presentation by pravin kolhe, executive engineer, maharashtra water resources department 23 aug 2014...
TRANSCRIPT
![Page 1: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering](https://reader038.vdocuments.mx/reader038/viewer/2022102808/56649cfd5503460f949cdb8d/html5/thumbnails/1.jpg)
Maharashtra Engineering Service
Presentation By
Pravin Kolhe, Executive Engineer,
Maharashtra Water Resources Department
23 Aug 2014
Vishwabharato COE, Ahmednagar
1
Maharashtra Engineering Service, by Pravin Kolhe
![Page 2: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering](https://reader038.vdocuments.mx/reader038/viewer/2022102808/56649cfd5503460f949cdb8d/html5/thumbnails/2.jpg)
MESE
2
Maharashtra Engineering Service, by Pravin Kolhe
![Page 3: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering](https://reader038.vdocuments.mx/reader038/viewer/2022102808/56649cfd5503460f949cdb8d/html5/thumbnails/3.jpg)
Maharashtra Engineering Service Examination (MESE)-Departments
3
1) •Water Resources Department (WRD)
2) •Public Works Department (PWD)
3) •Water Supply & Sanitation Department (WSSD)•Maharashtra Jeevan Pradhikaran
Maharashtra Engineering Service, by Pravin Kolhe
![Page 4: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering](https://reader038.vdocuments.mx/reader038/viewer/2022102808/56649cfd5503460f949cdb8d/html5/thumbnails/4.jpg)
Hierarchy of Posts in PWD/WRD4
• Assistant Executive Engineer• Assistant Engineer Grade-1• Sub-Divisional Engineer• Sub-Divisional Officer
Deputy Engineer
Assistant Engineer, Grade-II
Sectional Engineer
Junior Engineer
Secretary
Executive Director/Director General
Chief Engineer
Superintending Engineer
Executive Engineer
![Page 5: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering](https://reader038.vdocuments.mx/reader038/viewer/2022102808/56649cfd5503460f949cdb8d/html5/thumbnails/5.jpg)
जलसं�पदा� विभा�गा�ची� रचीना�5
MWRD
Minister, MKVDC
Minister of State, WR
Secretary, WRD&D
Secretary, WRM &
CAD
Minister, WR (Other than MKVDC)
Minister of State, WR
Secretary, WRD&D
Minister of State, CAD
Secretary, WRM &
CAD
Minister, Kharland
Minister of State, Kharland
Secretary, WRD&D
Maharashtra Engineering Service, by Pravin Kolhe
![Page 6: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering](https://reader038.vdocuments.mx/reader038/viewer/2022102808/56649cfd5503460f949cdb8d/html5/thumbnails/6.jpg)
जलसं�पदा� विभा�गा�ची� रचीना�6
प्रधा�न सचि�व (२)
का�र्य का�री� स���लका (५) व महा�स���लका (२)
मु�ख्य अभिभाय�ता� (२२)
• स्था�पत्र्य-२०• र्य��त्रि�का�-१• त्रिवद्यु�त-१
अधी�क्षक अभिभाय�ता� (९१)
• स्था�पत्र्य-८१• र्य��त्रि�का�-५• त्रिवद्यु�त-५
क�य�क�र� अभिभाय�ता� (४६६)
• स्था�पत्र्य-४१६• र्य��त्रि�का�-२५• त्रिवद्यु�त-२५
Maharashtra Engineering Service, by Pravin Kolhe
![Page 7: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering](https://reader038.vdocuments.mx/reader038/viewer/2022102808/56649cfd5503460f949cdb8d/html5/thumbnails/7.jpg)
जलसं�पदा� विभा�गा�ची� रचीना�7
सहा�र्यका अभि%र्य�त� श्रे'णी�-२ (~२२००)
• स्था�पत्र्य-१६२४• र्य��त्रि�का�- ३००• त्रिवद्यु�त- ३००
शा�खा� अभि%र्य�त� (~५५००)
• स्था�पत्र्य-४८७४• र्य��त्रि�का�- ३००• त्रिवद्यु�त- ३००
उप-अभि%र्य�त� (~२३५०)
• सहा�र्यका का�र्य का�री� अभि%र्य�त� (१६६)• सहा�र्यका अभि%र्य�त�-श्रे'णी�-१ (६६०)• उपत्रिव%�त्रि.र्य अभि%र्य�त� (६४२)• उपत्रिव%�त्रि.र्य अधिधाका�री� (६४२)
