presentation for: city of mustang comprehensive …...project objective existing conditions intro to...

23
CITY OF MUSTANG April 21, 2015 Comprehensive City-Wide Water Distribution Model WDB ENGINEERING PRESENTATION FOR:

Upload: others

Post on 24-May-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PRESENTATION FOR: CITY OF MUSTANG Comprehensive …...Project Objective Existing Conditions Intro to Hydraulic Model Model Development Model Analysis Recommendations Q & A PRESENTATION

CITY OF MUSTANG

April 21, 2015

Comprehensive City-WideWater Distribution Model

WDB ENGINEERING

PRESENTATION FOR:

Page 2: PRESENTATION FOR: CITY OF MUSTANG Comprehensive …...Project Objective Existing Conditions Intro to Hydraulic Model Model Development Model Analysis Recommendations Q & A PRESENTATION

Project Objective

Existing Conditions

Intro to Hydraulic Model

Model Development

Model Analysis

Recommendations

Q & A

PRESENTATION OVERVIEW

WDB ENGINEERING

Page 3: PRESENTATION FOR: CITY OF MUSTANG Comprehensive …...Project Objective Existing Conditions Intro to Hydraulic Model Model Development Model Analysis Recommendations Q & A PRESENTATION

Operation and Maintenance

Economic Development & Planning

Water Quantity and Quality

City-Wide Fire Flow

Capital Improvement Planning

PROJECT OBJECTIVE

WDB ENGINEERING

Page 4: PRESENTATION FOR: CITY OF MUSTANG Comprehensive …...Project Objective Existing Conditions Intro to Hydraulic Model Model Development Model Analysis Recommendations Q & A PRESENTATION

Water Sources

Water Distribution

Water Pumping

Water Storage

EXISTING CONDITIONS

WDB ENGINEERING

Page 5: PRESENTATION FOR: CITY OF MUSTANG Comprehensive …...Project Objective Existing Conditions Intro to Hydraulic Model Model Development Model Analysis Recommendations Q & A PRESENTATION

Eleven (11)

Groundwater

Wells

Two (2) OKC

Connections

EXISTING CONDITIONSWater Sources

WDB

ENGINEERING

SW 104th

SW 119th

SW 134th

Page 6: PRESENTATION FOR: CITY OF MUSTANG Comprehensive …...Project Objective Existing Conditions Intro to Hydraulic Model Model Development Model Analysis Recommendations Q & A PRESENTATION

Over 116 miles of waterlines & 7000 meters

EXISTING CONDITIONSWater Distribution

Page 7: PRESENTATION FOR: CITY OF MUSTANG Comprehensive …...Project Objective Existing Conditions Intro to Hydraulic Model Model Development Model Analysis Recommendations Q & A PRESENTATION

Four (4) water booster stations:

EXISTING CONDITIONSWater Pumping

Clear Springs

Page 8: PRESENTATION FOR: CITY OF MUSTANG Comprehensive …...Project Objective Existing Conditions Intro to Hydraulic Model Model Development Model Analysis Recommendations Q & A PRESENTATION

Four (4) water booster stations:

EXISTING CONDITIONSWater Pumping

59th Street

Page 9: PRESENTATION FOR: CITY OF MUSTANG Comprehensive …...Project Objective Existing Conditions Intro to Hydraulic Model Model Development Model Analysis Recommendations Q & A PRESENTATION

Four (4) water booster stations:

EXISTING CONDITIONSWater Pumping

74th Booster

Page 10: PRESENTATION FOR: CITY OF MUSTANG Comprehensive …...Project Objective Existing Conditions Intro to Hydraulic Model Model Development Model Analysis Recommendations Q & A PRESENTATION

Four (4) water booster stations:

EXISTING CONDITIONSWater Pumping

Rockwell

Page 11: PRESENTATION FOR: CITY OF MUSTANG Comprehensive …...Project Objective Existing Conditions Intro to Hydraulic Model Model Development Model Analysis Recommendations Q & A PRESENTATION

Three (3) Water Storage Tanks:

EXISTING CONDITIONSWater Storage

Clear Springs

Page 12: PRESENTATION FOR: CITY OF MUSTANG Comprehensive …...Project Objective Existing Conditions Intro to Hydraulic Model Model Development Model Analysis Recommendations Q & A PRESENTATION

