D9-1113

    Zaneen Style #D1-2020

  • 8/14/2019 Presentation of Atelier 292, May 2007

    22/40

    Ground Floor Lighting suggestions

    CCC 419 Interior Upgrades

    Lobby and Vestibule, - a combination of fixtures

    Recessed

    Provides washes of light todark spaces and walls

    Punches of light create areas of interest andhighlight architectural features of the space

    Downlights

    (C-MAX S2, 202 23 15)Halogen DownlightMetal Halaide Downlight

  • 8/14/2019 Presentation of Atelier 292, May 2007

    23/40

    Ground Floor Upholstery suggestions:

    CCC 419 Interior Upgrades

    'Bravo' fabric,by ISA International

    Leatherlook vinylin a variety of colours

    'Crypton' fabrics,by HiTex

    Woven synthetics with aprotective coating designedto withstand very high levelsof abuse

    'GORE SeatingProtection

    Waterproof, breathable moisturebarrier seating products, resistsstains

    Unika Vaev Fabrics Arc-com Fabrics

    Counterpoint 489-94 Look Twice 471-94 Cyclone AC 66770-1 Sublime AC 67472-3 Abacus AC66853-4

  • 8/14/2019 Presentation of Atelier 292, May 2007

    24/40

  • 8/14/2019 Presentation of Atelier 292, May 2007

    25/40

    ProposedCorridor Option 1:

    new multidirectional light fixtures

    1/4 abuse-resistant drywall withdamage resistant surfacing andpaint finish

    refinish existing doors, install newbarrier-free, scratch-resistanthardware

    1/4 plywood with hardwoodveneer and clear-coat finish withexposed fasteners and aluminum

    trimstainless steel corner guards

    6x6 porcelain perimeter tile

    carpet tile

  • 8/14/2019 Presentation of Atelier 292, May 2007

    26/40

    ProposedCorridor Option 2:

    new linear light fixtures in

    veneer plywood enclosures

    1/4 abuse-resistant drywall withdamage resistant surfacing andpaint finish

    refinish existing doors, install newbarrier-free, scratch-resistanthardware

    metal or wood wainscoting trim

    stainless steel corner guards

    12x24 porcelain tiles at entrances

    carpet tile with accent edge

  • 8/14/2019 Presentation of Atelier 292, May 2007

    27/40

    CCC 419 Interior Upgrades

    CORRIDORS - Option 1

  • 8/14/2019 Presentation of Atelier 292, May 2007

    28/40

    CCC 419 Interior Upgrades

    CORRIDORS - Option 1

  • 8/14/2019 Presentation of Atelier 292, May 2007

    29/40

    CORRIDORS - Option 2

    CCC 419 Interior Upgrades

  • 8/14/2019 Presentation of Atelier 292, May 2007

    30/40

    CCC 419 Interior Upgrades

    CORRIDORS - Option 2

  • 8/14/2019 Presentation of Atelier 292, May 2007

    31/40

  • 8/14/2019 Presentation of Atelier 292, May 2007

    32/40

    LOBBY

  • 8/14/2019 Presentation of Atelier 292, May 2007

    33/40

    ProposedCorridor

    Option 1:

    stainless steel corner guards6x6 porcelain perimeter tile

    carpet tile

    LOBBY

  • 8/14/2019 Presentation of Atelier 292, May 2007

    34/40

    Flooring Suggestions:OPTION 1 & 2

    CCC 419 Interior Upgrades

    'Interface' Carpet Tiles (commercial grade)

    Easy to maintain, easy to replace

    Costeffective and highly durable

    Readily available in a wide variety ofcolours and patterns

    Recyclable

    (Syncopation 3295) (Outline 7782) (Kabuki 100375)

  • 8/14/2019 Presentation of Atelier 292, May 2007

    35/40

    Flooring Suggestions:OPTIONS 1 & 2

    CCC 419 Interior Upgrades

    'Olympia' Porcelain tile, Regal & Rustik Pietra Series

    Easy to maintain

    High quality, very durable

    Readily available in a wide variety ofcolours, textures, and sizes.

    Other design options:

    Combination of carpeting andtile in front of unit doors

    Durability and easy maintenance oftile, combined with the acousticbenefits of carpeting

    Regal Series -Chocolate Brown

    Rustik Pietra -Ceylon Stone

    Rustik Pietra -Borneo Stone

    Regal Series -Gold Polished

  • 8/14/2019 Presentation of Atelier 292, May 2007

    36/40

    Common Corridor Lighting suggestionsOPTION 1 & OPTION 2

    CCC 419 Interior Upgrades

    New Wall Lights in Corridors to Replace Existing Lights

    Option 2 Wall Sconce

    Zaneen Style # L-3008 Delta Light - 214 6371 Ober

    Option 1 Wall Sconce

  • 8/14/2019 Presentation of Atelier 292, May 2007

    37/40

    Wall suggestions:

    PAINT - Option 1 & 2

    CCC 419 Interior Upgrades

    Acrylic paint

    Easy to maintain

    Costeffective

    Readily available in a wide variety of colours

  • 8/14/2019 Presentation of Atelier 292, May 2007

    38/40

    Wall suggestions:

    Corridors:

    CCC 419 Interior Upgrades

    WOOD LAMINATE PANELS OVER EXISTINGWALL COVERING

    Easy to maintain, easy to replace

    Costeffective and highly durable

    Wood laminate paneling will add a more uniformand distinguised look

    (Maple or Birch, Satin Finish) (Chrome Carriage Bolts)

  • 8/14/2019 Presentation of Atelier 292, May 2007

    39/40

    CCC 419 Interior Upgrades

    ESTIMATE REVISED Quantity Unit Unit Rate Amount Remarks

    Demolition

    Surface preparation

    Removal of Carpet

    Disposal fees

    New Construction

    Wood Panels

    Fasteners

    Finishing

    Sheetrock Primer - Surfacer

    Paint - Walls

    Paint - Ceiling

    Paint - Doors

    Carpet tiles

    Perimeter Tiles

    Corner Protection - Stainless Steel

    Potlights (Lobby)

    Wall sconces (Corridors)

    Pendant light

    Planters & plants

    Re-upholster chairs

    New artworkClean-up

    SUB-TOTAL

    Labour & O.H.

    Contingency

    TOTAL

    5,100 sf $0.50 $2,550

    5,100 sf $0.60 $3,060

    4.00 bins $600 $2,400

    8,000 sf $3.70 $29,600 1/4" maple veneer

    16,000 ea $0.25 $4,000 #10 screws w/ washers

    15,700.00 sf $0.75 $11,775

    8,300 sf $0.80 $6,640

    8,300 sf $0.75 $6,225

    5,600 sf $0.75 $4,200

    40 # $180 $7,200

    4,380 sf $15.00 $65,700 avg. price

    689 sf $4.50 $3,100

    192 lf $29.40 $5,645

    20 # $150.00 $3,000

    49 # $250.00 $12,250

    1 # $600.00 $600

    4 # $500 $2,000

    4 # $400 $1,600

    2 # $1,800 $3,6001 # $3,000 $3,000

    $178,145

    30% $53,443

    10% $17,814

    $249,403

  • 8/14/2019 Presentation of Atelier 292, May 2007

    40/40