उप-अभि%र्य�त� (स्था�पत्र्य) २११०
उप-अभि%र्य�त� (र्य��त्रि�का�) १२५
उप-अभि%र्य�त� (त्रिवद्यु�त) १२५
Maharashtra Engineering Service, by Pravin Kolhe
![Page 8: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering](https://reader038.vdocuments.mx/reader038/viewer/2022102808/56649cfd5503460f949cdb8d/html5/thumbnails/8.jpg)
8
स�ि1व • ९वरी1 3. १ अधाि1का1�री1�
• ~३०००
वरी1 3. २ अधाि1का1�री1�
• ~७०००
अत1�1�त13रीि1का कारी13म�1�री1�
• ~४०,०००
एका1�णी
• ~५०,०००
जलसं�पदा� विभा�गा�ची� रचीना�
Maharashtra Engineering Service, by Pravin Kolhe
![Page 9: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering](https://reader038.vdocuments.mx/reader038/viewer/2022102808/56649cfd5503460f949cdb8d/html5/thumbnails/9.jpg)
Career Prospects9
AEE
Executive Engineer/US to GoM
Superintending Engineer/DS to GoM
Chief Engineer/JS to GoM
ED/DG/Secy to GoM
Principal Secretary to GoM
4 Years
After 12 Yrs
After 8 Yrs
After 5 Yrs
After 3 Yrs
AE112 Years SDE12
Years SDO12 Years
Through MPSC MESE-Gr A
MPSC MESE-Gr B
JE12 Years
Local Recruitment
AE2
12 Years
12 Years
Sect Er.
![Page 10: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering](https://reader038.vdocuments.mx/reader038/viewer/2022102808/56649cfd5503460f949cdb8d/html5/thumbnails/10.jpg)
Posts in MPSC Exam10
• Promoted to EE after 4 years of serviceAssistant Executive
Engineer (AEE)
• Promoted to EE as per seniority of AE1• (Approx. 12~15 year)
Assistant Engineer, Grade-I (AE1)
• Promoted to DE as per seniority of AE2• (Approx. 12~15 year) & then EE (approx. 10 year)
Assistant Engineer, Grade-II (AE2)
Maharashtra Engineering Service, by Pravin Kolhe
![Page 11: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering](https://reader038.vdocuments.mx/reader038/viewer/2022102808/56649cfd5503460f949cdb8d/html5/thumbnails/11.jpg)
11
1)
• Maharashtra Engineering (Civil) Services Examination-Group-A (MESE-A)
• for AEE & AE1 Posts
2)
• Maharashtra Engineering (Civil) Services Examination-Group-B (MESE-B)
• for AE2 posts
MPSC Exams
Maharashtra Engineering Service, by Pravin Kolhe
![Page 12: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering](https://reader038.vdocuments.mx/reader038/viewer/2022102808/56649cfd5503460f949cdb8d/html5/thumbnails/12.jpg)
Maharashtra Engineering Service, by Pravin Kolhe12
MESE-Group-A(AEE & AE1 Posts)
![Page 13: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering](https://reader038.vdocuments.mx/reader038/viewer/2022102808/56649cfd5503460f949cdb8d/html5/thumbnails/13.jpg)
13
1)• Preliminary Exam
2)• Main Exam
3) • Interview
Examination Pattern-Group A Exam
Maharashtra Engineering Service, by Pravin Kolhe
![Page 14: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering](https://reader038.vdocuments.mx/reader038/viewer/2022102808/56649cfd5503460f949cdb8d/html5/thumbnails/14.jpg)
1. Preliminary Exam14
• 1 Objective Type Paper• 100 Questions• 100 Marks• Time:- 2 Hours
Maharashtra Engineering Service, by Pravin Kolhe
![Page 15: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering](https://reader038.vdocuments.mx/reader038/viewer/2022102808/56649cfd5503460f949cdb8d/html5/thumbnails/15.jpg)
2. Main Written Exam (4 Papers, 750 Marks)15
• 1) Marathi, English & GK (Objective Type)
• 150 Marks, 150 Questions, Time: 90 minutes.