Three (3) Water Storage Tanks:

EXISTING CONDITIONSWater Storage

Mustang

Page 13: PRESENTATION FOR: CITY OF MUSTANG Comprehensive …...Project Objective Existing Conditions Intro to Hydraulic Model Model Development Model Analysis Recommendations Q & A PRESENTATION

Three (3) Water Storage Tanks:

EXISTING CONDITIONSWater Storage

County Line

Page 14: PRESENTATION FOR: CITY OF MUSTANG Comprehensive …...Project Objective Existing Conditions Intro to Hydraulic Model Model Development Model Analysis Recommendations Q & A PRESENTATION

EXISTING CONDITIONSSystem Model

WDB ENGINEERING

Page 15: PRESENTATION FOR: CITY OF MUSTANG Comprehensive …...Project Objective Existing Conditions Intro to Hydraulic Model Model Development Model Analysis Recommendations Q & A PRESENTATION

Dynamic Movement of Water

Pressure System

Complex GIS Based Software

Steady-State Simulation

Extended State Simulation

Creating Demand Patterns

INTRODUCTION TO HYDRAULIC MODELING

WDB ENGINEERING

Page 16: PRESENTATION FOR: CITY OF MUSTANG Comprehensive …...Project Objective Existing Conditions Intro to Hydraulic Model Model Development Model Analysis Recommendations Q & A PRESENTATION

Existing Conditions and Mapping

Distribution System - Data

Distribution System - Operations

Water Demands

Model Calibration

MODEL DEVELOPMENT

WDB ENGINEERING

Page 17: PRESENTATION FOR: CITY OF MUSTANG Comprehensive …...Project Objective Existing Conditions Intro to Hydraulic Model Model Development Model Analysis Recommendations Q & A PRESENTATION

1. Existing Water Distribution System

2. County Line Tank

3. New Ground Storage at Rockwell

4. 16-inch Waterline along SH 152

5. 2045 Water Distribution System

MODEL ANALYSISScenarios

WDB ENGINEERING

Page 18: PRESENTATION FOR: CITY OF MUSTANG Comprehensive …...Project Objective Existing Conditions Intro to Hydraulic Model Model Development Model Analysis Recommendations Q & A PRESENTATION

Critical

Short Term

Long Term

RECOMMENDATIONS

WDB ENGINEERING

Page 19: PRESENTATION FOR: CITY OF MUSTANG Comprehensive …...Project Objective Existing Conditions Intro to Hydraulic Model Model Development Model Analysis Recommendations Q & A PRESENTATION

Flow Meters

VFDs

SCADA

Well Field Waterlines

RECOMMENDATIONS

Critical

WDB ENGINEERING

Page 20: PRESENTATION FOR: CITY OF MUSTANG Comprehensive …...Project Objective Existing Conditions Intro to Hydraulic Model Model Development Model Analysis Recommendations Q & A PRESENTATION

County Line Tank

New Storage Tank at

Rockwell Booster Station

Extend 16” Waterline West

Upgrade/Construct New

Water Lines

AMR

WDB ENGINEERING

RECOMMENDATIONS

Short Term

Page 21: PRESENTATION FOR: CITY OF MUSTANG Comprehensive …...Project Objective Existing Conditions Intro to Hydraulic Model Model Development Model Analysis Recommendations Q & A PRESENTATION

Asset Management

Update City Ordinances

Encourage Water

Conservation

WDB ENGINEERING

RECOMMENDATIONS

Short Term

Page 22: PRESENTATION FOR: CITY OF MUSTANG Comprehensive …...Project Objective Existing Conditions Intro to Hydraulic Model Model Development Model Analysis Recommendations Q & A PRESENTATION

Construct New Elevated

Water Tower at Clear Springs

Site

Explore Additional / New

Water Sources

WDB ENGINEERING

RECOMMENDATIONS

Long Term

Page 23: PRESENTATION FOR: CITY OF MUSTANG Comprehensive …...Project Objective Existing Conditions Intro to Hydraulic Model Model Development Model Analysis Recommendations Q & A PRESENTATION

QUESTION

&

ANSWER

WDB ENGINEERING