• 2) Civil Engineering Paper-I, II & III (3 Papers)
• Subjective Type
• Each Paper of 200 Marks
• Each Paper has 5 Sections (A, B, C, D, E)
• Each Section have 2 questions each with 40 marks
• Solve only one question from each section
• Solve total 5 Questions out of 10
• Time: 3 hours for each paper
![Page 16: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering](https://reader038.vdocuments.mx/reader038/viewer/2022102808/56649cfd5503460f949cdb8d/html5/thumbnails/16.jpg)
Main Written Exam Syllabus-CE Paper-116
Section
Marks Topics
A 40 Strength of material, Theory of structure
B 40 Structural analysis, Steel structures
C 40 Design of Reinforced Concrete Structures
D 40 Concrete Technology, Pre-stressed Concrete
E 40 Application of Computer Programming to structures, Numerical Methods
Total 200Maharashtra Engineering Service, by Pravin Kolhe
![Page 17: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering](https://reader038.vdocuments.mx/reader038/viewer/2022102808/56649cfd5503460f949cdb8d/html5/thumbnails/17.jpg)
Main Written Exam Syllabus-CE Paper-217
Section
Marks Topics
A 40 Surveying
B 40 Engineering Materials, Building planning
C 40 Building Construction, Estimating, Costing & Valuation
D 40 Geo-technical Engineering
E 40 Construction Planning and Management
Total 200Maharashtra Engineering Service, by Pravin Kolhe
![Page 18: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering](https://reader038.vdocuments.mx/reader038/viewer/2022102808/56649cfd5503460f949cdb8d/html5/thumbnails/18.jpg)
Main Written Exam Syllabus-CE Paper-318
Section
Marks Topics
A 40 Fluid Mechanics
B 40 Engineering Hydrology, Irrigation Engineering
C 40 Highway Engineering
D 40 Bridge Engineering, Tunnelling
E 40 Water Supply Engineering, Waste Water Engg. & Pollution control, Solid Waste Management
Total 200Maharashtra Engineering Service, by Pravin Kolhe
![Page 19: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering](https://reader038.vdocuments.mx/reader038/viewer/2022102808/56649cfd5503460f949cdb8d/html5/thumbnails/19.jpg)
3. Interview (100 Marks)19
• Focus on Personality• 100 Marks• Time:-10~30 minutes• Study Projects in your district
• Total Marks = 750+100 = 850Maharashtra Engineering Service, by Pravin Kolhe
![Page 20: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering](https://reader038.vdocuments.mx/reader038/viewer/2022102808/56649cfd5503460f949cdb8d/html5/thumbnails/20.jpg)
Maharashtra Engineering Service, by Pravin Kolhe20
MESE-Group-B(AE-2 Posts)
![Page 21: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering](https://reader038.vdocuments.mx/reader038/viewer/2022102808/56649cfd5503460f949cdb8d/html5/thumbnails/21.jpg)
21
1)• Preliminary Exam (100 marks)
2)• Main Exam (3 papers-550 marks)
3) • Interview (75 marks)
Examination Pattern-Group B Exam
Maharashtra Engineering Service, by Pravin Kolhe
![Page 22: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering](https://reader038.vdocuments.mx/reader038/viewer/2022102808/56649cfd5503460f949cdb8d/html5/thumbnails/22.jpg)
1. Preliminary Exam for AE222
• 1 Objective Type Paper• 100 Questions• 100 Marks• Time:- 2 Hours
Maharashtra Engineering Service, by Pravin Kolhe
![Page 23: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering](https://reader038.vdocuments.mx/reader038/viewer/2022102808/56649cfd5503460f949cdb8d/html5/thumbnails/23.jpg)
2. Main Written Exam for AE2 (3 Papers, 550 Marks)23
• 1) Marathi, English & GK (Objective Type)
• 150 Marks, 150 Questions, Time: 90 minutes.
• 2) Civil Engineering Paper-I & II (2 Papers)
• Objective Type
• Each Paper of 100 questions with 200 Marks• Time: 2 hours for each paper
Maharashtra Engineering Service, by Pravin Kolhe
![Page 24: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering](https://reader038.vdocuments.mx/reader038/viewer/2022102808/56649cfd5503460f949cdb8d/html5/thumbnails/24.jpg)
3. Interview for AE2 (75 Marks)24
• Focus on Personality• 75 Marks• Time:-10~30 minutes• Study Projects in your district
• Total Marks = 550+75 = 625Maharashtra Engineering Service, by Pravin Kolhe
![Page 25: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering](https://reader038.vdocuments.mx/reader038/viewer/2022102808/56649cfd5503460f949cdb8d/html5/thumbnails/25.jpg)
Prelim Exam-Important Points25
Exam centre for Prelim & Mains Exam: Aurangabad, Mumbai, Nagpur and Pune.
Preliminary exam is just screening test. The marks of Prelim Exam are not intimated & not considered for final merit list
There is no re-revaluation system for Prelim Exam as it is multiple choice question based and answer key is available on MPSC website for self verification by candidate.
There is 25% negative marks for wrong answer in Prelim Only those candidates are allowed to appear for the Main Written Exam who
qualifies the Preliminary Exam.
![Page 26: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering](https://reader038.vdocuments.mx/reader038/viewer/2022102808/56649cfd5503460f949cdb8d/html5/thumbnails/26.jpg)
Maharashtra Engineering Service, by Pravin Kolhe26
Strategy for Study
![Page 27: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering](https://reader038.vdocuments.mx/reader038/viewer/2022102808/56649cfd5503460f949cdb8d/html5/thumbnails/27.jpg)
Main Written Exam Syllabus-Strategy27
There are 3 Papers of 3 Hr duration for total 600 Marks There are 5 sections in each paper for 40 marks each (i.e. A,
B, C, D, E) In each section there are 2 questions, solve any one. i.e. total 10 questions in a paper, each carrying 40 marks, i.e.
total 400 marks in a paper Attempt any ONE question from TWO, i.e. attempt 200 marks
from 400Maharashtra Engineering Service, by Pravin Kolhe
![Page 28: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering](https://reader038.vdocuments.mx/reader038/viewer/2022102808/56649cfd5503460f949cdb8d/html5/thumbnails/28.jpg)
Main Written Exam Syllabus-Strategy28
Thus for 3 papers, attempt 600 marks out of 1200 Thus, for 4 papers, attempt 750 marks out of 1350 For interview, there are 100 marks Thus, attempt 850 marks out of total 1450 Generally topper gets 50 to 60% of 850 marks. i.e. 450 to 500 i.e. to be a topper, get 500 marks out of 1450 i.e. ~ 33% of total marks.
Maharashtra Engineering Service, by Pravin Kolhe
![Page 29: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering](https://reader038.vdocuments.mx/reader038/viewer/2022102808/56649cfd5503460f949cdb8d/html5/thumbnails/29.jpg)
Cut-offs29
Cut-off will be different for each post/each category. Generally cut-off line for main exam is decided such that there will be 10 to 12
times candidates will be called upon. Generally cut-off line for interview is decided such that there will be 2 to 3 times
candidates will be called upon and it will be different for each post/each category.
Min Percentile* for Cutoff in Main Exam for interview call are as follows- 1) General Candidates : Min. 35% 2) Backward Class : Min. 30% 3) Physically Disabled/Players : Min 20% *As per MPSC Ltr Dated 24/10/2013
![Page 30: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering](https://reader038.vdocuments.mx/reader038/viewer/2022102808/56649cfd5503460f949cdb8d/html5/thumbnails/30.jpg)
For details:-
For further details visit:- www.pravinkolhe.com/articles/mpsc_engg_service_exam.html
30
Maharashtra Engineering Service, by Pravin Kolhe
![Page 31: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering](https://reader038.vdocuments.mx/reader038/viewer/2022102808/56649cfd5503460f949cdb8d/html5/thumbnails/31.jpg)
THANK YOUThis presentations is available at www.pravinkolhe.com Er. Pravin Kolhe, email: [email protected], Mob: +91-8806-999-777